GRC 5.3 | ERM | Synch ERM - Back-End

Hi Experts,
suppose a role is generated in the back-end over ERM, it hence exists in both.
If changes are made to the authorizations (e.g. deletion of a tcode, changed field value, ...) in the back-end, how can these then be synchronized automatically in ERM?
Is this done by the background job "Trans/Obj/Fld Sync"? Or does this job only synch the back-end with changes in ERM?
Much appreciated!
Kraell

Kraell,
   It will be better to maintain roles from only one place so if the role is generated by ERM then you should stick with ERM to modify the role. If you still want to use PFCG then there is a way to open PFCG via ERM. Use this option so you can get best of both worlds.
If you already used PFCG to modify a role then only way to sync is to download the role from SAP backend system and upload it into ERM. I hope SAP simplifies this process and makes it just one click sync the way CUP has.
Regards,
Alpesh

Similar Messages

  • Regarding connection between front end HTML and back end SQL 7.0

    Hi!!
    I am working on the project 'ERM'. I have designed 12 forms using HTML. Can u please give me brief idea how to establish the connection between a back end and front end i.e. between HTML and SQL 7.0. If possible can u provide me the source code for the same.
    I will be very thankful to you.
    Thanks,
    Jigar.

    Read up about multi-tier applications.
    You need servlet and JSPs for the server-side presentation layer, some classes for the business logic, and some mor for the persistence layer either using JDBC or some framework like Hibernate.

  • SQL Express LocalDB as Back-end for MS Access

    Can a MS Access front-end database be connected to the new SQL Express LocalDB backend on the same machine?
    If the answer is YES, where do I find information about the driver/connection string?
    This is what I’m trying to accomplish. I have a project that uses MS Access to collect data using stationary PCs located far from the actual data collection site. The use of Tablet PCs with the use of wireless network has been suggested to make data entry
    more efficient so data collection is done at the point of inspection. The problem is that MS Access was not build to transmit data/be used in a wireless network environment, so my idea was to use the same MS Access front end (to save time by not building anther
    FE and keep same interface for user) with a LocalDB as back end on the Tablet PC and have the LocalDB either at time interval send the data to synch to a network replica backend for everybody use.
    If answer is NO, suggest a feasible approach with any other product of way to accomplish this data transmission.
    Just so this post question is clearer a SQL Server is not be permitted in this site.
    Thanks
    IB_4

    Hi,
    These threads may be helpful:
    Using SQL Server LocalDB and Access across servers and platforms
    http://social.msdn.microsoft.com/Forums/sqlserver/en-US/5fed23bd-5f2f-4dfa-a7d2-66ce5874f333/using-sql-server-localdb-and-access-across-servers-and-platforms
    Link Access 2013 To SQL Server LocalDB Tables
    http://social.msdn.microsoft.com/Forums/sqlserver/en-US/a05b7650-3ab5-4b3e-beb1-2094336c589c/link-access-2013-to-sql-server-localdb-tables
    Meanwhile, your question is related to Access database. I would suggest you initial a new thread in Access forum for dedicated support.
    http://social.msdn.microsoft.com/Forums/office/en-US/home?forum=accessdev
    The reason why we recommend posting appropriately is you will get the most qualified pool of respondents, and other partners who read the forums regularly can either share their knowledge or learn from your interaction with us. Thank you for your understanding.
    Tracy Cai
    TechNet Community Support

  • Inconsistency between Bex and Back end

    Hello, I have a query about bex issue. I have few fields in my DSO/Cube which has data showing correctly in the back end but in Bex it shows partial of those values. like if i have something like this:
    ZField
    000000000000000000008
    It shows correct in DSO table but in Bex it only shows the zeros. do you know why and how to get this to show the whole field value?
    Thanks.
    By the way this is a characteristic and not keyfigure.

