Error while transfer request from development to production server

Hi,
We have generated some request on development and while transer the same on production server, following error message appear "Transport control programe tp ended with error code 0247"
Pl give us the solution.
Regards
Suresh

hi
repeat your transport run
or re-create transport and execute again.

Similar Messages

  • How to transport requests from development  to production server

    hi gurus
    i am new to SDN
    can u pls give me detailed information how to transport requests from development server to production server?if possible give me screen shot documents
    regards
    surya

    Hi
    Transporting
    There are help pages that discuss creation of transports.
    In simple terms, you: create a transport package
    add objects to the package  export the package, plus optionally any related objects to a predefined folder/directory on the portal server into a file with an extension of .EPA copy the .EPA file to the import folder of your QA system and import it  test the contents on the QA system  copy the .EPA file to the import folder of your production system and import it  Create a transport package file
    Here is the step by step procedure to create a transport package:
    For Export
    1. Go to system administration, and click on transport?export.
    2. In the middle pane, select the folder you want to export and right click on the Transport Package. 3. Fill in the General Properties i.e the name of the package, id and description. 4. And say finish and open the object for editing.
    5. When the object has been opened then right click on the object you want to transport, and say "Add object to the Transport Package".
    6. Check the checkbox of the item u have added and see the properties if it has been added properly. 7. Now click on the save button.
    8. After the object is saved, click on the export button. 9. U will have an option to select where to store the .epa file which will be generated. U can overwrite an existing one by selecting the browse button, or store it with the generated name in the location it automatically generates. 10. Now Click on the Start Export button.
    11. once the export is completed, it shows a report on how much time is taken to generate the .epa file. 12. Here there is an option for downloading the .epa file. Click on the link and download the file. This file is ready to be uploaded into any other EP Server.
    For Import:
    Pre-requisites: You have to copy the .epa file created while export into the local drive. Optionally, you have to manually copy the .epa file generated in the export function into the Import directory of the server ie. chooseFollow the steps below for importing a certain file. 1. Go to System Administration in the portal, and click on Transport?Import. 2. For the source of the package, Click on the radio button Server for the .epa file you have copied lately. Else, click on the radio button on client if you are operating in the client and select the .epa file you have stored on the local drive. 3. Now select the file from the browse option and click on Upload.
    4. Now click on the import button. 5. Once the import process is finished, the report is shown. In the whole process, the par files are not included in the .epa files. For the par files to be included into the .epa files then we have to change the pcdStartup.properties file in the server. The property to be changed is Pcd.TransportApplication.Export.ExcludeObjectTypesAfterRuleProcessing: Keep this property's value as empty for enabling the par files to be uploaded into the .epa. You can check for this property in the portal in the following -System Administration-Support-Portal Content Directory-PCD Configuration.

  • How to transfer request from Development to Production

    Hi,
      Can anybody tell me Step by Step procedure to transfer request form Dev. to Prod.

    Hi
    It depends how many enviroments you have and the transport routes is defined: anyway I can suppose there are development, quality and production system.
    So:
    - A) U have to release the request in dev system (trx SE09 or SE10): after releasing the request the system will move it to the queue of quality system.
    After the step A u need to use only the trx  STMS in all next enviroments in order to transfer the request to the production.
    - B) It needs to import the request to the quality system:
    - run trx STMS,
    - press the first icon (with a truck);
    - double click on the quality queue
    - refresh the list;
    - place the cursor on the request;
    -  Go to Request->Import
    After importing the requet to the quality, the system will place it in the production queue, so now it needs to repeat the step B, but u have to choose the production queue:
    - C) It needs to import the request to the production system:
    - run trx STMS,
    - press the first icon (with a truck);
    - double click on the production queue
    - refresh the list;
    - place the cursor on the request;
    -  Go to Request->Import
    Sometimes the system is setted not to transfer the request to the next queue after importing it, in this case u need to transfer it by yourself (trx STMS):
    After choosing the right queue go to: Request->Forward->System
    Anyway yuo should consider the steps above should be done by your basis, so perhaps u have no authoriations to run trx STMS.
    Max

  • Query related to request transfer from development to production server.

    Hello,
    I am transfering request from development to production server , the error occured is object REPT of particular program is inactive.
    What is this error ?
    Plz give answer as early as possible .
    Thanks in advance.
    Vikram.

    Did You try my solution'
    Hi..,
    go to the request in SE09...
    in the menu
    Request/Task->Complete Check-> Display Inactive objects..
    you will get the objects which are inactive and u can active them there itself.
    santhosh

  • Error while converting schema from oracle to SQL server

    Hello,
    I am getting following error while converting schema from oracle to SQL server using SSMA.
    I get Errors 1-3 while migrating procedures and error 4 while migrating a table.
    1- O2SS0050: Conversion of identifier 'SYSDATE' is not supported.
    2- O2SS0050: Conversion of identifier 'to_date(VARCHAR2, CHAR)' is not supported.
    3- O2SS0050: Conversion of identifier 'regexp_replace(VARCHAR2, CHAR)' is not supported.
    4- O2SS0486: <Primary key name> constraint is disabled in Oracle and cannot be converted because SQL Server does not support disabling of primary or unique constraint.
    Please suggest.
    Thanks.

