Enhancements formulas in APD

Hi Experts,
It is possible add or enhancement a functions or exit variable in the apd's formulas.
I need the next scenary:
I a previous step to the formula, i have a filter transformation based in a exit variable selecting the information from 001 until the actual fiscal period; in the formula I need take only the actual fiscal year and assign this value a variable fisper.  After I do aggregation function for year.  With I am obtaining a value acumulated to year fiscal, actual fiscal period.
The problem is that; in the formula functions for transformation I havn´t for add the formula neccesary.
My doubt is if is it possible add or do some enhancement.
Thank you very much.
Jeysi

Sure, Frank.
I have a user exit for obtain the valid month from a table Z.  In the query, I take this customer exit Ok but in the APD I need reference this exit for group the values for apply after a add data transformation.
For apply this the value of the exit i am assigning to the variable in the formula transformation but i can´t reference any exit or routine personalize in the formula builder.
For example:
I have a query with values selection from 1 until customes exit month table Z.
In the APD, I use this query for do acumulated values; for this I need to apply add data tansformation.
The values that obtain of th query is month: 1, 2, 3 ,4 y month bases table (6). In the APD I need to group all data to month 6 and after apply transformations.  The problem is for determine the actual month I need to read the table Z newly because in the apd i don´t take the MAX values for month of the query selection.
Regards,
Jeysi

Similar Messages

  • A Way to add a zero to an alphanumeric code?

    Does anyone know how I can add a zero to this kind of code?
    The list I get sent each week is:
    1m1
    1m2
    1m3 and so on..
    but I need
    1m01
    1m02
    1m03
    I would really appreciate it if someone could show me this!
    Best regards,
    Felix

    It would be useful to know the exact problem.
    Is the first part always a two chars one ?
    What to do if the original value is 1m11 ?
    I guess that the complete description of the problem is :
    *I receive strings made of a first part of two characters,*
    *and a second part which may be one or two digits.*
    *I want to edit them so that second part made of a single digit become a two digits one starting with a zero.*
    To treat this problem, use the formula :
    =IF(LEN(B)>3,B,LEFT(B,2)&"0"&RIGHT(B,1))
    If the column B may contain blank cells, it would be useful to use an enhanced formula :
    =IF(LEN(B)>0,IF(LEN(B)>3,B,LEFT(B,2)&"0"&RIGHT(B,1)),"")
    Read *_iWork Formulas and Functions User Guide_* to get details about what the used functions are designed to achieve.
    Yvan KOENIG (VALLAURIS, France) mercredi 28 juillet 2010 19:03:41

  • BADI or userexit for QP01

    Hi
    After creation or change of Inspection plan (QP01 and QP02) i need to start some additional process. Is there any BADI or userexit?
    Thanks all,
    Branko

    HI,
    Check the below enhancements.
    QPAA0001  Enhancements: Formula checking / editing
    QPAA0002  Customer exit - info fields
    QPAA0004  Enhancement for transferring mstr insp. char. to task lists
    QPAA0005  Deactivation of functions for insp. char. maintenance
    QPAA0006  Additional consistency checks - inspection characteristics
    QPAP0002  Enhancement for material/plan assignment, plan selection
    QPAP0003  Conversion of sample unit of measure to material unit
    CNEX0026  Customer enhancement for general inspection of material
    QAPP0001  User exit QAPP 1 (create inspection point)
    QAPP0002  User exit QAPP 2 (create inspection point & other data)
    QAPP0003  User exit QAPP 3 (IDI: inspection point and other data)
    QEEM0002  User exit add. functions after reading inspection features
    QEEM0006  User exit: add. functions after closing inspection characs
    QEVA0002  Calculation of share of scrap in inspection lot
    QEVA0003  Calculate "Next inspection date" for batch
    QMSB0001  User exit after reading in inspection catalog data
    QMSC0001  User exit after reading in inspection method data
    QMSC0002  User exit for search field entry in the inspection method
    QMSC0003  User exit after saving inspection method data
    QMSD0001  User exit after importing master inspection charac. data
    QMSD0003  User exit after saving master inspection charac. data
    QPAA0003  Additional (auth.) check in plan (inspection chars.)
    QPAA0006  Additional consistency checks - inspection characteristics
    QPL10003  Sample calculation for inspection lot without plan
    QVDM0003  Determ. of deliv. type for inspection lots from deliv. note
    Thanks,
    Ramakrishna
    Message was edited by: Ramakrishna Prasad

