Dynamic date range in the variant

Hi,
We have a background job that is scheduled to run on every 25th. One step of the job has a selection screen which has a Payment date range which is to have the dates 25th of previous to the 24th of the current month.
So every month this needs to be updated dynamically. For ex: If I look at the variant of the step of the job in period 04 the date should be "03/25/2010 to 04/24/2010". If I look in Period 05 then it should be "04/25/2010 to 04/25/2010".
Can anyone tell me if this can be achieved through a variant or does this have to be put in the code?
Regards,
raj/

You can create a dynamic variant using STVARV following the steps in the given link...
http://wiki.sdn.sap.com/wiki/display/ABAP/Creatingdynamicvariantusingtable+TVARV
Now, the values in TVARVC need to be updated for each period. It can be done scheduling a separate BDC program, which runs for each period and updates the values. So, your date values will be changed for a new period by the background job and program variant wil pick up automatically the values from TVARVC. Check this link, which depicts a similar kind of requirement.
Re: Update TVARVC Table Dynamically
You can also calculate the values in intialization event each time the program runs as suggested by Sumit. But, if you need a variant then it won't help. The advantage with TVARVC is you can maintain different set of variants with different values.

Similar Messages

  • Dynamic date range

    I'm on ECC6.0, and looking to set up a dynamic date range in a variant.
    The date range is a select-option on my selection screen.
    I can easily setup the dynamic date for the 'low' value in the range,
    but I can see no way to also declare a dynamic date in the 'high' value.
    I also looked in TVARV maintenance and it doesn't seem possible there
    either, as there's no way to declare variable values.
    If I can't resolve this, I will have to change my program to include a
    default high date and use that.
    But even that may not work if we call the variant, which may overwrite
    my default in the high value of the range with a blank value.
    Does anyone know how to do this?
    Thanks in advance for your help.

    Hi Jagan,
    If you save the variant you can choose some options for the select-option. If you choose selection variabel type D (dynamic date calculation) you can choose out of several Names of Variables that provide for a LOW and HIGH value.
    If you use type T, you can choose a variable that is stored in tabel TVARVC. You can add your own variable to table TVARVC using SE16.
    Regards........
    Chaitanya.

  • Scheduling WebI reports for Dynamic Date Ranges

    Hello Everyone,
    Our Env is BOBJ XI 3.1 SP2 FP2.5 integrated with SAP NW  BW 7.02 EPH1
    We are trying to schedule few WebI reports which can be used on ad-hoc basis as well. Some reports need to get data from starting of the month to today (like MTD) and few are with dynamic date ranges.
    In case of relational universes i used to do Magic Date as mentioned here :  http://www.dagira.com/2008/07/21/using-a-magic-date-value-in-prompts
    But for OLAP Universes i have written a MDX filter prompt as :
    <FILTER KEY= "@Select(Debit Memo Date\Debit Memo Date LOV)">
    <CONDITION OPERATORCONDITION= "Between">
    <CONSTANT CAPTION= "IIF (@Prompt('Enter\Select DM Start Date: ','D','First day of Current Month\First day of Current Month',mono,free,not_persistent,{'First Day of Month'},,User:0)='First Day of Month','First day of Current Month\First day of Current Month',@Prompt('Enter\Select DM Start Date: ','D','First day of Current Month\First day of Current Month',mono,free,not_persistent,{'First Day of Month'},,User:0))"/>
    <CONSTANT CAPTION= "IIF (@Prompt('Enter\Select DM End Date: ','D','Date2\Today',mono,free,not_persistent,{'Today'},,User:0) > '1/1/2100 12:00:00 AM',''1/1/2010 12:00:00 AM'',(@Prompt('Enter\Select DM End Date: ','D','Date2\Today',mono,free,not_persistent,{'Today'},,User:0))"/>
    </CONDITION>
    </FILTER>
    We are getting MDX erros because IIF can only return numeric values. So are there any other approaches for dynamically scheduling the reports or can the above MDX prompt be modified to make it work ?
    - Vamsi Ch

