How to Stop workflow which is in Progress status.

Hi ,
I have started a workflow while testing , now it has reached to the inbox of different agents.
could you please suggest how to stop the workflow and rollback everything affected because of it .
best regards
abhijeet chitale

You could use the transaction SWIA to manually complete workitems. If you use the the workitem ID of the workflow instance you set the status of the workflow to logically deleted.
Other option is to use the object FLOWITEM with method statuschange to change the status to completed. Also go in there with the ID of your workflow instance.
However, my question is why you want to do this? If you're testing you could also just execute the workitem in the inboxes. Undo work which is done has to be executed manually.
Kind regards,
Joost van Poppel

Similar Messages

  • How to stop spooling and get error or status of the statement

    Hi All,
    I am using the bellow in .sql file to generate a spool file which is called from a shell script.
    The issue is whn i kill the job the .csv file is still generated and doesnt thow any error.
    Could any one please let me know how to stop spooling if the script end in between or catch the status of the error and email if spooling stops in between.
    Please help. Thanks
    below is used in .sql
    set feedback off
    set term off
    set trimspool on
    set pagesize 0
    exec dbms_output.disable
    exec dbms_output.enable(40000)
    set linesize 2000;
    set long 2000;
    WHENEVER SQLERROR EXIT 1 ROLLBACK
    whenever oserror exit 1 rollback
    alter session set global_names=false;
    spool  $HOME/data/abc.csv
    select statement;
    spool off;
    exit
    sql is called from this script:
    #!/bin/ksh
    status=`sqlplus -s / @$HOME/sql/extract/abc.sql `
    status1=$?
    if [ $status1 -ne 0 ]
      then
    mailx  -s "Fatal - Error in Extraction process "  [email protected]
    fi ____________________________________
    Edited by: user11942774 on 1 Mar, 2012 4:07 AM

    Hi, dczay, and welcome to the Community,
    Sign in to your Skype account via the Skype website; the link to Sign In appears at the upper right corner of the website page.
    Cancel the subscription.
    Please contact Skype Customer Service to explain the situation and to request a refund.
    (The blue type is actually a link to the instruction related to contacting Skype Customer Service and how to request a refund.)
    Regards,
    Elaine
    Was your question answered? Please click on the Accept as a Solution link so everyone can quickly find what works! Like a post or want to say, "Thank You" - ?? Click on the Kudos button!
    Trustworthy information: Brian Krebs: 3 Basic Rules for Online Safety and Consumer Reports: Guide to Internet Security Online Safety Tip: Change your passwords often!

  • How to stop a rman backup in progress?

    OS: AIX 5.3 L and Oracle 10g R2
    I got panic when my scheduled rman backup (incremental level 0 plus archivelog) run too long and I want to stop the process. I could not find the rman doc mentioning how to use any rman command to do that, instead of just shutdowning the database instance.with ps -ef, there were just too many PID of oracle. Is there a way by rman to STOP the process?
    Furthermore, I had no idea why it happened. Last week when I did a full copy backup, it only took 23 minutes for 32G database, Today, I changed the scheme to a level 0 incremental, and it is still running after 5 and half hours. But it already created the archivelog, datafile backupset (checked by the DB control). How to find out what went wrong?

    I did not use any third party application with rman or TSM in my AIX. what is the tdpo? Killing at OS level is probably only thing I can do now. kill -9 PID#
    Message was edited by:
    user508054
    Message was edited by:
    user508054

  • I want know to how to stop adds which is irretating me just one click i am geting 5page adds just i cant browse freel i really feel irritate

    i am using window 7 and fire fox 29 but i am not happy really because when i try to open page i am getting more 5 page and suddenly adds comes first and it take to time close but immidiatly it come again i really just cannot browse freely i feel bad really the best explorer is doing best but way not you explorer is not allow adds but way you crome and opera more adds which comes centre page corner page last page which you luck get price myatas and so many adds which irritating me i cannot brouse freely same thing also requist to crome and opera also please help to stop adds unnesary comes ways
    when i tried to open one page but i am opening other page this is very bad feeling and if open other page i wast date it give me more money unnesary data service provider please help me to solvue this proble which is very big problem for me

