Error 200524 Different number of channels in task and data

Anyone out there with some information would be greatly appreciated. I  have attached my VI. Essentially I am trying to build a simple PID VI to controll the temperature of a piece of equipment in a system I am building. I have heating wire powered by 120 V source. The circuit is controlled by a simple relay, which is controlled by a digital line on my NI USB 6343 board. I have seen numerous examples throughout the forums and the shipped examples, but I cannot seem to figure out how the PID VIs work. I understand the basics of a PID controller, but cannot make the connections of how to actually get it to work in LV.
I figured that this VI I wrote is pretty simple and should work, but I keep getting this error.
Error -200524 occurred at PID_v0.vi:Instance:19:1
Possible reason(s):
Write cannot be performed, because the number of channels in the data does not match the number of channels in the task.
When writing, supply data for all channels in the task. Alternatively, modify the task to contain the same number of channels as the data written.
Number of Channels in Task: 1
Number of Channels in Data: 1000
Task Name: _unnamedTask<1>"
Any advice, direction, sample VIs that are not overly complicated, etc would be greatly appreciated.
Attachments:
PID_v0.vi ‏97 KB

Hi andyabs,
I'm not getting the same error you are when running this VI.  How are you setting up your channels and tasks in the DAQ Assistants?  It seems like this may be the source of your error.
You should also take a look at Section 4 of the attached White Paper.  Using DAQmx functions rather than the DAQ Assistant will give you a bit more functionality with your program.  Let me know if you have any questions about this example.
Control Applications with Data Acquisition Hardware: http://www.ni.com/white-paper/9086/en/#toc4
Myriam
Applications Engineer
National Instruments

Similar Messages

  • Issue while perform the Task and Data Audit in Workspace

    Hi All,
    When we try to perform the task and data audit functions in workspace it throws the following error please advise how to fix this issue.
    An error has occurred. Please contact your administrator.
    Show Details:
    Error Reference Number: {110FD8BF-AD33-4257-BA3D-46FF30208EA2};User Name: admin@Native Directory
    Num: 0x80040e31;Type: 1;DTime: 6/24/2010 3:42:55 AM;Svr: USNSAP03EX;File: CHsvSystemActivity.cpp;Line: 479;Ver: 11.1.1.2.0.2207;DStr: Timeout expired;
    Num: 0x80004005;Type: 0;DTime: 6/24/2010 3:42:55 AM;Svr: USNSAP03EX;File: SystemInfoUsersActivities.cpp;Line: 617;Ver: 11.1.1.2.0.2207;
    Num: 0x80004005;Type: 0;DTime: 6/24/2010 3:42:55 AM;Svr: USNSAP03EX;File: CHsvSystemInfo.cpp;Line: 2664;Ver: 11.1.1.2.0.2207;
    Num: 0x80004005;Type: 0;DTime: 6/24/2010 3:42:55 AM;Svr: USNSAP03EX;File: CHFMwSystemInfo.cpp;Line: 1846;Ver: 11.1.1.2.0.2207;
    Thanks in advance,

    If you have any SELECT FOR UPDATE in your code, these will produce locks, and it will not be released until the session which has locked the record has released it. This can be one reason why you have this behavior.
    you need to trail your code if it's explicitly locking a row or more.
    Tony

  • Error: No exchange rate from CAD to USD and date 28.02.2007 found

    Hi BW experts,
    I getting following error in report :
    <b>No exchange rate from CAD to USD and date 28.02.2007 found (currency transl. TRAV/TRAV) 
      Notification Number BRAIN 380 </b>
    <b>
    I am getting this message for only 4 months i.e March April,May,June but rest of months its fine.</b>
    Currency translation is done in query with a variable.
    I tried the following solutions:
    1.transfer Exchange rates from source systems Via Program :RSIMPCURR
    2.I checked in Table <b>TCURR</b> and there exists a exchange rates between CAD to USD.
    3.I checked TCODE:  RSCUR the variable exists and created properly.
    4.I searched through forums but none of them present a clear solution.
    <b>SO can somebody help me to solve this error ,its very urgent</b>
    null

    So check in OB08 which gives the overview of Currency Exchange Rates for each month.Check what is the exchange rate maintained for the months u r looking into.
    Else ask the users what exchange rates they maintained for those months and upload the exchange rates for those months.
    Here is the link which will explain how to load the exhange rates.
    <u>http://help.sap.com/saphelp_nw04s/helpdata/en/36/412ad80cb511d5b2df0050da4c74dc/content.htm</u>
    Thanks & Regards,
    Suchitra.V

