How to reverse/change SRM PO with status "transaction completed"

We use Extended Classic scenario in our company.      There is a PO has outstanding G/R balance,   but user accidently hit the button "complete"on this PO  in SRM ,   in result the PO has been completed with status "transaction completed".    And nothing can be performed on this PO.   
G/R balance is out there and now it has financial impact as it blocked the funding thru internal order. 
Anyone have idea how we can resolve this problem.    Can we reverse/change the PO status?   Please note G/R canu2019t be entered in ECC as restricted.  
Thanks,
Frieda

I think it was CRM_JEST. But the way to easily select the correct entries:
1. Go to transaction BBP_PD
2. Enter BUS2201 and the order number
3. Double click on the status table, this will take you to SE16 with all the different status for the PO
4. Select the entry to delete
5. Enable debugging by putting /h into the transaction field
6. Double click "CODE" and change this to "DELE"
7. F8 (leave debugging)
8. Click on the delete icon and save.
Done.

Similar Messages

  • How to delete a PS network with status 'Technically Completed' (TECO)?

    Dear all,
    We have Webdynpro application, which will create a PS network in background. In the past it was working fine and many PS network  are created. Now we have a scenario where some of the networks which are with status 'Technically Completed' (TECO) needs to be deleted from system. I tried to delete it from CJ20N, but it was not possible as the status is set to TECO. Please let me know how to delete a PS network which is with status 'Technically Completed'  (TECO).
    Thanks in advance.
    Regards,
    Vijay

    The cluster goes out and finds all networks that are available.  This is an automatic process.  As long as there is a network there, it will show it.  If you don't want it to show, disable the interface and it will disappear.
    . : | : . : | : . tim
    Thanks a million Tim! Disabling the correct interface made it disappear!
    Actually, I had disabled the interface before I started this thread. When you posted the suggestion, I went back and looked at the network connections again and found out that I had disabled the wrong interface! My bad!
    However, here is the interesting thing:
    After I disabled the NIC and it disappeared from the FCM I physically disconnected its cable (actually I disconnected all unused / unconfigured NICs) ....then I re-enabled it. Now I see that FCM does NOT pick it up again.
    I think FCM picked up those NICs because at one time I had put that NIC in the production VLAN (from the switch side).
    One observation:
    If you have NICs in a HV machine which are not connected to a switch, they do NOT show up in FCM. Once you connect them to some network, they start showing up. I guess by connecting them to a network, they are able to see NICs in other HV nodes.
    Take a look at this screenshot. I have 6 NICs in there which are disconnected, none show up in FCM
    -Rajeev rajdude.com

  • How do I change my country with a balance in my account

    How do I change my country with a balance in my account

    Contact iTunes Customer Service and request assistance
    Use this Link  >  Apple  Support  iTunes Store  Contact

  • How can I change from paying with a credit card to using prepaid for itunes

    How can I change from paying with a credit card to using prepaid for itunes on ipad 2 .alrwady have app ID

    iTunes Store: Changing Account Information
    http://support.apple.com/kb/HT1918
    Apple ID Support - Manage Account
    http://www.apple.com/support/appleid/manage/
     Cheers, Tom

  • How can I change the language with the .dat (.bak) file?

    How can I change the language with the .dat (.bak) file? Is it legal?
    How does it work?
    Thanks for answering

    https://discussions.apple.com/message/17364930#17364930

  • How can I change of page with double click on my I-pod nano 7th generation?

    How can I change of page with the double click feature on my I pod nano 7th generation?

    I can't really understand what you are asking. Can you elaborate?

  • How to create  a test plan with specific transactions (or program)

    Hello,
    I'm a new user in Sol Man !
    How to create  a test plan with specific transactions (or program).
    In my Business Blueprint (SOLAR01) I've created in 'transaction tab' the name of my specific transactions and linked it.
    In my test plan (STWB_2) those specific doesn't appear to be selected !
    Thanks in advance.
    Georges HUYNEN

    Hi 
    In solar01 you have defined but you have to assign the test case in solar02 for this test case in the test cases tab.
    When you do so expand the business sceanario node in test plan generation of STWB_2 transaction and now that will appear.
    Also visit my weblog
    /people/community.user/blog/2006/12/07/organize-and-perform-testing-using-solution-manager
    please reward points.

