How to change source system in COMMPRO1
I have two back hand systems of R/3 in COMMPRO1.
I want to change my backhand system(that is s ource system) how to do so.
Parag
Parag
COMMPR01 is the t-code and it does not contain any backend system info.It only contains Category and Hierarchy IDs.
Do you mean to say COMM_PRODUCT table??
If that is the case, you cannot change logsys field. Because that field refers to the backend system from where you replicated materisl.
If you feel that material should come from different backend system then delete the existing material and replicate the new material from the backend system which you want to be.
For this you need to set up the replication procedure for the new backend system.
P.S. -- Do reward points to the helpful solution.
Thanks
Jagdish
Similar Messages
-
How to Change Source system type of ECC6.0 in BW system
Hi BW Experter,
I connected ECC6.0 PRD system with BI7.0 PRD system , the connection is successful,
but the source system type of ECC6.0 PRD is not collect . The ECC6.0 PRD is as a
BW system type in the source system list of bw system .
I found that Tcode RSA1 has ever been run in PRD ECC6.0 , So I did a connection testing of
ECC6.0 QA with BI7.0 PRD .
Step 1. Connect ECC6.0 QA with BI7.0 PRD , ECC6.0 QA was as SAP system type in source system list of bw system .
Step 2. Run tcode RSA1 in QA ECC6.0
Step 3. Delete connection of ECC6.0 QA with BI7.0 PRD .
Step 4. Connect ECC6.0 QA with BI7.0 PRD again , ECC6.0 QA was as SAP system type in source system list of bw system .
I want to know how to change ECC6.0 PRD source system type to SAP .
If it can't been change to SAP ,Is there any impact when ECC6.0 PRD is as bw system type in source system .
Thank you for your help .I got the soulution from note: 1087980 - ECC Source systems appearing in BI folder
Summary
Symptom
Source system connection for an ECC system appears in the BI folder, rather than in SAP folder, as expected.
Other terms
Wrong folder,RSA1, RSBASIDOC, RSAP_BIW_DISCONNECT
Reason and Prerequisites
Transaction RSA1 was inadvertently used on an ECC system , thereby creating a 'Myself' source system entry in RSBASIDOC table
Solution
This is just a display issue and does not cause any operational issues. Therefore, it need not be corrected, especially if the ECC system in question is used as a BI system as well.
If it is absolutely required that the ECC source system appear in the correct folder, perform the following steps.
1. Check that an entry with SRCTYPE 'M' exists in table RSBASIDOC table of ECC source system.
2. Note the values for SLOGSYS and RLOGSYS. It should be same.
3. Run the function module RSAP_BIW_DISCONNECT in the ECC system.
NOTE: Never run that function module in a BI system!
4. Enter the following values :
I_BIW_LOGSYS <RLOGSYS> as noted in step 2
I_OLTP_LOGSYS <SLOGSYS> as noted in step 2
I_FORCE_DELETE <X>
< DO NOT ENTER ANY VALUE IN THE FIELD - RFC target sys !!!!! >
5. Go to RSA1-> Source systems in the BI system connected to the ECC system.
6. Select the ECC source system and select RESTORE in the right click menu.
Now the ECC system should appear in the SAP folder.
If running RSAP_BIW_DISCONNECT results in an error like OTHER_ERROR, please check if a valid RFC connection exists in transaction sm59.
If the myself source system connection cannot be deleted in any case, log a service marketplace message with SAP Support.
Edited by: fang frank on Jul 15, 2009 8:31 AM -
How to change source system in SAP BI
Hi,
In Sap BI we are having a source system ECC1CLIENT100, based on this we developed all the data modelling, now due to some reasons we made a copy of the souce system ECC1CLIENT100 to ECC2CLIENT100 and we removed ECC1CLIENT100 from SAP BI connections, Now what changes we have to do to connect the ECC2CLIENT100 to BI in the place of ECC1CLIENT100, please give me step to step what to do for sucessfull operations, Both the clients are having different IP, SYSTEM ID,
Thanks in advance,Hi Bazi,
-->you need to maintain RFC to the new source system
-->delete old source system
-->create source system connection from RSA1
--> Run BDLS to point the data sources to new source system. This should be run on both BW and ECC.
You will need to run this BDLS several times
for more info check the below link
How to change the BI source system
http://help.sap.com/bestpractices/crossindustry/businessintelligence/v131/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
Regards
KP
Edited by: prashanthk on Aug 18, 2010 6:22 AM -
How to change source system in process chain
Hi All,
In our Bw quality system, process chain is pointing to the Production system ,
I want to keep the process variant name same as production but want to change the source system
For example.. let us say currently process chains(All DTPs) are pointing to the Production server (PD001) ip (200.12.23.22)
now i want to keep the Server name same but want to point it to the quality system..so after change Process chain will show same name but it should point out to quality system.(let us say bwq 200.12.23.232).
