Hello PP Guru ,
I am running MRP in various branch-plant .I maintained Special Procurement Key 40  for all the material in branch-plant .Here we have one supply plant .We run MRP at Supply plant once all our other branches(plant) completes their MRP run .My  requirement is
1.How to create STPR/STPO while running MRP at branches ? I did not find any option in MD01 to create STPR/STPO while executing MRP at plant level.Is there any configuration seting required?
2.How to create PR/PO in Supplying plant (Central plant) so that it will consider all the branches STPR/STPO and show List of PR in MD04 ?
Thanks and regards
Jia

Hi Jia,
Yes, there is some special setup for Stock Transport orders.  There are some business decisions you must make first.  Pls refer to [Stock transport orders|http://help.sap.com/saphelp_erp60_sp/helpdata/EN/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm] for basic functionality in helping you to make your decisions. 
For configuration settings, refer to
[Purchasing IMG|http://help.sap.com/saphelp_46c/helpdata/en/32/72369adc56d11195100060b03c6b76/frameset.htm] then Purchase Order>Set up Stock Transport order.
and
[Purchasing IMG|http://help.sap.com/saphelp_46c/helpdata/en/32/72369adc56d11195100060b03c6b76/frameset.htm] then Purchase Requisition>Set up Stock transport Requisition.
These steps can be reached in IMG>MM>Purchasing>Purchase order>Set up Stock transport order, and
IMG>MM>Purchasing>Purchase Req>set up Stock transport requisition.
For question 2, there is no special setup.  Once your STOs/STRs  are properly set up, you will see new requirements in your central plant, which represent the un-fulfilled requirements from the branch plants.  Assuming that you already have set up MRP in the central plant, MRP will create new proposals (pureqs or plndords) just as if all of these new requirements were new sales orders.
Rgds,
DB49

Similar Messages

  • How to consider the stocks of other plants in MRP run

    Hello All,
    I have a requirement in  which  A finished material which it´s planning and production is on PLANT 1 and and is transfered to plant 2 (there is no production and no planning on this plant, it is used for storage only). In that case, I would like the MRP to check the stock of finished material both in plant 1 and 2 for creating planned orders .
    I know  this can  be possible  with APO .  but is there any other way round we can do this like MRP area or scope of planning or some z developemenmts.
    Thanks in advance
    Regards
    Anupam Sharma

    Is there any stock at production plant?  Where does the goods issue to sales occur?
    If both plants can have stock and sales can occurs in both plants then it is the issue not only stock but also sales order consumption with planned independent requirement.  You need to have two BADI to do so.  First is the one you mentioned and the flexible PIR also (MD_PIR_FLEX_CONS).
    If only storage plant has stock and sales occurs here, then you may want to explore special procurement type produce in other plant and make storage plant a planning plant.  The receipt of production order at production plant will posted into storage plant directly.
    If sales occurs in storage plants, and there are stock in both plant, use special procurement type transfer from others (40 as standard).  When you run MRP, the system will check stock at storage plant first, then if shortage, create stock transfer request to production plant.  At production plant, the stock transfer request will be your demand to offset with stock there before create planned order.
    Like other comments stated previously, SAP cannot handle the multiple plants planning very well.

  • How to create intial stock of Material ?

    Hai,
    How to create initial stock of materials?
    Anybody can help me?
    With Regards,
    Jaheer,saudi arabia.

    Well Stock can be Initially Uploaded in Two ways :
    1 Make a goods Receipt with out Purchase Order Reference Using 501 Mov type. Just go to MIGO and Select Document A01 Goods Receipt and Reference Document as Others and Give Material and Other information and Save.
    2 Else Use Special Transaction MB1C 561 mov type for Initially Upload Stock.
    Regards,
    Ashok

  • How to create a STOCK

    how to create a STOCK
    Madan

    Hi Madan,
    If it is just for testing... then you can use MB1C transaction with movement type "561" or "501" or "521"
    Hope this helps...Reward your points if so,
    Regards,
    Prasobh

  • STO. How to create the stock in transit if the plant has been block.

    Problem with STO. How to clear the stock in transit if the plant has been block.

    The command builder takes a Select SQL and automatically creates a Insert, Update, and Delete SQL commands.  The database could have Insert priviledge and not Updates and Delete priviledges. But I don't think this is causing the problem.  I suspect
    the Orcacle Client handled an exception that wasn't returned to you code and the client is in an invalid state.  You may need call a new constructor for the client.  I would check the Control Panel : Adminsitrative Tools : Event Viewer to see if
    there were any error messages created when you ran the application.
    jdweng

  • How to create a stock purchase order ?

    Hi,
    I would like to create a stock PO to replenish stock and thus without any account information.
    What Account Assignment category and Item Category do i have to select to create my stock PO ?
    Thanks for your help,
    Kind regards,
    Yann

    Hi,
    For stock item, there is no need to give account assignment and item category. Just input the vendor, pur org, pur grp, company code in header screen, material number, qty, price, plant etc details and save the PO.
    Then do goods receipt wrt PO (TCode: MIGO). This updates the stock in the respective plant.
    Then do the LIV (TCode: MIRO)
    Hope this clarifies.
    Thanks,
    Viswanath

  • How system will generate schedule line for PO after  MRP run.

