Excessive whitespace apex svg cluster bar graph

Hi,
I've created a cluster bar graph which works fine except that it only fills half the space in the region, the rest is whitespace. If I expand the chart width the region increases size and the proportion of display to whitespace is still the same, about 50%. I'm pretty inexperienced with HTML, so don't be afraid of oversimplifying.
Any ideas on what to do?
Cheers

Try the APEX forum here: Oracle Application Express (APEX)

Similar Messages

  • Cluster bar chart throwing XML exception

    Hi,
    I am new to oracle Application express,
    I want to create a cluster bar chart in a page.
    I tried creating chart in region with chart as (SVG) and cluster bar. When I created the 1 series worked fine.
    After I created the page I edited the chart attributes to add one more series.
    After adding the second series I could not view and
    I get below error in firefox
    XML Parsing Error: no element found
    Location: http://192.168.1.137:8080/apex/f?p=102:20:4029915349100479:FLOW_SVG_CHART_R1580023116146280_en-us
    Line Number 1, Column 1:
    and nothing in internet explorer.
    Have I missed out something?
    Please help.
    Thanks,
    Marutha

    HI,
    Thanks for your inputs
    Below is my query
    Series 1      
    select NULL LINK, MIS_HOUR,Dialed from OBD_HOURLY_MIS where campaign_id=:P17_campaign_Id and mis_date=TO_CHAR(sysdate, 'DD-Mon-YYYY') order by MIS_HOUR     
    -      9     6999
    -      10     6944
    -      11     6862
    -      12     6428
    -      13     6630
    -      14     6671
    series 2      select NULL LINK,MIS_HOUR,Answered from OBD_HOURLY_MIS where campaign_id=:P17_campaign_Id and mis_date=TO_CHAR(sysdate, 'DD-Mon-YYYY') order by MIS_HOUR
    - 9     4751
    -      10     4658
    -      11     4682
    -      12     4511
    -      13     4513
    -      14     4584
    Please help me.
    Thanks,
    Marutha

  • Horizontal Cluster bar chart

    I am tasked by my PHB to produce a horizontally-stacked bar chart, the horizontal axis is for simple numbers of events, the bars are types of events. It should also have a negative 'reflection' (see drawing below) There is no Z axis. I have successfully generated this as a vertical stacked bar chart (very simple) and I think a simple rotate 90 degrees right would do it, but I can't find one.
    It should look like this, ignoring the dashes:
    ######## ######## Event 1, Value 8
    ----###### ###### Event 2, Value 6, etc
    Any ideas or workarounds welcome!
    Keith Templeman
    EDIT Post to refer to a horizontal cluster bar chart which is what I really want
    Edited by: mansfields on Dec 3, 2008 2:44 PM

    The horizontal equivalent of the vertical stacked bar would be a horizontal stacked bar, which is there on the menu for me to see. As said in my previous post 'what I am after is the horizontal equivalent of the vertical cluster bar'
    To repeat what my requirement is, I have a group of sales people who have five measures each against them, and I can already graph them thus:
    6 5 4 3 3
    but I want to graph them this way, like 90 degrees rotated to the right:
    6 ######
    5 #####
    4 ####
    3 ###
    3 ###
    I think this would be called a horizontal cluster chart, and there is no option on the list that is called that.
    Hope this makes it clearer, and thank you very much for your time and effort so far.
    keith
    EDIT
    From the online books section - "you can only display clustered bar charts in vertical format". That sorts that out then.
    Edited by: user10677133 on Dec 3, 2008 5:16 PM

  • Cluster Bar charts

    HI,
    I have a cluster bar chart that runs well with one query. The problem occurs when you add more than one series. I get an SVG Chart error ORA-20001 The only differenece is that the second and third series would have a distinct[b] resolution_type. Has someone run across this issue? I have pasted my query below:
    SELECT NULL l
    , MON
    , MAX(resolution_type) resolution_type
    FROM ( SELECT TO_CHAR(stat_date,'MM/YY') mon
    , NVL(COUNT(status), 0) resolution_type
    FROM ht_issues
    WHERE category = 'Help Desk Issue'
    AND resolution_type = 'Functional'
    and trunc(stat_date) between to_date(:P14_RPT_DATE, 'dd-mon-yy') - 27 and to_date(:P14_RPT_DATE, 'dd-mon-yy')
    GROUP BY TO_CHAR(stat_date,'MM/YY')
    UNION ALL
    SELECT DISTINCT TO_CHAR(stat_date,'MM/YY') mon
    , TO_NUMBER(NULL) resolution_type
    FROM ht_issues
    GROUP BY mon
    Any help would be appreciated,
    Thanks,
    Wally

