Is it possible change cost price when poss goods issue?

Hi experts,
I create a return sales order,then create delivery and post goods receipt,it generate a accounting document,the cost price take from material standard cost, is it possible change the cost price before post goods receipt.
thanks.
lance

Dear anand,
I have tried what you said,but it seam not in use.The VPRS in the delivery is 10, MAP in material is 12, after PGR the price in the accounting document is also 12, But I want the price in the accounting document is 10.
Could you tell me is there any mistake.
thanks.
Lance.

Similar Messages

  • Change Moving Average Price when Post Goods issue posted from VL02N

    Hi all,
    Please help me to find USER EXIT / BADI or Enhancement to change Price - MSEG-DMBTR
    when Post Goods Issue posted from transaction VL02N.
    Thanks in advance,
    Mila.

    Hi,
    Check these Enhancemnts...
    Exit Name           Description
    V02V0001            Sales area determination for stock transport order
    V02V0002            User exit for storage location determination
    V02V0003            User exit for gate + matl staging area determination (headr)
    V02V0004            User Exit for Staging Area Determination (Item)
    V50PSTAT            Delivery: Item Status Calculation
    V50Q0001            Delivery Monitor: User Exits for Filling Display Fields
    V50R0001            Collective processing for delivery creation
    V50R0002            Collective processing for delivery creation
    V50R0004            Calculation of Stock for POs for Shipping Due Date List
    V50S0001            User Exits for Delivery Processing
    V53C0001            Rough workload calculation in time per item
    V53C0002            W&S: RWE enhancement - shipping material type/time slot
    V53W0001            User exits for creating picking waves
    VMDE0001            Shipping Interface: Error Handling - Inbound IDoc
    VMDE0002            Shipping Interface: Message PICKSD (Picking, Outbound)
    VMDE0003            Shipping Interface: Message SDPICK (Picking, Inbound)
    VMDE0004            Shipping Interface: Message SDPACK (Packing, Inbound)
    Badi Name            Description
    DELIVERY_ADDR_SAP    Determine Time-Dependent Delivery Address in Delivery
    DELIVERY_PUBLISH     Returns BAdI Implementation: Automatic GR Posting T 2
    DELIVERY_PUBLISH     Updating of Delivery in Purchase Order
    DELIVERY_PUBLISH     AIP: Delivery Confirmation for Sales Order
    Regards
    Raghu

  • Userexit or BADI to change service price when create PO reference from PR

    Hi,
    I need userexit or Badi to change the gross price ( ESLL-TBTWR ) when create PO reference from PR.  Currently , when I do this it will recalculate the gross price based on the service master and ignoring whatever the price put in PR.  Could anyone tell me userexit or Badi that would allow me to change the price when i create PO from PR via ME21N.
    Thanks,
    Gilbert

    Hi Gilbert,
    You can try using Function Exit EXIT_SAPLMLSP_030 of Enhancment SRVESLL.
    This Function Exit has ESLL data as changing parameter.
    But this Function Exit is called from a number of transaction. So do put in correct checks (like sy-tcode or sy-ucomm) before substituting any values. If proper checks are not put in then values may be substituted when this function exit is called from other transactions (like tcode "ML81N").
    Hope this will help.
    Regards,
    Abhisek.

  • Error message KI248 on delivery document when posting goods issue

    Hi,
    On the delivery document, when posting goods issue I get the following message:
    "Account 60700000 requires an assignment to a CO object
    Message no. KI248
    Diagnosis
    All given account assignment objects (order, project) are defined as statistical.
    System Response
    Statistical orders or projects are ignored when FI and CO are reconciled. You must enter a cost center, order, project, or cost object to which the costs are posted for CO postings.
    Procedure
    Enter a cost center, an order, a project, or a cost object that is not statistical. The posting row affected is 000 and the account is 60700000."
    On the sales order I have a statistical order.
    CO-PA is active, cost element 607 is included in PA transfer structure.
    I also tried with cost center allocation in OKB9.
    60700000 is defined  as a cost element (category 1).
    Any suggestion could be helpfull.
    Thanks,
    Lavinia

    Hi,
    Thank for your answer.
    I tested with element cost category 12, it's working, but not the way I need: I don't have any value on the cost center.
    When I don't have statistical order in sales order, the sistem it's working exactly how I need: the costs are posted on cost center and the VPRS condition is transfered to CO-PA on profitability segment.
    Anyway, I finaly make it work with a cost center substitution.
    Lavinia

  • Override consignment price  determination during goods issue process

    Hi ALL,
    My requirement is that User is asking want to override consignment price  determination during
    goods issue process. Is there any BADI/User Exit or  Enhancement spot which can override the price value and in the
    database level during Goods issue.
    If yes provide me the enhancement details and where I can implement.
    I will very thankful to you all if I get your valuable input.
    Regards
    Subhasis

    Dear Laxman,
    Check these links,
    https://wiki.sdn.sap.com/wiki/display/ERPLO/Batch+Determination
    Automatic batch determination
    Re: how to make the batch determination process automatic
    Regards
    Mangalraj.S

