Hello All,
I wan to do the syntax check for multiple programs at single execution run.
SAP has provided SLIN transaction for single program, Is there any SAP standard transaction similar as SLIN for multiple program check at single execution run?
Thanks,
Feroz.

>
s feroz wrote:
> I need it in R/34.6b version.
I don't think you have much option there

Similar Messages

  • Can MRP be done for multiple plants in Single Run?

    Can MRP be done for (MRP Areas) for many plants, many storage locations and many
    subcontractors in a single run?

    hello
    u can perform mrp run at mrp area level which could be different then plant.
    thx
    dilip sadh

  • Reg:Single Check for Multiple Vendors

    Hi Experts,
    I want to Issue a Single check for all vendor open items...
    For this is I created one Group Key and assigned in the vendor master record, but while doing the payment separate check issuing for each vendor,
    any idea

    Hi,
    Can you check the below thread of urs.
    [Reg:Single Check for Multiple Vendors]
    In addition to the above, please make sure that in OBVU, the check box separate payment for each ref is deselected for your questioned comapny code.
    You would have continued your earlier thread instead, rather than a new thread.
    Thanks,
    Srinu

  • ATP check for multiple materials on multiple sales document

    Hi,
    System 4.70
    Is it possible to carry out an ATP check for multiple materials on multiple sales documents.
    I have written a bespoke program and the program requires an ATP check to be performed for each material and sales document, I am currently using BAPI_MATERIAL_AVAILABILITY which is bringing back the necessary information but it's a bit slow.
    Does any one have any ideas please.
    Regards
    J-J

    The ATP Check using the BAPI is done per material and plant. If you're looping through sales documents and then materials you're probably doing the ATP check for the same material over and over again.
    Just get the list of materials you need and the corresponding plants and call the BAPI for each of them.
    Also do a run-time analysis (tcode SE30) to check exactly what slows down your program.
    regards.

  • An you tell me how to add an advanced action to the TEB so you can check for multiple lines of input

    an you tell me how to add an advanced action to the TEB so you can check for multiple lines of input? How do you add the advanced action?

    Can you elaborate your requirement?
    If you want to have a text wrapped around and enable a scroller for the same, you can achieve it by TEB properties and check the scroll bar option,
    Is this what you are looking to achieve?
    Thanks,
    Anjaneai

  • How to make "check for multiple logons" mandatory in webdynpro application.

    Hi SDN members,
    Im having a problem with an application developed in webdynpro abap.
    We require that  end-user only have a session per computer (ip address),
    I already tried to achieve this by configuring the webdynpro application throguh SICF and going to Error Pages -> Logon Errors --> System Logon and mark the checkbox Check for multiple logons.
    This configurations give only a warning when the user logs multiple times, and show a checkbox letting the user decide to end or not the previous sessions.
    How to make end previuos sessions mandatory ??
    Regards,
    Franklin Cedillo

    You would have to enforce this at the application level. You can get the IP address of the current client from the framework - IF_WD_APPLICATION method GET_REMOTE_ADDRESS.
    You could write an entry with the IP address into a temporary table during WDDOINIT.  You could clear the entry in the WDDOEXIT.  Also during the WDDOINIT, check to see if there is already an entry for this IP address.  If so, then fire an exit nagivation plug to a static MIME object or BSP page that explains why the user can only be logged in once.

  • Need to do availability check for multiple materials (in bulk)

    HI Friends,
    I need to do availability check for multiple materials. Currently i am using function module AVAILABILITY_CHECK within a loop.For my purpose I could find this particular FM as well as BAPI "BAPI_MATERIAL_AVAILABILITY" however both of this options can not be used for more then one materials at a time.
    I want to take out the loop from the code and get multiple materials be ckecked at once for availability. If AVAILABILTY_CHECK FM can be used for multiple materials, please post the usage.
    Any other options are there?
    Any help or clue would be appreciated.
    Thanks in advance.

    Use the BAPI.  Even if such a function existed, it would still perform the relevant internal logic required for checking by material, so you wouldn't gain anything.

  • How to Maintain Payment with one check for Multiple Vendors?