    The exact statement in oracle side which causing this error (O2SS0050:
    Conversion of identifier 'to_date(VARCHAR2, CHAR)' is not supported.) is below:
    dStartDate:= to_date(sStartDate,'MON-YYYY');
    Statement causing error O2SS0050:
    Conversion of identifier 'regexp_replace(VARCHAR2, CHAR)' is not supported is below.
    nCount2:= length(regexp_replace(sDataRow,'[^,]'));
    So there is no statement which is using to_date(VARCHAR2,
    CHAR) and regexp_replace(VARCHAR2, CHAR) in as such. 'MON-YYYY'  and '[^,]'
    are CHAR values hence SSMA is unable to convert it from varchar2 to char.
    Regarding SYSDATE issue, you mean to put below code in target(SQL) side in SSMA ?
    dDate date := sysdate;
    Thanks.

  • Error while deleting request from DSO: S:RSODSO_ROLLBACK:259

    Hi,
    While deleting request from DSO, we face following errors:
    S:RSODSO_ROLLBACK:259                129 transaction rolled back by an internal error: fail
    Message no. RSODSO_ROLLBACK259
    Job is getting completed with message:
    Deletion of request REQU_3HHPSMIMMVRF87FI0EGC5CS4B from data target ZPR_ODS failed
    Deletion of request REQU_3T80EDOBQR7CWSC8QKKHAMH5N from data target ZPR_ODS failed
    Deletion of request REQU_8JIMF8SRDOG0T3QG6AGRA63Q3 from data target ZPR_ODS failed
    Deletion of request REQU_CMCCHOZGOF3KXNMVXB94ZHMCB from data target ZPR_ODS failed
    Deletion of request REQU_BPCAB8LY6V4CMC3XQ12AWN7MJ from data target ZPR_ODS failed
    <Message short text RSODSO_ROLLBACK 259 does not exist>
    Parallel processes (for Rollback); 000003
    Timeout for parallel process (for Rollback): 000600
    Package size (for Rollback): Dependent on Activation
    Task handling (for Rollback): Backgr Process
    Server group (for Rollback): No Server Group Configured
    Job finished
    FYI:
    Kindly help us to resolve the error.
    Regards,
    Antony Jerald.

    Hi Dinesh,
    Thanks for your reply.
    We have Netweaver 7.30 with BW on hana on SP 9.
    First 3 SAP notes doesn't meets the need.
    Shall I use 1007717 note? 
    Which says:
         use transaction SE16 to delete all entries for this request and for this Operational Data Store (ODS) object from the RSICCONT, RSMONICDP, RSODSACTUPDTYPE and RSODSACTREQ tables. Then set the 'from-date' in the administration of the data target to a value older than the oldest request loaded in this ODS object. Choose 'Refresh'. This corrects the administration.
    Will it resolves the problem?
    Kindly suggest.
    Regards,
    Antony Jerald.

  • Error while transfer data from SNP

    Dears,
    Am facing the below error while trying to transfer the data from DP .(SAPAPO/MC90
    Thanks for the help

    Hi Vijesh
    You may start looking into the issue by checking whether all Product/Location mentioned in the seletion exists as CVC in MPOS. This should be followed by running a consistency checks through /SAPAPO/TS_LCM_CONS_CHECK. This previous post may be helpful - https://scn.sap.com/thread/654202.
    Thanks,
    Prasun

  • Error while uploading roles from quality to production

    Dear friends,
    I have to upload roles from quality to production.
    I have downloaded it from qualtiy but while uploading to production it is giving me an error "File does not contain valid data".
    Can anybody tell me what could be the problem and how to resolve it.
    Thanks in advance
    regards
    Nirgun

    HI matore,
    the best way is to transport the roles from DEV to QA and then to production as julius suggested
    are you trying for mass down load are single role
    Mass download
    go to PFCG >> utilities>> Mass download>> select all the roles which you want to move it to production
    and execute save it on desktop
    now go to production system>> go to PFCG>>in menu click on roles>>click on upload>>select the file which is saved in desktop and click ok
    mass generation of roles
    in the menu click on utilities>>mass generation>>give the role names with you have uploaded and click on execute select all click on genetate button
    download a single role
    go to PFCG>>in the menu click on role>>click on down load and save it on desktop
    now go to production system>> go to PFCG>>in menu click on roles>>click on upload>>select the file and click ok
    now you needs to manully generate the role
    do the user comparison
    hope this helps
    thanks
    kishore

  • Error while Releasing Requests in Development Server

    Dear all,
                 While I am releasing request in development server, i m getting following error message, so i could not able to release request.
    Message : Test Call of transport control program (tp) ended with return code 0208.
               pls , give any good suggestion.
    Thanks & Regards,
    Sandip Sonar.