    Sometimes a problem with Firefox may be a result of malware installed on your computer, that you may not be aware of.
    You can try these free programs to scan for malware, which work with your existing antivirus software:
    * [http://www.microsoft.com/security/scanner/default.aspx Microsoft Safety Scanner]
    * [http://www.malwarebytes.org/products/malwarebytes_free/ MalwareBytes' Anti-Malware]
    * [http://support.kaspersky.com/faq/?qid=208283363 TDSSKiller - AntiRootkit Utility]
    * [http://www.surfright.nl/en/hitmanpro/ Hitman Pro]
    * [http://www.eset.com/us/online-scanner/ ESET Online Scanner]
    [http://windows.microsoft.com/MSE Microsoft Security Essentials] is a good permanent antivirus for Windows 7/Vista/XP if you don't already have one.
    Further information can be found in the [[Troubleshoot Firefox issues caused by malware]] article.
    Did this fix your problems? Please report back to us!

  • How to stop the 'Auto adjustment in progress' message during start-up

    Hi,
    I am using an HP 2311x  monitor and when I start up the message 'Auto Adjustment in Progress' flashes twice before my Desktop appears.  Can I stop this message from appearing?
    Thanks and regards,
    2harts4ever
    " ... Nuff Said. Keep Smiling Because I'm Smiling Too!"
    This question was solved.
    View Solution.

    Hi  Mister_Do,
    I just solved my problem by running the HP Support Assistant and then its Troubleshooting Program for Monitors.  After it got done testing my monitor and its settings everything seems to be back to normal ....i.e, no more  'Auto Adjustment in Progress' messages. 
    Thanks and regards,
    2harts4ever
    " ... Nuff Said. Keep Smiling Because I'm Smiling Too!"

  • How to stop / delete a tween in progress?

    Hi there
    I have a movie clip that I am moving with tweens. When the user clicks a button it creates a new tween and the movie clip moves. However, I have another button that sets the position of the same movie clip. The problem comes when this button is clicked if the tween is in progress. The tween continues and my content moves out of view. Is there a way to stop or delete the tween when the second button is clicked?
    Here is a simplified example of the relevant AS:
    button1.onRelease = function(){
       new Tween(movieClip, "_y", Strong.easeOut, movieClip._y, movieClip._y + 200, 1, true);
    button2.onRelease = function(){
       // code here to stop the above tween if it is in progress?
       movieClip._y = 0;
    I'm using AS2 in CS3
    Any help would be appreciated.

    Ah, I've just added that stop() command to the button function above the new Tween line:
    var tw:Tween;
    button1.onRelease =  function(){
         tw.stop();
         tw = new Tween(movieClip, "_y", Strong.easeOut,  movieClip._y, movieClip._y + 200, 1, true);
    button2.onRelease =  function(){
         tw.stop();
    It seems to work nicely. Thanks for your help!

  • How to terminate guest vm with in progress status in oem 11g

    in grid control 11g -->virtual central show:
    name type status
    ovm_build1     Guest VM     Editing
    guest :gvm11 status is alway "Editing".
    but in fact gvm22 status is Runing.
    virsh # list
    Id Name State
    0 Domain-0 running
    3 52_OVM_BUILD1 blocked
    because it is in progress in grid control 11g,we can't do anything, pls help me to correct or terminate.
    for exaple :stop guest vm ,it report the following:

    In OVM Manager there is a "reset" action that the new status is read from the OVS server.
    I don't know how this looks like in EM Manager, but there should be a similar action.
    Sebastian

  • Stopping channels which are in polling status

    HI,
    If we have a sender file adatper channel which is currently reading a file. If we stop the channel, does this stop the polling of the file.
    LIkewise for a receiver channel, if we stop a channel midway through writing a file, does the file only get partially created.
    Thanks
    Martin

    Hi Martin,
    Just Try to replicate the scenarios. You would understand the basic phenomina of polling files.
    Q1) If we have a sender file adatper channel which is currently reading a file. If we stop the channel, does this stop the polling of the file.
    Eventhough you stop the channel, it will complete the one which are under process.
    Q 2) LIkewise for a receiver channel, if we stop a channel midway through writing a file, does the file only get partially created.
    It will complete writing the files.
    Thanks,