    Hi Vekant,
    If you have not did any speecific thing at query level then value should be shown correctly.
    Please try this once and check.
    Create new test query on your data target drag and droup your charecteristic.please execute your test query and see if you are able to see the correct value.
    try this.
    Regards,
    Ganesh Bothe

  • Front end and back end questions

    Hi,
    If I want to develop a web base SOA application by using Jcaps, I have several question want to ask.
    1.) In the front end, if i create the page by using eVision to create the page
    flow and the page layout, how can I match the fields of the page (such
    as the username, email, tel no... with the back end web services?
    2.) Does the flow of the front end web pages are control by the page flow in
    eVision? When will the eVision supported AJAX or JSF?
    3.) What is the use of the eInsight Business process manager, does it
    control all the back end flow, such as the flow of each web services?
    Does Jcaps has the Bpel engine to control the flow of web services?
    4.) I know that in JBoss, there is a jBPM server to control the flow of the front
    end pages, does JCAPS has this kind of server?
    5.) If i want to connect to the Database? I know that there is a eTL to extract
    the data from the database, it is true? Or do u recommend to connect the
    database directly through the web services by using JDBC or other
    framework as well?
    6.) If I have an existing application that is developed by .Net (With no web
    services). How can i integrate with other systems? What can I do in order
    to reuse the system? Or what Jcaps can do in this manner?
    Thanks for you reply! ^ ^

    Generally, back-end would consist of the taks associated with configuration of data targets (ODS, Cubes), working with extractors, mapping data to the data targets, writing transfer/start rtn/update rules, and creating Infopkgs/ Process Chains.
    Front-end deals with the use of the BW - writing queries, workbooks, web (although I think some of the infrastructure aspects of web reporting. e.g. javascript/templates might really could be considered backend).  Think of Front-end as all of the client/customer/user facing components.

  • Refresh table and display the records after insertion of data from back end

    Hi Experts,
    JDEV 11.1.2.1
    I have a useacase which needs data to be inserted from oracle back end procedure and displayed in a ADF Table Component, when a button is pressed.
    is this possible?..if yes , how?
    Is view object will automatically refreshed and fetches newly created(from back end) rows?
    thankz in advance
    PMS

    Hi user707,
    thankz for ur reply....
    i think after executing a procedure you want to call commit operation. better you can perform this.getDbtransaction().commit In Application Module;yes i want to commit transaction after executing back end procedure using preparedStatement.Procedure is for inserting data into same table , which used for creating VO and Read only ADF Table.Procedure is executed fine, but newly created records are not getting into ADF table.Once i did commit opeartion inside back end procedure, whole records are getting into ADF Table.
    Is there any way to get whole records without doing Commit operation inside Back end procedure?
    PMS

  • How to know through back end employee position in Requisition approval

    Hi all,
    I have one Employee_id ,how to know this employee has a authority to approve the requisition through back end. what is the link between
    per_all_people_f and PO_POSITION_CONTROLS_all.
    Thanks

    hi
    I have one small doubut, what is the differnce in the PO_Requisiiton_headers_all Table Have PREPARER_ID and PO_action_history table Have Empolyee_id and also in po_action_history have created by .what is the main differnce between thease three PREPARER_ID,empolyee_id and created_by .
    Ex :- select created_by,last_updated_by,PREPARER_ID,creation_date,last_update_date
    from apps.po_requisition_headers_all where requisition_header_id=6731548
    O:P- created by last_updated_by prepaper_id creation_date last_update_date
    1216 83867 72208 5/26/2009 8:48:59 AM 5/26/2009 12:41:19 PM
    select created_by,last_updated_by,employee_id,action_code,creation_date,last_update_date
    from apps.po_action_history where object_id=6731548 order by sequence_num
    CREATED_BY, LAST_UPDATED_BY, EMPLOYEE_ID, ACTION_CODE, CREATION_DATE, LAST_UPDATE_DATE
    1216, 1216, 72208, IMPORT, 5/26/2009 8:48:59 AM, 5/26/2009 8:49:27 AM
    1216, 1216, 72208, SUBMIT, 5/26/2009 8:55:41 AM, 5/26/2009 8:55:41 AM
    1216, 1216, 72208, RESERVE, 5/26/2009 8:55:41 AM, 5/26/2009 8:55:42 AM
    1216, 1216, 72208, FORWARD, 5/26/2009 8:55:42 AM, 5/26/2009 8:55:43 AM
    1216, 83867, 72208, APPROVE, 5/26/2009 8:55:43 AM, 5/26/2009 12:41:13 PM
    My Mian Problem is why same employee forward him self to approve the requisiiton.
    but his last updated_by is different.
    I am not Understanding the functionality of this .
    Thanks

  • Deletion of filter components from Bex Report in BI 7.0 via back end.

