How to calculate the quota base quantity in quota arrangement?

Hi all,
As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
Regards,
Ranjan

Dear,
Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
This quota arrangement is also specific to material and plant level.
Quota rating = quota allocate quantity + quota base quantity / quota.
Quota based quantity used only when a new vendor introduced.
In the as on date situation, the minimum quota ratings will considered as preferred vendor.
The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
Regards,
Syed Hussain.

Similar Messages

  • How SAP calculate the outstanding PO quantity and amount.

    how SAP calculate the outstanding PO quantity and amount.

    Hi Arun Raj,
    APO does not calculate the open qty.
    Only the open qty of the PO is ciffed to APO from R/3.
    Regards,
    Ashok

  • How to Calculate the TDS Base on Journal Entry

    Hello Experts,
    Is it Possible calculate TDS base on Journal ENtry through our TDS Addon ?
    Dixit Patel

    Hi Rahul,
    Thanks for Reply,
    My Client do not create the Payment B'coz  He do not given the payment to party and also do not create the invoice b'coz invoice entry appearing in the Purchase analysis
    So What i have suggest to my client
    Dixit Patel

  • Ck11n:how to calculate the Quantity?

    Dear all.
    I use the tcode ck11n to create material cost estimate with quality structure.
    And input the parameter like below:
    Material = 600000-000000-0012
    plant = 1000
    Costing Variant = PPC1
    Costing Lot Size = 1
    After press return,the sap show the Itemization for material like below:
    20.11.2008                            Dynamic List Display                                   1
    Itemization for material 600000-000000-0012 in plant 1000
    Material             600000-000000-0012
    Plant                1000              
    Costing Variant      PPC1               Standard Cost Est. (Mat.)
    Costing Version       1
    Costing Date from-to 01.12.2008 - 31.12.9999
    Lot Size             1                  KARCarton
    Cost Base            1                  KARCarton
    Cost of Goods Manufactured
    ItmNo
    ItemCat
    Resource
    Cost Eleme
    Total
    Fixed
    Currncy
    Quantity
    Un
    1
    E
    J0103033   WC1      A03
    1001
    14,400.00
    7,200.00
    CNY
    3,600
    CAR
    2
    E
    J0103033   WC1      A01
    1001
    25,200.00
    10,800.00
    CNY
    3,600
    CAR
    3
    E
    J0103033   WC1      A02
    1001
    14,400.00
    7,200.00
    CNY
    3,600
    CAR
    4
    E
    J0103033   WC1      A04
    1001
    14,400.00
    7,200.00
    CNY
    3,600
    CAR
    5
    E
    J0103033   WC1      A05
    1001
    14,400.00
    7,200.00
    CNY
    3,600
    CAR
    6
    M
    1000 600000-000000-0013
    40000002
    9.00
    0.00
    CNY
    3
    CAR
    7
    G
    CC_AT01    41000001
    41000001
    2.25
    0.00
    CNY
    82,811.25
    39,600.00
    CNY
    At the first line,the Resource was "J0103033   WC1      A03",and the Quantity was "3600".
    I don't know why the Quantity was "3600" or where the Quantity come from?
    So I need someone tell me how to calculate the Quantity?
    Thank you so much.
    Regards
    Yoda

    Hi,
    Pl note the Item Category, " M "- Material - The 3 quantity has been picked up from BOM correctly.
    You are referring to Quantity 3600, which is against item category - E. Item category " E" means Internal activity allocation i.e the date flows through assignment to Routing. Check the Work center, Cost center & Activity types  J0103033 WC1 A03 1001.
    Now i think it is clear.
    Cheers !
    Siva
    Cost of Goods Manufactured
    ItmNo ItemCat Resource  Cost Eleme Total Fixed Currncy Quantity Un 
    1 E  J0103033 WC1 A03 1001  14,400.00  7,200.00  CNY  3,600  CAR
    2 E  J0103033 WC1 A01 1001  25,200.00  10,800.00  CNY  3,600  CAR
    3 E  J0103033 WC1 A02 1001  14,400.00  7,200.00  CNY  3,600  CAR
    4 E  J0103033 WC1 A04 1001  14,400.00  7,200.00  CNY  3,600  CAR
    5 E  J0103033 WC1 A05 1001  14,400.00  7,200.00  CNY  3,600  CAR
    6 M  1000 600000-000000-0013 40000002  9.00  0.00  CNY  3  CAR
    7 G  CC_AT01 41000001  41000001  2.25  0.00  CNY

  • How to calculate the salary of the employees when they are differentiated by monthly and hourly basis

    Hi all
    How to calculate the salary of the employees when they are differentiated by monthly and hourly basis
    How can we write the logic though sql
    Thanks in advance

    (case when pay_basis like 'HOURLY'
    then PROPOSED_SALARY_N*pay_annualization_factor
    when pay_basis like 'ANNUAL'
    then PROPOSED_SALARY_N*pay_annualization_factor
    end )
    I was actually trying to write the logic in this way but it was not calculating in correct format for hourly paid employees

  • How to calculate the unit for RATE?