  • How to stop email notification on PO revision - PO approval workflow

    This is part of the seeded POAPPRV Workflow. When a new PO is created, a notification is created (that requires acceptance). The PO is then revised before a response to the original notification has taken place, which deploys a new notification and closes the original one. When the original notification is closed with no response having been provided, the POAPPRV Workflow states:
    "You earlier received the notification shown below. That notification is now closed, and no longer requires your response. You may simply delete it along with this message."
    Can anyone tell me how to stop sending this second notification when notification is cancelled ?
    Thanks,
    Sunitha

    When a notification is sent to a user and the user has a notification preference to receive e-mail notifications then the notifications will be sent via e-mail and they will also appear in the user's worklist.
    If the user responds to the notification from the worklist (let's say approves) the notification will be responded to and will be removed from the worklist. Now, there is nothing that Workflow can do about the e-mail notification in the e-mail client (yahoo, ms outlook, gmail, etc). So if the user attempts to approve from there, the Workflow Inbound Mailer will realize the incoming e-mail corresponds to a notification that was responded to already. So it has to let the user know that his e-mail will not be processed. So the user will need to consider what he's done before sending an e-mail response.
    Regards,
    Alejandro

  • How to purge the workflow which is in process

    Hi Friends,
    I am facing one problem in the AME Workflow.
    when a user submit a page for approval process, workflow engine invokes . and in the hr_api_transcations table transacation id is created for that workflow transacation. now the problem is, if i purge that workflow process using concurrent program 'PURGE OBSELETE WORKFLOW RUNTIME DATA' . it is deleting the workflow. but when i see the hr_api_transacation table still the transacation id for that workflow is active.
    Example :-
    when i see through through the responsibility (workflow administrator web applications)=>Administrator workflow=>Status monitor
    when i type the item key say some x and search for the workflow status i cant see the workflow status. i can see it is deleted.
    but when i type the same item key in the hr_api_transacation
    like :- select * from hr_api_transactions where item_key='X' i can see the status of this transacation is active and workflow is in pending.
    can anyone explain me why system is behaving like.. how to stop the workflow process and how to delete the transacation id from the table.
    Thanks in advance

    Please check below nots
    453137.1 (Oracle Workflow Best Practices Release 12 and Release 11i) sections titled "Choosing Not to Use E-mail Notifications" and "Cleaning Up the WF_NOTIFICATION_OUT Queue"
    How to purge e-mail notifications from the workflow queue so the e-mail is not sent [ID 372933.1]
    264191.1 describes how to Purging Oracle Workflow tables of obsolete workflow runtime information for completed workflow processes is a required regular maintenance tas
    Notification Mailers Unavailable
    How to delete undelivered notifications from WF mailer

  • HOW TO STOP THE PROCESS CHAIN WHICH IS RUNNING IN THE PRODUCTION?

    HI ALL,
    CAN ANYONE TELL ME HOW TO STOP THE PROCESS CHAIN WHICH IS RUNNING DAILY AT 5.00 PM. I NEED TO STOP THE PROCESS CHAIN FOR COUPLE OF DAYS AND THEN RESTART IT AGAIN.
    cAN ANYONE TELL ME THE PROCEDURE TO STOP THE ENTIRE PROCESS CHAIN RUNNING IN THE PRODUCTION.
    THANKS
    HARITHA

    Hi,
    First and foremost let me advice you to be very careful while doing this.
    For Rescheduling
    RSPC> chain > Goto > Planning view and
    click on Execution tab > select > Remove from Schedule and then in Maintain variant of start process reschedule for the day you require it to run.
    For terminating active chain
    You can start from SM37, find the process WID/PID then go to SM50 or SM51 and kill it. Once its done come back to RSMO and check the request, it should be red but again manually force to red and save by clicking on the total status button in the status tab. This shuld ensure that the process is killed properly.
    The next step will be to go to targets that you were loading and remove the red requests from those targets.
    Note: For source system loads you may have to check if the request is running in the source system and kill if needed and pull it again.
    But for BW datamart delta loads u may have reset the datamarts in case u are going to pull the delta again.
    Re: Kill a Job
    Re: Killing a process chain.
    Regards,
    JituK

  • How to stop the restructuring (ran manually)  which is running in the backg

    How to stop the restructuring (ran manually) which is running in the background.
    Tried stop the data base from EAS , but got error message saying that it is not acceptiong any commands.