    Hi,
    I want to delete 2 filter field components from the BI 7.0 report via back end. Im using the Tcode RSZDELETE and giving the variable element UID, Inforprovide name, query tech name. But when i excute it says empty selection.
    Other than this is there any way to delete query components at back end???
    Regards,
    Nisha

    Thanks for the reply!
    This is to delete the variable created??
    My requirement is query specific , the restriction on the IO , ie the variable to be removed via back end.. that means deletion from that report..
    hope my statement is clear enough to give me some light .
    Thanks
    Nisha

  • Client Copy back-end system

    Hi Guys,
    We have made a client copy of the back-end system of SRM (SRM 5.0). Only the back-end and not SRM has been copied.
    After replication all the master- and customizing data again to SRM from the 'new' back-end I have found an issue with updating the suppliers.
    It seems that I can not remove old business partners from SRM with BUPA_TEST_DELETE if these are used already in SC's. However the new copy of the back-end system has completely different suppliers we need to use in SRM. This causes for an inconsistency with the supplier numbers, as we want to keep the R/3 numbers in SRM.
    Does anyone has a good idea how to proceed? That is, how can I remove the business partners (suppliers) in SRM which were used before the client copy of R/3, so that I will be able to completely get all the relevant 'new' vendors from the R/3 system after the client copy.
    When I execute BUPA_TEST_DELETE it will end up in error saying the suppliers can not be removed. Do I need to archive all the old documents (SC & PO) before I can remove all vendors in SRM, or is there a way to force the removal of all the business partners from before the back-end client copy?
    Thx.
    Skander

    Hi,
    I already figured out how to solve the issue.
    For anyone who wants to know how to:
    -First clear the vendor groups in the vendor hierarchy; do not renove the root node
    -Then run BBPGETVD which will get you the new vendors from the back-end; for me only role LF for suppliers.
    -Then run BBPUPDVD which will update all the fields for the old business partner numbers in SRM which were used in documents, and replicated from the old back-end system.
    In my case I had to play a litlebit with the setting 'only creditors', to update BP numbers which were not suppliers in the new back-end.
    After performing these steps everything should be fine.
    So it's perfectly possible to make a client copy of only the back-end system without copying SRM (in the classic scenario that is).
    Rgds,
    Skander

  • Dynamically switch back-end servers...

    Hi, ours is a middleware layer that connect directly to back-end systems. There
    is a new layer coming in between our layer and one of our back end system. I want
    to device a system that will skipp this layer and directly start communicating
    to the back-end programatically. That is at run time without getting the servers
    down and changing the configuration to send to the back end system straight.
    One way of doing this is shared memory where it read a value and depending on
    this value set will route requests thru this new layer or directly send it to
    backend. My only concern is, under high load conditions multiple processes of
    the same server instance will keep on accessing this value. May be there are lot
    other ways of doing this programmatically.
    I want to know if there is any other way of doing this in the tuxedo environment?
    thanks,
    Sachin.Rane

    Hi Sachin,
    You don't give details of your configuration (i.e. SSSQ or MSSQ) but perhaps the
    following will work:
    Include an additional service that is unique to your server (e.g. "ADMIN<servername>")
    and when you want to switch make a call to that service (using ud32, or write
    your own client). In this way the server will only act on receiving the message,
    and will not have to keep checking shared memory.
    Let us know if this solves your problem - if not please describe the situation
    in more detail (for example, is the additional layer Tuxedo-based? etc.).
    Malcolm.
    "Sachin Rane" <[email protected]> wrote:
    >
    My requirements is not this. I want skip this layer between my layer
    and backend
    when I want to. It is not as if I want to switch at start up if I am
    not able
    to connect but to change the connection when I want to and no longer
    use it again.
    "roopesh" <[email protected]> wrote:
    You can put the logic inside tuxedo servers tpsvrinit function
    to dynamically connect to the backend and when connection fails
    then it will retry for a specified no of times to that backend
    before taking connections to the backup database.
    "Sachin Rane" <[email protected]> wrote:
    Hi, ours is a middleware layer that connect directly to back-end systems.
    There
    is a new layer coming in between our layer and one of our back end
    system.
    I want
    to device a system that will skipp this layer and directly start communicating
    to the back-end programatically. That is at run time without getting
    the servers
    down and changing the configuration to send to the back end systemstraight.
    One way of doing this is shared memory where it read a value and depending
    on
    this value set will route requests thru this new layer or directlysend
    it to
    backend. My only concern is, under high load conditions multiple processes
    of
    the same server instance will keep on accessing this value. May bethere
    are lot
    other ways of doing this programmatically.
    I want to know if there is any other way of doing this in the tuxedo
    environment?
    thanks,
    Sachin.Rane