    Hey All,
    I am not sure if there is something standard for this or not.
    I am calculating the 'Rate' by using 'Value/Amount' and 'Quantity' as follows -
    Rate == Value /  Quantity
    I need to calculate the unit for the rate as below -
    Rate unit == Value unit (Currency) /  Quantity unit (Base_uom) 
    (for example -
    if value is 1000 USD and quantity is 10 TO then Rate should come out as 100 USD / TO)
    Could anyone please suggest how to calculate the unit in this case?
    Many Thanks!
    Tanu

    Hi,
    Go through the below link it may give some idea
    http://help.sap.com/saphelp_nw04/Helpdata/EN/19/1d7abc80ca4817a72009998cdeebe0/content.htm
    Regards,
    Marasa.

  • How to calculate the average inventory in ABAP

    Dear All,
    Please find the below formula and this formula how to calculate the Average inventory at value.Please let me know the abap base tables and the corresponding fields.
    Formula
    Inventory Turnover = Cost of Goods Sold (COGS) / Average Inventory at value.
    Thanks
    Regards,
    Sai

    Hi Arivazhagan,
    Thanks for your quick response .
    The field MBEWH from the table is fulfill the average inventory at value.
    For Eg :I want to calculate Inventory Turnover = Cost of Goods Sold (COGS)/
    Average Inventory at value.
    so shall i take Inventory Turnover = Cost of Goods Sold (COGS)/MBEWH
    The above formula will meet my requirement to find the average inventory Turnover.
    Thanks
    Regards,
    Sai

  • How to calculate the phase difference between two square wave (acquired from two channel in one DAQ)

    Hello everyone ,
     I need a quickly help that as below :
    I am trying use PCI-6220 to acquired six signals from one rotation encoder (channel A, channel B,channel Z ,and their non-signals) .The encoder out signals will be square wave and 4000pulses per revolution. I set it rotation at 300rpm speed. I need show every square wave of six out channels in waveform and measure the A-B phase difference to check if the value is correct (designed value should be 90deg) .
    I have no idea how to measure or calculate the phase difference of two square wave base on synchronizate to acquire these two square wave from two channel on the PCI-6620....
    Anyone can give a idea how to calculate the phase difference with two square wave ?
    Thank a lot and Thanks again...
    Tim

    Tim,
    Here is a simple rising edge detector for one channel.
    Lynn
    Attachments:
    Rising edge.vi ‏15 KB

  • How To Get The Total Delivered Quantity of a Sales Order

    Hello All,
    I have a requirement of getting the total delivery quantity of the sales order .I have checked it in LIps table but I am getting partially delivered quantity for a schedule line item.Can any one tell me how to get the total delivered quantity.
    Regards,
    Pavani.

    Hi
    Check the Table:
    VBEP  - Sales Document: Schedule Line Data.
    Inside the table check the Quantity Fields.
    Regards,
    Sreeram

  • How to calculate the Current APC (Acquisition and Production Cost)

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”.
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
    Please help me.
    Thanks in advance,
    Satish

    Hi,
    you'll find the logic in fm FI_AA_VALUES_CALCULATE
    A.

  • How to calculate the Current APC

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”. 
    Thanks in advance,
    Satish

    Hi,
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic where it is being done.
    Please help me.
    Thanks in advance,
    Satish

  • How to calculate the Daily Call Volume

    Hello,
    Can anyone please advise how to calculate the daily call volume in a contact center - the counts of the calls terminated in ICM ?
    Is there any webview report or a SQL query which provides the count ?
    Many thanks in advance for the help!
    Thanks & Regards,
    Naresh

    The ICM software generates a Termination_Call_Detail record for each call that arrives at the peripheral. From This report you can get the number of calls to ICM as well as the call details.
    To get the report run this sql query
    select * from dbo.t_Termination_Call_Detail where convert (varchar(10), DateTime, 101) = '12/03/2010'

  • How to calculate the variance in PO price history?

    hi
    i hav standard report ME1P, since i need to do some modifications in this program i copied to Y prgrm,,,'
    im getting all the values properly...
    but my prblm is im not getting how to calculate the variance? im not getting the logic behid it...
    can anybody expln me in breif plz....
    Regards
    Smitha

    Hi Venu,
    there is another way as well, however, you won't be able to see Variance and Variance% as a saperate keyfigure which is not under the period. Thats the reason I didn't mention it earlier.
    What you can do is, Drag the period to the columns, Now create a structure that has the two keyfigures std price, moving price. Here if you add Variance and Variance%, Then these CKF's would come under period as well, which you don't need. And the system won't allow you to add these CKF's outside this structure. The reason being because the interpretation of the data then wouldn't make any sense here. You can create a new structure as well with these CKF's but they would become a subpart of your previous structure.
    choose the required characteristics in the Rows section. Save it.
    Let us know, Sorry man, can't help u much at this problem.
    regards,
    Sree.

