hi experts,
i need the standard print progarm  for printing production order.

Hi Vijay
the printers first need to be configured by the BASIS consutant who will assign printers to Users based on their Roles and authorizations and i think this is a Config activity and needs to be transported
also from the menu go to user profile, under own data and under defaults Tab, you need to assign the printer here and save it and first log off and then i think it should help
also check in the Control key setting in OPL8 which you have used for routings operations whether they allow printing shop floor papers and confirmations and time tickets based on your requirements
this should probably help
if useful plese reward points
regards

Similar Messages

  • How to use smart form for production orders

    Hello Experts,
    I have a couple of questions about printing out production orders from SAP, from OPK8.
    My ABAPer has developed a smart form and I am trying to use the same for the list LG01, i.e. the object list.
    Since, there was no place to assign a smart form directly, so the ABAPer has copied the existing print program , defined for my ref. order type and LG01 and assigned the new smart form inside the program. This new program has now been assigned against my ref. ord type, LG01 and all the plants, as seen in screenshot below.
    Now, what is happening is that when I give print for my order, a pop-up screen asks for the printer. I give LOCL , check 'print now' and then click on the print preview.
    I can see the new form that has been developed and it is alright.
    Then, when I click on the back arrow, once again the print pop-up screen appears. Now, when I enter LOCL, print now and click  the print preview, then I see another form open up before me. I am assuming that this is some form which was pre-configured in the system, under the section 'Forms', for the same object list LG01.
    Do I have to assign the new smart form under the section "Forms' also, for the ref order type and LG01? or the change in the section 'print programs' is enough for the new form to kick in? Please guide me. I tried to but it gave the error that the form is not created in English. Also , my form is a smart form, not a SAPScript or PDF form, so I wonder if that will help at all.
    Requirement :-      I need to suppress this second form somehow but do not know how to do it. I want that only one form, i.e. my smart form should be printed out when someone gives print from the order.
    Let me know if something is not clear.
    Regards
    P.R

    Hi P,
    Go a few steps down and remove flags on the documents you don't want to print:
    this are just suggestions, they can be changed in your production order, in CO02, menu Order->Settings->List Control.
    regards,
    Edgar

  • SAPScript Form for Production order Pick List

    Hi gurus
    We need to make a small change on printout of production pick list and I can see the form name in transaction OPK8, which is the same one as printout of production order paper. But when I read the form with SE71, I cannot see section to do with "pick list". All I can see are about production order paper. I make a search with a few words currently printed on pick list however nothing can be found in that form.Can someone please help with a little input? Thanks a lot.
    yu

    Hi,
    In OPK8 you can find different lists. Each list is assigned to one form and one program. Check with the program.
    Regards,
    V. Suresh

  • Sfp adobe form for production order

    I need to supress printing a field within an adobe form base upon a condition.  I customized print program to allow printing production orderwhen order type is RM01 but I do not want to print the barcode field OPSDATA-RUECK.  I need to know how to supress printing under certain circumstances.
    How do I condition a field to prevent printing?

    Hi Vijay
    the printers first need to be configured by the BASIS consutant who will assign printers to Users based on their Roles and authorizations and i think this is a Config activity and needs to be transported
    also from the menu go to user profile, under own data and under defaults Tab, you need to assign the printer here and save it and first log off and then i think it should help
    also check in the Control key setting in OPL8 which you have used for routings operations whether they allow printing shop floor papers and confirmations and time tickets based on your requirements
    this should probably help
    if useful plese reward points
    regards

  • BAPI_GOODSMVT_CREATE for production order,not update database

    hi guru,
    i am using BAPI_GOODSMVT_CREATE for production order.When i m testing this BAPI
    at se37 it creates one mat doc no and i m not getting any return messages.Now i m
    writing code for it at se38. but it does not update the database even though i used
    bapi_transaction_commit. here sy-subrc = 0.bt when i m checking MSEG table showing
    that mat doc no does not exists.
    please help me out  asap.
    thanks and regurds,
    manasi