    The SELECT statement you have is still only defining one series. You do not use UNION ALL to add a second series to a cluster bar chart. Use the "Add Series" button in the "Chart Series" to add your "SELECT DISTINCT TO_CHAR(stat_date,'MM/YY') mon , TO_NUMBER(NULL) resolution_type FROM ht_issues" query. Each series needs to be defined separately with its own SELECT statement.
    Mike

  • Maximum Rows for series in Charts (Cluster Bar Charts)

    Question
    Is there a way to dynamically define the "Maximum Rows" value for all the series in a cluster bar chart? I tried putting "&item_name." into the "Maximum Rows" field for a series, but get an Application Builder error indicating that the value should be numeric. I would like to set the "Maximum Rows" for all the series in a chart "on the fly".
    Details
    I have one horizontal cluster bar chart with 4 series on my page that has a variable number of rows i.e. the number of bar clusters that I want plotted varies based on the user's criteria. For one set of data there may be 10 clusters. If the user changes the criteria, the chart could then have 20 clusters. I have the "Maximum Rows" field for all 4 series in the chart set to 31 rows.
    The Problem
    The chart with only 10 clusters is two thirds whitespace. The 10 clusters fills up the bottom third of the chart. The top two thirds of the chart is blank. The chart with 20 clusters fills up the chart with no whitespace. The chart with 40 clusters gets the top 10 clusters cut off and only displays the bottom 31 clusters.
    Any Suggestions
    If you have any suggestions how I can accomplish this, please post them. Currently I am not interested in going outside of HTML DB. I may end up doing that though to get a more dynamic charting tool.
    Thanks,
    Mike

    Note 367711.1 deals with this issue. The contents of the note are the below:
    At this time, this is not possible to dynamically set these charting attributes, however, an internal enhancement request has been created requesting that this functionality be incorporated into the product. The current plan is to incorporate this feature into 3.0 version of the product, however, this is just the current plan and can change depending on the complexity of the implementation.

  • Using the report generation toolkit, how do I make a bar graph verticle instead of horizontle?

    The attached vi is similar to what I am using, and it produces an Excel bar chart. I would really like to create the same chart, only vertically instead of horizontly. I have tried all kinds of things that don't work. Is there a way to do this that does work. I want a result similar to rotating the produced chart 90 degrees CCW.
    Thank you!
    Attachments:
    Chart Test.vi ‏20 KB

    you want to use a xy-graph.
    you can right click the plot legend to make a bar graph vertical.
    Harold Timmis
    [email protected]
    Orlando,Fl
    *Kudos always welcome
    Attachments:
    bargraph2.jpg ‏91 KB

  • BO 4.0 webi: Conditional formatting on a bar graph

    Hi,
    Is it possible to fiormat a Bar graph conditionally in BO 4.0(SAP BO BI: web intelligence)..
    I want to create a bar graph that displays bar in Green color if the value of bar is greater than target set and Red if it is less than target, which is not doable with BO xi3.1 version.
    Please let me know if this can be doable with latest version of BO 4.0 webi.
    Thanks in advance..

    Hi Bharath,
    One workaround in 3.1 I have found is to use a stacked bar chart and then create two variables out of the measure you want to be green if over a certain amount and make the formula:
    =[Measure Object] Where([Measure Object] >= 10,000)
    and the 2nd variable formula for red:
    =[Measure Object] Where ([Measure Object] <10,000)
    Then place these two measure variables on top of each other where the measure values go. Then go into the color palette and make a custom palette with the first two colors green and red see if that gives you what you are looking for.
    Thanks

  • How to use a single variable in multiple schedules in bar graph

    Hello Experts,
    I am usiing a variable X in different schedules for creating a bar graph.This variable X is used in all schedules with different restrictions.For that reason I have to use X and follow some space after X to use it in another schedule. Is there any method to use X again base on schedule name? For example: If schedule1 then X where key=1000 and if schedule2 then X where key=2000.