  • How to calculate the individual sums of multiple columns in a single query

    Hello,
    Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
    Will appreciate any help or suggestion.
    Thanks

    user13667036 wrote:
    Hello,
    Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
    Will appreciate any help or suggestion.
    ThanksLooks like you want a simple group by.
    select
              yr
         ,      mnth
         ,      region
         ,     sum(handled_package)
         ,     sum(expected_missing_package)
         ,     sum(actual_missing_package)
    from test
    group by
         yr, mnth, region
    order by      
         yr, mnth, region;I wouldn't recommend storing your data for year / month in 2 columns like that unless you have a really good reason. I would store it as a date column and add a check constraint to ensure that the date is always the first of the month, then format it out as you wish to the client.
    CREATE TABLE test
         year_month                              date,
        Region                     VARCHAR2(50),
        CITY                       VARCHAR2(50),             
        Handled_Package            NUMBER,       
        Expected_Missing_Package   NUMBER,   
        Actual_Missing_Package     NUMBER
    alter table test add constraint firs_of_month check (year_month = trunc(year_month, 'mm'));
    ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
      2  Values (to_date('2012-nov-12', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
    Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
    ERROR at line 1:
    ORA-02290: check constraint (TUBBY.FIRS_OF_MONTH) violated
    Elapsed: 00:00:00.03
    ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
      2  Values (to_date('2012-nov-01', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
    1 row created.
    Elapsed: 00:00:00.01
    ME_XE?select
      2        to_char(year_month, 'fmYYYY')    as year
      3     ,  to_char(year_month, 'fmMonth')   as month
      4     ,  Region
      5     ,  CITY
      6     ,  Handled_Package
      7     ,  Expected_Missing_Package
      8     ,  Actual_Missing_Package
      9  from test;
    YEAR         MONTH                REGION                         CITY                    HANDLED_PACKAGE EXPECTED_MISSING_PACKAGE ACTUAL_MISSING_PACKAGE
    2012         November             Western                        San Fransisco                       200                       10                      5
    1 row selected.
    Elapsed: 00:00:00.01
    ME_XE?Then you have nice a nice and easy validation that ensures you data integrity.
    Cheers,

  • How to calculate the number of sent/received emails of a certain domain

    Thank you for what you have helped me with!
    How to calculate the number of sent/received emails of a certain domain in a certain period? It is Messaging Server 5.2, Directory Server 4.2. Is there a log option for this?
    Thank you.

    Not sure where you find, "LOG_MESSSAGE_ADD". I don't actually find this option in the documentation.
    The domains that mails are coming from and being sent to are certainly logged in the normal mail.log, so why mess with additional logging options? If you're talking about "LOG_CONNECTION", I actually see no additional data that is useful to you.
    If you decide to change the option.dat, you do indeed need to
    imsimta cnbuild (note, it's not cnrebuild)
    imsimta restart
    If I were facing the same issue, I'd be looking at the log parsing perl script, and simply modifying it to do what I wanted.

Maybe you are looking for

  • Data Not loaded from  ap_invoice_lines_interface to the base table

    Hi , Please I'm working on Interface which load invoices from Cobol system to oracle , anyway procedure is working on fine & all data is loaded to the interface as i'm inserting 4 attributes which is DFF on the invoice line level Now when i ran the i

  • Boot Camp on External Hard Drive

    I have a 2008 Macbook Pro 15-inch running Lion(10.7.3). I want to install windows 7, but i want to use a external hard drive. Is that possible?

  • Message Mapping of Recursive Source Structure?

    Hello, a mapping needs to be implemented from a custom source structure to an IDoc. An XSD has been provided for the source structures which contains recursive elements --> an element of a specific type contains another element with the same type. If

  • JTextfield input Date convert to java.sql.Date

    Hi. I have a textfield for users to input date in 'dd/mm/yyyy' format and I would like to format this input into java.sql.Date to be stored into a database. How should I go about doing that ? I did the following: SimpleDateFormat formatDate = new Sim

  • Sap treasury PMP

    Hi, i got below issue while i am entering transactions 01A shares investment maintain the assignment of position management procedures. please suggest me  how to configure this with regards raju