  • Please tell me about Enhancement Technique like BTE , SET and Formula

    Hi Experts .
    Please guide me about Enhancement Techniques used in SAP apart from BADI/User-Exit .
    1.) what is set and how to create it ?
    2.) What is formula is SAP and How to set it for Enhancement Pupose .
    3.) What is BTE (Buisness Transection Events) ? How to create it for Enhancement Pupose ?
    Please Elabarate the reply with step by step procedure .
    Thanx .
    Regards : Rajneesh

    Hi rajneesh mittal  ,
    Business Transaction Events
    Business Transaction Events (Open FI) The Open FI enhancement technique was developed in the Financial Accounting component. Open FI is based upon the following principles: Application developers must define their interface in a function module, an assignment table is read in the accompanying (generated) code, and the customer modules assigned are called dynamically. This technique differentiates between enhancements that are only allowed to have one implementation and enhancements that can call multiple implementations in any sequence desired. Both industry-specific and country-specific enhancements may be defined.
    SAP business transaction events are one type of customer enhancements provided by SAP! We can access the business transaction events using FIBF.Next we have to find the process interface for duplicate invoice check!
    check this blog for details on SAP business transaction events
    Business Transaction Events
    Business Transaction Events
    http://fuller.mit.edu/user_exits/business_transaction_event.htm
    FI Enhancement Technique – How-To-Guide on the Usage of Business Transaction Events (BTE)
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/207835fb-0a01-0010-34b4-fef1240ba9b7
    Creation of Events via Business Transaction Events
    http://help.sap.com/saphelp_nw04/helpdata/en/3b/7f3e8be57c11d1951f0000e82dec10/content.htm
    In SAP R/3 you must activate the business transaction events (BTEs) for Availability Check Using SAP R/3. To set this indicator in SAP R/3:........
    http://help.sap.com/saphelp_crm40/helpdata/en/b6/de3efc6bbcdc4b948d466857a10323/content.htm
    cheers!
    gyanaraj
    ****Pls reward points if u find this helpful

  • BI-IP with WAD using enhanced SAVE_DATA command. It is possible?

    Hi,
    I have a BI-IP Planning application based on WAD and deployed in WEB. My customer is asking to add some enhanced functionality to the SAVE button (SAVE_DATA command in WAD). The basic idea here is to extend forward for a simple validation procedure just before save data into the planning infocube.
    The validation consists just in make a single arithmetic sum by testing 100% for the weekly contribution percentages (input ready). I mean (weeks) W1, W2, W3, W4 for a month. Percentages entries given by user are 25, 25, 25, 30.
    IF SUM(Wi) > 100 THEN ERROR (dont let to save data)
    ELSE THEN SUCCESS (let to save data).
    At the same time, this kind of validation allows to add some basic rule to don't exceed the contribution margin for the immediate upper level...
    It is possible to do this? Any experienced comments doing this? any user_exit or enhancenments?
    Please advise.
    Thanks in advance.

    Hi,
    This is the procedure step by step that we have used to solve the req...
    1) Create the aggregation top-down level for sales units WEEKLY contributions (percentage).
    2) No filter used.
    3) Create the TYPE Formula Planning Function: VALIDATE CONTRIBUTIONS with condition 0VERSION = Plan/Active and Sales Route = ZVAR_ROUTE.
    4) Add the FOX Code to the formula as follows:
    FTBCH -> {KF, 0CALMONTH, 0CALWEEK, 0VOLUMEUNIT}.
    DATA CURRPER TYPE 0CALMONTH.
    DATA PERIOD TYPE 0CALMONTH.
    DATA CALWEEK TYPE 0CALWEEK.
    DATA NVALIDA TYPE F.
    NVALIDA = 0.
    CURRPER = VARV('ZIPM_MTHPLAN').
    FOREACH PERIOD, CALWEEK.
      IF PERIOD = CURRPER.
        NVALIDA = NVALIDA + {ZIP_CONT, PERIOD, CALWEEK, HL}.
      ENDIF.
    ENDFOR.
    IF NVALIDA <> 100.
      MESSAGE E001(UPF) WITH 'ERROR: CCM PORCENTAJE SEMANAL NO ASIGNADO A 100%.'.
      EXIT.
    ENDIF.
    This basically performs for each PERIOD and CALWEEK an accumulated value in order to summarize  the user data entry values. So IF validation is different 100% then will raise a message error direct to the end user interfase and stops the program logic otherwise continues with success.
    5) Build your ready-input query and WAD template as required and then put some web items like Data Provider, Analysis, SAVE / REFRESH and CANCEL button group.
    6) Go to the button group properties and select SAVE Command configuration then go to ACTION -> Command  and hit the button NEXT COMMAND.
    7) At the EDIT COMMAND LIST screen insert a new command VALIDATION and add your new planning function (VALIDATE CONTRIBUTIONS). By default you can see the SAVE_DATA command already there. You can execute process chains, standard and custom planning functions, planning sequences, etc ,etc....for this case when the SAVE_DATA command executes but you can also create your own commands and use it as well.
    8) Execute your WAD application from the URL web and test it.
    Hope this helps...