  • Error when posting goods issue

    hi gurus,
    can anyone please help me with this error when posting goods issue to a free issue sales order " line item text is mandatory for vendor invoices".
    thanks in advance

    Dear Ysabella
    It seems the item texts is not maintained in the order which is made as mandatory.
    Go to sale order VA02, select that line item and click on "GotoItemTexts".  There maintain the relevant text and retry.
    thanks
    G. Lakshmipathi

  • Generate DELVRY  Idoc when Post goods issue is done in SAP

    I need to generate an Idoc when post goods issue is done in SAP (outbound to SAP) .I understood that I can do this using the message control .The message type DESADV with the process code DELV will support this.
    But I didn’t understand how to trigger the Idoc.In the current scenario our Company is doing the post goods issue in SAP for the in three different ways.
    1.Manually doing the post goods issue through the transaction VL02N
    2. an Inbound Interface (using Idoc)  which will do Post goods Issue in SAP
    3.Another Interface using BAPI, which will, do post goods issue in SAP
    I have to run my outbound interface when the post goods issue is done by all the above three ways.  Can any one help me out in this?

    You have to configure the output first .
    You can use output type LAVA ( avaialble in Std SAP ) .
    ( Tcode is NACE , Select Application V2 -> Outputtypes ).
    ( Create condition records suitable to generate an output)
    Next is ALE.
    Setup a distribution Model ( for DESADV ) and all other setup for ALE i.e. Distribute Dist. Model / Generate Partner Profile .
    In the Partner profile in WE20 select your partner system. Double CLick on Outbound Message DESADV ( this wd be there after you generate partner profile , if not add it here in outbound ) . On this screen goto tab MESSAGE CONTROL .
    Application - V2
    Message Type - LAVA
    Process Code - DELV.
    Now you are ready to go. The moment a PGI is done in any form an output LAVA would be proposed and processed using process code DELV.
    Cheers.

  • Update termination error when posting goods issue

    Helllo
    I have a strange problem I can not figure out.  We have serial numbers like 12345/345.  When trying to post goods issue I get an update termination error  for invalid character. This only happens if the quantity is more than 1 each.  A quantity of 1 each works fine and receives no update termination when post goods issue...only recieve termination error if the post goods issue is for a qty of 2 each.
    I searched the SAP site found OSS note 40355...applied the note.  The note also mentions the chaging print paramters to include "/ _"  this is all done.
    I tried doing a ABAP Debug in SE38 (for the delivery note print program) and setting the breaking point, but when I go to run the transaction after the setting break point...when I hit post goods issue...SE38 does not return back to its screen.  So not sure if I am running the correct program there...or if this works for the update terminations?
    So strange I do not get this for a qty of one each only when it is greater than that.  I am stumped need help....
    Any advice wiould be GREATLY appreciated....

    Looks like there is an error in the delivery (or material movement ?) print program. Easiest would be to disable these outputs for test purposes. When no dump then the error is somewhere in the print program an could be analysed by triggering the print separately with ABAP RSNAST00.
    regards Jack

  • Check material cost when post goods issue

    Hi,
    When i click the post goods issue in VL02N, I would like to check if the cost of mateial is equal to zero. If it is zero, I would like to stop the transaction with a error message.
    But in the user exit, I cannot find which field provide the material cost. Can any one help me?
    Many Thanks
    Jean

    Dear Jean,
    Good morning and greetings,
    In the movement type config make the accounting as mandatory and would surely meet your requirement. Maintain that in the transaction code OMJJ for the Accounting Control to Movement Type as + which is required entry.  The system would throw an error if no accounting entry is generated.
    Hope this meets your requirement
    Please reward points if found useful.
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • COPA document not generated when Post Goods Issue is reversed.

    Hello Friends,
    WE uses Stock Transport Order in two steps for transfering Stock from one plant to another.  We have defined a Condition type FRB1 to capture the Freight cost involved in the stock transfer.
    When the Post goods issue is done for the Stock Transport Order. following Accounting documents are generated.
    Accounting
    Profit Center
    COPA
    Spec. Purpose Ledger
    Controlling Document
    Material Ledger document.
    But When the Post goods issue is reversed through transaction code VL09 all the above documents are generated except for COPA document. Though in controlling document it shows the object type hit is REO i.e profitability Analysis
    For further information we have mapped cost element (600150) with Value field in PA transfer structure (Direct assignment from FI and MM. Movement type used for PGI are 641 & 642.
    Thank you

