HOW TO KEEP CLIENT COPY
Dear All,
In Dev Server, we have 2 clients 400 & 500.
In Client 400 all customization is done & also some master date is created, like material master, vendor master.
500 is a fresh client.
Now i need to put a client copy of 400 to 500, with only customizaation data.
can anybody please explain me the steps.
Thanks in advance
Appropriate points will be rewarded
HI
GOOD
Before doing a client copy, you need to prepare the following :-
1. Find the source client space with the client size custom program which can be implemented using the rel. note:
Find the space of the client - '0118823'. This will give you the size of the source client.
2. If your are on Unix OS, adjust all the file systems according to PRD file system to fit the PRD client in DEV
client based on space requirements also.
3. You can do the client copy by remote or export/import client.
Remote method is not preferred if you are doing a large client copy.
Do a client export/import.
4. To speed up the export/import, use R3trans export/import for the clustered tables.
Please find the rel. notes related to performance improvements for cluster tables in OSS.
5. Do import and post processing.
Note: Export may take 10 to 20 hr. for 50gb of data
import may take 4 days and post import will take 8 to 15 hr. for 50gb of data. And it all depends on
your system performance.
Please refer OSS rel. notes for the few RZ10 parameters which needs to be set for cluster tables to speed up the process.
Note :-
If it is a fresh installation, do this --
1. SCC4 --> Create client no. and fill other details.
2. Logon to the newly created client with SAP* and PASS as password.
3. SCCL --> choose any profile (preferably SAP_ALL), source client 000 and target client <as created just now>.
4. Preferably do a test run initially to check if it can go well.
5. As a care check space in databases.
GO THROUGH THESE LINKS
http://help.sap.com/saphelp_nw04/helpdata/en/69/c24c4e4ba111d189750000e8322d00/content.htm
http://www.sappoint.com/basis/clntadm.pdf
THANKS
MRUTYUN
Similar Messages
-
I love tethered Shooting but as default (at least for Nikon) Lightroom does only save the file on the computer, not on the memory card.
Now I want to have a backup of the image file on the memory card additionally to downloading it. The tethering software digiCamControl can do this with my camera, so it is technically possible.
So how can I achieve this using Lightroom tethering?Thanks. FWIW I'm very keen on improving tethering and lobbied Adobe endlessly until they added the overlay for shooting into layouts because it was a major reason why some of my clients were unable to switch to Lightroom from PhaseOne. But we have to be realistic and remember that tethering just isn't a key market for Adobe as it is for PhaseOne, so progress is painfully slow. For example, where is live view or setting exposure which are in PhaseOne? I'd be amazed if we get those features for a few versions, and that's why I point serious tethered shooters to other solutions. And realistically, assuming your understanding of the SDK is correct you shouldn't expect a change until the next full version of Lightroom. Good if it happens, but I wouldn't bet on it.
-
How to keep clients from disappearing from the SCCM console
I am running SCCM2012R2 in an environment with about 60 desktops as well as 8 laptops that are only occasionally connected to our internal network.
I've noticed that some computers such as the laptops that are seldom on the network and desktops that have been sitting ready in a cabinet for several months have disappeared from the Devices list.
I assume this is part of aging old clients out but I would like those clients to remain, possibly forever and then I can manually remove as needed.
I assume the settings I need to change are in Monitoring->Client Status which are all set to the defaults. Or do I just need to turn off something in Site Maintenance? Or both?
ThanksClient Status Settings has a maximum of 30 days.
You can max it out, but additionally, you also need to configure the Site Maintenance Tasks (there are
a few - e.g. Delete Aged Discovery Data). Just check their purpose on technet.
http://technet.microsoft.com/en-ca/library/e555d7e3-3681-440a-82d0-319d2b4bdd08#BKMK_PlanMaintenanceTasks
*en-ca -
Client Copy between Two Different Systems
Hi!!
Could someone please explain or provide any documentation which explains how to perform client copy between two r/3 systems of same version(ecc 6.0)
Thanks and Regards,
Vishwa.Hi,
Save the contents that need to be copied in a Transport request at source client.
Now at the target client system,
execute transaction 'SCC1' and give the TR number and execute it.
The changes from the source client system this way will get copied to destination client system.
Reward if useful!
Thanks,
KalpanaR -
Hi all,
How to create client copy within system? Can you help me??
