How to correspond the valuation area to plant?

SPROMaterials Managementvaluation and account assignmentaccount determinationaccount determination without areas--Group together valuation areas
I want to group my plant.
but no the plant which i created is in this view.
And
SPROMaterials Managementvaluation and account assignmentaccount determinationaccount determination without areas--Configure Automatic Postings
when i want to configure it.
the error message "VArea reference plant XXXX must correspond to valuation area XXXXX" was displayed.
Who can tell me how to correspond it?Thanks a lot.

Thank you, Suraj Ramamurthy .But I cannot do the Step 2.
I show the images of my step.(Click the picture and get good size to see it)
Standard step 1:
SPROMaterials Managementvaluation and account assignmentaccount determinationAccount Determination Without Wizard--Define Valuation Control : Here Valuation grouping code active
<b>My step 1:</b>
http://img209.imageshack.us/my.php?image=untitledxe3.jpg
here is the system message,is it right?
Standard step 2:
SPROMaterials Managementvaluation and account assignmentaccount determinationAccount Determination Without Wizard--Group Together Valuation Areas
<b>My step 2:</b>
http://img209.imageshack.us/my.php?image=untitled1ao5.jpg
<b>But in this view i cannot find the record which include the plant and company i created,So i cannot define the new valuation group code.
And this is my question,why i cannot find the record i need.</b>
Standard step 3:
SPROMaterials Managementvaluation and account assignmentaccount determinationAccount Determination Without Wizard--Configure automatic posting
<b>My step 3:</b>
http://img209.imageshack.us/my.php?image=untitled2wh0.jpg
here is the system message too.is it means automatic posting failed?
Message was edited by: shi jack

Similar Messages

  • The valuation area defined for the plant is not defined in table T001K.

    when i creating the PO for plant ,s/m is giving the following meassage
    The valuation area defined for the plant is not defined in table T001K.

    Hi,
    You have two options to check:
    Option---1:  You defined your plant ( in t.code:OX10) and if then copy from existing plant(ex. 0001 0r 1000),check the plant not assigned to company code properly .Now assign  in  t.code OX18 and also check the table T001K after this configuration.
    Option---2: Use t-code: OMWD, check whether your new plant ( valuation area) is assigned to valuation grouping code . If not assign the same .
    Now try creating PO.
    Regards,
    Biju K

  • How do I default valuation area to post all valuation area in TBB1 or TBB4

    Dear All,
    How do I default valuation area to 'Post All Valuation Area' when I run TBB1 or TBB4 or any other Treasury T-Code (that has these 2 valuation areas as option)? Currently, by default, SAP is pointing to Post Operative Area. What is required by the user is to post ALL Treasury transactions to All Valuation Areas. Therefore, they have to remember to change from 'Post Operative Area' to 'Post All Valuation Area'. If they do not change this, it will be a mistake and they have to reverse the transaction and re-post again.
    We have suggested to them to use Variants but again, they have to remember to choose the correct variant when they use these T-codes. Otherwise, the same thing will happen - wrong posting -> they have to reverse and re-post. Or, is there an option where we can default a variant when they use these T-codes?
    Please assist. Thanks.
    Regards
    Fauzi

    Hi,
    In all standard transactions the default option will be to post to operative valuation area only.
    I can think of a round about solution.  Create a variant for TBB1 and save it with name space CUS& which means it is a customer created variant and also it will be transported to other systems by default.  In this variant choose the option post all valuation area.
    Then create a Z transaction for TBB1 with this variant as default in SE93.  Now when you execute that Z transaction you will have post all valuation areas by default. 
    Please let me know if you can find a better solution.
    Regards,
    Ravi

  • How to get the depreciation areas for an asset in particular period

    Hi frndz,
      how to get the depreciation areas for an asset in a particular period for writeup or manual depreciation method.
    Thanks and regards.
    Harisumanth.Ch

    Try table ANLB, then read ANLC.
    Regards.

  • I want to know how to clear the text area by the push off my next question button and ask a new ques

    I want to know how to clear the text area by the push off my next question button and ask a new question - also I want to know how to code in my project to where a user can enter a math question in one border container and the answer enters into the next container
    heres my code so far
    <?xml version="1.0" encoding="utf-8"?>
    <s:Application xmlns:fx="http://ns.adobe.com/mxml/2009"
                   xmlns:s="library://ns.adobe.com/flex/spark"
                   xmlns:mx="library://ns.adobe.com/flex/mx" minWidth="955" minHeight="600" backgroundColor="#1E5C75">
        <fx:Script>
            <![CDATA[
                protected function button1_clickHandler(event:MouseEvent):void
                    //convert text area into labelid to be identified by actionscript
                    richTextLabel.text = myArea.text;
            ]]>
        </fx:Script>
        <fx:Declarations>
            <!-- Place non-visual elements (e.g., services, value objects) here -->
        </fx:Declarations>
        <!--container 1-->
        <s:BorderContainer borderWeight="7" x="28" y="10" width="200" height="138">
            <s:layout>
                <s:VerticalLayout paddingTop="10" paddingBottom="10"
                                  paddingLeft="10" paddingRight="10"/>
            </s:layout>
            <!--data Entry control-->
            <s:TextArea id="myArea" width="153" height="68"/>
            <!--end of data entry control-->
            <s:Button width="151" label="ask a question" click="button1_clickHandler(event)"/>
        </s:BorderContainer>
        <!--container2-->
        <s:BorderContainer borderWeight="7" x="509" y="10" width="200" height="138">
            <s:layout>
                <s:VerticalLayout paddingTop="10" paddingBottom="10"
                                  paddingLeft="10" paddingRight="10"/>
            </s:layout>
    <!--data entry control-->
            <!--convert tne data entry control into a label id in actionscript-->
            <s:Label id="richTextLabel" width="153" height="68"/>
            <s:Button width="151" label="next question" click="button1_clickHandler(event)"/>
        </s:BorderContainer>
        </s:Application>