    Ingo,
    When we schedule the WEBI report we use the BEX query with a variable based on a customer Exit .
    There are good examples in
    https://wiki.sdn.sap.com/wiki/display/profile/Surendra+Reddy
    In order to avoid providing a hard coded date restriction in the BEX query we want to have a flexible date range solution (e.g. data from 1.1.2011 until yesterday).
    Is the folloing scenario possible:
    Scheduled webi report with a hard coded date e.g. 1.1.1900 (for the BEX variable)
    The BEX query should return the data from 1.1.2011 until yesterday (dynamically)  if date = 1.1.1900
    else it should return the data (for the e.g. adhoc reporting)
    Is a customer exit like this possible ?
    Pseudo code:
    IF date = 1.1.900 then return sysdate-1 else return entered date
    For a relational universe I always used a magic date condition

  • Report with date range where the daily customer receipt profit centre wise

    Hi Experts,
    Could you please suggest me is there any developed  standard report or t-cod eis available  with which i can get date range where the daily customer receipt profit centre wise can be obtained............
    Thanks in Advance........
    Santosh Gupta...

    Hi:
              For this purpose you can develop Z report. There is no such standard report for it. Copy FBL5N to make a Z copy of it and use the table FAGLFLEXA for each document posted in BSEG/BKPF. You can also make use of BTE 1650.
    Regards

  • Need JavaScript for Sharepoint Designer 2010, to show a Pop-up to all the users between date range and the redirect the site

    Dear all,
    I am very new to Sharepoint designer 2010. Its better to say, i am just stepping in.
    I have sharepoint site which is accessible for all the users to update few information. But i want this site not to be accessible during a date range, say from 15th to 20th of every month.
    I am planning to have something like this: If any user tries to access this sharepoint site between 15th to 20th date range of everymonth, then the browser must show an pop-up alert saying "This site is not accessible during this date range" and Redirect
    this sharepoint site to someother site (Say http:// somesitename.xx.com) immidiately.
    I know very little about how to add Javascript in sharepoint webpart.
    Please provide the Javascript or any best alternate solution to my concern.
    Thanks in advance.

    Hi,
    From your description, my understanding is that you want to redirect sharepoint site to another site between 15th and 20th every month.
    I agree with what Sudip says. If you still want to use JS code,You could try these steps
    below:
    Open your site with SharePoint Designer.
    Click Master Pages in left navigation.
    Find file v4.master, and backup it(it is very important).
    Right click your v4.master,
    choose "Edit File in Adavance Mode".
    Add the code below into the <head/> tag.
    <script src="https://code.jquery.com/jquery-1.11.1.min.js" type="text/javascript"></script><script
    type="text/javascript">
    $(document).ready(function(){
    var today = new Date();  
    var day = today.getDate(); // get current day
    var id = _spPageContextInfo.userid; // get the id of current logon in user
    var boolFlg = false;
    $.ajax({
       url: _spPageContextInfo.webAbsoluteUrl + "/_api/web/SiteGroups/GetByName(\'"+"sharepoint Owners"+"\')/Users", //get users in a specified group can access the sharepoint site from 15th to 20th every
    month
       type: "GET",
       headers: {"accept": "application/json;odata=verbose"},
       success: function (data) {
          if (data.d.results) { 
             var src = data.d.results;
             for(var i = 0; i < src.length; i++){
                if(src[i].userid==id){ //check the logon in user in  the specified group or not
                   boolFlg = false;
                   break;
             if(!boolFlg){
                if(day <= 20 && day >=15){
                    alert("This site is not accessible during this date range"); // alert the message
                    location.href = "http:// somesitename.xx.com"; // redirect to another site
       error: function (xhr) {
          alert(xhr.status + ': ' + xhr.statusText);
    })</script>
    Best Regards
    Vincent Han
    TechNet Community Support

  • Dynamic date selections in a variant

    Hi All,
    I need to dynamically change the date field of a report which runs every month end. Our working calendar is designed such that the last working day is the last Friday of the current period and hence the first working day is the last Saturday of the previous period. Now we have Fiscal Calendar variant which takes care of the last Friday part. I also know we have to select 'D' in the variant screen but my problem is in assigning the Last Saturday of the previous period in the date range field. Any hints or suggestions on this would be highly appreciated and of course rewarded generously.
    Thanks & Regards,
    Rajesh