ThanksShahril,
Please follow the below instructions
1. Go to the transaction SCCL, Select the source client as 001, a target client (e.g 100)
2. The client copy does not take care sxmb_adm configuration, connection objects and exchange profile. These steps have to be performed manually.
a) Logon to the old client, and run sxmb_adm. Deregister the queues and set the role of the business system to " not yet configured".
b)Logon on to the new client register the queues and set the Business system to "Integration Server".
c) Register all Queues
d)Changes to Connections
3)
ABAP Stack
In the ABAP stack execute the transaction SM59 and locate the HTTP connection - INTEGRATION_DIRECTORY_HMI
Change the Client from 001 to 100 (as mentioned in the example)
4) Java Stack
There are a couple of places to change the logon client in the JAVA stack
1) In the Java stack -
Logon to the NW administrator and go to the Destinations
Configuration Management -> Security -> Destinations
Change the client in
a) I18NBackendConnection
b) I18NBackendConnection
f) The JCo RFC destination
The client has to changed for the four connection objects show below.
5)
Exchange Profile :
The Exchange profile defaults to the client 001 if a client copy is not performed. Go ahead and change the client for the following entries -
com.sap.aii.connect.integrationserver.r3.client
com.sap.aii.connect.rwb.r3.client
com.sap.aii.ib.server.connect.webas.r3.client
com.sap.aii.rwb.server.centralmonitoring.r3.client
The Final Step -
Change your client in your SLD business system. I found that it is better to delete the existing BS and create a new one with the same name.
Restart the system and you are ready to operate from your new system
Let me know if any issues.
Thanks
Sekhar -
How do I make and keep a copy of a photo in iPhoto (version 9.5.1) so that I can edit the copy and keep the unedited original?
You don't have to. iPhoto does that automatically. Note the command in Photos menu to 'Revert to Original' and the original can be exported at any time using the Export command.
Longer answer:
All edits in iPhoto are virtual. The database records your decisions and then applies them to a copy of the original. So your original is untouched. Your edited version is never "fixed" until you export it. -
How to assign values to server group when you parallelly client-copying
Hello all,
I'm now trying to create server group.
Currently, I use serial process, or default settings, when client-copying.
But I want to implement this in parallel processes.
Due to this, I have to create server group and assign a lot of values to something I don't know!
I want to create a server group, but don't know how to assign values to ones like "Max. requests in queue", "Max. no of logons" and so on.
Could you please advise me how to allocate values to the resourses shown below;
Advanced : 1 *I think "1" is the flag for advanced settings
Max. requests in queue
Max. no. of logons
Max. disp. of own logon
Max. no. of WPs used: *should be the total of SM50, I guess
Min. no. of free WPs
Max. no. of comm. entries
Max. wait time
thanks in advance,
HozyHi,
Would you check this [Parallel Processes |http://help.sap.com/saphelp_sm32/helpdata/EN/e8/df959834ac11d586f90000e82013e8/frameset.htm] and [Parallel processes FAQ|http://www.saptechies.com/ccinfo-parallel-processes-faq/] i hope will get some hint.
Regards
Mohan Rao -
System copy - CUA how to keep (merge) some of the old target system users ?
Hi,
can anyone suggest if the following is possible and if so, the best way to enable the following within a CUA landscape :-
Standard SAP System Copy of Production to QA.
Cleanup of "Production" user master records in the QA system to remove users not required in QA.
Resend a set of test user id's which existed in the pre-system copy QA system (and still in the QA CUA master system) to the newly copied QA system to merge with the cleaned up QA user master.
Re-link the new QA system with the QA CUA master system to transfer the "merged" list of QA users into the QA CUA.
I've simulated the above on a test server but the process of sending down the sub-set of old QA test id's from the CUA master (using report RSCCUSND) does not create the users in the QA client even though the report itself appears to have transferred the users. Checking SU01 on the target CUA client shows no user has been created and there are no idocs passed from Master --> Client.
Other than either exporting the QA users to a transport before the system copy (for re-import after the system copy to replace the copy of the production user masters with the old QA list), or using the "production" users in QA following the system copy I can't seem to find a way of merging some of the old QA users with a cleaned up list of production users in the QA system post system copy.
If anyone knows of a way to do what I'm suggesting then please let me know.
Brian.Hi Brian,
I don't think there is an option, directly.
However what I would do is.
Before System Copy
On the QA Side:
1) Create a new client in the QA and only copy user masters in the empty client.
2) In this new client, keep only those users I need after client copy.
