Indented Bills not costing - r12.1

Hello,
We have new indented bills and item master is setup with  Enable costing - checked and Include in Cost Roll up flags - checked.
We run supply chain cost roll ups and Cost manager is up and running.
Despite above, some of bills in indented bills of material show "Costed Flag" unchecked and extended cost as 0.00000.
Can any one advise with cost roll up is not revising costs on these bills and updating costs?
I also checked mtl_material_transcations for possible errors.  There are no errors for items having this issue. The costed flag is null.
Please advise.
Thanks,
Darsh

Hi Gerry,
For your scenario, the cost in period 4 will be the same like cost in period 1 because RMA transactions that are not related to specific sales order will be considered as cost derived transactions that will use the current period average cost. Then this current period average cost will be simply inherited from the previous periods [i.e. from period 1 to 2 and from 2 to 3 and then from 3 to 4 because the only cost owned activity was performed on period 1]
Hopefully this is answering your question ...
Regards
Sayed
Satyam

Similar Messages

  • Cost in Sales Order and Billing not match

    Dear all,
    I am facing a problem that the cost in Sales Order and Billing (order-related billing) not match.
    The error seems related to sales order is getting moving price (MBEW-VERPR) as cost but billing is calculated by issued amount / qty.
    Here's the detail (refer to the screen captures).
    Sales qty = 1330 PC.
    Local currency = HKD, sales doc currency = RMB, exchange rate = 1.26215.
    Condition type ZCSR, condition category = G (Internal price).
    When creating sales order ,
      Cost is take from MBEW-VERPR => 1.86 HKD
      Cost converted to doc currency =>  1.473 RMB => 1.47 RMB
      Total amount = 1,330 x 1.47 = 1,955.10 RMB
    When creating billing from the delivery note,
    Cost seems taking from total value divided by total stock in the article doc.
    Cost = 2,477.82 / 1,330 = 1.863022556390 HKD => 1.476 RMB => 1.48 RMB.
    Total amount = 1330 x [(2,477.82 / 1,330) / 1.26215] = 1,963.17 RMB
    My goal is to align the same cost and amount in sales order and billing.
    Please help.
    Thank you very much.

    Dear joan,
    Thank you very much for your advise.
    I implemented example 1 as in note 24832, trying to disable price re-determination in billing.
    However it doesn't work.
    Added code in example 1:
    Copy control Delivery type LF to invoice F2, pricing type changed to X:
    Still ZCSR re-determined but not copying from sales order (1.47 RMB):

  • KE350_We ticked "do not cost" in MM03 with KE4J setting, error in billing.

    Hi Experts,
    Most of materials need to be done costing run before creating billing in our company; therefore, we set "KE4J costing key for Type of Material (FERT) " to check if mat. already done cost estimate or not.
    But some of FERT mat. from old sys. and will not be produce anymore. Therefore, we tick "do not cost" in MM03, and transfer STD at accounting view 1 from old sys. by LSMW.
    When we've done billing, there's no accounting doc. produced.
    In VF02, release to accounting, we got these error msg.
    How do we solve this Q? (If we ticked "do not cost" and no need to check if cost estimates have been done or not.)
    Thanks in advance.
    *********Valuation with material cost estimate: error with product "1-EM-001COPY"*******************************************
    Message no. KE350
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "1-EM-001COPY" in plant "1010".
    Display material (View: Costing)
    The system looked for the material cost estimate using costing key "001", as defined in the Customizing settings for CO-PA.
    System Response
    The document cannot be processed.
    Procedure
    Contact your system administrator.

    Hi
    Either release a Std price from CK11N
    OR
    Remove the check box in KE40 "issue error msg if no cost estimate found" for the time being
    br, Ajay M

  • COPA document created from billing document, cost components are twice

    Hi Experts,
    Ref Subject line : COPA document created from billing document, cost components are twice.
    I have checked the following :
    1.  Cost Estimate of a material
    2.  Production Confirmation of the Order
    When comparing both of the above, they are same, without variance.
    Now when a COPA document is created, we observe the Cost Component Split in Sales Order to be exactly TWICE as compared to Cost Estimate of the material.
    May I please request help from you all. What must be the cause & where do i check / rectify.
    Regards,
    Hussein.