    CHECK THIS CODE
    REPORT ZBAPI_GOODSMVT_CREATE.
    *DECLARING INTERNAL TABLE TO HOLD FILE DATA.
    DATA: BEGIN OF itab OCCURS 0,
              text(200),
          END OF itab.
    *DECLARING INTERNAL TABLE TO PASS FILE DATA.
    TYPES: BEGIN OF tw_goodsmvt,
                pstng_date TYPE budat,
                doc_date TYPE bldat,
                material TYPE matnr,
                plant TYPE werks_d,
                stge_loc TYPE lgort_d,
                move_type TYPE bwart,
    *            entry_qnt TYPE erfmg,
                costcenter TYPE kostl,
            END OF tw_goodsmvt,
            tt_goodsmvt TYPE STANDARD TABLE OF tw_goodsmvt.
    DATA: lt_goodsmvt TYPE tt_goodsmvt,
          lw_goodsmvt TYPE tw_goodsmvt.
    *declaring internal table of bapi structure.
    DATA:s_goodsmvt_header LIKE  bapi2017_gm_head_01,
         lt_goodsmvt_item TYPE STANDARD TABLE OF bapi2017_gm_item_create WITH HEADER LINE,
         lt_return TYPE STANDARD TABLE OF bapiret2 WITH HEADER LINE.
    DATA:str_filename TYPE string,
         gm_code TYPE gm_code,
          v_head_count TYPE i VALUE 0,
          v_prev_count TYPE i VALUE 1,
          v_qnt TYPE string,
          v_dummy.
    *selection screen
    SELECTION-SCREEN BEGIN OF BLOCK bk with frame title text_001.
    PARAMETERS:p_docdat TYPE bldat,
               p_pstdat TYPE budat,
               fname LIKE rlgrap-filename.
    SELECTION-SCREEN END OF BLOCK bk.
    AT SELECTION-SCREEN ON VALUE-REQUEST FOR fname.
    *to provide F4 functionality.
      CALL FUNCTION 'F4_FILENAME'
        EXPORTING
          program_name = syst-cprog
        IMPORTING
          file_name    = fname.
    * start of selection
    START-OF-SELECTION.
      str_filename = fname.
      gm_code = '06'.
    * to upload data
      CALL FUNCTION 'GUI_UPLOAD'
        EXPORTING
          filename            = str_filename
          filetype            = 'ASC'
          has_field_separator = 'X'
          read_by_line        = 'X'
        TABLES
          data_tab            = itab.
    *SPLITING DATA TO INTERNAL TABLES.
      LOOP AT itab.
        IF itab+0(1) EQ 'H'.
          v_head_count =  v_head_count + 1.
          IF v_head_count GT v_prev_count.
            PERFORM bapi_upload.
          ENDIF.
          SPLIT itab-text AT ',' INTO v_dummy
                                      lw_goodsmvt-pstng_date
                                      lw_goodsmvt-doc_date.
          s_goodsmvt_header-doc_date   = lw_goodsmvt-doc_date.
          s_goodsmvt_header-pstng_date = lw_goodsmvt-pstng_date.
          v_prev_count = v_head_count.
      ELSEIF itab+0(1) EQ 'L'.
        SPLIT itab-text AT ',' INTO v_dummy
                                    lw_goodsmvt-material
                                    lw_goodsmvt-plant
                                    lw_goodsmvt-stge_loc
                                    lw_goodsmvt-move_type
                                    v_qnt
                                    lw_goodsmvt-costcenter.
    * PASSING DATA TO INTERNAL TABLE TYPE BAPI STRUCTURE.
        lt_goodsmvt_item-material = lw_goodsmvt-material.
        lt_goodsmvt_item-plant    = lw_goodsmvt-plant.
        lt_goodsmvt_item-stge_loc = lw_goodsmvt-stge_loc.
        lt_goodsmvt_item-move_type = lw_goodsmvt-move_type.
        lt_goodsmvt_item-entry_qnt = v_qnt.
        lt_goodsmvt_item-costcenter = lw_goodsmvt-costcenter.
        APPEND lt_goodsmvt_item.
      ENDIF.
      v_prev_count = v_head_count.
      ENDLOOP.
      PERFORM bapi_upload.
    *&      Form  bapi_upload
    form bapi_upload .
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
      EXPORTING
        goodsmvt_header             = s_goodsmvt_header
        goodsmvt_code               = gm_code
    *   TESTRUN                     = ' '
    * IMPORTING
    *   GOODSMVT_HEADRET            =
    *   MATERIALDOCUMENT            =
    *   MATDOCUMENTYEAR             =
      tables
        goodsmvt_item               = lt_goodsmvt_item
    *   GOODSMVT_SERIALNUMBER       =
        return                      = lt_return.
            PERFORM commit_work TABLES lt_return.
            CLEAR : lw_goodsmvt, s_goodsmvt_header.
            REFRESH: lt_goodsmvt[], lt_goodsmvt_item[].
    endform.                    " bapi_upload
    *&      Form  commit_work
    *       text
    *      -->P_LT_RETURN  text
    form commit_work  tables   p_lt_return structure bapiret2.
      IF NOT lt_return[] IS INITIAL.
    *error handling
    loop at lt_return.
    CALL FUNCTION 'FORMAT_MESSAGE'
    EXPORTING
       ID              = lt_return-id
       LANG            = sy-langu
       NO              = lt_return-NUMBER
       V1              = lt_return-message_v1
       V2              = lt_return-message_v2
       V3              = lt_return-message_v3
       V4              = lt_return-message_v4
    IMPORTING
       MSG             = lt_return-MESSAGE
    EXCEPTIONS
       NOT_FOUND       = 1
       OTHERS          = 2.
    WRITE: lt_return-id, lt_return-message, lt_return-message_v1, lt_return-message_v2,
                 lt_return-message_v3, lt_return-message_v4.
          CLEAR lt_return.
        ENDLOOP.
      ELSE.
    * commit work
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
    *   EXPORTING
    *     WAIT          =
       IMPORTING
         RETURN        = lt_return.
    WRITE: lt_return-id, lt_return-message, lt_return-message_v1, lt_return-message_v2,
                 lt_return-message_v3, lt_return-message_v4.
          CLEAR lt_return.
    endif.
    endform.                    " commit_work