  • JSP back-end interface to Remote server. Please help the newbie

    Could someone comment on pros and cons of the JSP back-end interfaces to the remote server/programs using..
    (1) Socket Interface between JSP and Remote Server. One socket for one JSP session. JSP to create and delete the socket when done.
    (2) RMI between JSP and Remote program.
    (3) Message Exchange using JMS between JSP and the Remote Server.
    (4) Peer-to-peer JAXM message exchange. JSP/JAXM Client to Remote JAXM Server
    (5) Anything else?
    Thanks in advance..

    (1) Socket Interface between JSP and Remote Server.
    One socket for one JSP session. JSP to create and
    delete the socket when done.JSPs are compiled to servlets, which use the HTTP protocol. The remote server should be the servlet/JSP engine.
    (2) RMI between JSP and Remote program.As soon as you say "JSP", you're assuming HTTP request/response. If you want to talk to RMI objects, I think that's best done elsewhere than a JSP. They really should be for interface only. Have your JSP talk to a central, front controller servlet and have it invoke methods that deal with RMI objects or EJBs or POJOs on the back end. That stuff doesn't belong in JSPs, IMO.
    (3) Message Exchange using JMS between JSP and the Remote Server.No.
    (4) Peer-to-peer JAXM message exchange. JSP/JAXM
    Client to Remote JAXM ServerNo. This is crazy. JSP = HTTP, which is client/server by definition.
    (5) Anything else?All these might be fine options, but they don't belong in JSPs. Those should be for Web interface, a thin client. The details of how you process (e.g., RMI vs. EJB, synchronous vs. asynchronous, etc.) are best encapsulated somewhere else besides a JSP.
    HTTP is a client/server, synchronous, request/response protocol, of course. As soon as you say JSP, these assumptions are built into your system. You can do asynchronous processing, but you still have to send back a response synchronously (e.g., "Your order is being processed. Please come back.")

  • What is BW Front-end and Whats BW Back-end? Technica ? Functional?

    Hi Gurus,
    Can some one throw light on the diff between a BW Front-end and BW BAck-end? How will u diff the responsibilities of a Functional BW Consultant and Technical BW Consultant?
    thanks
    kishore karnati

    Hi,
    BW Front end is the one that deals with reporting. Eg: BEx
    BW back end is the one that deals with the components that stores data which is used for the reporting purpose.
    Eg: R3
    Functional consultant comes into picture when there is a need to understand the functional aspects of a requirement, say for example, you have a requirement to use Sales Order in your BW application, as a pure BW person, you wont know what a Sales Order is about. A functional consultant has the ability here to map the sales order requirement in the BW application. This means that, he knows what field and what table this sales order relates to. This way, a functional consultant maps the user requirements to the technical detail in the system.
    A pure BW consultant is one who knows how to setup data extraction from source system , how to build various components in a BW system, how to schedule a load, how to troubleshoot in case of any issues in the BW application.
    Hope this helps..
    Assign points if this helps...
    Thanks,
    Raj

  • Vendor Replication and Different Back-end Systems

    Hello,
    Currently, we have vendor replication were the vendor number from the back-end is used in SRM-EBP.  Now, we want add another back-end but there are vendor number conflicts.  Is there a way to configure it so that the new back-end replicaition generates new numbers in SRM-EBP? 
    Honestly, there should be a cleansing and alignment of vendor numbers between the two back-end systems. However, that is big task that the organization doea not want to take on at this time.
    Has anyone encounter this issue and how did you resolve it?
    Regards, Dean.
    Edited by: Dean Hinson on Feb 3, 2010 3:26 PM