  • Error when giving untill condition for System time and date

    Hi Experts,
    i am using Untill Loop in my workflow to set condition for System time and date.According to this condition when system date and time is greater than equal to some date and time then mail goes to an agent.But during testing , the workflow gets into error stage.
                 In workflow log i am getting error like
    'Maximum number of    10000 nodes reached' in executed action 'DEQUEUE_NEXT_NODE'  for false condition.
                        Please suggest what may be possible cause or solution for it?
               Points will be rewarded for any good solution.
    Thanks
    Snehasish Das

    Hi,
    You should not use loop for that kind of purpose. It sounds to me that your workflow is looping all  the time, and the maximum numer of nodes is reached soon, and the workflow goes into error.
    You should use the WF deadline functionality for your purpose. For example use in a relevant step the "latest end" tab, and define the deadline there. Then when your deadline is reached, the workflow will continue in a separate outcome, and there you can send your mail.
    Regards,
    Karri

  • NEF to DNG 6.5 results in different number of unique colors, pixels and RGB values

    I took pictures from my old Nikon D40. I converted them with the standard settings from NEF to DNG.
    I then used UFRAW under Linux and saw that the pixel size increased from 3039x2040 in NEF to 3040x2040 in the DNG - and that the live view RGB values were about 5% higher for NEF that for DNG.
    "FastStone Image Viewer" shows the same increase in pixel size. Additionally, it shows that the DNG has roughly 93,000 unique colors compare to 90,000 for the NEF file.
    More pixel, different RGB values, different counted unique colors - what's going on here? This doesn't look like a 1:1 conversion?

    Not exactly sure what you're comparing.  For raw data you need to be comparing the original mosaic data values (not some converted result, or even partially converted result like demosaiced result).   Are you sure that's what you're doing?

  • Adobe 2.0 the Error Description of Number of DRM Authorized PCs and Devices with Adobe ID

    I  hope anybody who works in Adobe may browse my message.
    Adobe already announced the number of authorized PCs and devices are maximum 6 units respectively. It is posted over Adobe homepage, but ADE 2.0 is not correct the description yet, especially when deactivated DRM with Adobe ID and reentered it, the message still says the number of PC and devices is 3 units.

    >>> The .pdf must be transferred from a PC into the mobile device folder and conversion must take place in order to view the file on the mobile device. <<
    There are likely a number of ways which will render pdf's non viewable on ppcs... some thoughts on this specific issue;
    The activesync "plugin" is a "tagger" subject to failure... if the file can't be directly opened from the file menu of ppc reader, it is likely another problem.
    ppc reader is acrobat 5... most pdf's are created with "backward compatibility" but it's also possible that the original generator specified acrobat 6 or 7
    The "file associations" are often wrong with respect to pdf files... attachments apparently have another level of file association, so, before making any conclusion, save the file to the "My Documents" folder, start reader and open the file using the ppc reader's file menu.
    >>> it would be nice if Adobe and Microsoft could put their heads together to straighten this out. <<
    Remember something said long ago about "when pigs fly" ;-) ...we are on our own as there is zero evidence that anyone from adobe even reads these posts, and then you have to couple that with the fact that reader users are not adobe's customers... they have almost zero incentive to address ppc reader problems... wanna do something about it... get a major full acrobat user to complain to adobe that their pdfs are not really ppc readable.
    Beverly Howard [MS MVP-Mobile Devices]

  • Mysql query returns different number of records from coldfusion and navicat

    Hi
    I'm hoping that someone can suggest a basic strategy to debug this.
    I have a fairly large and complicated query that is executed by a function in a cfc.
    It returns (for example) 100 rows.
    If I use cfdump and then copy and paste the SQL of the query (with the variables, of course) into Navicat and execute exactly the same query on the same mySQL database, it returns 130 rows.
    Same SQL string, same database, same data - the only difference is that in one instance Navicat submits the query and in the other, Coldfusion does.
    Has anyone ever had anything like this happen before?

    Ok I found my own bug. Of *course* the sql queries were not identical.. they could not possibly have been. My mistake was thinking that they were.
    The problem was part of the WHERE clause:
    AND orderid in (500,503,505)
    In the coldfusion code this was
    AND orderid in (<cfqueryparam cfsqltype="cf_sql_varchar" value="#lstOrderID#">)
    which of course rendered in mySQL as AND orderid in ('500,503,505')
    This was not immediately apparent as the cfdump returns this as AND orderid in (?) with the variable in the array below.

