Dear Gurus,
            In Repetative scenerion I have given in REM profile that system should post activities using data from PRELIMENARY COST ESTIMATE. I have created 3 production version with diffrent BOM and Routings. And created 3 Product cost collector and 3 Prelimanary cost collector. For which i have got price 10, 18 & 25 respectively.But after i do the MFBF system is posted the goods receipt with using the standard price maintained in the material which is Rs 15. So my question is what is the purpose of making diffrent production version and difffrent prelimery cost estimate.
Regards
ACP

Hi,
Even though you have 3 different Product Cost Collectors based on your production version, you can update the standard cost estimate for the material against only one Version, so your Inventory valuation would be based on Standard Price in Material master.
Now coming to the effect of Product Cost collector, for every product cost collector, system would create a Internal Order(Production Order), against which all the costs would be collected and settled. So if you look at the costs accumulated in the specific cost collector for the backflushed production you can see the cost of GR based on the prelimenary cost estimate here it wont consider the cost based on the Standard Price.
Hope I was able to explain what you were looking for,
Regards,
Prasobh

Similar Messages

  • Goods receipt during reversal of production order

    Hello ALL,
    I use production orders confirmation with Aut.goods receipt.
    Example is the following:
    I confirm 3psc of production order for semi-finished product, so system posts 3pcs with 101 movement type.
    Production order status is DLV
    Then 1 pc is consumed for the next production step, it means the physical stock is now 2 pcs.
    In the next step I want to reverse the confirmation of  production order with movement type 102 ( I use CO13 )
    I get message in COGI - Deficit of  unrestricted-use - 1pc and I am not able to reverse goods receipt at all. Production order status is still DLV. Reversal of material document is impossible.
    I know it is reasonable but my question is: is it possible to reverse goods receipt only partially during CO13 - for 2 pcs and get production status PDLV ???
    I know the sulution is to return missing 1 pc, but I would like to avoid this
    thanks for help
    KS

    dear KS,
    as far as i know...
    ...every confirmation entered in the system can be canceled : if you entered three confirmations (just an example) for an operation, you can also cancel three confirmations and all confirmations automatically created by them
    1. you can change confirmations or partially cancel them;
    2. if you also activate user statuses when confirming an operation, these statuses are not automatically canceled when you cancel the confirmation;
    3.if you cancel a confirmation, the functions that were triggered by a trigger point are not revoked (for example, creating a rework operation).
    good luck!

  • MB31 Goods Receipt Price Control

    Dear Sir,
    We  need that during MB31 , Goods Receipt must happen at Std Price only  and it should not depend on the Target Cost appearing in the Production Order .
    During serching on the sdn , I came to know that Price control startegy during MB31 can be any-one of the following :
    the Goods Receipt for FERT/HALB happens according to either of the four strategies:
    • Standard Price ( if there exists one)
    • Customer Exit COPCP002
    • Sales Order Cost Estimate
    • Preliminary Order Cost Estimate for prod order
    Kindly guide us , as what steps need to be followed to define these price strategy control  during the MB31 . Does it require some thing in SPRO ? .
    Kindly guide pl .
    Rgds
    B Mittal

    Dear Mr Biswanath Rath
    Thanks for Reply .
    Our Requirement is that during MB31 , stock should come at the Actual Value (Amount spent on the Production Order) .  At present the Stock is comming at the Std Price (Std Price as per Material Master after the Cost run) .
    See , We are in Engineer-To-Order scenario and for us each manufactured Item (HALB & FERT both) are unique every time . So it is really impossible to know the accurate Std Cost in advance . Due to large variation between the Std Price and Actual Amount spent on Production Order , it leads to huge amount in Price Differnce during the Order Settlement and this affect the accuracy of monthly Profitablity figure .
    While searching on sdn , I came to know that by using USER-EXIT COPCP005 , we can exercise our logic about as what cost should be carried-out during MB31 .
    But , I o not know  what steps/ / code  need to be followed for this User-Exit to implement .
    I hope that now our requirement is pretty clear .
    With Rgds
    B Mittal

  • Goods Receipts 101 E from Production Order without valuation

    Hi,
    we faced a strange issue relating to the final confirmation of production order.
    In some cases, the goods receipt of main order, created by the confirmation in CO11N, has value "0".
    Taking a look to some production orders for the same product, they have no differences and the valuation is correctly with the plan cost estimate.
    The issue is triggered twice:
    1- Directly with the first confirmation in random cases;
    2- Confirmation with wrong value (higher than Zero), reversal of confirmation and new confirmation without valuation.
    Could you please help us?
    Thanks.
    MC