    Hi,
    You can create a variable with the same name but use this in a small case...
    All the Best,
    Madhu....

  • Single Line and Stacked Bar Graph Representation

    Data to be plotted on graph is as follows
    Year and Month               Study               Planned Subject               Study-Site ID #               # Enrolled          
    2001 / 03          AMXN 9374               50     US-001               1          
    2001 / 04               AMXN 9374               50               FR-101               1          
    2001 / 04               AMXN 9374               50               SP-301               1          
    2001 / 04               AMXN 9374               50               US-001               2          
    2001 / 05               AMXN 9374               50               FR-101               1          
    2001 / 05               AMXN 9374               50               US-001               1          
    2001 / 06               AMXN 9374               50               FR-101               2          
    2001 / 06               AMXN 9374               50               SP-301               2          
    2001 / 06               AMXN 9374               50               US-001               1          
    I want to display the above data in line stacked bar graph format where the
    #Enrolled will be in Stacked Bar by Study -Site ( Y axis)
    Planned Subject should represent a single line at 50 ( Y axis)
    Group by Year and Month ( X- Axis)
    Study excluded ( Study will be selected from dashboard prompt)
    I'm getting the stacked view of Study Site ID correctly but I want Single Line for Planned Subject .
    Currently I'm getting multiple line .
    Eg for 2001/03 I'm getting line at 50 in yellow colour
    for 2001/04 I'm getting a line at 150 in different color since it has 3 Study-Site ID's But the desired output is Single Line at 50
    As per 11g doc this is not possible because there is some upgradation in the nature of the graph
    " Stacked line-bar graphs in which 2 or more measures are shown as lines on the same axis and are not stacked in 10g are stacked in 11g."
    Refer - http://docs.oracle.com/cd/E21764_01/bi.1111/e16452/apndx_ui_chngs.htm
    Is there any workaround for it ?

    Did you found any workaround for it ? I am too looking for same scenerio.

  • How to get bar graph in word in labwindow/CVI ?

    how to get bar graph in word in labwindow/CVI ?

    ashwinic9,
    spawning your question over more and more threads (the present one, this one and this other one) won't give you a faster answer; instead, it will irritate forum users! 
    Especially if you have at your disposal a fast way to perform a test. I pointed you some days ago to word report example, that writes a table to a word document: did you tried changing the graph into a bar graph and generating the report? I have done it for you and the result is OK, as you can see in the attached document.
    Now, since the example works well, there must be something in your particular situation that prevents the graph to be shown; that is: you must add some more data on your actual problem and maybe a small example that exposes the problem.
    But please: keep active only this discussion and let the other threads die! 
    Proud to use LW/CVI from 3.1 on.
    My contributions to the Developer Zone Community
    If I have helped you, why not giving me a kudos?
    Attachments:
    wordreport.doc ‏38 KB

  • Creating a popup on mouse over in bar graph

    Hi,
    I want to create a popup using mouse over event on bar graph but I didn't find corresponding property in the property inspector. Is it possible to display a popup on mouse over in bar graph?
    At present I am able to create a popup in the backing bean based on click event. I want to align it to the bar in the graph which was clicked. But now, it is being aligned to the bar graph as a whole(like above the graph , below the graph) when I use "RichPopup.PopupHints.HintTypes.HINT_ALIGN_ID, source". Is there a way to align it to the particular bar?
    Any help is greatly appreciated
    Thank you,
    KK

    Hi,
    don't think you can align it to an area within a component. The align id property expects a component reference. Note that mouse over on a bar graph doesn't select the bar, which means that the data in the binding layer is not set to current (just in case that the data in the popup is meant to be dependent)
    Frank

  • How to create static line in line bar graph in obiee 11g?