  • Close PO's with status Transction complete programatically

    Hi all,
    We are on SRM 5.0..I need to programatically close some PO's in the system which are in status "Transaction complete".Is there any std FM which can be used to close such PO's?
    Thanks!

    Hi
    Try these two FMs BBP_PROCDOC_GETDETAIL,  BBP_PROCDOC_UPDATE  and BBP_PROCDOC_STATUS_CHANGE
    Regards
    Virender Singh

  • How to reverse A/P return with wrong price update

    Hi all expert,
    Case as below:
    1.  Key in GRPO 1959 u2013 received stock from supplier 20ctn, unit price 130/ctn.
        Journal entry created as below:
        Dr finish goods RM 2600, Cr Goods received not invoiced RM 2600.
    2. After that issue A/P return to return the stock for the GRN PO 1959. The customer
        Key in Goods Return 112 u2013 return 20ctn, unit price RM125/ctn.
        Thus double entry created
        Dr finish goods RM 2500, Cr Goods Received not Invoiced RM 2500.
        The correct price was RM 130/ctn. But user had key in the price wrongly in the A/P return.
        How to i reverse & change Goods Return to RM 2600, how to do this?
        My current solution is copy A/P return to A/P credit memo, then issue A/P Invoice with similar
        amount to offset the wrong credit memo? But there is too many step. Any better idea?
    Regards,
    Eric Tan

    hi,
    Do material revaluation to effect correct price of item.
    Jeyakanthan

  • How Can I change a report with base in another in the same dashboard?

    Hi,
    I need to publish two reports in a dashboard, the first report is a list of values and the second report is a chart. When I click in a value of the first report, the second report must change with the value selected from the first report.
    I first created the first report, and I changed the column properties in the data format, I selected treat text as: "Custom Text Format", the Custom Text Format is:
    @[html]"<f ont class=Nav oncl ick=\"Ja vaScr ipt:GoNav(event, '/path/reporte2','TABLE','FIELD','"@"');\">"@"< /fo nt>";;@
    The second Report has the next filter: FIELD is equal to / is in @{NQ_SESSION.@}
    With this the first and second reports works well, however, when I include the two reports in dashboard, the second report is updated in another window not in the same section.
    How Can I change the second report in the same page or section where this the first report?
    Thanks
    Edwin Guerrero

    I am not sure whether this would work but worth a try. Create a third report which would call the 2nd report using iframe and GO URL. Name the iframe of the narrative view. And use the java script to update the iframe using objWin = window.open(<ur go url>, “biee”,”height=480,width=240,scrollbars=yes,resizeable=yes”);. I had used a similar method to integrate biee with mapviewer. You can check it out here http://oraclebizint.wordpress.com/2007/09/26/oracle-bi-ee-10133-and-mapviewer-step-by-step-integration-phase2-and-phase3/
    Thanks,
    Venkat
    http://oraclebizint.wordpress.com

  • How to find out the projects with status "Invalid"?

    I'm new to Oracle Projects -OP. We are on 12.0.4. This' my new job.
    I have a task of "Remove projects with status 'Invalid' ".
    Questions:
    How to access the OP forms to verify the existent of the invalid projects?
    What are the PA tables having the status info -- I mean those showing the status with 'Invalid'?
    Thanks A lot.
    an apps dba