    Hi
    With Valuation Strategy M, a record is created in EBEW for each sales order
    1. The first goods receipt results in valuation on the basis of one of the subsequent strategies in the specified sequence. A standard price selected through one of the subsequent strategies is copied into strategy and serves as the valuation basis from this point onwards.
    - The system calculates the standard price on the basis of your customer exit COPCP002 Material valuation for valuated sales order stock.
    - The system calculates the standard price in a sales order cost estimate. This sales order cost estimate can be based on a unit cost estimate or on a product cost estimate.
    - The system determines the standard price using the production order cost estimate or the planned costs for the WBS element. If there are multiple production orders for the same sales order item, the system uses the standard price that results from the production order that delivers first (see strategy 1).
    2. If the above price is changed after first delivery, then the difference would be posted as output price variance at month end.
    3. Even reversal of first goods receipt does not reverses the standard price. You need to manually change it using MR21..
    4. Have you ticked "W/o Val Strategy" in your req class? If yes, it means that inventory is valuated using Std cost from CK11N... In your case, if it is ticked and Std cost is not released, then GR will be valuated at zero price
    BR,Ajay M
    BR,Ajay M

  • Goods receipt not ticked in production order converted from sales order req

    Hi all,
    In MTO scenario, where requirement trigger from Inquiry -> Quotatation -> Sales Order -> Plan Order -> Production Order, goods receipt indicator in production order was not checked if requirement is triggering from sales order, however it is ticked if requirement trigger from inquiry, therefore we are not able to do confirmation. Appreciate if anyone able to assist us as soon as possible.
    Thanks in advanced.

    Hi,
    I understood that---
    If u r creating Sales order directly without Quotation u r  not able to do the GR.
    If u create from Quotation, u r able to do GR. right?
    I think, Problem with Settlement. Please Look into that.
    Kiran.

  • Goods receipt not marked for production order trigger from sales order

    Hi all,
    In MTO scenario, where requirement trigger from Inquiry -> Quotatation -> Sales Order -> Plan Order -> Production Order, goods receipt indicator in production order was not checked if requirement is triggering from sales order, however it is ticked if requirement trigger from inquiry, therefore we are not able to do confirmation. Appreciate if anyone able to assist us as soon as possible.
    Thanks in advanced.

    Hi,
    I understood that---
    If u r creating Sales order directly without Quotation u r  not able to do the GR.
    If u create from Quotation, u r able to do GR. right?
    I think, Problem with Settlement. Please Look into that.
    Kiran.

  • Good receipt price and cost

    Hi experts,
    do you know what is the real unit price field used to calculate the value of the journal entry generated by the goods receipt ?
    For now, we are using IGN1.Price, but now we think that it is IGN1.StockPrice. Do you confirm it ?
    Thanks in advance
    Best regards

    Hi Sebastien,
    If you mention the column 'Item Cost' in the good receipt screen, yes the appropriate SQL table field is IGN1.StockPrice.
    Best Regards,
    J S L Geeganage

  • User Exit MIGO Good Receipt Price Change Upon Receiving

    I have this requirement where whenever a good receipt for the material X, the moving average price need to be revalue at 1.0.
    Can I use an user exit to run the MR21 whenever a receiving done for material X?

    -

  • Goods Receipt Price List

    Experts,
    I have a client who wants to know if there is a way to change the Default Price List on a Goods Receipt to another from the Last Purchase price?
    Any help would be appreciated.
    Marli

    Hello Sir,
    I faced this same issue, please let me know how to change the default price list from Goods Receipt?
    Is it possible to change the default Price List or not..???
    Regards,
    Pankit Sheth

  • "Goods Receipt List " document for production orders

    Hi Experts,
    I have a requirement where in I have to pick up the Header part from the standard form PSFC_PRINT_LAY  and concatenate it with 'Main Details' ?(item data) part which is picked from standard form PSFC_STD_LAYOUT. Can anybody tell me what is the best way to achieve this requirement.
    Whether I should use one of the standard form copied as a Zform and attatch the other part or is there any other of doing this.And also please let me know the transaction where this form is been triggering.
    Thanks in Advance,
    Esh.

    >
    KUMAR.S. wrote:
    > Hi Experts,
    >
    > I have a problem in MTO scenario with Collective production orders for all production orders are stopped due to this because unable to do GR for child items in collective orders.
    >
    > Collective Production Order is as follows,
    >
    > 20053566 - Production Order for Child Material (BFXu2026)
    > 20053567 u2013 Production Order for Header Material (INXu2026.)
    >
    > Also in (COGI) If I enter the sales order and plant we found the below error ie,
    >
    > Dependent goods movement was in correct (this error refers to 20053566)
    > CO Account Assignments have different profit centers (this error refers to 20053567)
    >
    >
    > Please guide me to fix this issue.
    >
    > Cheers,Kumar.S
    Kumar,
    Though it is not very clear, but I suspect that the sales order is assigned with a Profit center, which is different from the one which is assigned to the material master costing view of material 20053567. I better suggest you take the help of FICO guy in this regard.
    Regards,
    Prasobh

