Hi Gurus,
For a PO with A/C assignment category K, during invoicing a posting happens to a Cost center.
Similarly for a PO with account assignment category P, M, A during invoicing will there be any Posting to cost center.
Regards,
Murali Mani

Hi Murali,
in case of P & A , Invoice posting will take place cost center i. e. G/L which you have maintained in PO in Acct. assignment screen at item level.
whereas for M , Invoice posting will take plave to GR/IR G/L.
hope it will helps.
Cheers............
Manoj

Similar Messages

  • PO with new account assignment category to G/L without CO object

    Hello all,
    A customer in a company I work for asked me to create a new account assignment category (AAC) with G/L account as mandatory field and no CO object as mandatory.
    He would like to create a PO with this AAC directly to balance-sheet account without any CO invloved (such as PO to stock) without a material.
    I have bad feelings about this process but I do not have anything substantial to convince him against it.
    Am I wrong ? Is this process allowed ? What "bad things" may happen if we use this process ?
    Any help will be appreciated,
    Thanks,
    Isaac

    Sir -
    These stuffs are done by many indian companies to inject some bad accounts. If this is a requirement, no choices left.
    It is possible to enter the material text and u can proceed with the things u need. You can create the value contract for this requirement.
    Thanks,
    Shiva

  • Invoice transport costs with multiple account assignment

    Hello Gurus,
    My problem is the following:
    1) I create two sales orders with the same forwarding agent "A"
    2) I create the two deliveries with the forwarding agent "A"
    3) I create a transport for those two deliveries and the same forwarding agent A
    4) I create the shipment cost for that transport.
    So now we have the situation:
    2 orders --> 2 deliveries --> 1 transport --> 1 shipment cost
    when i go to transaction MIRO and I enter the delivery note number I get one line item with the total transport cost.
    If I click on the option "Multiple account assignment" I get a breakdown of all the amounts but I can not see which costs refers to which delivery.
    My question is: Is there any way I can link the amount to the delivery number or at least to identify which cost is linked to which delivery number?
    Thanks a lot in advance,
    Miguel

    gr non valuated is done in case ur procuring the material for direct consumption so at the time of gr no posting to accounts occur but at the time of invoice recipet the system debits the g/l account and crdits the vendor account 
    this multiple account ***. is also necessary to mark with gr non valuated and gr check box so that u can change the account assignment at the time of invoice and that acc. assg. should also be changebale in backend .

  • Prevent of using limit order with certain acc. assignment category

    We have in total 4 different account assigment categories. One of them (Asset with GR - Y in the backend) we do not want it to be used in combination with a limit order.
    So in the backend we did NOT maintain the combination between item category B and acc. assign cat Y.
    But users then still can make the PO which will end up in error "Combination item category B/acc. assignment Y not defined" , as stated before this is OK want we would expect.
    But is there any way to even prevent the user to make in SRM  a limit order with acc assigment cat Asset / Y

    thx,
    so we need to build a custom check. It is not like in backend you can configure which combinations are valid .
    Martijn

  • Error with Account Assignment Category

    Hi,
    While Creating the PO I am getting this error. I just copied the Material type of ROH into Consumables..
    In OMS2 alos I ticked Qty and Value based Updating..
    The Error Msg is...
    Account assignment mandatory for material RH1001 (enter acc. ***. cat.) Message no. ME062
    Diagnosis
         There is no provision for value-based inventory management for this  material type in this plant. Account assignment is thus necessary.
    Procedure
         Please enter an account assignment category.
    Rgs,
    Priya.

    Sorry for my earlier Post.....
    Actually for Consumable Material Quantity and Value Updations Should not be Active since they consume Once it is Goods Receipted.
    Regarding your Issue Purchase Order for Consumable Material will be always Created with an Account assignment Category Such as Cost center Etc.
    So Please go to OMS2 Trxn Code and Select your Consumable Material type and in Quantity / Value Update Field Put tick mark against In No Valuation areas and save.
    Now Create a Purchase Order in ME21N with Account assignment Category and Proceed.

  • Services with multiple account assignment.

    Hi all,
    How can I find out the POs which are having the multiple account assignment for the service line items from tables ?
    I am looking for services with multiple account assignments
    Regards

    Hi
    Go to SE16 , give table name -EKPO
    Now if you have purchase order nos with you then copy paste the PO numbers here , or select company code or site to restrict your entries. It will control the performance of the data execution.
    Then execute this (remove max no 200 ) . Go to Settings-- Format List -- Choose fields. Deselect all and select fields as per your requirement.If field names are coming in technical names you can change this via settings--User parameter and select -Field Label.
    You can extract this report to excel as well. Same PO number with all account assignment category.
    Please note if you have high volume of data then extract all the POs under service orders first from EKKO table and copy all the service PO numbers availbvale and paste in table EKPO, it will increase performance as well.
    Cheers
    Mukta