3) Take help from ABAP guys to include all usr* table entries (with MANDT field selected only for the new client) into a transport request and save it for later use.
On the Production Side:
1) Export user masters of the production client
2) Create a new client in Production and re-import the user masters
3) Work on the new client to cleanse the unwanted users.
4) Re-export the new user master of the new client and save it for later use.
After System Copy
1) Import the exported user masters from the production server , thus overwriting the client with the users selectively chosen from the production user master.
2) Import the transport request to merge the older users from the QA.
I know this is a crude way.. anyways..
Hope that helps,
Siddhesh -
Hello gurus,
we have a SAP GTS-client connected to our ERP quality assurance (QA) system for testing purposes.
Now, we are planning to do a client copy from our ERP production system to our ERP QA-system.
After that, there will be a inconsistency between ERP and GTS (QA clients):
E.g. I created several new vendors in our ERP QA-system that were then transferred to SAP GTS (QA) with the vendor number given by the system (lets say vendor 215245 u201CTestvendor Inc.u201D). Now after the client copy, those vendors will have been overwritten in SAP ERP (QA) and there will be a u2018realu2019 vendor with that vendor number (e.g. 215245 u201CRealvendor Corp.u201D)).
Same goes for documents created for testing before the client copy.
My question is: How can I handle those inconsistencies? May I just transfer all the changed business partners and documents again or will that give me additional trouble?
Thanks in advance
AliciaHello Alicia,
just execute initial transfer of customers/vendors. Changes will be overwritten with no inconsistencies.
With the documents i assume inconsistencies, but you will see them in the system log.
BR,
Gabriel. -
CLIENT COPY- HOW TO Transport client dependent objects
Hi
We are planning to do Client copy and after reading forums it seems that some objects doesnot get copied over like
Transfer rule
DataSource
Transfer Structure
InfoPackage
Process chain
Process chain variants (PSA processes)
now my understanding is i have to transport this object from System A to B
Release the transport and do the system copy.
Question 1-- what steps i need to make sure while creating a transport.
Q2 Should i click on the object in Transport connection and select (Transport all below, add/remove additional object)
(BECAUSE if i dont do that the boxes TRANSPORT is visible and no check box is in there )
q3 - What should be grouping ? (in dataflow before/afterwards, save for system copy etc. ?? )
q4 What should be Collection Mode - Collect automatically or start manual collection
q5 what should be selected in PACKAGE
q6 i can find Process chains and not PROCESS VARIANTS
q7 i can find Transfer rules but i cannot find TRANSFER STRUCTURE
i just want to make sure how to do these for all objects???
as i have to release the transport before system closes outthanks
but i still need to create transport and i want to know what options to choose while creating a transport request...
so
1 thing is clear i have to choose SAVE FOR SYSTEM COPY
but following question i still need to do manually and need to know what to select
Q2 Should i click on the object in Transport connection and select (Transport all below, add/remove additional object)
(BECAUSE if i dont do that the boxes TRANSPORT is visible and no check box is in there )
q4 What should be Collection Mode - Collect automatically or start manual collection
q5 what should be selected in PACKAGE
q6 i can find Process chains and not PROCESS VARIANTS while selecting process chains in transport
q7 i can find Transfer rules but i cannot find TRANSFER STRUCTURE -
How much space does client copy of ECC6 IDES client 800 requires
Hello
Does anyone knows how much space does client copy of ECC6 IDES client 800 requires?But I do not have enaugh disk capacity at the moment. So I ned to order it
You donot have to perform the client copy actually . You have to just run the test, it will not consume any disk, probably some archive files will be generated
Regards,
Subhash -
how i can create client copy .
pls tell me step by step procedure to create client.
and client copy.For client copy login to source client with t-code scc4 and create the new client. Provide the details for new clients.
Create the new logical client for new client.
check for the the profile parameter
login/no_automatic_user_sapstar = 0
login to destination client with sap* and p/w as pass.
run t-code sccl for local client copy with sap_all.
Kindly provide the points if issue solve.
Regards,
Rohit mehta -
My Client Copy/Export keeps failing!
Guys,
I have tried almost everything but any attempt to perform a local client copy keeps failing. I have tried a client export but that too didnt succeed.
Configuration:
- R/3 Enterprise 4.7 1.10
- AIX 5.2
- DB2 with FixPak10
Error log of the export.