  • Sum function do not work in oracle reports enhanced spreadsheet format

    we are using oracle reports 10.1.2.3 in our oracle application server 10gr2 and we are creating enhanced spreed sheet.And the report opens in MS excel fine.But we can not apply any formula like VALUE,SUM,AVG on that report after opening it into excel.First we thought that it may be because of the comma in the number filed.we removed that comma from the filed but t still gives the error "Error in value"

    Hi,
    I hope you already solved this problem, I had the same issue after spending an hour I found the workaround, this is just for the guys who experience the same issue. Try to format your number columns either at database level(not via Report builder property palette) with TO_CHAR(...) OR use this Format Mask at Report level to format your numbers -NNNGNNNGNN0D000(negative sign must be there to avoid space in output Excel).
    Hope it helps,
    Regards,
    Syed Khawar

  • Formula Variable with replacement path on 0CALDAY

    Hi,
    I am trying to enhance an existing query.
    I am creating a new formula variable processing by replacement path.
    In Reference Characterisitic I have choosen 0CALDAY.
    In the tab options , I selected replacement path.
    In the replacement path tab, in Replacement Rule /replace variable with I am trying to select the variable. But in the variable list I am not able to find 0CALDAY variable, which we have already created and restricting in some other key figures.
    Please help me in this regard.
    Thanks & Regards,
    Madhav

    Hey in the replacement path tab you need to choose either its infoobject or variable from which the value needs to be taken.
    If you choose infoobject you get the options of choosing its attributes etc.
    If you choose variable you get option to choose variable associated.
    But under "General Tab" under reference characteristic you need to choose your CALDAY.
    Hope this helps.
    Edited by: Praveen G on Sep 26, 2008 5:53 AM

  • Is it possible to populate cell A with the formula in cell B as opposed to the value of the formula in cell B dynamically?

    Hello,
    I am wondering if the following scenario is possible:
    Cell B contains a formula which refers to a number of other cells.
    Cell A refers to Cell B such that the formula in Cell B is applied in Cell A.
    I am aware that I can copy and paste, but I am wanting to do this dynamically, for the following reason.
    In order to avoid constructing a very complicated formula which involves lots of tricky IF functions, I use a formula with a chain of simpler IF functions, such as follows:
    =IF(A1=1,B1,IF(A1=2,B2,IF(A1=3,B3,IF(A1=4,B4,IF(A1=5,B5,IF(A1=6,B6,IF(A1=7,B7,"" )))))))
    Then in B1-B7 I include the complicated formulas, and depending on which value is actually in cell A1 that particular formula is applied in the cell (i.e the cell is populated with the respective formula).
    Is it possible to use Numbers in this way, or if not, is there another way of achieving my goal (i.e. to avoid having to construct one very long and complicated formula)?
    Thanks,
    Nick.