  • MM: Open POs with IR but no GR

    Hello MM Gurus,
    May I ask how can I execute two reports showing:
    a) open POs with IR but no GR
    b) open POs with IR and partial GR
    Your prompt response is highly appreciated.
    Thank you very much in advance!
    Best Regards,
    Albert

    hello Kishore,
    thanks for your prompt reply. i've tried following your suggestion. however, i found that the choosing both (REHNUNG and WE101),  the system displays ALL OPEN POs AND POs with OPEN invoices.
    i would need a report that displays ALL OPEN POs WITH INVOICE (Open POs with IR).
    it seems that multiple selection in ME2N only satisfies the condition "AND", and not "WITH".
    any further ideas?
    thanks very much.
    best regards,
    albert

  • Account assignement category for purchase requisition - error message

    Hi All!
    I created a new Item category in service order (IW31) "O" with the account assignment category "O". If I don't set the Consumption posting indicator to V for this category, when I set the account assignment category "O" to the purchase requisition in <i>Plant Maintenance and Customer Service-Maintenance and Service Processing-Maintenance and Service Orders-General Data-Define Account Assignment Category/Document Type for Purchase Requisitions</i>, I receive the message:
    <b>"Acct. assign. cat. "O" for purchase req. does not exist.
    Message no. CS 075"</b>
    The client request is not to charge immediately for the goods receipt with the relevant costs the service order. The client wants to create the goods receipt in a storage location for the plant and then confirm the components and charge the costs after the component confirmation (movement type 261) - similar to stock material.
    Any idea about what should I do?
    Thank you.

    Hi Everyone,
    The problem is solved now. The cause was that the test requisition that I was making was satisfying more than one rules and hence I end dated the remaining rules which solved the problem.
    Thanks!

  • Getting Account Assignment Category D error

    Dear All,
    While creating a debit note with internal order, with item category ZTPS (Standard item category for project) i am getting error message" item category "D" is not defined ". This is rollout prject and i have checked in the sytem i found some documents with same item cateogry .
    Please advice.
    Regards
    Sunil

    Hi,
    Create network parameters in sales document (SD)
    You can make the default settings required to create a network from a sales order in the menu options Basic data -> Standard structures -> Parm. SalesOrd->Ntwk (Parameters for sales order -> network).
    If you do not enter data here, you can also enter the necessary data online directly in the sales order.
    The data in the material master actually controls whether a network can be created from a sales order item. To set this up, you should enter the core information like (assembly type, order type (i.e. network or order type) configuration, account assignment category) in the requirements class for the material. The requirements class is determined by the strategy group (see above) which was maintained in the material master.
    Therefore, if you want to be able to create a network while working in a sales order, you must have maintained the corresponding MRP data or strategy group for the material being sold.
    Standard settings
    SAP has predefined the following strategy groups:
    83: Assembly processing with network, account assignment category E (assignment to sales document. A network with network type PS05 (header assignment) is created.
    85: Assembly processing with network/project, account assignment category D (assignment to project). A network with network type PS04 (activity assignment) is created.
    In both cases, the system automatically creates a network with network type PS04.
    Recommendation
    Do not change the default settings that SAP provides in Customizing. You can use these defaults to set up your own strategy groups, requirement types etc. and specify other network types or other settings for the availability check.
    Note
    When values are missing from the sales order item, such as the plant, the system cannot determine the requirements type which means that it also cannot create a network from the sales order.
    In order to have the scheduled dates in the network be copied into the sales document as confirmed dates, you must have maintained scheduling parameters for network type PS04 and PS05 in Customizing.
    Keep this in mind when you define your own network types.
    Among the scheduling parameters to be maintained, you should set the indicator reconcile basic dates .
    You must set this indicator if you want the system to copy the scheduled dates into the basic dates and then pass them on to the sales order as confirmed dates.
    Hope this will resolve your problem.
    Regards,

  • Account assignment category Asset to Cost Center in po items

    Hey,
    We have a Question how to handle this Exception:
    We have purchase order items with the account assignment category "A - Asset" and we have created Asset master data. Later, this assignment category is changed to "K - Cost Center". But the Asset Master Data is still there.
    How to handle this in the future? Do we have to delete the purchase order items with the account assignment category "A - Asset" and have to create new items with assignment category "K - Cost Center"?
    Thanks!

    Hi
    Once you change the acct assnment category to K, then there is no need for asset master. You can take help of your FICO consultant for deleting the asset master. You changed acct assnment in PO?
    Thanks

  • Invoice verification for blanket PO with account assignment category U (un

    Hi all
    While doing miro when i am doing invoice verification for blanket PO with account assignment category U (unknown) system is not allowing me to enter the GL it is disable,wat can be the possible reason
    Regards
    shailesh

    Hi Shailesh,
    As you have maintained the account assignment category as U the account assignment tab will not be available. If you want to enter a GL account then use the Account assignments K or F or X.
    Else if you want to use U in PO then you can give the GL account and other account assignment details only in the Invoice verification.
    Regards,
    Kathir