  • Bapi or FM or tabel or any standard transaction code for Production order linking to get child production orders based on parent production order

    Dear Guru's,
    we have a requirement i.e. user can convert planned orders in to production orders (CO41) based on those production orders we can get Route card( Z Smart form)  presently we are using manual input for that Route card. recently we got requirement for this i.e. make to automatic generation of route card for this requirement we need to get the list of child's production orders based on parent production order
    so as per my requirement i need to get all child part numbers production orders based on parent production order number and quantity i tried in MD4C and CO46 but those transactions codes are picking multiple lines also so for this requirement please give your valuable suggestions
    Regards,
    Venkat 

    Dear Friends,
    Thanks for your reply,
    My business process is MTS purely strategy 10, for route card all components with production orders we can give input as like bellow these production orders are converted from planned orders,between few components are don't have production orders those are F-30 materials,because of this reason i need link for production order to child components orders
    01
    IND1
    IND1
    A1CE2003520103-005
    55685815
    02
    IND1
    IND1
    A1CE2003520103-010
    55685814
    03
    IND1
    IND1
    A1CE2003520103-015
    55685813
    04
    IND1
    IND1
    A1CE2003520103-020
    55685812
    05
    IND1
    IND1
    A1CE2003520103-025
    55685811
    06
    IND1
    IND1
    A1CE2003520103-030
    07
    IND1
    IND1
    A1CE2003520103-035
    55685810