Main export
Transport request___: N02KT00205
System______________: N02
tp path : tp
Version and Release: 340.16.03 640
SQL error -902 accessing AGR_HIERT: SQL0902C A system error (reason code =
SQL error -902 accessing LKSML: SQL0902C A system error (reason code =
SQL error -902 accessing T074: SQL0902C A system error (reason code =
Incorrect export. Request is not imported.
Main export
End date and time : 20060508121828
Ended with return code: ===> 12 <===I have sm21 logs
20:37:52 BTC 11 220 DDIC BXF Table logging in program RSCLXCOP disabled by user DDIC
20:38:50 BTC 11 220 DDIC BB1 Buffer TABL reset
20:38:50 BTC 11 220 DDIC BB1 Buffer TABLP reset
20:38:51 BTC 11 220 DDIC F77 Spool: Invalid Output Device
20:38:51 BTC 11 220 DDIC F77 Spool: Invalid Output Device
20:38:51 BTC 11 220 DDIC FBJ DB_RTAB_ERROR at Table TSP0A, Error 64 rspogdio 2
20:38:58 DIA 03 000 SAPSYS D01 Transaction Canceled BT 513 ( )
20:38:58 DIA 03 000 SAPSYS R68 Perform rollback
20:44:58 SPO 15 000 SAPSYS Q0I Operating system call gethostbyname failed (error no. 0 )
20:46:52 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
20:47:23 DIA 00 200 Z714G41 DB13 BYM SQL error -902 . Work processes in reconnect status
20:49:18 BTC 12 220 DDIC BYM SQL error -902 . Work processes in reconnect status
20:49:18 BTC 12 220 DDIC R68 Perform rollback
20:49:18 BTC 12 220 DDIC BYY Work process has left reconnect status
20:49:18 BTC 12 220 DDIC AB0 Run-time error "DBIF_RSQL_SQL_ERROR" occurred
20:49:18 BTC 12 220 DDIC AB1 > Short dump "060503 204918 rn0434 DDIC " generated
20:49:18 BTC 12 220 DDIC D01 Transaction Canceled 00 671 ( DBIF_RSQL_SQL_ERROR 20060503204918rn0434 DDIC 2201 )
20:49:19 BTC 12 220 DDIC R68 Perform rollback
20:51:48 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:04:45 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:12:14 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:13:34 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:42:13 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
22:01:37 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
22:36:14 BTC 11 220 DDIC R68 Perform rollback -
How to cancel a test client copy
Hello together,
please can somebody tell me, how to cancel a client copy in testmode, which in called in dialog ?
The GUI is off, but the clientcopy in SCC3 is running.
In sm50 you can see wpxx working on the test client copy.
How to cancel?
There is no job in sm37?!
best regards,
Carsten Schulz
ebmpapst.com... and do not be surprised if it "comes up" again ...
just my 2 cents - as I had this once, that it always reoccured :-((
Regards
Volker Gueldenpfennig, consolut.gmbh
http://www.consolut.de - http://www.4soi.de - http://www.easymarketplace.de -
Im trying to get ride of Alias but it keep making copy Now my trash is so big....How long it will take to empty the trash
That's not how it works. Once a device (including a computer) is associated with an Apple ID it cannot be switched for 90 days. See this Apple KB article for more information: http://support.apple.com/kb/HT1420.
Maybe you are looking for
-
Check number on payment document number
Hi, I made vendor payment through F-53. Document number generate: 1700000043 & 1700000044 Now i printed check through FBZ5 and drew a manual check through FCH5 for each document mentioned above. Now i went to FB03 and view the above two documents. Bu
-
Unable to access the AdfLibraryJar bindings
Hi All,a I am using Jdeveloper 11.1.14.0, I have ADF Application and if i run this application it is running fine with out giving any errors. For this application i have created AdfLibraryJar and placed in the local file system. I have Webcenter appl
-
JFileChooser - filename going away on switching directory
When the JFileChooser opens up, a selected file name can be shown in the file name edit box. However, as soon as the user switches directories, it is cleared. Is there any way to make the filename stay after switching directories? A perfect example w
-
View Aquired Image in a Tab control
In order to conserve space I would like to view a live image, aquired from a 1409 board,in a page of a tab control. Also to decrease cpu usage I have set up a Low Level ring. I have tried sending the image to a picture control, but the image is chopp
-
Battery service error + running quite hot
I've notices the last couple of weeks that my macbook is acting very strange, it sometimes dies at 32% and when i try to reboot it gives me the icon that the battery is empty. Now today i notices this error on my battery where it says "service batter