    The only way I know to do it is to stop the application through task manager(Windows) or Kill(Unix). First you have to figure out what PID it is, then kill it. It does come with risk of corrupting the application depending on what step it is in. If you go this route, you should clean up the new created temporary files (Otn, Esn, etc) Some newer versions don't need this last step and will clean up when the application restarts, but I'd rather make sure things look good myself.

  • Workflow infinite loop how to Stop?

    hi,
    My workflow is having a loop it runs infinite bcos the condition is not proper. Inside the loop i have a send mail step.. How to stop the Running workflow???
    Regards
    Roops

    Roop,
    It seems that the loop condition is a workflow step and not something in the method code.
    For active instances of this workflow you will have to manually intervene. There can be 2 options -
    1. Open the workflow log and change the container values such that it comes out of the condition
    2. Logically delete the workflow.
    Hope this helps

  • Hi! I've just purchased a new iPhone 5s but whenever I text people with iPhones it's always sent from my iCloud account. This means that my email show instead of my name/number which is really frustrating! Does anyone know how to stop this?

    Hi! I've just purchased an iPhone 5S but whenever I text people with iPhones it sends from my iCloud account. This means that my email comes up for other people not my name/number which is really frustrating! Does anyone know how to stop this?

    Go into Settings>Messages>Send and Receive> Is your phone number checked there? If you do not want your email used, then tap on them and remove the checkmark. If there is no checkmark by your phone number, then turn iMessage off, perform a reset on the phone, hold the sleep/wake and home buttons together until you see the Apple logo and then release. The phone will reboot. Turn iMessage on. When it activates, check your settings again under Send and Receive and make sure the number is checked and the emails are not.

  • HT4623 iPhone 4s will not boot after trying to install ios7 beta 4. Stops at apple logo with progress line under it. how can I reset it or get it back up to do a restore then try the iOS 7 beta 4 install again. Issue was probably caused by disconnection

    iPhone 4s will not boot after trying to install ios7 beta 4. Stops at apple logo with progress line under it. how can I reset it or get it back up to do a restore then try the iOS 7 beta 4 install again. Issue was probably caused by disconnection

    Obviously since you have iOS 7 you're a developer.  As a developer, you signed a NDA with Apple not to discuss the iOS on a public forum.  Please log in to the Developer Forum using your credentials and ask for help there, lest you risk having your credentials terminated.
    Thanks, and best of luck to you.
    GDG

Maybe you are looking for

  • Purchase Order and Invoice

    Hi, Is there a way to link a PO with its invoice details? Thanks

  • Error while posting the stocks

    Dear Gurus, please tell me, when I tried to post the Material1 using T-code MB1C for the wh no-6400, I am getting an error message "Material1 does not exist in 6400" Plz suggest................

  • Fujitsu ScanSnap no longer recognized in Windows 7

    After my husband installed FitBit software on our laptop, our ScanSnap S1500 suddenly stopped working.  I have uninstalled and reinstalled the original software from CD, run Microsoft's FixIt, shutdown and restarted the laptop several times and the l

  • Configuring maximum protection mode in dataguard with oracle 10g

    Dear All, I am facing a big problem in my configuration for oracle dataguard in maximum protection mode. as per oracle documentation i have done the following. on the primary database i configured the floowing parameter. LOG_ARCHIVE_DEST_2='SERVICE=C

  • Numbering the row returned

    Hi, i m having difficulties numbering the rows returned.. im using rownum function, but it returns me duplicate records even after i distinct it. and also it doesnt start from 0 ANy other way to number the row ? EDIT: using oracle function : ROW_NUMB