  • Production Order   : OUTPUT Type Configuration for Production Order  as EDI

    Dear SDN All ,
      OUTPUT Type Configuration for Production Order.
    <b>Doubt in third Point</b>
    We have found the IDoc " LOIPRO01 " for Production Order
    (Please confirm that this IDoc can be used for outbound IDoc for Production Order)
    And foloowing
    <b>1. Defining the Output Type for Particular Application.
       T-Code: “NACE”</b>
      A. Output type have created upder application "ME" description : "Inventory Management"
      B.  " ZEDI "  created for getting output as EDI type
         ZEDI is copied from "WF01" output type. and
         Transmision mediam as "EDI"          
         Program : RSNASTED
         Form Routine :  EDI_PROCESSING
              (Please confirm is this for IDoc creation)
    <b>2. Partner profile creation:</b>
      A. Partner profile created under logical system and
      B. and In outbound parameter declared as "LOIPRO"(This is for sending the IDoc "LOIPRO01" to XI system).
    <b>3. Customization for output type for Proction Order -- (For CO02,CO08)</b>   ---
       A. But only one functional customization is remaining to do, for getting the IDoc while saving the Production Order in T-Code "CO02" and "CO08"
            <i>For Example:
                in sales order transaction va02 (in DBI 450 client) and select any Sales order.
                & select following menu path.
                 Extras --- > Output -
    > Header -
    > output
               Here we can set our output type "that U defined in NACE Transaction-Code"</i>
    <b> Like the same way I want to set output type  for CO02, CO08 transaction.</b>
    But I couldn't find the menu Item in Co02 and Co08 for setting the output.(like VA03)
    Please help me out for setting the output type for Production Order Creation.
    Thanks in advance,
    Dhanabal T
    Message was edited by: Dhanabal T

    Hello.
    I have a similar requirement. Did you guys find the solution?

  • Actual activity price calculation for production order

    Hi
    Can any one guide me in how many ways we can assign actual activity price calculation for production order?
    I knew only one way by assigning PPP2 costing variant?
    I have another doubt is: if we don't mention any material valuation indicator (moving average, standard) in valuation variant, how system will calculate material prices? is there any other way, to recognize the prices by system?
    regards,
    Ramesh B

    Dear,
    Costing variant PPP2 is linked to some valuation variant inn OPL1
    System will check the valuation of material and activity according to this valuation variant
    For material valuation there are many stg acceding to which system will take the price the raw material,
    Valuation strategy for material component
    Strategy sequence that determines the valuation of the materials used in the cost estimate.
    Use
    The materials are valuated using the price in the material master record or the values calculated in a material cost estimate.
    Procedure
    You can enter a single strategy, or you can enter multiple strategies in the form of a strategy sequence. If you enter multiple strategies, the priority of the strategy determines what price or what values are selected.
    Examples
    Assume that the following strategy sequence is entered for material valuation:
    1. Planned price 1
    2. Standard price
    3. Moving average price
    If the system finds a value in the Planned price 1 field (costing view), this value is taken as the value for valuating the material.
    If the system does not find a value, the value in the Standard price field (accounting view) is used.
    If the material does not have a standard price, the system uses the value from the Moving average price field.
    if you have not mentioned, then system will give error that "valuation stg not found"
    Valuation strategy for internal activities and processes-
    Strategy sequence that determines how internal activities and processes are valuated in costing.
    Use
    The activities and business processes used are valuated with the prices from Cost Center Accounting or Activity-Based Costing to determine the production costs or process costs. The prices can either be calculated iteratively through price calculation, or entered manually by the user.
    Procedure
    You can enter either a single strategy or more than one strategy in the form of a strategy sequence. If you enter more than one strategy, the priority of the strategy determines which price is selected.
    Examples
    The following strategy sequence is entered:
    1. Actual price of the previous period
    2. Plan price of the previous period
    3. The most current plan price
    If the system finds a price for the activity type, this price is used for valuating the internal activities. If no price was calculated for the previous period, the plan price from the previous period is used to valuate the activity type.
    If the system cannot find a plan price for the previous period, it looks for a future plan price, using the next price in the posting period to valuate the internal activities. For example, if plan prices have been entered for periods 2 and 3, and a plan price is calculated in period 1 for period 4, the system uses the price from period 3 in accordance with the valuation strategy Most up-to-date plan price.
    Again if you have not mentioned, then system will give error that "valuation stg not found".
    You can use any costing variant for actual (PPP2)and planned(PPP1) according to your requirement.. check in OPL1