    Hi,
    This is purely basis issue, you have nothing to do with it.
    Forward the same screen shot to your basis people,they will take care.
    This happens when some problem in transport layer between servers.

  • Getting "Risk Analysis Failed " error while raising request from IDM

    Hi friends,
    Some of the User to Role mapping requests from IDM did not reach CUP (request ID = null) . When noticed the VDS log , we found the error from GRC webservice to be Risk Analysis Failed . We thought it might be an RAR issue , however , the request just got through CUP when submitted from GRC webservice directly . From RAR perspective also, everything looks ok .
    Please provide your thoughts as to whether this error is pertaining to some other issue or suggest me what I can check in Identity center to correct this .
    Thanks in advance for your help .

    The connector set up are all looking correct . However the requests are not getting raised in many cases .
    At one point we identified that , since our SAP systems have been migrated to DB2, some of the systems were down .
    So when the system is down we decided , Risk analysis is failing . however , now the systems are up and running and still the risk analysis is failing .

  • How to transfer menus from development to production instance

    Hi,
    Any suggestion on how to transfer menus between development instance to production instance would be really great.
    Thanks
    --Kumar                                                                                                                                                                                                                                                                                           

    There is also an application which can do it for you without you need to know about the FNDLOAD command. We are using one of them.

  • Transporting object from development to production server

    Hi Everyone,
    Could you plz tell me how can i transport a object from development server to production serevr if that object is local in production server. And also could u tell me if the transfer structure is replaced if the names are different in both the server???

    Could you plz tell me how can i transport a object from development server to production serevr if that object is local in production server.
    Case 1: Object is in Prod, but not in Dev. and you want to align the systems through transports.
    You will have to send it to D (which could be done by changing transport routes & then following normal transport procedure) & then will have to bring it back with overwrite originals.
    Case 2: Object is present both in Prod & Dev. 
    You can send the transports D->P with Overwrite originals (following the transport procedures).
    And also could u tell me if the transfer structure is replaced if the names are different in both the server???
    If technical names are different in both the servers, the transfer structure will not be overwritten.

  • Deploying portal from development to production server

    Scenario:
    - Development server running OracleAS Standard Edition One.
    - Production server running OracleAS Standard Edition One
    Idea is to develop portal on development server, and, once satisfied and tested, deploy to production server.
    Questions
    1. Is this the right development model? If not, what is the recommended approach?
    2. Would deployment take place via Enterprise Manager? If so, would the development portal have to be turned into an EAR file, and then pulled in to the production server? Or can the two servers be managed within a single instance of Enterprise Manager (on the production server?), and if so, how would the deployment model work?
    Thanks for the input.

    Hi there,
    A1: Yes, I believe so, but will depend actually on what you wish to do.
    A2: Depends how is your application made. I don't think you'll be using EM to make the deployment as this would be a Portal. So you may need to either use the cloning process of the iAS or the RDBMS utilities (where Metalink may help you further depending on the version of the Portal you are in)... or use the Portal Export / Import feature to pass a Page Group from one side to another (this will work only one-way - please refer to the Portal Configuration Guide chapter 10).
    As to the "two servers be managed within a single instance of Enterprise Manager"... why not? You can have two RepCA dbs hooked to the same iAS infrastructure to be managed. If I'd recommend it this way... maybe not... remember that if it will be a Development env and a Production env... I'd recommend them to be really separated (just playing on the safe side... maybe :-) ).
    I hope it helps...
    Cheers,
    Pedro.

  • Transfer data from Test to Production Server

    Dear All
    I want to know how to transfer data from test server to production server.
    Lets say we have done all the setup steps of GL, and we have also feeded chart of accounts, journal entries, recurring etc. at our test server. Now we want to shift our data from Test Server to Production Server.
    What can be the procedure?
    I shall be really thankful.
    Best Regards
    Muhammad Habib
    http://mhabib.wordpress.com

    Dear hsawwan
    Thanks for your reply. Can you send me this document via email. My email id is: [email protected]
    Secondly can you please tell me how to just transfer my Chart of Account.
    I shall be really thankful to you.
    Best Regards
    Muhammad Habib

  • Error while importing request from DEV to PROD

    Dear Experts,
                      i am having the problems with request no.. There are two transport request nos and these have to be transported
                     from DEV to PROD. I relesed these two but while importing into PROD showing everthing completed successfully
                      with one error and error is Generation or programs and screens  for both transport  requests .
                      I am just enable to understand what this message is for ..
                       Please someone help me out in this....
    with regards.
    Praveen.
    Moderator message: please search for available information/documentation before asking, read the detailed transport logs, correct the errors, try again.
    Edited by: Thomas Zloch on Dec 13, 2010 6:05 PM

    Hi,
    First check the source system: ZSTGLDV110 is exists or not. check the rfc connections (Also check the source system assignment in both the system to each other). check the settings in the stms tcode. check the suppoet pack on your quality system,.... there are plenty of reasons.
    thanks.

Maybe you are looking for