    I could not find a sample for the DELETE_PROJECT. I have coded the delete project by modifying the sample of the CREATE_PROJECT.
    -- delete a project with the status INVALID shown in pa_project_statuses.project_status_name
    --set serveroutput on size 20000
    DECLARE
      -- Variables needed for API standard parameters
      l_api_version_number          NUMBER := 1.0;
      l_commit               VARCHAR2(1) := 'F';
      l_return_status          VARCHAR2(1);
      l_init_msg_list          VARCHAR2(1) := 'F';
      l_msg_count               NUMBER;
      l_msg_index_out          NUMBER;
      l_msg_data               VARCHAR2(2000);
      l_data               VARCHAR2(2000);
      l_pm_product_code          VARCHAR2(10);
      l_responsibiity_id          NUMBER;
      l_user_id               NUMBER;
      l_pm_project_reference     PA_PROJECT_PUB.PROJECT_IN_REC_TYPE;
      l_pa_project_id          PA_PROJECT_PUB.PROJECT_IN_REC_TYPE;
      API_ERROR               EXCEPTION;
    BEGIN
    -- GET GLOBAL VALUES
      select user_id, responsibility_id
        into l_user_id, l_responsibiity_id
        from pa_user_resp_v
       where user_name = 'J23N';          -- need to get from Apps
    --SET GLOBAL VALUES
        pa_interface_utils_pub.set_global_info(
        p_api_version_number     => 1.0,
           p_responsibility_id     => l_responsibiity_id,
           p_user_id          => l_user_id,
        p_msg_count          => l_msg_count,
           p_msg_data          => l_msg_data,
           p_return_status          => l_return_status);
    -- PRODUCT RELATED DATA
      l_pm_product_code := 'R_INVALID';           -- can be user defined
    -- PRODUCT DATA (PROJECT_IN_REC_TYPE)
       l_pm_project_reference.pm_project_reference := null;
       l_pa_project_id.pa_project_id := 1001;
    --INIT_CREATE_PROJECT
      --pa_project_pub.init_project;
      dbms_output.put_line('Before delete_project');
    --DELETE_PROJECT
      pa_project_pub.delete_project(
         p_api_version_number => l_api_version_number,
         p_commit                    => l_commit,
         p_init_msg_list         => l_init_msg_list,
         p_msg_count                => l_msg_count,
         p_msg_data                  => l_msg_data,
         p_return_status         => l_return_status,
         p_pm_project_code       => l_pm_product_code,
      p_pm_project_reference => l_pm_project_reference,
      p_pa_project_id         => l_pa_project_id 
    -- Check for errors
      if l_return_status != 'S'
      then
        raise API_ERROR;
      end if;
      dbms_output.put_line('Deleted Project Id: ' || l_pa_project_id.pa_project_id);
      --dbms_output.put_line('Deleted Project Number: ' || l_project_out.pa_project_number);
      Commit;
    --HANDLE EXCEPTIONS
    -- Get the error message that were returned if it did not complete sucessfully
      EXCEPTION
      When API_ERROR then
        dbms_output.put_line('An API_ERROR occurred');
        if l_msg_count >= 1
        then
          for i in 1..l_msg_count loop
            pa_interface_utils_pub.get_messages(
              p_msg_data      => l_msg_data,
              p_encoded     => 'F',
              p_data           => l_data,
              p_msg_count      => l_msg_count,
              p_msg_index_out => l_msg_index_out);
            dbms_output.put_line('error message: ' || l_data);
          end loop;
          rollback;
        end if;
      When OTHERS then
        dbms_output.put_line('An error occured, sqlcode = ' || sqlcode);
        if l_msg_count >= 1
          then
          for i in 1..l_msg_count loop
            pa_interface_utils_pub.get_messages(
              p_msg_count      => l_msg_count,
              p_encoded     => 'F',
              p_msg_data      => l_msg_data,
              p_data           => l_data,
              p_msg_index_out => l_msg_index_out);
            dbms_output.put_line('error message: ' || l_data);
          end loop;
          rollback;
        end if;
    END;Can anyone with the experience of PA_PROJECT_PUB make comment on this Delete Project block? On the struncture level is it correct?
    I run it and get
      pa_project_pub.delete_project(
    ERROR at line 48:
    ORA-06550: line 48, column 3:
    PLS-00306: wrong number or types of arguments in call to 'DELETE_PROJECT'
    ORA-06550: line 48, column 3:
    PL/SQL: Statement ignored
    Please make your comment on the structure (the logic)  of the delete project before providing the advice on the debug.
    I would like to make sure the logic is correct first.
    TIA