    Hi Hussein
    If you are seeing double in KE30 Report - May be you are updating both sales order and billing doc in COPA and hence you are seeing 2 line items.. But one of them will be record type A and the other one with F
    If the above is not the case and you are seeing double in the COPA document itself - Then See if you have mapped VPRS cond type in KE4I to the same value fields as Cost Comp Split
    Also, one strong possibility that you are using Batch Split in SD.. .... Which means your delivery document (VL03N) will have multiple batches of materials being delivered to the customer....
    a. In this case, your Item Category for main item (HPOS) and Sub Item (UPOS) has to be different and the Item catg for UPOS should not be relevant for billing / Costs... Note 77414 descirbes this situation and the settings to be done in SD Customizing
    b. You may need to apply note 352441 in your system
    Regards
    Ajay M
    Edited by: Ajay Maheshwari on Dec 1, 2010 5:36 PM

  • Why Indented Bills  display extened quantity as decimal ?

    I set Round Order Quantity = 'y' in master item, %yield in BOM = .9 and enforce to integer quantity = 'up', but extended quantity in Indent Bill still display in decimal. Why?

    hi,
    round order qty can be supported only in planned orders.
    next, oracle WIP will not support enforce integer rounding.
    so, intended qty will be in decimal only.

  • Find Indented Bills

    I have found a SQL query which will list all the indented bills. However, I like to list only those BOM with display option as "Future and Current". Following query lists the BOM with display option as "All". Any suggestion how I can get BOM with "Future and Current" seletion?
    SELECT bom.organization_id, msib.segment1 PARENT, msib2.segment1 CHILD,
    bic.component_quantity, LEVEL
    FROM
    apps.bom_inventory_components bic,
    apps.bom_bill_of_materials bom,
    apps.mtl_system_items_b msib,
    apps.mtl_system_items_b msib2
    WHERE bic.bill_sequence_id = bom.bill_sequence_id
    AND (bic.disable_date IS NULL OR bic.disable_date >= SYSDATE - 1)
    AND bom.assembly_item_id = msib.inventory_item_id
    AND bom.organization_id = msib.organization_id
    AND bic.component_item_id = msib2.inventory_item_id(+)
    AND bom.organization_id = msib2.organization_id
    AND bom.organization_id = :origID
    AND bom.alternate_bom_designator IS NULL
    START WITH msib.segment1 = :P1_ITEM_NUMBER
    CONNECT BY PRIOR bic.component_item_id = bom.assembly_item_id
    AND bic.bill_sequence_id = bom.bill_sequence_id

    Try
    AND (bic.disable_date IS NULL OR bic.disable_date >= trunc(SYSDATE))
    Add the following if you are looking for implemented changes only
    implementation_date is not null
    Sandeep Gandhi

  • How to calculate Amount of goods received bill not received

    Hi Gurus,
    In my vendor aging report client require one filed which is amount of goods received bill not received (Goods received amount- Invoice amount)
    can u please tell me what should i do?
    Thanks in Advance
    Kavita