    Hi,
    You can find option "If R/3 number assignment is not possible: Internal number assignment" in the bottom of BBPGETDV transaction screen.
    Regards,
    Masa

  • About back-end adapter and IDoc

    Hi everybody!
    I was watching in the FAQ of Mobile 7.1 about the possibility to use IDOC as a mechanism to push data to DOE, but this document only says: "IDocs are supported only for back-end-triggered scenarios" and provides a link to configure ALE between the backend and DOE, but the link doesn't work. (Somebody has this information on a link that works?)
    I'm trying to find any information, blog, article, how-to guide, however I cant found anything. Anybody has documentation about how to configurate and implement a backend-adapter to push data from the backend through IDOC? Any information will be welcome.
    Thanks in advance.
    Best regards,
    Simon.

    Hi San,
    You will have to look after this in Tansaction SE80. Open the BSP application cProjects, and find the appropriate view. (The naming convetion will help a little). Open the view tab: layout >> e.G. progAssignedPha.bsp Here you will find what BSP elements it consists of. You will find the
    <htmlb:tableView and <htmlb:inputField ... elements.
    Here you will find the information you are looking for.
    As easy as in SAPGui you can not find out this information.
    Regards.

  • Creating a connection between the GUI and a program's back end

    I have created a program (over 50 classes) and am currently a little confused as to how I should connect the back end of my program (the real functionality) to my front end (the GUI). Currently I am thinking about using a list of event listeners in my back end that will announce when certain events have completed and thus front end can handle the updates accordingly.
    But I want to ensure that the back end doesn't "know" about the front end. In other words, I would like to ensure that the back end and the front end are as independent/modular as possible.
    Can anyone make some suggestions besides event listeners?
    Thanks,
    Timmers

    From what I am able to ascertain from your post, you would advocate using EventListeners in the back end (in same VM) to inform the GUI of changes?
    Is this the commonly accepted way of communicating your back end functionality to your front-end (GUI)?
    I've read that all EventListeners are part of a single thread. So what happens if two events occur simulataneously in the back-end. Do those events get queued or do some of them get lost?
    Thanks,
    Tim
    If the back-end changes state asynchronously to the
    front-end GUI (ie does work in background threads and
    then notifies the front-end when something happens),
    then you should make it send events when this happens.
    The basic concept is the same for CORBA, RMI, JINI,
    or running everything in the local VM.
    To do this you define a set of events (or maybe you
    can use the java.beans.PropertyChangeEvent) and
    listener interfaces. The front-end then registers to
    receive events (probably via an addXXXListener()
    method in the back-end). You would have to have a
    class (or classes) in the front-end that implemented
    the event listener interfaces to receive the events.
    If you are using a distributed technology (CORBA, RMI,
    JINI, ...) the concept is the same, but the event
    mechanisms are slightly different.
    To notify the back-end of state changes in the
    front-end you probably can just do plain old method
    calls from the front-end to the back-end.

Maybe you are looking for

  • Runtime error F110

    Hello Gurus, I got an error while running F110 (automatic payment program). I reviewed previous posts but couldn't find something from which I could get any help. In the job log, everything else looked ok except the following: Company code is not ass

  • Selection OPTION: Date input problem in Module POOL through Subscreen

    Dear ALL, Being new to ABAP, I am struck in a Problem. Requirement: I want an option on the Screen( My Screen 9000) for Date Range. Through this Date-Range I want to filter and pull some data from Database. As Date Range Selection option is possible

  • Derivation rule - Table look up

    Hi All, Can u explain about the Table look up, Move and Clear options in derivation rule. What type of Fields can be looked up, Moved and cleared to what characters? Can u advise me for detailed study. Regards

  • Imac 8.1 OS X 10.5.8 reboot loop at startup

    I have an Imac 8.1 running OS X 10.5.8 After I had shut it down yesterday I'm doing a start-up end it ends up in loop of rebooting. So I hear the chime it loads for a while (apple plus loader), then the screen goes black and restarts again, and that

  • What is the difference between Hardware Encryption & On-Board Encryption & Device Encryption

    Hi Can anyone explain me, What is the difference between Hardware Encryption & On-Board Encryption & Device Encryption. Thanks