    Dear Colleagues
    I thank all those who put in thier time and efforts for possible solution for my problem. But I could resolve this issue with help from SAP.
    Basically in costing based COPA the system does not post the cost of goods sold to COPA during goods issue but it is done at the time of posting the invoice since the system wants to see the revenues and the COGS values together.
    Since the system posts the COGS into COPA at the time of invoice posting, you will appreciate that if this is also done during goods
    issue then you will have duplicate entries in your COPA (i.e. the COGS will be doubled).
    If in transaction VL01N/VL02N a costing-based line item would be posted, the costs would be double in CO-PA (the billing and goods issue). For this reason, no costing based line items will be created in the standard R/3 system for transaction VL01N/VL02N.
    If for some reason you still wish to post the COGS to COPA during goods issue you have to do the same thro a modification of the system.In your case you have applied note 214381 for the same. Please note here that movement type '641' is used as an example. For other movement types you will need to code accordingly.
    as per note 337488 point 2. the changes of note 214381 were not required in our case. Therefore we reverted these changes in LKEIIF01 and added the relevant coding for movement type 642 in function COPA_DOCUMENT_CHECK as per note 337488 point 2.
    Looking forward for your continued support
    Regards
    Umesh Gothankar

  • Exit or substitution GL account when posting goods issue

    Hi out there,
    does anyone know how to change BSEG-HKONT via a subsitution ? It seems to be blocked for that purpose. Although if I unblock it in table GB01 this does not work.
    If there is no possibility does anyone know a customer exit to change the account determination for GBB VBR when posting a goods issue ? It is needed for special postings and I want to program it either in a substituiton or exit.
    Thanks a lot for your help.
    Sebastian

    Dear Sebastian,
    It is possiable to change G/L through subsitution. But you will have to take help from abaper who will write code for the subsitution.
    Any subsitution which is realted to G/L can be written though the following path
    Financial Accounting (New)->>Financial Accounting Global Settings (New)->>Tools->>Validation/Substitution->>Substitution in Accounting Documents
    after that enter new line and double clik to write ABAP code based on your requirement.
    Hope you got the way.
    Rupesh

  • Wrong Unit Price in a Good Issue Document using DI

    Hi,
    in my addon I want to create a new Goods Receipt document, using DI.
    In the Lines, I set the ItemCode, I set the Quantity, and I set the Price, then I add the document, but when I go to Sap, in the Goods Receipt created, the Unit Price is wrong. I've try to set Quantity and LineTotal, Quantity and Price, Quantity Price and LineTotal but all the combinations is not correct, and the Unit Price is not equals to the price that I have set.
    I have try to change the Price List, but nothing is happened.
    This is my simple code:
    Dim entrataMerce As SAPbobsCOM.Documents = myDB.GetBusinessObject(SAPbobsCOM.BoObjectTypes.oInventoryGenEntry)
    entrataMerce.CardCode = cardCode
    entrataMerce.Series = series
    entrataMerce.Lines.ItemCode = itemCode
    entrataMerce.Lines.Quantity = 1
    entrataMerce.Lines.Price = 100
    entrataMerce.Lines.WarehouseCode = whsCode
    entrataMerce.Add()
    Where is the error?
    Thanks
    Marco

    Instead of Price, try using UnitPrice? This is a confusing area of the DI :/

  • Update was terminated when Post Goods Issue

    Hi all,
    When I post goods issue, I receive a message "Update was terminated".
    Then, I use SM13 to check update requests, I see an error
       900     USERNAME     20.11.2007     10:47:27     VL02N                         
    double click on that line I see error at module
       8     MB_POST_DOCUMENT     V1     Error
    more details:
       Row 13 in report LMBMBU04
       00 671: ABAP/4 processor: SAPSQL_ARRAY_INSERT_DUPREC
    Finally, Error occurr at line:  
       INSERT mkpf FROM TABLE zmkpf.
    Can anyone help me to solve this problem?
    Thanks.

    Hi Nam,
    This probelm is becuase you are trying to enter a record for which primary key already exists in the table.
    The insertion you are doing with a set of values which already exist and sap is getting this error that the "Duplicate record during insertion". try to check your insertion values and through se16 check if they already exist in the table mkpf.
    To rectify the data or else change the table and add one more unique to the primary key.
    Abhishek Purwar
    http://abhishek.purwar.googlepages.com

  • How to change movement type of Delivery goods issue?

    Hi all!
    I need to change the movement type used by posting Goods Issue in an outbound delivery (tcode VL02N).
    Please provide some instructions or cookbooks on how to do the configuration..
    Thanks a lot!

    Hi,
    Get the Schedule Line Category used in Sales order. Go to VA03, here double click on the sales order line item and go to "Schedule Lines" tab, here get the Schedule Line category.
    And then go to VOV6 and double click the Schedule Line category and in detailed screen, change the movement type.
    Then try for Delivery and PGI.

  • Cost Center restriction while goods issue

    Hello Gurus,
    While posting the goods  issue, we need to enter the cost center in the account assignment tab.
    for that Cost Center, user should be enter his cost center which is allocated to him. system should give error if he enter worng cost center.
    How can i achieve this requirement?
    Thanks in advance,
    Laxmi.

    Hi,
    It is not really as easy as it sounds, especially if you want to have the default depend on the movement type etc.
    If the user always uses the same cost centre then try the parameter ID in the user master (doesn't always work). I have just tried this and the program doesn't appear to use the KOS parameter so this does not help.
    If the default cost centre is the same for everyone for the GL account then within FICO there is a transaction to have a default cost centre for each GL / Element.
    Steve B
    Message was edited by:
            Stephen Birchall

Maybe you are looking for