  • SD extractors - different number of records in RSA3 and in the table MC*

    Hi
    After deleting setup tables and creating it again
    for extractor 2LIS_11_VAITM
    I have
    in RSA3 - 64686 records
    but
    in MC11VA0ITMSETUP structure only 14857.
    The same situation is for 2LIS_11_VASTI.
    Where this difference is getting from?
    Thanks
    PWnuk

    The reason is that the MC* setup tables "cluster" the data, so there is not a 1 to 1 match in record count.  Therefore, you shouldn't validate using record counts between the setup tables and RSA3.
    See these links:
    Re: no of records in setup tables
    Hope this helps

  • How to show two different plots with current system time and date on waveform chart

    I am using  one waveform chart to display the more than one value continiously. The data  are comming properly but i am not getting my system (pc) time and date on x axis. It is showing default date and time (i.e.01/01/1904 5:30:45). Please  give me suggestions to display the real time and date on x axis of waveform chart. 

    How does your data look like? Do you graph waveform data types, dynamic data, or plain arrays/clustes? In the case of plain arrays, you need to set x0 to the absolute start time of your data, e.g. with a property node.
    I you would attach your code (or an image) we could offer more specific advice. There are too many possibilities.
    LabVIEW Champion . Do more with less code and in less time .

  • If I log out of iTunes and log in with a different account, will all my apps and data be deleted?

    This is not only a question for my computer but also for my phone and my iPad. My mom has an Apple account that both she and I use. Unfortunately, without turning on iCloud, all of my Safari bookmarks are transported to her phone and her notes go to mine. I want to get my own account so I can use iCloud and only MY stuff will be synced to MY devices, but I already have a lot of apps on my phone and iPad and computer that I don't want to lose.

    Welcome to Apple Support Communities
    Of course not. Apps are not deleted if you change your Apple ID on any of your devices. However, you will need the old Apple ID to update those applications, unless you download them with the new Apple ID.
    iCloud lets you choose if you want to delete or keep your data stored on iCloud. The only exception is for documents stored on iCloud, which are deleted if you change your iCloud account

  • Surround bounce - how do you select the number of channels?

    When doing a surround bounce, Logic is always giving me a 5.1 even though I want a different number of channels. I have my surround setup selected in audio preferences, and it seems like it should bounce using that same config, but it does 5.1 either interleaved or split. I don't see any options for number of channels in the bounce window.
    Any ideas? It seems like this worked in earlier versions of Logic, but with the latest I can't get any other number of channels.

    Found where it's set in the app, but looks like it's buggy in 9.x. I went back and checked 8.x and it works fine there.
    Anyone want to try it out? Under project settings->surround format, you should be able to set a format and then do a bounce with Surround Bounce and Interleaved selected. In L8, the bounce would be the number of channels selected in project settings, but in 9, it looks like it always bounces 6 channels regardless of settings.
    If someone could take a minute and test it out, I'd really appreciate it - I'll be reporting it to apple but I'd like to make sure it's not just my system. Thanks.

  • Error message "Maximum number of drilldown characteristics exceeded"

    Hello,
    an user created a Web report. In the navigation block there are nearly 100 selection fields. If you make either "drilldown in the rows" or "drilldown in the columns" you recieve after 50 drilldowns the error message "Maximum number of drilldown characteristics exceeded" and it is not possible to proceed further. Does anybody has got an idea what this can be?
    Thanks!
    Regards,
    Christian

    Hi Check SAP Note No -
    Note 144478 - BEx: Termination/Message at 10th/20th drilldown characterstc
    1. Terminations occur when you drill down a large number of characteristics at the same time during interactive navigation in the Business Explorer Analyzer (Excel).
    2. In the global query definition, the system displays message 'Termination: the maximum number (10/20) of drilldown characteristics is exceeded' if the total of the characteristics and structures you are using exceeds
                  - 10 objects in Release 1.2B
                  - 20 objects in Release 2.0A/2.0B/2. 1C
                  during the definition of a query.
    Hope it helps
    regards
    Vikash

  • Fixed duration tasks and time budget

    I am fighting with MS Project 2013 and cant figure out how to do this task:
    I am creating a schedule for a project. It is to be used as an estimate for planning purposes.   
    What I want to do is list a number of Fixed Duration tasks and assign the task a budget in hours (For example the task may span 2 weeks duration but the amount of budgeted work days may only be 4 days the work can be done anytime during the 2 week period). 
    I am guessing I can choose one of the 'built in' columns to capture the work budget for the task, but which one????
    Then I want to  assign some people with a percentage of their time/week to each task.  (I know how to do this...)
    Finally I want to add a column that will display, for each task, if the people I have assigned (with their respective % work) will  be less than, equal to, or greater than the budgeted hours for that task.  I don't know how to do this...any pointers???
    Any help is really appreciated.
    thanks
    J