    Hi Rajesh,
    After seecting Selection Variable "D" you have to carry out following things to cater your requirements;
    (a) Goto Name of Variable (input only using F4)
    (b) Select your variable depending upon your business requirement.
    Current Date
    From month start to today
    Current date +/- ??? days
    current date +/- ??? work days
    First day of current month
    <b>nth working day of current month</b>
    First day of next month
    First day of previous month
    Last day of previous month
    Last Day of the Current Month
    First quarter ????
    Second quarter ????
    Third quarter ????
    Fourth quarter ????
    Current date - xxx,current date + yyy
    Date - xxx, Date + yyy (work days)
    Previous month
    Current period
    (Beginning of mth-xx months, end of mth+yy months)
    I think nth working day of current month is suitable for your requirement.
    Bye,
    Muralidhara

  • How do you save dynamic data type, from the DAQ assistant, for use in Excel or matlab?

    Currently, I have the following basic VI setup to save Data from my PCI6221 Data Aquisition Card.  The problem I'm having is I keep getting the last iteration of the while loop in the measurement file and that's pretty much it.  When I try to index the data leaving the loop it gives me a 2D array of Data which cannot be input into the "Write to Measurement File" VI.  How would I save this to a useful Data/time step format?  I was wondering of a way to continuously collect the Data and then save it in a large measurement file that I would manipulate in Matlab/excel?  Am I using the wrong type of loop for this application?  I also noticed my Dynamic Data array consists of data, time, timestep and then a vector of the data taken.  Is it possible to just get a vector of the time change per sample alongside the data?    Sorry for the barrage of questions but any help would be greatly appreciated, and thanks in advance!
    -Bryan
    Attachments:
    basic DAQ.vi ‏120 KB

    There is a VI in the Express > Signal Manipulation palette called "From DDT" that lets you convert from the Dynamic Data Type to other data types that are more compatible with operations like File I/O....for instance, you could convert your DDT into a 2D array and use the Write To Spreadsheet File.vi.  Just a thought...
    -D
    Darren Nattinger, CLA
    LabVIEW Artisan and Nugget Penman

  • Get Months for the given date ranges on the Selection Screen

    Hello All,
    If I give Begin Date (Begda) and End Date (Endda) on the Selection Screen, I need to get all the months given in the selection screen ranges.
    Could any one please suggest me how to proceed further on this.
    Thanks in Advance
    Regards
    Yathish

    HI,
    Check this FM
    HR_99S_INTERVAL_BETWEEN_DATES  ---> this can help you it will return the month in this table MONTH_TAB
    HR_99S_MONTHS_BETWEEN_DATES

  • Date range in the view

    Hi Team,
    I created one sales report but here my requirement is it as to show the date range i.e (1-07-2012 To 30-07-2012) in the title view.
    Is this possible by using variables can any one send clear steps how to achieve this.
    Thanks,

    Hi User,
    May i know how did you created the sales report.
    You said that you dont have any date range or date fields in your tables/report.
    Then, what are the results... how do you know for which date range did you created the report ?
    Is it default report which generated for the entire database without selecting dates ?

  • Passing the Date range within the query

    Hi ,
    In my query , I have two date characteristic, and while doing the selection I have to do selection on only one date field.
    This selection is a date range selection , So I have used a selection variable for this.
    Can anyone please let me know if it is possible to pass the selection range to other variable. Is it possible to use Customer exit to pass the complete range.
    Thanks
    Altair

    Hi,
    You can do it in the user exit.And that is the only approach to transfer the values of one variable to other variable .
    Search this forum for the code. you will find  lot of postings.
    With rgds,
    Anil Kumar Sharma .P

  • Dynamic date range creation for WebI query

    Hi
    I have a webi query where I need to provide a date range as selection.  But the from date will be based on number of days that user will provide during query execution. For e.g. user will give no of days as 10 so the date range need to be created as  (system date -10) to (system date).
    I am not sure how to provide the option for user to input no of days and then calculate the date range.
    Could you please help me here.
    Regards,
    Amit