Can you please help me on thisHi Pravender,
In our BW system , we have same process chain in all the system (Dev, Quality and production)..and naming convention is also same ..(all process chain points to Production system only)..
So when I want to load data from development i just need to change the source system ip adrress to the Development Server (So names in process chain will indicate production but it will point to the development server), .
I want to know how can i change the source system mapping.
Hope i am clear now -
Change source system name in variant in BWQ
Hi Gurus,
I created a process chain for global seetings for unit of measurement and fiscal year variants and transported to BWQ.
In BWQ, I found the source system name in variant is showing ERD source system name, but I need to change it to ERQ source system name. Any advice how to change source system name in variant in BWQ I would appreciate it.
Thanks
LizaHello Again Liza...
I had the same problem but I didn't need to include in process chain...
So to execute periodically you can change it in debug mode, not the best solution...
But since you need to use it in a process chain, you should copy that program to one of yours Z.
Do this:
Go to transaction se38 and insert the program name "RSIMPCUST".
Click on the button of "Copy" (Ctrl+F5).
Change the source program name to ZRSIMPCUST (or whatever you want)
Click Enter
Click the button to mark everything (F8)
Click Enter
On the next window of the name of the include click enter (leave it blank)
Click on the button Change of your Source Code
In line number 54 you'll find this in Selection Screen part:
PARAMETERS: logsys TYPE rsa_logsys MODIF ID p01.
PARAMETERS: logsysnm LIKE tbdlst-stext MODIF ID p02.
Delete those two lines and insert this ones:
PARAMETERS: logsys TYPE rsa_logsys.
PARAMETERS: logsysnm LIKE tbdlst-stext.
Now click on Activate button (Ctrl+F3)
Now you have a new program just like the old one but you can change the source system to whatever you want!
Please assign points,
Diogo. -
Does not allow to change source system in Variant
Hi Gurus,
I am creating a variant for the program RSIMPCUST, but it does not allow me to change source system name. It is showing me gray color. Do you how to fix this issue ?.
Thanks
LizaHello Liza,
Did you try my solution?
[Re: Change source system name in variant in BWQ]
There are solutions to change variants properties, but that particular program has the logsys parameter not able to change, so you cannot change the value of that variant (only with debug).
It's best to go for that solution I already provided to you...
Diogo. -
How to create Source System in BI 7.0
Hi Experts,
How to create Source System in BI 7.0, please urgent
ThanksHi Mark,
Did you see the help site below which is telling how to create a source system .If not please take a look at it.
http://help.sap.com/saphelp_nw04/helpdata/en/80/1a61e5e07211d2acb80000e829fbfe/frameset.htm
Regards,
® -
Change Source system Tech.Name
Production : PRE -
> PRB
PRE-Production : PPE -
> PRE
We make a copy of our production BI to Preproduction BI (PPB) we follow note # 886102. We want to connect this system to our pre production ERP (PPE).We already run BDLS change the logical system name we created new RFC created which is pointed to new R3 system .Problem is when we are going to run Tcode RSA1 in source system it shows old Tech name PRE600. We are unable to activate the source system.
We can create new source system (PPE),but All our BI objects mapped with old source System (PRE600). I am afraid to change thousands of BI objects ( change source system from PRE600 to PPE600).
Is there any work around we can change the Logical Source system Tech.Name? or some batch job which change the source system name for all BI objects.
Appreciate your earliest reply.
NawabHi
Can you please check the Tcode BDLS
Check the document it will be helpful
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bff13df2-0c01-0010-6ba7-bc50346a6fd8
Regards -
How to Check source systems in RSA1 and verify that connections are working
How to Check source systems in RSA1 and verify that connections are working ok and how to Check Planning Area have green status.................
Hi,
In rsa1, go to 'Tools' and option 'Manage Source System' - the screens are self explanatory there after. To check the planning areas, go to transaction /SAPAPO/MSDP_ADMIN anc check the status of the relevant planning areas.
Regards
Vinod -
How to modify Source system in DS
Folks,
I have a Data Source with old Source System for one of my InfoObject. I need to load the new master Data for this InfoObject. But I am unable to change the Old source system to new source system as the Pencil is diabled?
Do I need to reinstall the InfoObject from BI content and do this from scratch..??
Any Help please..
Thank You!You cannot change source system directly this way.