    Hi,
    Actually i written a code in CMOD and enhanced the data source but the value is not proper......
    something is missing ...can anyone explain
    here is my code
    when '0FI_AP_4'.
      data  wa_DTFIAP_3 type  DTFIAP_3.
        loop at c_t_data into wa_dtfiap_3.
         select single ebeln lifnr from ekko into  (it_ap03-ebeln,it_ap03-lifnr)
            where lifnr = wa_dtfiap_3-lifnr.
           it_ap03-budat = wa_dtfiap_3-budat.
           it_ap03-budat = wa_dtfiap_3-belnr.
          if sy-subrc = 0.
            append it_ap03.
           endif.
        endloop.
      loop at it_ap03.
       select SINGLE mblnr from mkpf into mkpf-mblnr WHERE budat =  it_ap03-budat and blart = 'WE' AND
         VGART = 'WE' .
         IF SY-subrc = 0.
         SELECT SUM( dmbtr ) from mseg into   it_ap03-dmbtr where mblnr = mkpf-mblnr and xauto = '' and
           bwart in ('101','102') and lifnr = it_ap03-lifnr .
       SELECT SINGLE ebeln matnr from mseg into (mseg-ebeln,mseg-matnr) where mblnr = mkpf-mblnr.
         select sum( dmbtr ) from ekbe into it_ap03-dmbtr1
         where ebeln = mseg-EBELN  and vgabe = 2  and matnr = mseg-matnr  and budat = it_ap03-budat.
         it_ap03-tamt = it_ap03-dmbtr - it_ap03-dmbtr1.
        ENDIF.
    select sum( wrbtr ) from ekbe into it_ap03-dmbtr
    where ebeln = it_ap03-EBELN  and bewtp = 'E' and budat = it_ap03-budat.
      select sum( wrbtr ) from ekbe into it_ap03-dmbtr1
    where ebeln = it_ap03-EBELN  and bewtp = 'Q'  and budat = it_ap03-budat .
      modify it_ap03.
      clear it_ap03.
      endloop.
    loop at c_t_data into wa_dtfiap_3.
    read table it_ap03 with key lifnr = wa_dtfiap_3-lifnr belnr = wa_dtfiap_3-belnr.
    wa_dtfiap_3-zzbillamt = it_ap03-tamt.
    modify c_t_data from wa_dtfiap_3.
    endloop.
    endcase.
    Edited by: kavita on Sep 11, 2010 8:48 AM

  • Billing doc cost PCA versus GL

    The billing doc cost should be different for the PCA posting versus the GL posting. We have transfer pricing activated as well as material ledger. On the material master the standard price for legal valuation is different than profit center valuation and that is fine. When the billing doc posts it uses standard price for legal valuation for the GL posting. It should use standard price for profit center valuation. It uses legal valuation instead. Goods issue does use the correct standard price for GL versus PCA though.
    How do I make the billing doc use the correct standard price ( profit center valuation ) for PCA?

    Hi,
    I am a bit confuesed on scenario explained by you and I am tring to restate the same:
    1.  You are using Transfer Pricing and Material Ledger is active.
    2.  You have different prices updated in Standard Price for Legal and Profit Center Valuations respectively.
    3.  When you make a goods issue, the system uses the Standard Price in the Legal Valuatoin for accounting. 
    4.  You need the system to use Profit Center Valuation Price for accounting.
    Opinion.
    The Goods issue as updated in the Financial Accounting should use only the Legal Valuation values.  The Profit Center Document anyhow will have the cost of sales based on the profit center valuation.  This is by design and correct approach.
    If your question is related to values posted in Profitability Analysis.  You need to activate profit center valuation in PA and then you will see that both values flow to Profitability Analysis.
    Hope this helps you.
    Varadharajan

  • Billing note and delivery notes

    Hi, please tell me the what is meant by billing note and delivery note

    Hi Madhu,
    Delivery Note:-
    Its a Document which consists of all details realated to the Delivery Like,
    Customer,Material, Quantity, Price Etc., which is complusory document while leaving the Goods from the Plant and have to submit the Delviry note to the geat men.
    Billing Note:- It is also a document which consists of detials like customer,material,Quantity and price et., which is also compulsory doc while the goods in the Trasnsit.it will be use for sales tax,excise etc.,
    Hope this clarifies your doubts,Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Do Not cost and CCS