    Amit.
    it can be done but by creating multiple objects.
    create Obj1: @prompt("Enter Number Of days",N,Mono,etc..) and capture the number of days in it.
    Create your second object infact a filter object: Obj2: Sysdate
    Third Object(filter) Obj3:  (Sysdate-(@select(class\Obj1)))
    give the between condition in webi using these two objects
    between Obj2 and Obj3

  • How to schedule report filtered by dynamic date based on the date the Agent runs

    Hello
    I have a question about delivering report using OBIEE agent.
    If i am running an agent today to deliver report A, can I get report A based on Last Monday's date or any dynamic dates?
    For example, say today is Dec 18th 2013 and my agent is running according to how I set the schedule. Now the deliver content will have report A being delivered. Now report A has a date column, normally this column is filtered by current date. But if it's delivered through agents to various users, Report A's data should be the previous Monday, so in this case Dec 9th 2013. When this agent is run again said on Dec 27th 2013, then report A should be filtered by Dec 16th 2013, which is the previous monday of Dec 27th.
    Can something like this be achieved in OBIEE 11G?
    Thanks in advance.

    Yala,
    Not a straight forward way
    1) Let the report run through Agent with Current Date filter
    2) once it ran for the first time you can see IBOT name/last run time(LAST_RUNTIME_TS) in  S_NQ_JOB
    Create a repository variable 'last_run_agent' using below sql to get max(LAST_RUNTIME_TS)
    select max(LAST_RUNTIME_TS) from s_nq_job where name = 'AGENT_NAME';
    Edit the analysis report with current date filter and modify the filter condition accordingly to filter on newly created repository variable
    Thanks,
    Saichand

  • Customer exit variable for date range for the last day

    Hi,
    If user enters date ranges in variable
    suppose user enters 9/1/2010 to 9/15/2010 and we have to calculate currency conversion based on last day i..e 9/15/2010 . 08
    2)User input is date range 08/01/2010 to 08/30/2010
    I need from the customer exit 08/30/2010 (on last day) to calculate currency conversion.
    Can anyone help me with ABAP code to achieve this customer exit?And please tell me how to proceed step by step
    Sridhar

    create a variable to enter date range (ZDATE1)
    create a key date variable(ZDATE2) with processing type customer exit, should not be ready for input.
    In the exit ZXRSRU01 write below code.
    DATA: l_s_range TYPE rsr_s_rangesid,
          loc_var_range LIKE rrrangeexit.
    WHEN 'ZDATE2'.
        IF i_step = 2.
           read table i_t_var_range INTO loc_var_range
                    with key vnam = 'ZDATE1'.
            CLEAR l_s_range.
            l_s_range-low = loc_var_range-high.
            l_s_range-sign = 'I'.
            l_s_range-opt = 'EQ'.
            APPEND l_s_range TO e_t_range.
        ENDIF.

  • Display of date range in the top-of-page of report

    have a question like this.
    i have a date range selection on the selection screen where the user will enter the range from this to this.
    now whatever period he will enter,that range should be displayed on the output of the report in the top-of page.
    can we do like this.
    plz explain.
    thanks!

    Hi,
    Use the below logic.
    data:      events      type  slis_t_event,
          event       type  slis_alv_event,
          heading     type  slis_t_listheader,
          hline       type  slis_listheader,
    start-of-selection.
    "get the data into the internal table and fill your fieldcatalog table.
    then fill the event ... ie top of page like this.
      CLEAR event.
      event-name = slis_ev_top_of_page.
      event-form = form_name.
      APPEND event TO events.
    then fill the comments to display in the top of page event.
    DATA: text(50).
      CLEAR hline.
      hline-typ  = 'H'.
      hline-info = "report title".
      APPEND hline TO heading.
      CLEAR: hline,text.
      read table s_pernr index 1.
      IF s_pernr-low IS NOT INITIAL.
        WRITE: 'Sal Code:' TO text.
        WRITE: s_pernr-low TO text+15.
      ENDIF.
      IF s_pernr-high IS NOT INITIAL.
        WRITE: 'to' TO text+25.
        WRITE: s_pernr-high TO text+28.
      ENDIF.
      hline-typ  = 'S'.
      hline-info = text.
      APPEND hline TO heading.
    and then...
    CALL FUNCTION 'REUSE_ALV_GRID_DISPLAY'
       EXPORTING
         i_callback_program                = sy-repid
         it_fieldcat                       = ist_fcat[]
          it_events                         = events[]
        TABLES
          t_outtab                          = ist_main[]
       EXCEPTIONS
         program_error                     = 1
         OTHERS                            = 2
      IF sy-subrc <> 0.
        MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
                WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
      ENDIF.
    and then create a subroutine for top of page.
    FORM top_of_page.
      CALL FUNCTION 'REUSE_ALV_COMMENTARY_WRITE'
        EXPORTING
          it_list_commentary       = heading[]
          I_LOGO                   =
          I_END_OF_LIST_GRID       =
          I_ALV_FORM               =
    ENDFORM.                    "TOP_OF_PAGE
    regards,
    Santosh Thorat