    This is a user to user support forum.  We are all iphone users just like you.
    You are not addressing Apple here at all.
    This is an odd way to ask your fellow iphone users for help. Berating oterh users will not help you.
    "it's too fragile"
    No it is not.  i have never damaged one, nor has anyone I know.
    " U loose data when Ur phone is locked"
    No you don't.  Why do you think this?
    "and there is no customer support!!!  "
    Wrong yet again.  Apple has an 800 number and they have many retail stores and they have support articles that you can access using the search bar. Or you can contact them throgh express lane online
    "but I will go back with Blackberry "
    Please do.
    Good ridance

  • How to fetch the Business area field value from MIRo into report

    Hi,
    I want to create a report for MIRO with payment details.
    How to fetch the business area field value in to report.
    What is the table name. I verified it is storing in structure. Which is the right table for fetching that value with reference to MIRO.
    After that, how to find the accounting document for payment and check details.
    What are the table names and field names. What we can get from PAYR table.
    With regards
    Lakki

    Dear,
    For Bussiness area
    RKPF-GSBER

  • How to Upload the Materials for one Plant and then copy the same to all oth

    Hi All,
       I am using Material Types NonStock, Service, Spare Parts and Trading.
       How to Upload the Materials for one Plant and then copy the same to all other plants.
    can anybody give response for this requirement.
    Regards...
    <b></b>

    Hi,
    Using MM01 Only we can upload Plant Details.
    If you want to extend to other plant also, Use MM01 and select Plant view and give new plant details.
    If you want to copy from one plant to another plant after selecting Plant view , next screen you can select From Plant and To Plant Details.
    Reward Points If it helps you.
    Regards,
    Murali K

  • Compensation Management - How to define the Compensation Area

    Dear Experts,
    We are implementing Compensation Management module for our client which contain global entities( 14 Countries.(Payroll- Country wise)
    Can you please guide me, how do define the Compensation Area for all the 14 countries.
    The following components are defined with similarities for our Client like (regionally)
    India Corporate Office:
    Salary Increase
    PMS Based Incentive(F)
    PMS Based Incentive(B)
    India Factory:
    Salary Increase
    Bonus Factory
    PMS Based Incentive(F)
    PMS Based Incentive(B)
    African Countries: (including 10 Countries having the same components)
    Salary Increase
    PMS Based Incentive(F)
    PMS Based Incentive(B)
    Bonus Africa(only)
    Europe: (3 Countries having the same components)
    Salary Increase
    PMS Based Incentive(F)
    PMS Based Incentive(B)
    Kindly guide me how to define the above business scenario into SAP and looking forward your valuable guidelines.
    Thanks in advance.
    Regards,
    Anbazhagan.N

    Hi,
    Do you mean to say you have diff payroll areas for India say Corp and Factory like wise,then you can group Compensation Area as 01-corp with Ctry Grp 40 and 02-Factory with Ctry Grp 40 so on and so forth,same with other countries depending upon their payroll.
    Also check with the Documentation of Compensation area.

  • How to change the field status of "plant" of standard activity ?

    hi,dear all:
    I want to know how to specify the field status of "plant" of standard activity from  "ready for input" to "required entry".
    Can the field of the stand network be changed?
    Thanks.

    Hi,
    Try in T-code OPN6
    Regards,

  • How to refresh the client area

    i used javax.swing.JPanel and drawed many shapes with paintComponent method. i wonder how to refresh the client area.
    ps: i first used paint method to draw shapes, but i found a copy of the menu bar appeared. at last i found paintComponent method works, but when i tried to refresh the client area with repaint, the same scene appears.
    could some one help me?
    thanks in advance!

    when i tried to refresh the client area with repaint, the same scene appears. When you invoke repaint() on a component, the paintComponent() method of that component is invoked. So unless your code in that method is different, the image painted will be the same.

