How to stop a running job in 10g Scheduler?

The following is a duplicate post. I posted the following to the general database forum before seeing that otn has a new scheduler forum:
I am not able to find in the Admin Guide a method to stop a currently running instance of a job in the 10g scheduler.
In 9i, I run the following script calling DBMS_JOB.broken and DBMS_JOB.remove to shut down currently running jobs:
DECLARE
jobid NUMBER;
CURSOR c1
IS
SELECT job
FROM dba_jobs
WHERE priv_user = 'ME';
BEGIN
OPEN c1;
LOOP
FETCH c1
INTO jobid;
EXIT WHEN c1%NOTFOUND;
DBMS_JOB.broken (jobid, TRUE);
COMMIT;
DBMS_JOB.remove (jobid);
COMMIT;
END LOOP;
CLOSE c1;
END;
How may I create similar code to shut down currently running jobs using DBMS_SCHEDULER in 10g? According to the Admin Guide, disabling jobs with the force option will still allow the job to finish.
How can I terminate a running job in 10g?

You can stop a currently running job using the STOP_JOB api.
STOP_JOB Procedure
This procedure stops currently running jobs or all jobs in a job class. Any instance of the job will be stopped. After stopping the job, the state of a one-time job will be set to SUCCEEDED whereas the state of a repeating job will be set to SCHEDULED or COMPLETED depending on whether the next run of the job is scheduled.
Syntax
DBMS_SCHEDULER.STOP_JOB (
job_name IN VARCHAR2
force IN BOOLEAN DEFAULT FALSE);
Parameters
Table 83-44 STOP_JOB Procedure Parameters
Parameter Description
job_name
The name of the job or job class. Can be a comma-delimited list. For a job class, the SYS schema should be specified.
If the name of a job class is specified, the jobs that belong to that job class are stopped. The job class is not affected by this call.
force
If force is set to FALSE, the Scheduler tries to gracefully stop the job using an interrupt mechanism. This method gives control back to the slave process, which can update the status of the job in the job queue to stopped. If this fails, an error is returned.
If force is set to TRUE, the Scheduler will immediately terminate the job slave. Oracle recommends that STOP_JOB with force set to TRUE be used only after a STOP_JOB with force set to FALSE has failed.
Use of the force option requires the MANAGE SCHEDULER system privilege.
Setting force to TRUE is not supported for jobs of type executable.
Usage Notes
STOP_JOB without the force option requires that you be the owner of the job or have ALTER privileges on that job. You can also stop a job if you have the CREATE ANY JOB or MANAGE SCHEDULER privilege.
STOP_JOB with the force option requires that have the MANAGE SCHEDULER privilege.

Similar Messages

  • How to stop the running infospoke

    Hi Experts,
    there is a infospoke is still running so long time, it's incorrect, i'll cancel it as kick off the dependenies, i have no idea to how to stop the running infospoke. Anybody could tell me how to do it. thanks in advance.

    hi denny,
       Go to SM37 , find the job , stop the process
    or
       To stop the job find the job with the help of the request name ( TC - SM37 ),then in the job Details find the PID .
    find the process in the process Overview (SM50 / SM51 ).
    Set the restart to NO and Cancel the process without core
    u can also see these threads that are already posted:
    stopping v3 run job LIS-BW-VB_APPLICATION_02_010
    how to cancel or change the background job which is scheduled
      In SM37, for the job , click on Step button. Then from the menu Goto > variant. You can see the process chain name here.
    sure it helps
    Thanks
    Varun CN

  • How to stop the background job "Sap_collector_for_job_statistic"

    Dear All,
    Kindly let me know how to stop the Background job "Sap_collector_for_job_statistic" which is running everyday.
    We want to stop this background job.
    Kindly suggest.
    Regards,
    Mullairaja

    Select the Job using SM37 transaction. In the Menu Choose
    Job ---> Cancel Active Job.
    Before you do this it may be good idea to check the pid using SM50.
    It will be using a Background work process. Check the pid and the status.
    Select the same and in the Menu Choose Process --> Cancel with Core.
    Refresh and check in SM37 for the Active and Cancelled Jobs.

  • How to stop the running process chain

    How to stop the running process chains or infopackges...just qm status change is enought?

    BI - SM 37 - Kill the Job
    ECC - SM 50 - Kill the job

  • How to stop a batch job

    Hi Folks,
    Please do let me know how to stop a batch job.
    I am having a batch job which will run a program for every 15 mins in order to update some Z-tables.
    I need to debug and do some investigation. Meanwhile when I am doing this debugging it may take 20-30 mins also. Here this background job scheduling is getting started and the table getting updated and I am not able to do any investigation..
    Can anyone please let me know how can I stop this batch job scheduled every 15 mins taht is make it stop for an hour. So that after my investigation it should keep on running the batch job for every 15 mins.
    Regards
    Mac

    If u schedule this job from SM36 then u can make it active or inactive from there only. From SM36 ..give the name of ur job then press Extended job selection button..then in next screen choose Active tab and there u can check the checkbox "Job on longer active in time interval" and then give ur time.
    Hope this info will help u.
    Regards,
    Joy.