    Dear Experts,
                                 i have updated  MPS in MD61, the period indicator was  M (monthly),  after  MRP run, system  generating schedule  lines  on daily basis for Scheduling Agreement(ME38), i want  schedule lines   on mpnthly basis, how to achive this,
    thanks in advance.
    regards
    rajakarthik

    Hi
    1. Are you maintaining any Planning time fence period for MPS- No 
    2. What is the PIR qty you maintained in MD61:
                                                                                    i.) FG01 is having BOM  child part RM01.
                              To  produce 1 nos of  FG01 , I need 1 nos of  RM01                                                                               
    ii.) i maintained  FG01 in MD61  with PIR  Qty 5000. in MD61,Planning period is M  and planning hirizon1- jan10To 31-Jan10
           ii.)  i maintained lot size:Monthly lot size for RM01.
           iii.)  there is  no stock  available for  both RM01 and FG01.                                                                               
    3. After MRP how much qty is get planned on what date-     
         i)   planned order created for FG01 in co41 with qty-5000 nos.
         ii)  in ME38, schedule  line created for RM01,  on 01-01-2010, with 5000 nos,  currently Category of Delivery Date
    field is D and delivery date is   01-01-2010, but i want Category of Delivery Date should  be M and delivery date should be 01.2010.
    thanks
    raja

  • Repeated purchase req. in MRP run procudure

    Dear SAP experts,
    Here at my client site, i have one scenario of mrp run of consumables.They maintain safety stock in material master MRP view,
    I am using MRP type PD.Now after MRP run,system creates purchase requisition as per safety stock qty,( consider initial stock
    is zero) now when i convert Purchase requisition into purchase order. i refresh the MD04 list, as soon as i refresh i get the
    purchase req. converted into PO item.Upto this point its ok. but during this refresh function i get repeated purchase requisition
    of the same quantity as previous one..Why this is happening? any specific reason behind this? my logic is not getting clear.
    please assist me to find exact reason..
    Thanx in advance..
    Regards,
    Ravi

    HI
    If the initial stock is zero then system will generate the PR for the safety stock also and then for the Dependent requirement.
    Check and revert
    Regards
    Anupam Sharma

  • How to create Special Stock Partner SB in Business Partner BP

    I dont see the option SB in partner function while trying to add special stock partner in partner function of customer master (Tcode BP). Is it possible? and can it be used in SD? I have used partner function in tcode XD01 but this is the first time using tcode BP. can someone please explain me the steps. The special stock partner i m trying to add to orignial customer master is set to SP. Customer master has BP and payer already added to partner function. thanks.

    Thanks for the reply Mastan Shaik.
    I actually need to create a special stock partner for consignment and add it to the Business Partner master record in partner function. I have done that using XD01/XD02 but never used Tcode BP for creating a special stock partner and adding in partner function of Business partner / customer master. .
    I have a BP master (created using tcode BP) which has a separete Bill to and Payer alraedy added to its partner function (also in BP), but when i try to add special stock partner (created as a Sold to) to the master in partner fucntion i dont see partner function SB (for special stock partner). how can i add special stock partner to customer master?
    Can you also tell me what is the difference using XDxx or VDxx tcode and BP tocde for creating customer master.
    Also can you assign a business partner specifically for Consignment in BP master record somehow (assuming special stock partner not added to partner function of customer master?
    Thanks and sorry for being too long.
    Danny

  • How to create a  Stock ticker application

    Hi,
    We are currently using EP 7.0 and want to create a stockticker application. I have no idea how to achieve this, please advice with the steps required for creating the application at the earliest.
    Your help will be rewarded
    Thanks,
    Swetha

    Hi,
    These are the URLs
    1) http://www.cmlinks.com/fe/ticker.asp
    2) http://www.contentlinks.asiancerc.com/HT/chart.asp
    You may try to open these URLs on a normal browser. See if you like them !!!
    You just have to create URL iviews and then depending on where you want them, you can play them. If you want them to be see throughout the portal, then we need to add it to the default framework page. Or if you want them to be seen only on a particular page, add that iview to a page and put that iview at the top.
    Let me know if you have any issues using it.
    Cheers,
    Sunil
    PS; Reward points for helpful answers.

  • How to create a stock transfer order?????

    as subject
    TCode and detail steps
    thanks

    Hi
    For detail Stock Transfers
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/e0/b118418291a854e10000000a1550b0/frameset.htm
    Regards
    Srinivas.

  • How to create a report with selection screen that can run in background

    Sorry to ask these basic questions but I am knew to ABAP Programming.
    To keep it simply, I am attempting to create a report that has a simple parameter driven selections screen with one field.  That field takes in a folder path from the user.  The user executes the report.  The report creates a simply BDC that goes into SE16, gathers data from a table, and exports the results to a text file using the folder path provided.  I created a variant for the folder path field in the selection screen hoping to use it while executing the report in the background.  The report is not exporting the file as it did when run in the foreground for some reason.
    I am wondering what event is triggered when a report is executed in the background.  In the foreground (or when I execute the program via SE38->Execute->With Variant) the user needs to execute the program by hitting the execute button once the variant has populated the folder path field.  It works then, so I am trying to get the same to work in the background.  I am thinking I didn't put the program together correctly to accommodate the running in the background.  How can you create a report that can accept user input via variant into a selection screen and then run in the background?
    Please, any information would be greatly appreciated.
    Thanks you all for reading this!!!