    It depend of what you want to achieve.
    Here, in standard cells of column B the formula is :
    =IF($A=1,C,IF($A=2,D,IF($A=3,E,IF($A=4,F,IF($A=5,G,"")))))
    Here, in standard cells of column C the formula is :
    =$A*10
    Here, in standard cells of column D the formula is :
    =$A^2
    Here, in standard cells of column E the formula is :
    =$A*12345
    Here, in standard cells of column F the formula is :
    =$A+10000
    Here, in standard cells of column G the formula is :
    =20000-$A
    Here, in standard cells of column H the formula is :
    =OFFSET($A$1,ROW()-1,A+1)
    Here, in standard cells of column I the formula is :
    =CHOOSE($A,C,D,E,F,G)
    Here, in standard cells of column J the formula is :
    =IF($A=1,$A*10,IF($A=2,$A^2,IF($A=3,$A*12345,IF($A=4,$A+10000,IF($A=5,20000-$A," ")))))
    As you see, the formulas used in column B,H, I, require the use of the columns C, D, E, F, G
    The one used in column I doesn't require these columns.
    When a task requires a complex formula, I often used the columna A thru G
    then when I'm sure that the formula in column B return behave exactly what I want, I replace in the formula of column B the references to columns C thru G by the formula embedde in the pointed columns minus the equal symbol.
    It's what I did to build the formula of column J.
    If you build the sample table, you will see that the formula in column I isn't perfect because it return a red triangle when the cell in column A is empty.
    I decided to leave it as is and created an enhanced synthetic formula for column K:
    =IFERROR(CHOOSE(A,$A*10,$A^2,$A*12345,$A+10000,20000-$A),"")
    As you see a single problem may receive different answers.
    Sometimes, one is clearly the best, sometimes it's matter of taste.
    Here my best choice would be the very last one which I added for column K.
    Yvan KOENIG (VALLAURIS, France) mardi 23 août 2011 16:44:11
    iMac 21”5, i7, 2.8 GHz, 4 Gbytes, 1 Tbytes, mac OS X 10.6.8 and 10.7.0
    My iDisk is : <http://public.me.com/koenigyvan>
    Please : Search for questions similar to your own before submitting them to the community
    To be the AW6 successor, iWork MUST integrate a TRUE DB, not a list organizer !

  • Formula in Report

    Hi,
    I have following fields in the reports Vendor, Net Due Date, Clearing Date and Credit Amount. Cube being used is 0FIAP_C03. I want to display the difference in Days (Net Due Date - Clearing Date) for each Vendor Payment made. How can this be done.
    Thank you,
    sam

    Hi,
    If you donot want to ready to change the ODS ,still you have others way to do it.
    1) Try to Create A Global calculate KF with  Aggregation = Before Aggregation. But still you need 2 formula varibles in the CKF. But Formula variables will be evaluated after OLAP Aggregates the data. So I am not sure whther you will get correct results here.
    2) Create A base query with document number ,Date fields and Difference Between dates.
    Use this query to upload a Transactional ODS by using APD.
    And create a Info set on this ODs.
    And tehn finally you can create your required Query on infoset with out any calculations in teh query.
    With rgds ,
    Anil Kumar Sharma .P
    This is one of limitaiton of Bex (this calculation with a single query),what I want to see when will the SAP get rid of it.
    Message was edited by:
            Anil Kumar Sharma

  • How to do Enhancements in Reporting & What is Role and How to create Roles

    Hi All,
    Can any one tell How to do Enhancements in Reporting, and also What is Role and How to create Roles in Reporting?
    Plz reply back me on [email protected]
    Regards,
    Kiran

    Reporting Enhancement - RSR00001 - BW: Enhancements for global variables in reporting
    And using the SAP Exit - EXIT_SAPLRRS0_001
    RSR00001- With this enhancement to global variables in reporting you have the option of determining your default values for variables. You can use this enhancement for variables, for which 'Processing by Customer-Exit' has been selected in the variable maintenance. This is valid for all variable types (characteristic value, node, hierarchy, formula and text variables). You use the Exit EXIT_SAPLRRS0_001 for this.
    The Enhancement component (RSR00001) must be assigned to a Project Created using the Transaction CMOD. On activating the Project, the Exit would become active and in turn the logic written inside the Exit.
    To ensure that the data warehousing soultion reflects your company's structure and business needs it is critical that you establish who is authorized to access the data.With SAP BW, Authorizations can be defined and maintained by object and can also be applied to hierarchies and these authorizations can be inserted into roles that are used to determine what type of content is available to specific users or user groups.
    T-code for Role maintainence -PFCG.
    Please assign points if it is useful.
    Regards
    Pavan Prakhya