    Dear Gurus,
    i have a scenario for outgoing payment, here it is
    i have some open items for multiple vendors. say it for open item
    1. with amount 5000 USD for vendor A
    2. wiht amount 10000 USD for vendor B
    my company pay both open item 1 & 2 with one check, say the check no is 27382830 and the amount is 15000 USD. The check is given to the Bank as an order to Pay the vendor. so the check does not have receiver name. i attach a formal letter to the bank to ask them for making payment with that check. the letter contains a detail the amount, vendor bank account number, account holder, and the vendor name.
    so how i can threat this business scenario into SAP? i want to trace check number used to pay the vendors.
    hope you can give some clues. is it possible to maintain scenario above with automatic payment?
    best regards,
    land lord

    Hi,
    Yes you can map this scenario in SAP and use F110 for this. But you will also have to use some Z programs..
    1. For F110 FBZP configuration, maintain outgoing bank clearing Account (this will be a dummy account and not the actual Outgoing Bank Account) as the Bank Sub Account.
    By doing this when you run payment in F110, entry will be
    Vendor A A/c...Dr.
    outgoing bank clearing Account Cr.(1)
    Vendor B A/C... Dr.
    outgoing bank clearing Account Cr.(2)
    2.Then you will have to use Post with clearing transaction codes and make one entry
    outgoing bank clearing Account Cr.(1)..Dr.
    outgoing bank clearing Account Cr.(2)..Dr.
    To Bank Outgoing Account(Actual Bank outgoing Account) Cr.
    3. Now, when you get the single cheque no. from Bank against both the vendors, then thru FB02, change the assignment field/Reference field for Che No. updates.
    But do check BRS also for its reconciliation.. If you do it on a daily basis.. then it would not be difficult.
    Hope this helps you..
    Regards,
    SAPFICO

  • How To Install Platform for Multiple Developers on Single UNIX Machine?

    Hello,
         What is the best way to install the WL 8.1 Platform for multiple
    developers on a single UNIX machine? These developers may start
    concurrent instances.
         The problems I see are that the log files generated by Workshop would
    be shared among concurrent users, permissions would need to be set so
    that the user that is running the instance that creates the log files
    will need to create the file with permissions that everyone can use. Are
    there any other issues to doing this?
         I could not find the information on this in the documentation.
    Thanks

    I was referring in particular to the logs that are created by Workshop
    itself (in the workshop directory). It creates workshop.log and netui.log.
    Raj Alagumalai wrote:
    Steven,
    which workshop log file are you referring to ?
    the workshop log files are usually saved to the domain directory.
    If the developers are each going to start their own server instances then
    there should be no issues.
    The best option for you is to create multiple domains for each developer.
    They will share the same workshop installation, but they will each have
    their own instances.
    Thanks
    Raj Alagumalai
    WebLogic Workshop Support
    "Steven Ostrowski" <[email protected]> wrote in message
    news:[email protected]..
    Hello,
    What is the best way to install the WL 8.1 Platform for multiple
    developers on a single UNIX machine? These developers may start
    concurrent instances.
    The problems I see are that the log files generated by Workshop would
    be shared among concurrent users, permissions would need to be set so
    that the user that is running the instance that creates the log files
    will need to create the file with permissions that everyone can use. Are
    there any other issues to doing this?
    I could not find the information on this in the documentation.
    Thanks

  • SRM 7.0 extended classic possible for multiple backends?

    Hi all,
    I know that SRM 7.0 can be set up for multiple backends in the classic scenario.
    And i assume it is also possible to do so in the EXTENDED classic scenario.
    Could somebody please confrim that this is possible?
    Has somesone already set up this landscape and any recommendations, advice, hits, do's and dont's?
    Cheers
    Ulrike

    Hi Ulrike,
    SRM 7.0 supports ECS for multiple backends. We are using it now.

  • Searching for multiple faces in single picture

    Is it possible to search for multiple faces in a single picture. I would e.g. like to search for all pictures containg Person X and Person Y.

    File -> New Smart Album
    Face -> is -> X
    +
    Face -> is -> Y
    To get pics with both, set the condition to Match All, to get either, set the condition to Match Any
    Regards
    TD

  • Cisco LMS - Check for multiple words?