    Ok, finally I understand what you're doing. Initially you lost me with the SE16 reference...
    Not sure what you're trying to achieve overall, but apart from the fact that you cannot export/download a file to a user's PC via background job (unless you have a mapped network share on the server or something like an FTP server on the user's PC, but both are pretty hypothetical scenarios and unlikely to occur).
    Also, the BDC approach to get data via SE16 is pretty awkward. Note that SE16 is guarded by some authorization checks and often users won't have access in production (which might not matter if you intend to always run your program in background via dedicated batch user). However, I have no clue why you wouldn't want to use [open SQL|http://help.sap.com/abapdocu_70/en/ABENOPEN_SQL_READING.htm] to read the data. You could then save it on the application server or if you really have to get it to the user you can consider e-mailing the file (extracts should be compressed before sending). For the latter you'll find plenty of references here, basically it's the [business communication services|http://help.sap.com/saphelp_nw2004s/helpdata/en/2d/1c5d3aebba4c38e10000000a114084/frameset.htm] that you'd need to look at.

  • How to create a jobsteps for a new user to run a report on portal

    Hello Experts,
    Is there any program that automatically creates a jobsteps for the new users for
    a role??
    My company BW roles are mapped with R/3. so whenever a new user is created in a R/3 role
    it comes and maps with BW Role and creates that users automatically in BW.
    Now the problem is if any new users are created in r/3 and mapped with BW. the report
    fails to run for the new users unless and until they really login in to the system.
    For ex: I have 5 new users which are created in R/3 and properly mapped with BW. But
    report fails to runs for the new users.
    ERROR: Jobs step fails for the User X
    Is there any programe that automatically creates a jobsteps for the new users??
    Please advice.
    Thanks in advance,
    Harish

    Hello Kedar,
    Do you manually add a new users to the role??
    How the reports run for new users in your company??
    Thanks,
    Harish

  • Inconsistent Dep req in MRP run

    Let me explain the scenario with an example:
    B is child part of A. When we ran MPS, A's planned order has generated dep req on B. Subsequently A's Requirement and Planned order were deleted . But in the subsequent MPS run it is not deleting Child parts (B) dep req due to some error. ( We know the mistake what we did). Now we wish to delete this inconsistent Dep req for B.
    I know that there is a program RM06C020 to delete such sub contracting purchase req . Similarly is there any program for deleting inconsistent dep req for a planned order?

    Hi Srinivasan,
    To delete the inconsistent dependent requirements of planned orders...you have the only option to run the MRP for the header part so the dependent requirements will be deleted and adjusted automatically as per the new planned orders quantity.
    There is no program and transaction to delete the dependent requirements except MRP.
    If any questions then write to us OR close this thread with rewarding the suitable points.
    Regards
    TAJUDDIN

  • How to create WXGA and 720p screenshots using the Emulator Screenshot Tool?

    I just don't see how to increase the zoom of the emulator in order to be able to take a screenshot bigger than 480x800. I need to get WXGA and 720p screenshots in order to complete my store submission.
    How to create such screenshots?
    Thanks,
    Julio

    How do you run emulator in 720p?? I don't see how
    You should have a 720p emulator. Click on the dropdown menu at the green Run button in the Toolbar.
    Alternatively, right click on your project in the Solution Explorer and open its properties. Select the emulator under Debug.

Maybe you are looking for

  • From an Banking Site I am not able to open PDF form

    Hi Team, I am trying to open a form which is in PDF format but when  click the form which is a Link provide in a Banking website, the page open but the with out form and it give a message as below Message: Please wait... If this message is not eventu

  • Upgrade Path from 5.1.4

    We are currently running version 5.1.4 and are looking to upgrade.  What is the recommended upgrade path or version we should be planning to go to?  Our pipeline isn't very complicated since I've read some articles about there not being a direct migr

  • Sql query to generate this output

    Hi, I have a table as follows; SET_MASTER ID set_id attribute_id attribute_value 1 1 2 10 2 1 3 20 3 1 4 50 4 1 5 60 5 2 2 10 6 2 3 30 7 2 4 40 8 2 5 50 I want to generate an output as folllows; Attr_id Set1_attr_value Set2_attr_value min_attr_value

  • My Airport did not show in top bar

    Hi my Airport Extreme will not appear on my menue bar MacBookPro ? The hard reset of the Airport Station, will end with no result, even all lamps are blinking, even disconecting from power for hours. Software installed 5.5.3 Airport Utility My MacBoo

  • Any idea how to test wether the cropBox actually contains art?

    I'm  exporting large drawings as tiles for a google maps project. I do so by moving the cropBox and exporting the covered area as PNGs. Works great so far but ... since the drawing is kind of organic and does not fill the whole area i'm exporting i h