As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
Regards,
Ranjan
Dear,
Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
This quota arrangement is also specific to material and plant level.
Quota rating = quota allocate quantity + quota base quantity / quota.
Quota based quantity used only when a new vendor introduced.
In the as on date situation, the minimum quota ratings will considered as preferred vendor.
The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
Regards,
Syed Hussain.
Similar Messages
-
How SAP calculate the outstanding PO quantity and amount.
how SAP calculate the outstanding PO quantity and amount.
Hi Arun Raj,
APO does not calculate the open qty.
Only the open qty of the PO is ciffed to APO from R/3.
Regards,
Ashok -
How to Calculate the TDS Base on Journal Entry
Hello Experts,
Is it Possible calculate TDS base on Journal ENtry through our TDS Addon ?
Dixit PatelHi Rahul,
Thanks for Reply,
My Client do not create the Payment B'coz He do not given the payment to party and also do not create the invoice b'coz invoice entry appearing in the Purchase analysis
So What i have suggest to my client
Dixit Patel -
Ck11n:how to calculate the Quantity?
Dear all.
I use the tcode ck11n to create material cost estimate with quality structure.
And input the parameter like below:
Material = 600000-000000-0012
plant = 1000
Costing Variant = PPC1
Costing Lot Size = 1
After press return,the sap show the Itemization for material like below:
20.11.2008 Dynamic List Display 1
Itemization for material 600000-000000-0012 in plant 1000
Material 600000-000000-0012
Plant 1000
Costing Variant PPC1 Standard Cost Est. (Mat.)
Costing Version 1
Costing Date from-to 01.12.2008 - 31.12.9999
Lot Size 1 KARCarton
Cost Base 1 KARCarton
Cost of Goods Manufactured
ItmNo
ItemCat
Resource
Cost Eleme
Total
Fixed
Currncy
Quantity
Un
1
E
J0103033 WC1 A03
1001
14,400.00
7,200.00
CNY
3,600
CAR
2
E
J0103033 WC1 A01
1001
25,200.00
10,800.00
CNY
3,600
CAR
3
E
J0103033 WC1 A02
1001
14,400.00
7,200.00
CNY
3,600
CAR
4
E
J0103033 WC1 A04
1001
14,400.00
7,200.00
CNY
3,600
CAR
5
E
J0103033 WC1 A05
1001
14,400.00
7,200.00
CNY
3,600
CAR
6
M
1000 600000-000000-0013
40000002
9.00
0.00
CNY
3
CAR
7
G
CC_AT01 41000001
41000001
2.25
0.00
CNY
82,811.25
39,600.00
CNY
At the first line,the Resource was "J0103033 WC1 A03",and the Quantity was "3600".
I don't know why the Quantity was "3600" or where the Quantity come from?
So I need someone tell me how to calculate the Quantity?
Thank you so much.
Regards
YodaHi,
Pl note the Item Category, " M "- Material - The 3 quantity has been picked up from BOM correctly.
You are referring to Quantity 3600, which is against item category - E. Item category " E" means Internal activity allocation i.e the date flows through assignment to Routing. Check the Work center, Cost center & Activity types J0103033 WC1 A03 1001.
Now i think it is clear.
Cheers !
Siva
Cost of Goods Manufactured
ItmNo ItemCat Resource Cost Eleme Total Fixed Currncy Quantity Un
1 E J0103033 WC1 A03 1001 14,400.00 7,200.00 CNY 3,600 CAR
2 E J0103033 WC1 A01 1001 25,200.00 10,800.00 CNY 3,600 CAR
3 E J0103033 WC1 A02 1001 14,400.00 7,200.00 CNY 3,600 CAR
4 E J0103033 WC1 A04 1001 14,400.00 7,200.00 CNY 3,600 CAR
5 E J0103033 WC1 A05 1001 14,400.00 7,200.00 CNY 3,600 CAR
6 M 1000 600000-000000-0013 40000002 9.00 0.00 CNY 3 CAR
7 G CC_AT01 41000001 41000001 2.25 0.00 CNY -
Hi all
How to calculate the salary of the employees when they are differentiated by monthly and hourly basis
How can we write the logic though sql
Thanks in advance(case when pay_basis like 'HOURLY'
then PROPOSED_SALARY_N*pay_annualization_factor
when pay_basis like 'ANNUAL'
then PROPOSED_SALARY_N*pay_annualization_factor
end )
I was actually trying to write the logic in this way but it was not calculating in correct format for hourly paid employees -
How to calculate the unit for RATE?