  • How to stop the v3 jobs?

    how to stop the v3 jobs?

    Goto SM37... Give Job Name as LIS. User  *.
    Enable Scheduld, Released and Active Check boxes...execute.
    check job belongs to your Application.
    You cancel the Active Job if you stop the Job.
    or
    You can make Released Job to Scheduled (Menu option Job --< Released --> Scheduled.).
    Hope this helps.
    Nagesh Ganisetti.

  • How to 'STOP' a running java thread in J2ME?

    Dear All,
    How to 'STOP' a running java thread in J2ME?
    In the middleware viewpoint, for some reasons we have to stopped/destroyed the running threads (we have no information how these applications designed).
    But in J2ME, Thread.destroy() is not implemented. Are there other approaches to solve this problem?
    Thanks in advance!
    Jason

    Hi jason,
    Actually there are no methods like stop() and interrupt() to stop the threads in J2ME which is present in normally J2SE Environment.
    But the interrupt method is introduced in Version 1.1 of the CLDC.
    So, we can handle the thread in two ways.
    a) If it is of single thread, then we can use a boolean variable in the run method to hadle it. so when the particular boolean value is changed , it will come out of the thread.
    for eg:
    public class exampleThread implements Runnable
    public boolean exit = false;
    public void run()
    while(!exit)
    #perform task(coding whatever u needed)
    public void exit()
    exit = true;
    b) If it is of many threads then we can handle using the instance of the current thread using currentThread() method
    for eg:
    public class exampleThread implements Runnable
    public Thread latest = null;
    public Thread restart()
    latest = new Thread(this);
    latest.start();
    public void run()
    Thread thisThread = Thread.currentThread();
    while( latest == thisThread )
    #perform some tasks(coding part);
    public voi d stopAll()
    latest = null;
    while ( latest == thisThread )
    performOperation1();
    if( latest != thisThread )
    break;
    performOperation2();
    Regards,
    Prathesh Santh.

  • How do I monitor running jobs in the Portal (or other J2EE)

    How do I monitor running jobs in the Portal (or other J2EE), like SM66 in
    R/3 ?  We were having an issue that one "job" doing database work was
    holding up doing any modification work in KM. The DBAs could see what was
    holding this up in the database by not doing commits, but unlike R/3, I
    can not find a way to tell what process is generation the database work.
    Is there a monitor in J2EE or Portal that would provide this
    information? This would be valuable in our Webdynpro for Java environment also.
    Thanks for any guidance.

    Hi,
    You can monitor java using Visual Administrator tool and through CCMS RZ20.
    Following PDF shows the JAVA monitoring tools availabe in SAP netweaver.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/1f21b290-0201-0010-5c9b-e9f777c17902
    http://service.sap.com/javamonitoring
    Rakesh

  • Reg: How to Stop Polling of JDBC Adapter without Scheduling the adapter

    Dear Gurus,
    Here I am having one requirement. My clients wants to send data from JDBC adapter (ORcale System table) to R3 system via RFC.
    His Requirement::
    1. He is not telling the time of data flow from Oracle server so that based on that we can schedule the adapter in the Communication Channel monitoring (Availablitiy Time Planning) or Else we can Schedule by deciding the setting of the polling interval time.
    2. He is telling that When ever he waants to send the data he will place one dummy file in the File Adapter FTP location so that it will became an Indication for u to poll the jdbc adapter and to transfer the data to R3.
    3. Untill he keeps the file or gives indication he doesn;t want to communicate with Oracle server due to some security and it s a most important data base he doesn't want to disturb that Oracle Server as so many business are running  on that.....
    We Proposed::
    1. Atleast you need to tell the scheduling time or poll interval time so that we can schedule our adapter.
    but he s not accepting for this
    2. Atleast U need to give access for Data base to enter one more extra field like STATUS CODE so that we will add one number and we keep on Update in the Update table and based on that Update table statement it will poll.
    but he s not even accepting for this
    3. Finally we prposed that to create another table in the Oracle SYstem as Dulplicate Table which is similar to Standard Orginal table when ever he wants to pick the data please keep that data in this Duplicate TABle so that JDBC adapter will pick the data from thsi TABLE instead of picking the data from that standard table so that it will not effect any standard table data in the table.
    but he s not even accepting for this
    We have done some R & D:::
    1. WE approached even through BPM and via switch conditions is one scenario
       FILE RECEIVE >SWITCH CONDITION> RECEIVE AND SEND or else EXIT
    2. Using correlation in anotehr scenario means correlating File adapter and JDBC and based on one dynamica value it will goes to SEND STEP ( RECE IVE --> RECEIVE --> SEND STEPS )
    Even though we know this...concept that...we jsut tried::
    In BPM we can control the flow in XI 3.0 but we cannot Stop the Polling of JDBC adapter at backend because one the data comes from FILE adapter it will keep on HOLD untill it receives the JDBC from Oracle then based on the condition or Correlation it will goes futher SEND step means after that file adapter is picking file or not ...what ever it may be JDBC will polls at backend and brings that data to BPM"
    Hence sugest me How to Stop Polling of JDBC Adapter without Scheduling the adapter or else using STATUS CODE Update statements in JDBC Tables 
    Regards:
    Amar Srinivas Eli