    Can anyvbody help me out with a Cisco LMS query.
    I'm doing a complaince check for snmp-server location
    +snmp-server location [#.*#]
    But I assume as I've got mulitple words which may vary it shows as not present in the complaince check even though it's in the config.
    e.g. snmp-server location Martin's house in the middle of Scotland
    I think [#.*#] stands for a missing string but not for multiple words, can anyone help me out with what I could use for multiple words?
    Thanks in advance
    Martin

    I could solve the monitoring issue with snmp context configuration. I had to map each OSPF process to a snmp community. So i could retrieve data for each OPSF process. My issue now is how to add multiple communities to an LMS controlled device.
    As far as i know, LMS support only one RO community per device.
    regards
    alex

  • Query for multiple row to single

    Hi All,
    Need help in Multiple row to single row
    create table cust_tranc_track
    (id number,
    payment_dt date ,
    emi_dt date,
    appr_dt date
    SET DEFINE OFF;
    Insert into CUST_TRANC_TRACK
       (ID, APPR_DT)
    Values
       (425, TO_DATE('11/12/2012 00:00:00', 'MM/DD/YYYY HH24:MI:SS'));
    Insert into CUST_TRANC_TRACK
       (ID, PAYMENT_DT, EMI_DT)
    Values
       (425, TO_DATE('11/01/2012 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), TO_DATE('11/13/2012 00:00:00', 'MM/DD/YYYY HH24:MI:SS'));
    COMMIT;
    Output :
    ID     PAYMENT_DT     EMI_DT              APPR_DT
    425     11/1/2012     11/13/2012     11/12/2012thanks
    ajr

    *> g2500 wrote:**> Hi All,*
    *>*
    *> Need help in Multiple row to single row*
    *>*
    *> *
    *>*
    *>*
    **_+Hi,+_**
    **_+I cant clear about ur question. I m giving the solution wat i can understand.to get multiple row inti single u can use listagg function.+_**
    **_+use hr.employees+_**
    **_+select department_id,listagg(first_name,',') WITHIN GROUP (ORDER BY first_name) AS employeename+_**
    **_+from employees+_**
    **_+group by department_id;+_**
    **_+u [http://dba-oracle.com/t_oracle_listagg_function.htm]+_**                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

  • Printing check for partial processing of payment run without voiding

    Hi,
    Our payment run (Done via F110) has created only some checks for some payment documents, as the check lot got exhausted.
    How to print the check now for the remaining payment documents without voiding the earlier one? (As we have issued those checks to vendors.)
    Thanks,
    Bhaskar

    Hi,
    Please do below:-
    1. Create the new Check Lot in FCHI transaction as the next lot for the expired check lot
    2. Go to SE38/ SA38 and give your check printing program (Like program RFFOUS_C). Execute.
    3. Give the Payment Run date and identification in this program selection screen
    4. GIve the New Check Lot number here from which you need to print.
    5. Give the Payment Document number range for which the check needed to be printed
    Then system will generated the checks for the remaining payment documents.
    Regards,
    Gaurav

  • Best Practices for multiple authors using single project?

    We are having many issues, particularly with moving, renaming, and multiple check out warnings.  We have a single project with many authors and it seems like RH is not designed to work that way. There is an article in the RH devnet-archive in an article entitled "Sharing RoboHelp Project Among Multiple Authors" that says"
    "At first there may be the temptation to let every author work on every file in a project.  This is certainly not a best practice. Regardless of source contraol, it is always best to designate certain authors as owning certain content-related sections, folders, or topics within a project -particulary at the folder level."
    This statement, and our experience seems to indicate that RH is not a true CMS as we had envisioned.  What are the best practices for this scenario to avoid stepping on each others toes and having problems with source control.

    I have moved this to the source control forum for the gurus there to answer.
    Meantime I must admit I read that statement the same way as you first time. However, on rereading I think what the author is saying is not that what you want cannot be done, rather it is best practice to guide authors to work in discrete areas.
    I will leave it to the author or another guru to give you a more complete answer.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

Maybe you are looking for