    Hello Everyone,
    Afresh to CO module and have a question on the 'Do Not Cost' indicator on material master data and it's effect on material costing.
    I have a raw material that has this indicator marked and the OBYC configuration has GBB - VBR mapped to, say, cost element 123.
    Now, when I run CK11N for the finished product (the BOM has the raw material), I get the error message that the cost element 123 is not assigned to a cost component.
    I understand this error can be resolved by OKTZ configuration with the 123 cost element and origin group from the material master data.
    However, my question is, what is the purpose of 'Do Not Cost' indicator in the material master data and what role does it play in costing of a FG of which the RM is a component ?
    I have read the SCN threads on this topic (a lot I would say) but didn't really understand what it means by "If the material is included in another cost estimate as a component to be valuated, the valuation price is determined through the valuation variant if no cost estimate with the same key exists for the material."
    So summarizing, my question is "for the costing of a FG with a RM having Do not cost, is OKTZ configuration really required ?"
    Regards,
    -Ani

    Hi
    Till now by seeing reply of the other consultants specially of Cristian Sir you may be convinced with your initial query.
    Now coming to the your 'Ghost material', I suggest to check OKTZ settings again and see that if the GL hit by this material is asigned in any of the cost components.
    If not the check if you have a cost component defined without giving a range of cost elements. You can check this on the screen where we assign the cost elements to the cost components. If that is the case then any cost elements which is not assigned to any of the cost components will automatically go to this blank cost component.
    Now coming to its value of .01, please check your valuation variant and check according to the strategies defined for material valuation one by one. You will definitely find this some where. Or else paste the screen of accounting 1,2 and costing 1 and 2 tabs of material master along with the  valuation variant first screen i.e. strategy for material valuation.
    Regards
    Rajneesh Saxena

  • I downloaded A software to your computer. And I connected with my iPhone. Main page does not work. I can not see it. Iitnos Store does not cost me why?

    I downloaded A software to your computer. And I connected with my iPhone. Main pagedoes not work. I can not see it. Iitnos Store does not cost me why?

    Your posting makes no sense in the English language.  Please post in your native language.

  • HT3702 İ didnt buy anything from app store but you sent me a bill that costs 2,99 usd. So, i dont want to pay this bill!!!

    Hello, as i said, even i didnt buy anything from appstore, you sent me an email that includes a bill that costs 2,99  usd. So i dont want to pay this bill because that bill is out of my knowledge!!!

    Welcome to the Apple Community.
    Select the content which is causing a problem and use the 'Report a problem' button in Your Purchase History on your computer.

  • Sto billing not proforma invoice

    Hi,
    please explain me what is the process for intra company (with in the company code)stock transport order with billing not proforma invoice .i didn't get any information relating to this scenario.
    regrads
    vr

    Hi
    There is two scenario for STO
    INTER COMPANY STOCK TRANSFER
    There is two plant under one company code. Transferring of stock is required from one plant to another plant. So there is no invoice will be generated (Except Excise Case) cause there is no sales is happening and this transferring of stock do not impact on Accounts.
    INTRA COMPANY STOCK TRANSFER
    In this scenario there is need to transfer the stock between the plant under two differenct company code. So there Invoice is required to generated cause sending plant will invoice to receiving plant cause it will be sale for sending plant. This scenario is also consider as Cross company Sales
    For any other clarification please write shambhu78 rediffmail.com
    points if solve

  • I can Billing shipment costs to the customer, But......

    hi
    I can Billing shipment costs to the customer, But i can't get an additional entry in the customer billing document.how to do? and could anyone help me?

    In the Pricing procedure, add a condition type for Freights ( preferably Manual condition). In the calculation make it add to the Net Price.

  • Error in CK11N ( Object was not costed )

    Dear All,
    In CK11N run with Costing variant NTAX.  Error message CK 060 Object was not costed.
    I updated moveing average price in material master - accounting 2 - Tax price 1 field i give the value.
    Please help me on this.
    Best Regards,
    Venkat.
    Edited by: venkateswarlu reddy on Sep 18, 2009 6:58 AM
    Edited by: venkateswarlu reddy on Sep 18, 2009 7:18 AM

    Hi,
    there could be variety of issue that would result in a cost object not being costed.
    You need to check the error log and find out what exactly the issue and then resolve it.
    Best regards
    Surya

Maybe you are looking for