  • Formula at the time of confirmation

    hello anybody pls help,
    my client is asking formula at the time order confirmation for scrap qty. l am explining the scenario.
    i have created BOM for FG. In that i have maintaing RM, scrap and packing materials and i have two operations for this.
    i have created production order for FG with backflush. in this my scrap qty is not atcual qty. i have confirmed first operation and made goods issue more than the planned qty with movment type 261. then i am going to confirmed for second operation. here my client is asking formula before posting goods movement in CO11 t.code for scrap qty. it should be caluculate automatically from Issued RM qty to FG QTY (101 MVT) and RM return qty( 262 MVT). like
    scap qty = (RM1 qty +RM2 qty) - FG1 qty-FG2 qty - RM return qty.
    let me know is it possible.
    thanks & regards
    Bhakta

    Bhakta,
    Following are the list of Confirmation related  enhancements,
    Cust. specific enhancements when saving - CONFPP01
    Determine customer specific default values - CONFPP02
    Customer specific input checks 1 - CONFPP03
    Cust. specific check after op. selection - CONFPP04
    Customer specific input checks 2 - CONFPP05
    Customer specific enhancements when saving- CONFPP06
    Confirmations: Actual Data Transfer - CONFPP07
    Since I dont have the SAP access at this point of time, I will not be able to comment on which one can be usefull.
    Regards,
    Prasobh

  • APD not loading correct data...

    Hi,
    I am using APD to load the data of a query to an ODS. In the ODS I added one more key figure that holds the total sum of the same key figure in the infocube which my query belongs to. for this aim, I added a field with a formula using SUMGT.
    when I run the query, that field works fine but when I run the model at APD that field is not filled correctly. i.e. I need that to be  the sum in the infocube but I get a very very lower value.
    Do you have any idea?
    Thanks in advance..

    Hi Yasemin,
    To use a report to load an ODS is not a good idea. The reports that you create in APD's are way different than regular bex reports. They are much slower and not reliable and also if you face a problem in the future you cannot even debug it via RSRT. There is another way to debug it which is another long story. Instead you may want to use the source it self and you can set up filters and write ABAP routines to get the same result as you use the report.
    Please let me know if I can assist you further with your APD design,
    Regards,
    Serkan

  • Formula Problem in BEx

    Dear All,
    I am using BEx Query Designer to make a query.I view the report using browser. I have 2 keyfigure fields "price" and "forecast quantity". I have to arrive at "forecast Value" = price * forecast quantity using formula in Query designer. Although for each material this proves correct in report material wise. If I see the report customer-wise a customer who has bought 10 materials first the prices are added up andthen the forecast quantity is added up and then the sums are multiplied to get forecast value which is wrong.
    Illustration :
    For Customer 1 :
                    Quantity    Price     Value(Quantity * price)
    Material1   | 2           | 10        | 20
    Material2   | 3           | 10        | 30
    Material3   | 5           | 10        | 50
    Material4   | 7           | 10        | 70
    Total         | 17          | 40        | 170 = Correct value
    But if I see report customer wise I get the value as 17 * 40 = 680 which is wrong.
    Is there any way when I see an aggregation of materials the calculation in formula column first multiplies individual rows and then add the rows to give me final value?
    Regards,
    Ratish
    [email protected]

    Hello ,
               Right click on the calculated key figure select properties enhanced and change to Before aggregation , now the result is calculated correctly.
    But if you use before aggregation, the cubes aggregates are not used, so this will have negative effect on performance , this property is applicable to query level key figures.
    hope it is clear
    assign points if useful

  • Cumulative Key Figure (Running Total) - how to use in formula?