  • Table name& field name for production order  & operation confirmation

    Hi All,
              I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
    Thanks and Regards,
    PSS

    Hi there,
    CORU(R/3 Application development: PP Confirmations )
    AFFW       Goods movements with errors from confirmatio
    AFRC       Table of planned changes to conf.: Automatic
    AFRD       Default values for collective confirmation 
    AFRH       Header information for confirmation pool   
    AFRP1      Table of planned changes to conf.: Automatic
    AFRP2      Table of planned changes for confirmation: B
    AFRP3      Table of planned changes for confirmation: C
    AFRP4      Table of planned changes to confirmatn: Data
    AFRU       Order completion confirmations             
    AFWI       Subsequently posted goods movements for conf
    TAFWD      CORU: Messages that are not interpreted as e
    TCORD      Table for field-dependent check routines   
    TCORU      Parameters for order confirmations         
    TCORV      Table with Routines for structureing variabl
    TCORW      Confirmation: Window Control               
    TPARU      Control parallelized confirmation processes
    TPRRU      Control table for process chain for confirma
    TPRRUT     Text table for process control of confirmati
    TRUGS      User status caused by deviation            
    CO(R/3 Application development: PP Production orders )
    AFBP        CIM order: Batch print requests            
    AFFL        Work order sequence                        
    AFKO        Order header data PP orders                
    AFPO        Order item                                 
    AFVC        Operation within an order                  
    AFVU        DB structure of the user fields of the opera
    AFVV        DB structure of the quantities/dates/values
    FAPW        Index of production-/issuing plant for produ
    FTIND       Missing parts index                        
    ORDCOM      Communication control Operation download   
    T024F       Production scheduler                       
    T399X       Parameters dependent on order type         
    T441C       Profile - availability check               
    T441CT      Texts for Profile "Display Availability Chec
    T490        Transactions PP - orders - order category  
    T496B       CIM order: Assigning document types to refer
    T496D       CIM: Destination/lists/spool parameters per
    T496F       CIM order: Form description of the list    
    T496K       CIM order: Entity table of possible table id
    T496N       CIM order: List descriptions               
    T496P       Print PP documents: Determination of output
    T496R       Print PP shop papers: Report control       
    T496T       Print PP shop papers: Transaction control  
    T496V       PP Print: Default Value for Printing Online
    T496Z       CIM order: Table-controlled table access   
    TC32        Assigning subscreen to processing location 
    TC34        Allocating operation to object type for the 
    TC62        Sequence of detail screens when processing h
    TCO01       Sequence/operations control in logicstics or
    TCO03       CIM order: Texts for TCO01, Description of o
    TCO04       Table for controlling the screen sequence gr
    TCO05       CUA status depending on panel, trans. type, 
    TCO06       Exclusive functions for PP orders           
    TCO09       CIM order: Text IDs of objects in orders    
    TCO10       Valuation variant for order costing         
    TCO11       Control table for production orders - availa
    TCO12       Control table production orders - stock dete
    TCO36       PP orders: Control table for calling up pop-
    TCO41       CIM order: Default values for generating ope
    TCO43       PP-SFC order profile                        
    TCO43T      Description of production scheduler profile 
    TCO60       Sequence keys for input facility and verific
    TCO61       Sequence key for PP orders                  
    TCO62       Defining screen sequences for input facility
    TCO63       Sequence of detail screens when maintaining 
    TCODB       Database fields development class CO per ord
    TCOF        Profile for missing parts info system       
    TCOFF       Profile for Missing Parts Info System: Displ
    TCOFFT      Texts for Missing Parts Info System: Display
    TCOFG       Profile for missing parts info system: crite
    TCOFGT      Texts for Missing Parts Info System: Criteri
    TCOFK       Texts for functions in milestones/trigger po
    TCOFS       Profile for Missing Parts Info System: Sort
    TCOFST      Texts for Missing Parts Info System: Sort Cr
    TCOFT       Texts for Missing Parts Info System        
    TCOKO       Constants for PP orders                    
    TCOKT       Account assignment categories for order    
    TCOP        Field selection profile                    
    TCOPS       Field selection profile                    
    TCOPT       Description of Profile for Field Selection 
    TDUMMY      Dummy structure of a table for READ with VER
    TRUG        Reason for variances in completion confirmat
    TRUGT       Text describing the reason for a variance in
    TXPR1       XPRA control - missing parts info system   
    Regards
    Hemant G