Depending on what is your situation there are 2 workarounds:
Case 1: you want to keep mapping of your existing source system and also want to load from the new system. Follow these steps:
1. Right Click on InfoSource and selectassign data source
2. Select the new source system (press F4 for options)
3. Select the datasource
4. Next in the transfer rules screen do the mapping and activate.
Case 2: You don't want to load from the new system without making any change to the transfer rules (and update rules if any). Follow these steps:
1. In SM59 change your old system RFC connection to point to the new system.
2. Then right click the source system and perform a check/restore. This will update partner profiles for the new system.
3. Replicate the datasource and activate the transfer rules.
4. Request your BASIS team to run program for BDLS that changes the system pointer.
You dont have to reinstall anything from business content in any case -
Change source system in Infosource
Hi
I am working on BI7. I have one isse. For an infosource source system has been assigned to client 100. I would like to change it to 200. Pl let me know how to make this change.Hi
I didn't get your question,how a infosource is assigned to source system,your data source will be assigned to source system and your infosource and data sourece will be assigned to each other..
delete the datasource from source system 100 and create a data source in 200 and assign it to your infosource(i am considering both 100 and 200 source systems are assigned linked to your BW system via RFC(SM59))..
Hope it helps
Thanks
Teja -
Hi Experts,
We did a system copy of BW system alone, and when we tried to restore the connection with the source system, i am getting the following message.
Source system cannot use any of the proposed connection names
Message no. RSAR362
Diagnosis
Every connection to a source system is named using a unique two-digit identifier. Source system DEVCLNT030 does not accept any of the proposed values.
The last proposed value was BA.
System Response
Source system has not been connected.
Procedure
If you want to recreate the source system from BI information, then you can only use a single value, namely BA, because the connection already has this name in BI.
Delete the existing connections in the source system or contact a BI consultant.
BDLS was successfull, and returned no errors.
I checked the source ID in the RSA1 and it exists, how do i change this value.
Thanks in advance
PraveenHi Praveen,
Login to ur SAP R/3 or ERP Source System and go to table RSBASIDOC.
Put the R/3 logical System Name and BI logical system name as parameters and see the table values, i am sure the 2 digit unique identifier value will be the one giving u the problem.
This error comes after system copy of source system as ur system still behaves as Production System (the one from which it is copied).
Execute function module RSAP_BIW_DISCONECT in SAp R/3 System with parameters as ur R/3 logical System Name and BI logical system name and option forced delete as X. to delete entry from RSBASIDOC table.
now go to BW system RSA1 > Source System> restore ur system.
Hope it helps
Thanks
CK -
How to craete Source system in BW from R/3 box
Hi,
I requested to basis to create source system in bw with R/3 Box.they were created RFC connection and told me to create source system in the BW .
Iam not sure how to create. please can any body help me in creating source system in BW with R/3 system.
Thanks in advance.Hi,
1. You have made the following settings in the SAP Customizing Implementation Guide (transaction SPRO) under SAP NetWeaver ® SAP Business Information Warehouse ® Links to Other Systems:
¡ General Connection Settings
¡ Links Between SAP Systems and BW
¡ Verify Workflow Customizing
2. You have made the following settings in the SAP Customizing Implementation Guide of the source system under the node SAP NetWeaver ® SAP Web Application Server ® IDoc Interface / Application Link Enabling (ALE) ® Basic Settings:
u2022 Logical Systems
- Define Logical System
- Assign Logical System to Client
u2022 Make basic settings for workflow (Perform Automatic Workflow Customizing)
The name you used for the source system (logical system) has to be used again when creating the source system in the SAP BW Administrator Workbench.
3. You have taken the server name from the source system under Tools ® Administration ® Monitor ® System Monitoring ® Server.It is displayed as follows:
Server_
pswdf090_IDF_90
4. As a rule, system changes are not ever permitted in productive systems. However, connecting a system (as a source system) to an SAP BW, or connecting an SAP BW to a new source system, will require changes to the system change options. Therefore you have made sure that the following changes are allowed in the relevant clients for the system, when connecting to the source system:
u2022 Cross-client Customizing and repository changes
In the SAP Customizing Implementation Guide under SAP NetWeaver ® SAP Business Information Warehouse ® Links to Other Systems ® General Connection Settings ® Assign Logical System to Client, select the relevant clients under Goto ® Details. In the Cross-Client Object Changes field, choose the Changes to Repository and Cross-Client Customizing Allowed option.
In the source system, make the following settings in the SAP Customizing Implementation Guide under SAP NetWeaver ® SAP Web Application Server ® IDoc Interface / Application Link Enabling (ALE) ® Basic Settings ® Cross-Application Components ® Distribution (ALE) ® Basic Settings ® Logical Systems ® Assign Logical System to Client.
u2022 Changes to the local developments and Business Information Warehouse software components
You use transaction SE03 (Transport Organizer Tools) to set the change options. Choose Transport Organizer Tools ® Administration ® Set System Change Option, then Execute. Make the following settings in the next screen.
u2022 Changes to the customer name range.
Again, you use transaction SE03 to set the change option for the customer name range.
u2022 Changes to BW namespaces /BIC/ and /BI0/
Again, you use transaction SE03 to set the change option for the BW namespaces.