  • Variance Journal Appear in Reversal Goods Receipt of CO Production Order

    Good afternoon
    Currently we face a problem that variance journal appear when doing Reversal Goods Receipt (MBST) of CO Production Order.
    But the variance journal appear after we reverse goods receipt for the second time, third time, and so on.
    No problem for the first time cancellation.
    Here is the example:
    Step 1. We do the Goods Receipt on CO Production Order #1
    Journal
         Inventory (Db)                       36000
              COGM Allocation (Cr)                  36000
    Step 2. We do the Goods Receipt Reversal on CO Production Order #1 (with reference to Step 1)
    Journal
         COGM Allocation (Db)          36000
              Inventory (Cr)                               36000
    Step 3. We do the Goods Receipt again on CO Production Order #1
    Journal
         Inventory (Db)                      36000
              COGM Allocation (Cr)                  36000
    Step 4 (Problem). We do the Goods Receipt Reversal again on CO Production Order #1 (with reference to Step 3)
    Journal
              Inventory (Cr)                                   36000
         COGM Allocation (Db)         54000
              Purchase Price Variant (Cr)              18000
    Why Variance appear in Step 4 ? Is there any mistake ?
    Note:
    *We use Price Control "V" for this material
    *No Goods Issue were made
    *No Settlement Process were made
    *Only this 4 transaction for this CO Production Order
    Thanks in advance for your help

    Done... Closed... Please refer to SAP Notes 1666871.
    Thx...

  • Avoid posting of Goods receipt of finished product without consumption of components in Subcontracting process

    I have one requirement:
    I provide components using movement type 541 to the subcontracting vendor.
    Now system will allow the goods receipt of the finished product using movement type 101.
    If the components which are to be consumed using movement type 543 O are unchecked when doing goods receipt of the finished product then system will allow to do the goods receipt.
    As a result of which the component consumption will not be done.
    Subsequent adjustment can be done but,
    I want to have a check that without consuming the components the system will throw an error message when tried to do goods receipt using movement 101.
    Please advice if it can be done, if so how to achieve it.

    Hi,
    It depends on what you want your subcontractor to do with the faulty raw material stock - if you want them to scrap it you can scrap stock from subcontractor stock using movement type 551 and special stock "O" (the system should prompt you to enter the vendor code). If you want it returned for you to scrap it - movement 542 to return it then scrap it from your own stock.
    You shouldn't receive an additional 20 of the finished parts - as you only received 80 not 100. Close the purchase order off to close off the balance of 20 remaining.
    Thanks

  • Auto goods receipt against production order

    is it possible to do auto goods receipt against production order of (material with serial number)
    if not please suggest me solution
    please also tell me possibility of enchancement
    for goods receipt against production order
    sunil

    Hi
    If you check mark the auto goods receipt in the control key used in the work center used in the routing then you can have auto goods receipts posted for the production order against a confirmation.
    Rathnakar

  • Goods Receipt PO Error

    Hi,
    I had code that add a good receipt PO with the DI API that works with SAP 2004 and 2005.
    Now, with SAP 2007, I receive this error when adding a goods receipt po with a product managed by serial number.
    -10 You should use existing serial/batch numbers for this document type
    or
    -10 Blank string are not allowed  in row 1(in unique field)
    Thank you for your help
    Jodérick Picard

    Hi,
    It seems to be a version problem. At that time, using another version solved the problem, or at least told us that the problem was the version used.
    HTH

  • Creating Unplanned Batches for Goods Receipts

    Recently we had an incident where a goods receipt for a final product did not meet an analytical FDA requirement. We were able to segregated the portion of the material that did not meet this regulatory commitment. We have a manufacturing process in place that will allow us to rework this material however we need to assign this failed portion a new batch number. Since part of this final product is good we want to avoid a re-id of the total quantity of the goods receipt. Is there a way we can create unplanned batches and split a goods receipt for a planned process order after manufacturing has occurred?

    Ryan,
    For these requirements, you might want to consider classifying your batches. Through classification function, you can assign multiple characteristics to your materials (e.g., one characteristic for inspection type, one class for original batch number, and one class for process order number) and assign specific characteristic values in batch.
    I'm not sure which version of SAP you're currently using, but the following is the link to help.sap.com on batch management.
    <a href="http://help.sap.com/saphelp_46c/helpdata/en/25/28428b4f7811d18a150000e816ae6e/frameset.htm">BatchManagement_46c</a>
    Batch classification is specifically discussed in Batch Specifications section.
    Hope this helps.

Maybe you are looking for