  • SRM GoA with status as "Distribution Incorrect" althogh contract is created in ERP

    Dear SRMers,
    We are using the classic scenario with SRM 7.0.2.
    I am facing a problem with Global out line agreements in SRM where the status of the GoA is showing as: "Distribution incorrect".
    We have verified that the respective IDOC of type BLAORD is generated and posted in the backend R/3 system and the respective Contract is also created in the R/3 system(ME33K).
    Can you advise me why this wrong status and can we correct this status to: "Distributed"
    or Is it a standard product error?
    Looking for your valuable advise.
    Thanks in advance.
    -Loknath

    Hi Loknath,
    Try to check transaction RZ20. It should show the real errors behind the "distribution incorrect status".
    I hope this helps,
    Marta

  • I am planning to change my e- mail address to a g mail account.... how do I change the info with Apple?

    I am planning to change my e-mail address to a g-mail account.
    How do I change my apple accounts?

    Manage your Apple ID primary, rescue, alternate, and notification email addresses. Add, change, or delete the several types of email addresses you can use with your Apple ID account.

  • How can I change Time data with List Entry Screen ?

    Hi expert.
    I transfer Time Data (Infotype 2003) via CAT6.
    When I go to transaction PA61 and click List Entry icon.
    Record is display and cannot change data.
    If I wanna change data.I must to click Choose Icon one by one record.
    How can I change data with List Entry Screen?
    ps. If record create via PA61. I can change data with List Entry Screen.
    I can't change with record that create via CAT6.
    Best Regards.

    have u tried to change your time entry through CAT2 tcode, ithink if u have created profile for time entry then it should allow you to change and you can use esc otherwise, its generally the standard profile given by SAP. but is 4 one user
    hope this helps
    guds

  • How can I change iPhone 3GS with iPhone 4 White ?, How can I change iPhone 3GS with iPhone 4 White ?

    I am using a iPhone 3GS at the moment...and I would like to change that phone with iPhone 4 White.. so.. where can I change and how ?...

    Not sure I understand the question... you want to swap your phone out?
    If that's the case, depending on who your provider is, and where you originally purchased the phone, you should probably begin your discussion there, and find out if you have an upgrade or exchange option.
    If you've purchased the iPhone 4, and just want to sync and start using THAT phone instead? And have all of your apps, and music moved over there? Well... we can do that!
    If you can clarify the question, I'll narrow down the answer!
    Thanks...

Maybe you are looking for

  • Wi-fi option on my ipod touch is greyed out?

    Hi, My ipod touch won't connect via wi-fi and the option is greyed out when I try to connect manually. Two other ipod touches in my house are working fine. I've already reset it 3 times and no change. Help!

  • No video on wmv file

    When i play an WMV file on QuickTime Player - I get sound, but no video .... any suggesions?

  • ASM LABLED DISK NOT SHOWN IN GRID INSTALLATION

    Hi Guru, Im new to oracle,just started, we are installing ORCALE 11gr2 11.2.0.3 single node cluster for an test environment on RHEL 6.2. we installed oracle prerequisite with yum provided by oracle with following command. yum install "oracle-rdbms-se

  • ADD a column in a query

    Hi I want to add a column in my query. This column is the sum of the net value and the tax ..please how can I do this without refering to ABAP development.. thanks in advance

  • How to display this  ... ?

    Hi all, I have two data model where each one generate data as example below :- Data Model A Reqnum __ Data 10671____ Submit 10671____ Forward 10671____ Approved 10672____ Submit 10672____ Forward 10672____ Approved 10673____ Submit 10673____ Forward