    Hi! All,
    Finally I decided to do the scenario in two steps:
    1: FILE REQ --> JDBC REQ -->JDBC RES --> FILE RECV
    2: FILE RECV --> RFC
    But I am getting issue while doing first scenario
    Desgn :
    I have created 2 Synchronous interfaces :
    1) FILE 2 JDBC REQ
    In this a) out put message is FILE  Req
              b) Input msage:; FILE RES
    2} JDBC2FILE RECV
            a) Output mesage;; JDBC REQ
            b) Input Msge :: JDBC Response
    Mappings:
    1) File REQ-->JDBC REQ
    2) JDBC RES-->FILE RES
    Interface mappings:
    1: FILE 2 JDBC REQ--> JDBC 2 FLE RECV
    CONFIGURATION ::
    1: One Seder File CC
    2: Two reciever CC's one is for JDBC RECEIVER and other s FILE RECEIVER
    3; One Sender Agreement
    4: 2 Recver agreements
    5: One Interface Determination and
    6: One RECCV Determination
    My Question;;
    1. First let confirm whether my development steps are right or not ?
    2: Another thing s I am not sure reg Configuration Steps means
    whetehr one interface determination and one Receiver Determinations are required or not as these are synchronous Interfaces
    3: main Issue is::::
    If my scenario s FILE2RFC2FILE then I will get RFC response automatically but here issue is this is JDBC
    My reqquirement is By sending one Field from fILE to JDBC REQ it needs to send entire TAbLE records as a Response to file as XML
    without having Sender JDBC how can I send the JDBC Res to FILE and If that is the case then again JDBC adapter is polling which is contradict to the client requuirement which i explained above.
    pleas suggest me the Detailed steps mainly Colloboration agreements and logical routings and
    also explain in detail if i can  go for BPM
    Also give cleear blogs but before giving make sure that it contains detailed screen shots because aIready gone thorugh
    Scenario File-JDBC-RFC
    File<-->JDBC Sync coomunication.
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/xi/file-rfc-file(Without+BPM)
    /people/luis.melgar/blog/2008/05/13/synchronous-soap-to-jdbc--end-to-end-walkthrough
    Regards::
    Amar Srinivas Eli

  • How to stop Parrallell running of same batch jobs

    Dear Experts,
    I have a batch job running every 10 minutes to create and process Outbound Delivery.
    Now, Due to high volume, some jobs may take more than 10 minutes.
    In this case, some times we have 2 jobs running parallely because of the 10 minutes interval.
    How can we stop parrallell running of same jobs?
    I want to stop starting of the next job if the first job is already running.
    Please suggest
    regards,
    Sehtty

    maybe you need to reorganize how you run your jobs, instead of 10 minutes interval you may need to change it to event triggered job run.
    Create a small program B that checks if the job A is running, and that triggers an event in case the job A is not running.
    plan this small program B to run every 10 minutes, change your old job A to run based on the event that is given by the other program.
    Result: if the job A is not running after 10 minutes, then the event is issued and your job A is started.
    if job A is still running after 10 minutes, then no event is triggered, 10 minutes later B is again checking if A is running  and the loop starts again.

  • How to stop a refresh job

    Hi,
    on 10g R2 Win 2003,
    I have 10 refresh jobs running since 10 Jan. What is the best way to stop them ?
    In DBMS_JOB package I do not see STOP or KILL option.
    SUBMIT procedure
      Submits a new job to the job queue. 
    REMOVE procedure
      Removes specified job from the job queue. 
    CHANGE procedure
      Alters any of the user-definable parameters associated with a job. 
    WHAT procedure
      Alters the job description for a specified job. 
    NEXT_DATE procedure
      Alters the next execution time for a specified job. 
    INSTANCE procedure
      Assigns a job to be run by a instance. 
    INTERVAL procedure
      Alters the interval between executions for a specified job. 
    BROKEN procedure
      Disables job execution. 
    RUN procedure
      Forces a specified job to run. 
    USER_EXPORT procedure
      Recreates a given job for export. 
    USER_EXPORT procedure
      Recreates a given job for export with instance affinity. 
    Thank you.