Thanks,
Vinod
Edited by: Vinod on Nov 26, 2009 10:54 AM -
How to delete source system in BI system
Dear Experts ,
recently we finished client copy in BI production system to quality system,
now we are facing problem with source system connections in bI system
in RSA1 APO production system's source system is comes to BI quality system now i need to delete that APO source system in BI quality system ..please let me the process how can i delete source in BI quality
can i delete it as below
log in into BI quality system --> RSA1 --> select source system which i need to deletse --> right click & delete
or we have any other process to delete it.
RegardsHi Swathimatta,
Apart from the two ways to delete the source system:
1.- log in into BI quality system --> RSA1 --> select source system which i need to deletse --> right click & delete
2.- Execcuting the FM 'RSAP_BIW_DISCONNECT.
If you cannot delete the source system:
Use fuction module RSAR_LOGICAL_SYSTEM_DELETE to delete
the source system:
1 - Go to SE37.
2 - Run fuction module RSAR_LOGICAL_SYSTEM_DELETE.
3 - Fill with the parameters as mentioned below:
I_LOGSYS = FUENTE
I_FORCE_DELETE = X
I_NO_TRANSPORT =
I_NO_AUTHORITY =
Or follow the recommendations from note 140276, Solution 2:
"You cannot delete the source system. Two cases have to be distinguished:
o The source system still exists.
Switch to Transaction SM59. Find the destination which has the
same name as the logical system of the source system from field
SLOGSYS in table RSBASIDOC (see above).
- Such a destination does not exist in Transaction SM59. In this
case, you have to create the destination to the source system.
Name the destination equal the entry in SLOGSYS from above.
Then return to the Administrator Workbench and repeat the
deletion.
- The entry exists but a remote login is not possible. Correct
the communication parameters.
- Everything works. Change to Transaction SE37, function module
RSAR_LOGICAL_SYSTEM_DELETE, Sngl. test. Parameter I_LOGSYS =
<log. name of the source system>, I_FORCE_DELETE = 'X'.
o The source system no longer exists or was replaced with another
source system with the same IP address.
Proceed as described in the first case but make sure, that the
field 'Target host' contains a not existing server in the
maintenance screen of the destination (Transaction SM59). If
necessary, change an existing entry. Later when you delete, the
system asks you whether you want to delete, although the source
system is not available. Select 'Ignore'. "
I hope it can help you.
Regards,
Fran. -
Changing source system reference
Hi,
When I transport from dev to Q, how can I change the source system assignments to Q system? I guess I have to change the assignments as they are referencing dev source system in development and should reference Q when they come to Q.
Thanks.Consider you have BWD, BWQ and BWP and you want to have them loaded from R3D, R3Q and R3p respectively.
First you need to create R3 source systems in each of the BW systems (and not transport it).
For steps refer:
Creating Source System in BW
Before transporting your rest of the development make sure you have maintained source system mapping.
If it is not maintained then the same source system name will be used in the target system.
This can be done via rsa1->tools->mapping source system or transaction RSLGMP
Lets say your landscape in BWD, BWQ and BWP connected R3D, R3Q and R3P respectively.
In BWQ create a new entry with values, OrSrceSyste = R3D and TargSrceSy = R3Q
In BWP create a new entry with values, OrSrceSyste = R3D and TargSrceSy = R3P
If you are tranporting any datasource of BW sourcesystem (ex: technical content datasources), then
In BWQ create a new entry with values, OrSrceSyste = BWD and TargSrceSy = BWQ
In BWP create a new entry with values, OrSrceSyste = BWD and TargSrceSy = BWP
Maybe you are looking for
-
Firefox automatically upgrades me to 3.6 but form some reason the next time I start up it reverts to 3.5. Consequently, it takes forever to load each time and it is getting very irritating. Don't make me go back to IE! == This happened == Every time
-
my ipod touch os5 wont sync the song artist with my itunes... help me... i wan't my ipod song artist to be organized again like lha last OS... i already organized my ipod songs name and all the artist.. buat it won't sync with my iPOD using OS5... i
-
Latest photos are marked with a cloud symbol but do not appear on-line in Revel.
-
Regarding the Summarization in Infospoke
Hi Gurus, We are having 0ne Million Records in the Infocube,But once when we send the data through a logical file,when are getting only 2hundredthousand records.Is The infospoke Summarizes the data in Badi.Please shed some Light on this issue. Thank
-
How to make my xfmedia to play rmvb?
I have installed xfmedia in xfce4.6 and all of the gstreamer plugins and lib. Now I can play mpg in my xfmeida, but only got audio when I play rmvb files. so I think maybe I need more codecs. I heared the codecs had been replaced by ffmpeg. I had ins