    We have a scenario where I need to use the cumulative value of a Key Figure in a subsequent formula. The “Cumulated” property setting at the Key Figure level in the query is a “Displayed Data Only” setting, however, so the cumulated values are not available for use in a formula  The individual values are used by BW as opposed to the cumulative values that are displayed in the column.
    I’ve tried using the “Cumulated” property at the characteristic level. I am then able to use the displayed cumulative values in a formula. However, I also need to display the individual (not cumulated) Key Figure values in a column. These individual values are no longer available for display if the “Cumulated” property is set at the Characteristic level.
    I thought that the “Define Cells” functionality could possible be used, but there is only one Structure in the query, so the “Define Cells” functionality is unavailable. I could not think of a way to use a second structure in the rows, as the rows need to be dynamic (two characteristics, populated based on user input variables).
    It may be possible to accomplish this requirement by adding a column using VBA in the SAPBEXonRefresh sub, but use of VBA is not a preferred option, as the query may be run in either the Excel Analyzer or the Web Analyzer.
    The infoprovider does not contain a Key Figure field for Cumulative Volumes.
    The scenario details:
    Rows (Characteristics):
    A: Plant (values based on user input variable)
    B: Calendar day (values based on user input date variables for start & end dates)
    So there is one row for each day within each plant.
    Columns (Key Figures):
    A: Cumulative Volume at Start of Period (uses user input date variable for start date, and “Constant Value” property. Hidden column.)
    B: Daily Volume (for each day in the period defined by the user input variables for start and end dates)
    C: Cumulative Volume at End of Each Day (formula, meant to be equal to the sum of the Cumulative Volume at start of period plus the total so far of the Daily volumes. In other words, equal to the sum of Column A plus the running total of Column B).
    Does anyone out there have any more ideas on how to accomplish the required Cumulative Volume computation?

    Thanks for your reply Jurgen.
    I've created a Global Calculated Key Figure (CKF), and have looked at and tried a number of settings in the Properties of this new CKF.
    I have not yet been able to make this work for me.
    The "Cumulated" property for a Global CKF is also a display-only property. The displayed running total is not used in any formula containing this CKF, only the individual values are used in the formula.
    If I select the 'Enhance' option, where exception aggregation can be done as I think you suggested, I do not see a 'cumulated' option. If I select the 'Summation' option for 'Exception Aggregation', then the 'Reference Characteristic' pull-down is not available.
    Is there a different 'Exception Aggregation' option I should be using for running totals at the calendar day level?
    Or am I unclear on the concept of your suggestion?
    Perhaps you're on a later version of BW that has more Exception Aggregation options? (We're on BW3.5)

  • Enhancing 2LIS_04_P_ARBPL for STATUS of Operation

    Hi,
    I need the status of the operations of the production orders.
    NOT the status of the production order head(Thats in the attributes of the 0PRODORDER)
    I thought on enhancing the Datasource 2LIS_04_P_ARBPL for the statusfields.
    As I see, the status comes from the table JEST.
    Any Ideas how to select the status from JEST in a routine?
    So that I enhance the datasource and fill the field via a routine.?
    Or is there any other way to get the status of the operations into BI?
    We are already loading the table AFRU via a VIEW into BI - could I include the status into this View?
    Thanks

    Hi,
    If you just need the confirmation counter, that I guess is the number of Confirmation that happens after the TECO at the R/3 side (I guess you can check the same at the R3 side using Report COOIS).  Have you considered the option of managing the same at the reporting level.
    At the Bex level you can get the number of confirmation (Counter) for a period. This can be achieved by multiple ways, the simples one is
                   - Create one formula (while creation of formula give 1 in the Formula box then go to Aggregation tab in the formula then select reference infoobject as confirmation number then save, it will work)
    1 = Numeric one constant in the formula
    go to calculation tab then select as sum or total .
    There is another way please check
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/009819ab-c96e-2910-bbb2-c85f7bdec04a
    Regards,

Maybe you are looking for

  • Missing editing toolbar in Iphoto to make a picture book

    I'm trying to make an iphoto picture book but I'm missing an editing toolbar so I have no editing options.  When I go to "View" then "Show in Toolbar" - there are no editing options. Can somepone please point me in the right direction?

  • Getting ip of client

    I have made a server socket so how do i get the ip address of the client connecting to my server ??

  • In the apps is unavailable to download

    hi it's unavailable to download any apps in creative cloud. and a sign to connect the tech support

  • Dreamweaver edit with Fireworks

    I have a website designed using Dreamweaver and Fireworks.  I have upgraded to CS3 and now trying to make changes to Dreamweaver file using Fireworks original png file that created the html, is seemingly impossible.  I have set the default editor to

  • Bridge selectively ignores JPGs in Review Mode

    hello. I have this issue : http://img27.imageshack.us/img27/6060/60232032.jpg and after restarting the review mode: http://img59.imageshack.us/img59/1466/37671094.jpg as you can see, Bridge selectively denies to render jpg images in review mode. This