  • The data type of the variant is not compatible with the data type wired to the type input.

    Hello all..
    Iam curently struggling with the following:
    On my main(top)_VI, I have a mix-signal graph which will output several or one signals depending on the user. I also have an inner subvi which has the analisys i want to give the the data before outputing it to the main(top) VI, which has the mix-signal graph control.
    Now, I created a reference from the mix-signal graph and Iam imputing this reference into the subVI (which inside has a property node type_control_mix-signal graph in which Iam connecting the refnum from the top VI to view the output data). The data consists of an array of clusters of 2 arrays of doubles each.
    -- let say I create the property node type control mix-signal graph and i choose value property; it lets me put the array of clusters of 2 arrays of doubles each without problems; Now the second I connect the refnum pointing to the mix-signal graph on the Main_VI it brakes the cables and only accepts one cluster of two arrays os doubles instead.
    --if on the other hand I connect the refnum to the property node type_control_mix-signal graph before connecting the imput it doesnt complain until I run the VI where it gives the error 91.
    I have also notices a (strict) parenthisis at the end of the property node sometimes. [what does this (strict) means?]
    FInally if instead of creating the refnum from the Main_VI, I create either a xy graph or a mix-signal praph it lets me connect the an array of clusters of 2 arrays of doubles each without any problem. The refnum connection seems to be the problematic factor, but  by the same tolken I dont know any other means of sending that data from the inner to the outter VI.
    I have the feeling Iam missing on one or more Labview fundamentals regarding refnums.
    Any help will be apreciated

    You almost found it on your own. The refnum needs to be 'strict', that means that the data type of the graph is set (2D dbl), otherwise it will use the default data type. To do this you create the refnum directly from the graph after you have wired the correct data type to the terminal. In this case the refnum wire will break if you change the data type of the graph.
    Independend of this issue, I suggest you not to use the value property on the graph but directly wire the data (e.g. the 2D double) to the SubVI. The property value is by far the slowest way to get data, and 2D arrays are really some amount of data.
    Felix
    www.aescusoft.de
    My latest community nugget on producer/consumer design
    My current blog: A journey through uml

Maybe you are looking for

  • Error in site-to-server mapping

    I have a Webcache standalone running in load balancer mode. When I try to change something in Site-to-Server Mapping I'm getting the this error: Error This modification would generate an invalid configuration file, thus it is ignored Does someone kno

  • Controlling Plan "Action"  Recommendations

    Question for Kevin and other experts, While running ASCP unconstrained plans, when we have purchase order supplies in the future and no corresponding demands, the plan comes with a recommendation of action = "Cancel" on these supplies. Let's assume o

  • Can't add new Widgets to Dashboard on main user account

    I recently switched to a new MacBook Air and after the initial intstallation used migration assistent to move my old data to the MacBook Air. All works fine except the Dashboard. With the old useraccount (which is my main account) I can't add new wid

  • Can a RAP fallback to a MAP?

    Hello all, If the wired connection of a Root Access Point(Cisco 1522AG) goes down, can a RAP fall to a MAP role, find a parent and still offer client connectivity? Thanks, Rares

  • Project will not Run

    I am encountering a problem when trying to run a project. It generates an error message saying there is a problem with the code; when I go to the code view I see that the error is generated because it is looking for a file called Main.css. Why would