  • Exchange rate problem between GR&IR for PO with account assignment category

    ear SAP experts.
    We have used expense puchase order through account assignment category.
    the cost object include cost center,sale order,order.because we don’t use Fixed assets module in SAP,when purchase fixed assets,we also use account assignment category but no need to fill assets number(Not use account assignment category A).
    the processing in current system when there is exchange rate difference between GR&IR  as follows.
    purchase order Currency :USD  company code currency:HKD
    example 1-- when something purchased into expense account,
    Good receipt  (1USD=7.75HKD)
    Dr :expense account  100USD    775HKD
      Cr: GR/IR        100USD    775HKD
    Invoice receipt
    Dr : GR/IR         100USD    775HKD
        Expense account            25HKD
    CR: Vendor        100USD    800HKD
    Example 2-- when something purchased into Fixed assets account,
    purchase order :USD  company code currency:HKD
    Good receipt on Oct .01. 2007  (1USD=7.75HKD)
    Dr :Fixed assets account  100USD    775HKD
      Cr: GR/IR           100USD    775HKD
    Invoice receipt on Dec.01.2007  (1USD= 8HKD)
    Dr: GR/IR              100USD     775HKD
       Fixed assets account                25HKD
      Cr: Vendor            100USD     780HKD     
    The fixed assets is depreciated from Nov,2007.
    There is one problem that after the fixed assets is depreciated, the value for the fixed assets is added , the finance clerk have to adjust the added value from fixed assets account to Exchange Difference-Gain/Loss account by manual.
    Our problem is
    How to configure in order to make  the exchage rate difference into Exchange Difference-Gain/Loss account for purchase order with account assignment category,not the original assigned account in purchase order item.
    Many thanks
    Fanny

    Hi Fanny
    Even though the question is bit unclear, I guess you are looking for the T-Code OBYC. Use transaction key KDM for configuring the exchange gain/loss
    S Jayaram

  • PO with account assignment category F

    Hi Gurus,
    For PO with account assignment category F, the system is creating aaccounting documents during GRN for some POs & for some pOs it is not . What could be the reason.
    Regards,
    Kumar

    Hi SAPMM6,
    Check details of account category refernce 'F' whether tick is there for GR Valuated.
    Also when you are creating PO with multi-account assignment then also GR is non-valuated as per SAP standerds.
    Also check the both POs for material code and there valuation classes.
    Hope your problem gets resoled.
    Regards,
    Gitesh

  • PO with account assignment Category M

    Hi Friends,
    In an intercompany stock transer scenario for a PO with account assignment category M, can the receiving plant receive the goods before the supplyig plant issues it? In my case it's happening only for POs with account assignment category M, so I wanted to consult you all if this is possible per standard SAP functionality.
    Thanks for your help.
    Rana

    Hi
    Yes this is  standard functionality only. and this is not an intercompany procurement.
    This is something like a Individual purchase order process. Using Item category TAB in the sales order.
    In this process Goods receipt is done before you perform the goods issue to the customer.
    In an inter compnay PO process the process starts with creation of a PO and not SO. where as you are creating a SO beofre the PO, and using the SO as an account assignment object.
    Thanks & Regards
    Kishore

  • Partial invoice with multiple account assignment

    I'm using PO with multiple account assignment with distribution by percentage and proportional distribution for partial invoice.
    When i post invoice verification for this kind of orders the amount and quantity field in PO item are closed for update and no automatic proportional distribution has been performed.
    The only possibility to update amount in case of partial invoice is to update amount of each account assignment manually (using account assignment button).
    Why the amount and quantity fields are closed for update?
    How i can post partial invoice for multiple account assignment order without manual distribution of changed amounts among different account assignments items?
    Thanks in advance.

    Thanks Charlie.
    I am aware of that. But do we have that "partial invoice" field where we can select teh distribution as proportionate or sequence.
    My POs item are having around 30 to 45 account assignments. In that case it is not possible to manual distribute the amount.
    Please advise.
    Thanks,

Maybe you are looking for

  • Language conversion issue in PI7.1

    Hi, My sceanrio is file to Idoc. Am facing language conversion issues. For example one of the field in the source file is having the value "Différence sur net". And in the IDOC field the value is appearing as "Différence sur net". With the same data

  • Slow Internet (iMac)

    I have 3 computer and iPads, 2 MacBook Pro and one iMac all update new version macvericks, 2 MBP pretty good faster internet and i test speed internet  download 17 MBPS and upload 1.8 MBPS and for iMac download 0.12 MBPS and upload 0.56 MBPS very slo

  • How to remove disabled plugin in Firefox

    I have three Firefox Plugins which are disabled, but no means to remove same, and they do not show up Microsoft Uninstall or Change a Program Panel.

  • Titling iPhotos outside of iPhoto - ipad, etc.

    I have a client who has an enormous iPhoto library, and wishes to title every single photo. She has been asking me for a way to be able to title them without sitting in front of her iMac in her office. She'd love to be able to sit on the couch with h

  • Weblogic DataSource connection per thread

    Hi, We are using spring-jdbc to call stored procs (Sybase database) from a web-app. We can't use spring-transactions because the stored procs are all unchained. We look up the DataSource that is configured in Weblogic using JNDI like      <bean id="d