Hey All,
I am not sure if there is something standard for this or not.
I am calculating the 'Rate' by using 'Value/Amount' and 'Quantity' as follows -
Rate == Value / Quantity
I need to calculate the unit for the rate as below -
Rate unit == Value unit (Currency) / Quantity unit (Base_uom)
(for example -
if value is 1000 USD and quantity is 10 TO then Rate should come out as 100 USD / TO)
Could anyone please suggest how to calculate the unit in this case?
Many Thanks!
TanuHi,
Go through the below link it may give some idea
http://help.sap.com/saphelp_nw04/Helpdata/EN/19/1d7abc80ca4817a72009998cdeebe0/content.htm
Regards,
Marasa. -
How to calculate the average inventory in ABAP
Dear All,
Please find the below formula and this formula how to calculate the Average inventory at value.Please let me know the abap base tables and the corresponding fields.
Formula
Inventory Turnover = Cost of Goods Sold (COGS) / Average Inventory at value.
Thanks
Regards,
SaiHi Arivazhagan,
Thanks for your quick response .
The field MBEWH from the table is fulfill the average inventory at value.
For Eg :I want to calculate Inventory Turnover = Cost of Goods Sold (COGS)/
Average Inventory at value.
so shall i take Inventory Turnover = Cost of Goods Sold (COGS)/MBEWH
The above formula will meet my requirement to find the average inventory Turnover.
Thanks
Regards,
Sai -
Hello everyone ,
I need a quickly help that as below :
I am trying use PCI-6220 to acquired six signals from one rotation encoder (channel A, channel B,channel Z ,and their non-signals) .The encoder out signals will be square wave and 4000pulses per revolution. I set it rotation at 300rpm speed. I need show every square wave of six out channels in waveform and measure the A-B phase difference to check if the value is correct (designed value should be 90deg) .
I have no idea how to measure or calculate the phase difference of two square wave base on synchronizate to acquire these two square wave from two channel on the PCI-6620....
Anyone can give a idea how to calculate the phase difference with two square wave ?
Thank a lot and Thanks again...
TimTim,
Here is a simple rising edge detector for one channel.
Lynn
Attachments:
Rising edge.vi 15 KB -
How To Get The Total Delivered Quantity of a Sales Order
Hello All,
I have a requirement of getting the total delivery quantity of the sales order .I have checked it in LIps table but I am getting partially delivered quantity for a schedule line item.Can any one tell me how to get the total delivered quantity.
Regards,
Pavani.Hi
Check the Table:
VBEP - Sales Document: Schedule Line Data.
Inside the table check the Quantity Fields.
Regards,
Sreeram -
How to calculate the Current APC (Acquisition and Production Cost)
Hi,
Please help me how to calculate the Current APC.
The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line Acquisition Value and column Posted values.
I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
Please help me.
Thanks in advance,
SatishHi,
you'll find the logic in fm FI_AA_VALUES_CALCULATE
A. -
How to calculate the Current APC
Hi,
Please help me how to calculate the Current APC.
The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line Acquisition Value and column Posted values.
Thanks in advance,
SatishHi,
I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic where it is being done.
Please help me.
Thanks in advance,
Satish -
How to calculate the Daily Call Volume
Hello,
Can anyone please advise how to calculate the daily call volume in a contact center - the counts of the calls terminated in ICM ?
Is there any webview report or a SQL query which provides the count ?
Many thanks in advance for the help!
Thanks & Regards,
NareshThe ICM software generates a Termination_Call_Detail record for each call that arrives at the peripheral. From This report you can get the number of calls to ICM as well as the call details.
To get the report run this sql query
select * from dbo.t_Termination_Call_Detail where convert (varchar(10), DateTime, 101) = '12/03/2010' -
How to calculate the variance in PO price history?
hi
i hav standard report ME1P, since i need to do some modifications in this program i copied to Y prgrm,,,'
im getting all the values properly...
but my prblm is im not getting how to calculate the variance? im not getting the logic behid it...
can anybody expln me in breif plz....
Regards
SmithaHi Venu,
there is another way as well, however, you won't be able to see Variance and Variance% as a saperate keyfigure which is not under the period. Thats the reason I didn't mention it earlier.
