How can I change order of songs in a playlist from alphabetical. I'm using v. 10.7. In a previous version I could drag the songs into any order, but this doesn't work anymore.
The playlists in version 10.7 always put the songs in alphabetical order rather than the order in which I add them. With my older version I could re-order them by dragging them. With this one they just pop back into alphabetical.
It turns out that by clicking a little arrow to the left of "name" on the header, the titles can be unalphabetized.
Similar Messages
-
How do I transfer PDF files from PC (Windows 7) to IPAD using Itunes 12.1.2. I would like to do files manually rather then auto synch. Previous versions let me drag file in Itunes to Ipad and files appeared under Ibook and then I could move them to an appropriate collection title. The interface appears to have changed in the latest ITunes version and I am not sure what the proper procedure is.
King_Penguin - Thanks it worked perfectly. I had my pdf files copied into ITunes on my PC but when I clicked on a pdf file to copy it I thought the sidebar would appear with my IPAD name and then I would drag it over. I didn't realize that I needed to click-and start dragging it towards the left-hand side for the sidebar to appear. It worked like a charm - THANKYOU!!!
-
I can't seem to get my iMac (late 2009 model) into automatic sleep mode. If I manually put it into sleep I don't have any issues.
I used to solve the issue by running "PleaseSleep" application but that doesn't work anymore since Lion. I now want to fix the underlying problem.
I'm not running any weird background processes and in my energy saver settings I've tagged "put the hard disk to sleep when possible:, "allow power button to put computer to sleep" and "automatically reduce brigthness". All pretty standard.
Is there anyone who can give me some pointers ?Today I solved the same problem for my iMac running Snow Leopard. See https://discussions.apple.com/thread/3008791#15947706. The method may help you, too.
For me it was the DynDNS Updater preventing my iMac from automatically entering sleep mode.
To my knowledge the cause of this sleep problem can only be a peripheral device or a process. So I suggest to first unplug all peripherals and test whether that's the cause. If not, I suggest to terminate one process after another and to test automatic entering of sleep mode after each. Start with user processes; continue with system process if necessary.
At least that's the way I found the offending process. Fortunately, I was able to change the configuration of that process to allow again automatic entering of sleep mode.
Good luck! -
I changed my password and used the new computer, next time I tried to log in it wouldn't accept the password. I tried the old one as well but that doesn't work either. Can anyone help?
Boot to the Recovery HD:
Restart the computer and after the chime press and hold down the COMMAND and R keys until the menu screen appears. Alternatively, restart the computer and after the chime press and hold down the OPTION key until the boot manager screen appears. Select the Recovery HD and click on the downward pointing arrow button.
When the menubar appears select Terminal from the Utilities menu. Enter resetpassword at the prompt and press RETURN. Follow instructions in the dialog window that will appear.
Or see Reset a Mac OS X 10.7 Lion Password and OS X Lion- Apple ID can be used to reset your user account password.
Be sure to open Keychain Access and repair the keychain:
Assuming that you are using a recent build of OS X, go to /Applications/Utilities and launch the app called Keychain Access. Go to the Window pulldown menu and select "Keychain First Aid". Enter your password, set the radio button to "Repair", and click "Start". -
How can I change game centre and iCloud account information from previous owner of my iPad?
How can I change game centre and iCloud account information from previous owner to me?
You can't do it on your own. The previous owner has to erase the device for you. You would need his Apple ID and password in order to delete his iCloud account. This is due to the Activation Lock in iOS 7 - assuming that your iPad is running iOS 7.
Contact the owner and ask home to erase it remotely using iCloud, or return the device and ask for your money back. If you can't contact the pervious owner, you will have a useless iPad on your hands.
Read this for more information. This is what you need the previous owner to do.
What to do before selling or giving away your iPhone, iPad, or iPod ... -
I want to Open a PDF attachment in iBook, but it doesn't work anymore.
I want to Open an Email attachés PDF in my iBook. Just do ist like always, but it doesn't work anymore.
Can you help me.
ThanksTry quitting the iBooks App completely, restart the iPad and see if that helps.
Go to the home screen first by tapping the home button. Quit/close iBooks by double tapping the home button and the task bar will appear with all of you recent/open apps displayed at the bottom. Tap and hold down the iBooks icon until it begins to wiggle. Tap the minus sign in the upper left corner to close the apps. Restart the iPad.
Restart the iPad by holding down on the sleep button until the red slider appears and then slide to shut off. To power up hold the sleep button until the Apple logo appears and let go of the button. -
I already made an accoount, so how can I change it so that I do not have to choose a type of credit card. Cause it does not give me the option of NONE
Did you follow the instructions on that page exactly ? The instructions work for me e.g. selecting a free app in the App Store app and tapping on 'free', then 'install app' and 'create new apple id' - filling in my details then gave a 'none' option on the payment details :
-
At the moment I can use my apple Id on my iPod touch to connect to iCloud and IMessage and FaceTime but it doesn't work on App Store & iTunes just on iPod Face to an error: can not connect to iTunes Store. (Setting... itunes & app store)What's wrong? My apple Id is working on my MacBook Pro as well. And it was working on this iPod before resetting . Just after resetting I can not connect to App Store & iTunes and I can not instal any app even free apps
Try
Can't connect to the iTunes Store -
I lost my iPhone 5S battery percentage after I upgrade the system to the newest one. I do turn on the percentage in battery usage, but it doesn't work. I also tried to restart my phone but nothing changed. Could somebody please help me? Thank you!
You did turned in Settings > General > Usage > Battery Percentage: ON?