  • Owner Exception for Production Order

    Hi Experts,
    Can we use Owner exception for Production Order Window..?
    I did try with excluded forms, though it is not working.
    We are using SAP 2007A
    Thanks in advance

    Hi Yeni,
    Thanks for the reply,
    But even though I include Production Order in the excluded form in owner exception, it doesn't work.
    Any reason for the same.
    Regards,
    Aditya

  • Output ytype for production order ?

    Hello,
    What is the output type for production order. ? i have to attached customized forms for it.
    Thanks,
    Shehryar Dahar

    Hi,
    You can check in the Table T685/ T685T by entering the KVEWE = 'O' (output)
    I don't find any std output type for production order in those tables.
    May be you have to define you own Z type and use .
    Even you can check the table TNAPR (which stores NACE  T code entries).
    Regards,
    Anji

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

  • Report to check open reservations for production orders where GI not posted

    Hi experts,
    Can we get reservation details from any report/ table for production order where material has not been issued, report should also display the value of the reserved material.
    I could not find desired details in RESB (it has price but not value) and MB25.
    Thanks in advance, useful ansers will be rewarded.
    Thnx
    Anand

    Hello Anand,
    there is no report but you may use the production order info system with list "components" and create a layout contaning the issued quantity and/or the final issue indicator. With a correct sorting, the list should show all orders with non-issued components at the top.
    Regards, Andreas

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • How can I add a new line item for production order?

    HI all,
    How can I add a new line item for production order through BAPI/FM? Thanks in advance.

    Hi Mil,
      Unfortunetly SAP is not in front of me.
    But if possible go to BAPI transaction , check for any production order's bapi for CHANGE purpose. Where you will be able to add your new line.
    Reward if useful!

Maybe you are looking for

  • Hp 915 printer driver for windows 8.1

    i am using a laptop lenovo g50. operating system is 2indows 8.1  64 bit. iam unable to connect it to my hp allin one printer 915. still in very good condition since i am using it very carefully. Now because of the driver problem iam unable to take pr

  • Not showing up in iTunes

    I've had ATV for a month now and I'm about to reset the ATV for the third time due to various connection issues. The first time the ATV was frozen and no amount of soft resetting cured the problem so I hard reset. This time I have full control of my

  • Current Date in file name

    Hi gurus, I export daily a report to csv using RSCRM_BAPI ... I need to the put the date of the extraction in the file name (export_csv_120506.csv) ... It's possible ? export_csv_ + "sysdate" ... something like that ? Thanks in advance for your help,

  • What does this logo mean and how do I resolve it?

    I started my macbook and this happened. When I tried reformatting it, it can't detect the start up disk. Methinks it's a hardware issue already but I just want to know if I can still resolve it on my own before I take it to the center to get it fixed

  • To activate my second HD

    I have a POwer MAc G5 2.7 and I want to activate my second hard drive. I tried to use it but it appears lock. I am new in Macs computers. What can I do...?