What you can do is, Drag the period to the columns, Now create a structure that has the two keyfigures std price, moving price. Here if you add Variance and Variance%, Then these CKF's would come under period as well, which you don't need. And the system won't allow you to add these CKF's outside this structure. The reason being because the interpretation of the data then wouldn't make any sense here. You can create a new structure as well with these CKF's but they would become a subpart of your previous structure.
choose the required characteristics in the Rows section. Save it.
Let us know, Sorry man, can't help u much at this problem.
regards,
Sree. -
How to calculate the individual sums of multiple columns in a single query
Hello,
Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
Will appreciate any help or suggestion.
Thanksuser13667036 wrote:
Hello,
Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
Will appreciate any help or suggestion.
ThanksLooks like you want a simple group by.
select
yr
, mnth
, region
, sum(handled_package)
, sum(expected_missing_package)
, sum(actual_missing_package)
from test
group by
yr, mnth, region
order by
yr, mnth, region;I wouldn't recommend storing your data for year / month in 2 columns like that unless you have a really good reason. I would store it as a date column and add a check constraint to ensure that the date is always the first of the month, then format it out as you wish to the client.
CREATE TABLE test
year_month date,
Region VARCHAR2(50),
CITY VARCHAR2(50),
Handled_Package NUMBER,
Expected_Missing_Package NUMBER,
Actual_Missing_Package NUMBER
alter table test add constraint firs_of_month check (year_month = trunc(year_month, 'mm'));
ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
2 Values (to_date('2012-nov-12', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
ERROR at line 1:
ORA-02290: check constraint (TUBBY.FIRS_OF_MONTH) violated
Elapsed: 00:00:00.03
ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
2 Values (to_date('2012-nov-01', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
1 row created.
Elapsed: 00:00:00.01
ME_XE?select
2 to_char(year_month, 'fmYYYY') as year
3 , to_char(year_month, 'fmMonth') as month
4 , Region
5 , CITY
6 , Handled_Package
7 , Expected_Missing_Package
8 , Actual_Missing_Package
9 from test;
YEAR MONTH REGION CITY HANDLED_PACKAGE EXPECTED_MISSING_PACKAGE ACTUAL_MISSING_PACKAGE
2012 November Western San Fransisco 200 10 5
1 row selected.
Elapsed: 00:00:00.01
ME_XE?Then you have nice a nice and easy validation that ensures you data integrity.
Cheers, -
How to calculate the number of sent/received emails of a certain domain
Thank you for what you have helped me with!
How to calculate the number of sent/received emails of a certain domain in a certain period? It is Messaging Server 5.2, Directory Server 4.2. Is there a log option for this?
Thank you.Not sure where you find, "LOG_MESSSAGE_ADD". I don't actually find this option in the documentation.
The domains that mails are coming from and being sent to are certainly logged in the normal mail.log, so why mess with additional logging options? If you're talking about "LOG_CONNECTION", I actually see no additional data that is useful to you.
If you decide to change the option.dat, you do indeed need to
imsimta cnbuild (note, it's not cnrebuild)
imsimta restart
If I were facing the same issue, I'd be looking at the log parsing perl script, and simply modifying it to do what I wanted.
Maybe you are looking for
-
Data Not loaded from ap_invoice_lines_interface to the base table
Hi , Please I'm working on Interface which load invoices from Cobol system to oracle , anyway procedure is working on fine & all data is loaded to the interface as i'm inserting 4 attributes which is DFF on the invoice line level Now when i ran the i
-
Boot Camp on External Hard Drive
I have a 2008 Macbook Pro 15-inch running Lion(10.7.3). I want to install windows 7, but i want to use a external hard drive. Is that possible?
-
Message Mapping of Recursive Source Structure?
Hello, a mapping needs to be implemented from a custom source structure to an IDoc. An XSD has been provided for the source structures which contains recursive elements --> an element of a specific type contains another element with the same type. If
-
JTextfield input Date convert to java.sql.Date
Hi. I have a textfield for users to input date in 'dd/mm/yyyy' format and I would like to format this input into java.sql.Date to be stored into a database. How should I go about doing that ? I did the following: SimpleDateFormat formatDate = new Sim
-
Hi, i got below issue while i am entering transactions 01A shares investment maintain the assignment of position management procedures. please suggest me how to configure this with regards raju