Try a
Reset: Hold down the Sleep/Wake button and the Home button at the same time for at least ten seconds, until the Apple logo appears. Note: You will not lose any data -
How can I hide an app from the list of purchased apps using iOS6? With iOS 5 you can swipe the icon to display a red Hide icon, but this doesn't work with iOS 6. Suggestions (that work) will be appreciated.
Yes. On a computer. Not ios6.
On iTunes on your computer under purchased, select the x on the top corner. That will hide them. -
Hİ
My ipad's screen is black. When it take charge, I can hear sound but still black. I press and hold both the sleep and home buttons for about 10 to 15 seconds but this doesn't work. Screen still black! PLS HELP ME!How long did you let it charge? It may take 30 minutes before the iPad responds when the battery is completely drained. Let it charge for at least 30 minute using the wall charger. Then rest the iPad. Press and hold both the Home button and the Sleep/Wake button continuously until the Apple logo appears. Then release the button and let the device restart. You will not lose data doing this. It's like a computer reboot.
If the iPad restarts let it continue to charge until the battery is 100%.
If the iPad still does not start make an appointment at an Apple Store to have your device examined by a technician. Or contact Apple Support. -
The main button of my Iphone 5 doesn't work anymore. do you have a solution? thanks
The main button of my Iphone 5 doesn't work anymore. do you have a solution? thanks
Get a replacement phone. If it is still covered by warranty it will not cost anything. See: https://selfsolve.apple.com/agreementWarrantyDynamic.do
-
My Ipad2 won't turn off. I have tried the reset method by holding both buttons down for at least 10 seconds, but this doesn't work. I can't get onto the internet via wi-fi either (don't have a 3G card fitted). All other functions seem to be working OK including charging. Not had this problem before, but I recently upgraded software to 5.1.1 so is there a bug in there somewhere?
Look at last link.
Look at iOS Troubleshooting Wi-Fi networks and connections http://support.apple.com/kb/TS1398
iPad: Issues connecting to Wi-Fi networks http://support.apple.com/kb/ts3304
iOS: Recommended settings for Wi-Fi routers and access points http://support.apple.com/kb/HT4199
Additional things to try.
Try this first. Turn Off your iPad. Then turn Off (disconnect power cord) the wireless router & then back On. Now boot your iPad. Hopefully it will see the WiFi.
Go to Settings>Wi-Fi and turn Off. Then while at Settings>Wi-Fi, turn back On and chose a Network.
Change the channel on your wireless router. Instructions at http://macintoshhowto.com/advanced/how-to-get-a-good-range-on-your-wireless-netw ork.html
Another thing to try - Go into your router security settings and change from WEP to WPA with AES.
How to Quickly Fix iPad 3 Wi-Fi Reception Problems
http://osxdaily.com/2012/03/21/fix-new-ipad-3-wi-fi-reception-problems/
If none of the above suggestions work, look at this link.
iPad Wi-Fi Problems: Comprehensive List of Fixes
http://appletoolbox.com/2010/04/ipad-wi-fi-problems-comprehensive-list-of-fixes/
Fix iPad Wifi Connection and Signal Issues http://www.youtube.com/watch?v=uwWtIG5jUxE
Unable to Connect After iOS Update - saw this solution on another post.
https://discussions.apple.com/thread/4010130?tstart=60
Note - When troubleshooting wifi connection problems, don't hold your iPad by hand. There have been a few reports that holding the iPad by hand, seems to attenuate the wifi signal.
~~~~~~~~~~~~~~~
If any of the above solutions work, please post back what solved your problem. It will help others with the same problem.
Cheers, Tom -
Using my iMac, I'm trying to log onto another PC at a remote location whilst in VNC mode. Control-Alt-Delete is the request, but this doesn't work. Any clues??
Thanks, great work... I think that's where I was headed!
-
Both Google and Yahoo accounts have a box which says "Stay Signed In", but this doesn't work. Why?
When I try to go to these accounts, they continue to ask me to provide Username and Password, but I've checked the "Stay Signed In" box each time.Websites remembering you and automatically log you in is stored in a cookie.
* Create an allow cookie exception (Tools > Options > Privacy > Cookies: Exceptions) to keep such a cookie, especially for secure websites and if cookies expire when Firefox is closed.
* In [[Private Browsing]] mode all cookies are session cookies that expire if that session is ended, so websites won't remember you.
* Do not use [[Clear Recent History]] to clear the "Cookies" and the "Site Preferences"
Clearing "Site Preferences" clears all exceptions for cookies, images, pop-up windows, software installation, and passwords.
* http://kb.mozillazine.org/Cookies
Maybe you are looking for
-
hi guys, im tryin to open a file then add changes to the end of it, at the mo im using the following but it doesnt add to the end, any ideas? try { BufferedReader br = new BufferedReader(new FileReader("H:\\new folder\\TransactionFile.txt")); Bu
-
How to get the coordinate of any character in just a single text frame?
I am using Illustrator CS5. Better solutions in c# language.
-
ABAP Proxy caught cx_ai_system_fault but its ErrorText is empty
Hi All, I have Proxy->WS Synchronus scenario. I can see both ( Reqest and Response) messages in MONI of both my PI and QA-ECC Server. However my proxy call do no return the result. I debuged my program in QA-ECC system the proxy call code cat
-
Can't drag files from a DVD I burned
I transfer files off of my hard drive to conserve space from time to time. After burning the files to a DVD I am now unable to drag the files off the disk and transfer them back to my hard drive. I can only read them from the disk. What am I doing wr
-
Now I have to: 1) click again on the stupid blue star to get the menu to place my new bookmark where I choose to instead of have it go to unsorted bookmarks... OR 2) bring up or have up the menu bar and click on the "bookmarks" menu choice of "bookma