    J --
    On a Fixed Duration task, when you change the Duration, Microsoft Project ALWAYS recalculates the Work.  This is the default behavior of the software, and you cannot change this behavior. 
    Oh, I thought it could be changed.....oh well....
    My intention with the Work Difference column is: Given I have a task that is planned to span a number of weeks and the actual amount of work hrs is specified and less than the number of days in the task duration, I want to be able to show in the work difference
    column the difference between the estimated work days for the task compared to the number and allocated percentage of time of resources assigned to that task.
    For example: task duration is 2 weeks.  actual work is 4 days.  Two ppl are assigned to the task, each at 20% of their time.  So, 2 ppl *(40 hrs*0.2) = 16 hrs of work, would be less than the actual work of 4days*8hr/day = 32 hrs.  
    In the duration column I'd see 4 days and looking at the work difference column I'd see 2.0 days, and I would know that I need to increases resources or add more time availability to the existing resources.
    Why is this useful to me?  In my world, (for project estimating purposes), people are assigned multiple projects so they split their time accordingly.  When we are estimating another project, and consider resources for that project, we generally
    get a percentage of their time.  Often the smaller sub-tasks can be worked in parallel so people can work efficiently.  If person X can only spend 20% of their time on a task, and the task requires more work, then we can bring another person on the
    task to make up the difference for the budgeted work.  I can look down the Work Difference column and immediately tell if we have enough effort on the project to accomplish the tasks and the entire project.
    Thanks for your help!
    John

  • Different profit center in Project definiton and  WBS

    Hi,
    Our client facing a problem for closing the project due to  different profit center. In Project definition  the assigned on profit center and WBS they assigned another different profit center . There is not data posted or planed .
    SAP won't allow me to change the Profit Center because it says the project is released.
    Now they try to  close the project but it showing error like different profit center in project definition and  wbs.
    Could you please anybody help to solve this issue?
    Thanks.
    V.K

    From the error message It seems there is a validation using Field exit. Ask your abaper to debug. Then would be able to know the logic behind it.
    Venkat

  • BestPractices Error - Set Decimal Notation and Date Format

    Hello everyone,
    first of all, I don't know, if this is the right forum for my question, but I hope so
    We're trying to implement the Best Practices Scenarios to a new SAP ERP System.
    We did the steps of the following url, where everything worked fine: http://help.sap.com/bp_dm603/DM_DE/html/index_DE.htm
    Then we integrated Best Practices 603V8 via Solution Builder (TA: /n/SMB/BBI). But now, when we switch to Implementation Assistant and try to activate Scenario DE_109 --> 100(DE) --> Folder USERSETTINGS, we receive the following error in report /SMB99/SU3_O009_B32: Set Decimal Notation and Date Format.
    So we called transaction SU3 and changed Decimal Notation and Date Format, but the error still exists.
    Anybody knows what to do?
    Thanks for your help!
    Best regards
    Patrick
    PS: We executed Testscript /SMB99/SU3_C009_B32 via TA SECATT and there is the error:
    TCD SU3 0,292 sec N Maintain Users Own Data

    Hi,
    Follow below link to verify whatever you have done is correct:
    http://help.sap.com/bp_bblibrary/600/Documentation/B32_BB_ConfigGuide_EN_MX.doc.
    Thanks
    Sunny

Maybe you are looking for

  • Logical AND , OR operations in calculated Column

    Hi Frzz, I need to apply AND & OR operators in IF statement of Calculated Column. Could some one help he how to achieve this. IF( employeetype = = 'temporary' AND experiance == '5years' )      IF( employeeDesignation == ' BA' )          logic     ELS

  • Duplicate Albums in White Stripes section?

    Hi, I was going through the White Stripes albums and I'm not sure if what I'm seeing are duplicates; titles, descriptions and prices are repeated. Not sure which one I should be clicking to add the album. Thanks, Rick.

  • Read Receipt for Email using Java Mail

    hi, i am trying to implement requesting the read receipts for the email sent out. for that i got some information that by setting header "Disposition-Notification-To" and the value should be "<Destination email address>" should i need to make any cha

  • Import return

    hi sap guru I just want know return import material senario in sap ,how we can return import material back to vendor when creation of return po system showing nagative delivary cost  massage so how can i return import material to vendor and account e

  • Stuck at startup in FCPX

    When i last worked at my project I accidentally quit the program (not a force quit). I think it happened during a background transcoding, but I'm not sure. All I know is that the shutdown of FCPX tok long time. Now when I try to open it, it stops at