    Hello,
    I have requirement where user wants to see a line in bar graph.
    Now the line is just static line, we dont have data field available to draw the line in graph.
    is there a way to create a static line in chart and show it in Line bar ombo graph??
    Thanks in advance..

    e.g. i created the static line '10' in fx and now using this column as line in line bar report , but its not displaying the line at measure of '10' in chart.
    Drag the column to measures section of graph (Line - Vertical Axis) to change this static value create an edit box prompt and pass the value to the column using Presentation Variable (as said by Fernando)
    Thanks,
    Saichand

  • How to plot bar graph in the real time?

    Hi guys
    I have n row and 3 column array, n will vary according the time, for example t=10ms, n=1;t=20ms, n=2;..., I would like to display all the data of the array in the bar graph  in real time. I tryied with example "array to bar graph demo.vi" but very time, only one row was displayed.
    Could anybody help me?
    Many thanks. 
    Sorry I don't know how to capture the picture from VI, so I pasted it diagram to word document.
    Attachments:
    question.doc ‏240 KB

    Where did you get this example. I can't find it listed in the current shipping examples.
    Also, posting a small image of a section of a block diagram is not much to work with. You are using local variables and a sequence structure. Neither one is a good sign. If you would simply post the actual VI (and any subVIs), it would be much easier to see what you mean.

  • Command link at DVT Horizantal Bar Graph

    Hi All,
    I want to display command link in the place of y-axis in Horizantal Bar Graph.
    I am using jdev 11.1.1.6 version
    Please provide me suitable answer with proper sample code.
    Thanks,
    Sai

    Hi,
    the proper answewr is that you cannot have a command link in a graph. However, graphs respond to click events and you can define a click listener that then allows you to access the clicked on value.
    http://www.jobinesh.com/2010/11/example-of-clicklistener-implementation.html
    Frank

  • Dedicated Archive mailbox databases generate excessive whitespace

    Our company has several mailbox databases that are dedicated to arhive mailboxes.  I just joined the company a month ago and found one database that was about 500 GB with about 300 GB of whitespace!  So, I created a new DB and moved all the archive
    mailboxes, and removed the original DB.  at the time there was minimal whitespace.  Today, the DB is in much the same condition.  what makes this so odd is that there are less that 30 mailboxes on database!  Further, it seems
    as though these DBs are also generating way too many transaction logs and causing management to become concerned about drive space and DBs dismounting.   Bottom line:  how can I determine what is causing the excess whitespace to be generated? 

    Hi,
    I recommend you refer to the following article :
    Exchange 2010 whitespace reclamation
    In addition, as Ed mentioned, you can monitor the available new mailbox space with the following command:
    get-mailboxdatabase  -status | ft Name, AvailableNewMailboxSpace
    Hope this helps!
    Thanks.
    Niko Cheng
    TechNet Community Support

Maybe you are looking for

  • How to populate a default value in Text box depending on Poplist selection

    We have a requirement to populate a default value in a Text Box when user chooses a value from poplist (of type MessageChoice adjacent to the Text Box). This page is a Oracle Seeded Page. I understand that this is not possible using personalization.

  • Help setting up windows auth for lighttpd/ldap etc

    I'm running a server on my office that I only have accessible to people in our workgroup. I'd like to set it up to authenticate into our windows domain for ease of password management. I havent been able to get ldap working..and was wondering if anyo

  • New report for Archiving data

    Hi to all, Can anybody kindly tell me how to solve the following: Due to the huge volume of records in the table ZMES_SEQ_DETAIL it required to archive the data based on the Date on which the record was created, which is 18 months older in the table

  • Installation of SAP Productivity PAK - Installation Guide

    Hi Everybody, We need to install SAP Productivity PAK . I am looking for more information on this in terms of Installation guide, pre-requisites, installation steps and configuration steps. I would appreciate if any of our members help me by sharing

  • Dynamic selective deletion of last working day in cube

    Hi experts I have studied this document: http://scn.sap.com/community/data-warehousing/netweaver-bw/blog/2013/08/06/selective-deletion-in-process-chain We need to delete each month at the 6th working day all records of the last working day of the pre