    Thanks Helios,
    Stopping Jobs
    You stop one or more running jobs using the STOP_JOB procedure or Enterprise Manager. STOP_JOB accepts a comma-delimited list of jobs and job classes. If a job class is supplied, all running jobs in the job class are stopped. For example, the following statement stops job job1 and all jobs in the job class dw_jobs.
    BEGIN
    DBMS_SCHEDULER.STOP_JOB('job1, sys.dw_jobs');
    END;How to find job1 (is it job name ? ) and can we not write job class ?
    Regards.

  • How to stop a running report in BI Publisher?

    Is there a way to stop a running report/sql in BI Publisher from BI Publisher itself?  ( killing it in database by DBA is one way)
    Thanks
    Ashish

    Yes that is the only option which we can stop a running report in BI Publisher
    I suspect you'll need to ask your DBA to kill the session.
    However, if you have DBA privileges yourself, you can do this by a few methods, some of which are described here:
    http://www.oracle-base.com/articles/misc/KillingOracleSessions.php
    Mark if helps,
    Thanks,

  • Urgent! How to stop a running publication

    Hello all
    We're on CCM 2.0 (still with SP03).
    We have several CATALOG_PUBLICATION_REQUEST jobs running and stopping again immediately with 1 single error message (in SLG1) telling us that the publication of our master catalogue will again be scheduled in 15 minutes.
    We stopped / deleted all those scheduled jobs because it didn't come to an end else.
    Now when trying to publish the catalog, regardless whether initially or only delta/differences or even when trying to cancel the publication request the system tells us that there is already a publication in process.
    Now how to set the system status back so that publication attempts can run again properly?!?
    TIA
    Renaud

    Finally found the solution myself...
    <a href="https://forums.sdn.sap.com/click.jspa?searchID=10950961&messageID=5197763">https://forums.sdn.sap.com/click.jspa?searchID=10950961&messageID=5197763</a>
    BR
    Renaud

  • 11G R2 How to stop the backup job totally

    I have a third party application connected to 11G R2 database and is having issue every morning at 2. After applying the patch from the third part application, most of the issues are resolved. Unfortunately, I still get an ORA-12528 error - Failed to connect to database instance. Look like the third party application is having issue with the backup job. I have tried the command "alter tablespace tsname flashback off", but I check the alert log, the backup job is still running. I may have turn on the backup job during the database installation. How do I stop it?
    Thanks for any help!
    - Johnny

    Sorry, I forgot to add "alter database flashback off "command on top of the other one. The third party application is basically a monitoring and scheduler tool. It uses JBOSS and TOMCAT connecting to the database using both jdbc and odcb. It doesn't store a lot of data. Here is the alert email I got this morning:
    Target Name=MEDIAMGR
    Target Type=Database Instance
    Host=mediamgr2-db
    Metric=Status
    Metric Value=0
    Timestamp=Jan 4, 2012 2:01:12 AM PST
    Severity=Critical
    Message=Failed to connect to database instance: ORA-12528: TNS:listener: all appropriate instances are blocking new connections (DBD ERROR: OCIServerAttach).
    Notification Rule Name=Database Availability and Critical States
    Notification Rule Owner=SYSMAN
    Notification Count=1
    as for backup, I have already disabled the archive logs and flashback database. A few minutes ago, I just turn off RMAN autoback. What else can I turn off related to backup?
    Thanks,
    - Johnny

  • How to Get Current running Sqltext in 10g

    I'm using 10g and i'm using following query to get current running sql.
    SELECT A.SID,B.HASH_VALUE, OSUSER, USERNAME, SQL_TEXT
    FROM V$SESSION A, V$SQLTEXT B
    WHERE B.HASH_VALUE = A.SQL_HASH_VALUE
    AND USERNAME LIKE upper('%UOBA%')
    ORDER BY B.HASH_VALUE, B.PIECE;
    This does work for all user-triggered sqls,procedures etc.
    But when i submit a Oracle Job the above qurey doesn't give any output.So,could please anybody help me in this regard.
    Thanks in Advance.

    I have found a way to retrieve some SQL statements for a session started by DBMS_JOB using v$open_cursor: however in my test, you can only retrieve some SQL statements in v$sql_area but not all of them: query takes some time to execute and some committed statements are not (or nor more) in v$open_cursor:
    select s.sid, s.serial#, s.username, sq.sql_text
    from v$open_cursor oc, v$sqlarea sq, v$session s
    where s.username = 'TEST'
    and oc.saddr = s.saddr
    -- only for session started by DBMS_JOB
    and s.sql_hash_value = 0
    and oc.address = sq.address
    and oc.hash_value = sq.hash_value;Message was edited by:
    Pierre Forstmann

Maybe you are looking for