  • How to Track the valuation for IC Stock Transfer

    Hi Folk,
    I have a requirement for Intercompany Stock Transfer Where Plant "A" place PO to Plant "B" and Plant "B" does the Stock Transfer to Plant "A". Both the plant belongs to differnet company code. But both the company code share the same Chart of Account.
    The Issue here is how the Plant "B" maintain the valuation for the Stock Transfer as there is no invoicing generated for this.
    Should you need any further information / clarifiction pls feel free to let me know.
    Pls share your expertise with me.
    Looking forward to hear from you at the earliest.
    Thanks,
    Nihar

    In intercompany STO delivering plant should invoice to recieving plant and it will have the accounting entries as well.Keep in mind that both plants are related to different company codes.Accounting will be done as normal sales process in delivering plant.
    Regards
    Sunil

  • How is full the "Valuated Quantity Structure" of CKM3 transaction?

    Hello everyone!
    I need some help to understand how works the CKM3 transaction, specially the "Valuated Quantity Structure". I need to know where comes those data, in what table can I see the multilevel data that is display on CKM3?. I need the maximun detail level of the Valuated Quantity structure to extract the values of consumption of some products to make the material in the specific plant  that I entered as a filter of CKM3.
    I attach a image with an example of what level I need to find, I highlight in yellow the level of the information that I need.
    Thanks for any help! Regards,
    Rosmar.

    Hi Rosmer
    1. This OSS explain the tcode 1004597 - CKMLQS: Valuated quantity structure (multilevel)
    2.  About the tcode:
    + This tcode is some sort of advice.
    +The detailed info is in CKM3N.
    + In general, the sum of the componentes is not equal to the cost of the principal material.
    3. The info is spread in tables, here just some hints
       + CKML_MGV_BOM_READ: This function gives you the QTYs in the level BOM and Activities. No values here.
      + The values are calculated by  the tcode, reading lots of tables and doint lots of calcs. Its a bit difficult to explain. tcode CKMDISPTAB - Technical View of ML Master Data  can give you a good advice. In ckmlqs, all the calcs are packed methods, so reuse the code is a bit difficult.
    Wish this give you an advice.
    Arturo.

  • How to specify the vendor for supply plant in stock transfer oder process

    Hi experts,
    In the sceniro of intercompany STO, I want to know how to set up the link between supply plant and the vendor ?
    Thank you.

    Hi
    I think you are talking about Inter Company STO...if yes,
    Follow the below steps to to make STO between two plants belongs to  different company company codes.It is also called as Inter Company STO.....
    *1)Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure,In Customer Master,sales Area Tab: you are maintaining shipping condition)*
    *2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group,Shipping Condition and Supplying plant combination,Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receing Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Reward if useful
    Regards
    S.baskaran
    Edited by: baskaran srinivasan on Feb 28, 2008 9:53 AM
    Edited by: baskaran srinivasan on Feb 28, 2008 9:54 AM

  • How to transfer the requirement from one plant  to many plants(STO)

    hai gurus,
    My scenario is as follows:
    1) Plant "A" is Receiving plant.
    2) Plant "B" ,Plant "C", Plant "D" is three production plant.
    3) All the above 4 plant under same company code 1000.
    4) Now plant "A" gets the requirements and pass on to all the three production plants, which
    is based on forecast.
    5) How the requirement to be passed on from plant "A" to all the three production plants namely B/C/D
    under sap
    6) After production of fert under 3 production plants the final products is transferred to the plant "A"
    ware houses which is situated near by plants of B/C/D.
    7) Only one fert material( Fert 1) is common for all three plants produced based on the capacity at all three plants.
    8) Remaining fert material is plant specific, that is for Example Fert 2,3,4 produced only in plant" B"
    Fert 5,6,7 produced in plant "C" and Fert 8,9,10 produced only in plant "D".
    How to map into sap
    waiting for the positive reply
    Regards,
    sekar chand

    Hi again,
    For more details on stock transfer from alternative plant in MRP, see also the attached link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm
    Regarding FERT1, you can place sales order, but it will not trigger requirements in the manufacturing plant. Also, because all plants are in the same CC it is not a good idea.
    If you are willing to do some manual/external work in determining how much of FERT1 will each manufacturing plant produce, then you can just manually create STOs accordingly. These STOs will generate MRP requirements in the manufacturing plants.
    Regards,
    Mario

  • How is full the "valuated Quantity structure" in CKM3 transaction?

    Hello everyone!
    I need some help to understand how works the CKM3 transaction, specially the "Valuated Quantity Structure". I need to know where comes those data, in what table can I see the multilevel data that is display on CKM3?. I need the maximun detail level of the Valuated Quantity structure to extract the values of consumption of some products to make the material in the specific plant  that I entered as a filter of CKM3.
    I attach a image with an example of what level I need to find, I highlight in yellow the level of the information that I need.
    Thanks for any help!
    Regards,
    Rosmar.

    Hi,
    This  is a material ledger component.You can use the datasource: 0CO_PC_ACT_1 for the same and  ensure that report is running  after the month end close. Let me knowif you need further help.
    Regards,
    Rajesh

Maybe you are looking for