Is SWCV required to be present in production SLD? Debate

I have DEV and QA XI systems pointing to one SLD and Production XI is on another SLD. I created Product and Software Component Version in DEV SLD and developed my scenario. After transporting to QA and subsequently to Production, the scenario runs fine despite the SWCV not being moved from DEV SLD to Prod SLD. So it appears there is no reference to the SWCV from SLD after the design is done the first time and transported completely (including the SWCV from Repository not SLD).
Is this how it is supposed to work and what is the need to maintain SWCV's in production SLD if they are not referenced at runtime.

I think this is possible if you scenario used business service, rather than using Business Systems maitained in SLD, not clear with your situation.
Your SWCVs in PRD are orphaned, I had similar experience that I have particular SWCV used for my mapping test, however, one day when i checked SLD, I found that the SWCV is missing from SLD.
Someone else has deleted it. but I did not come up complete scenario to test.
I also imported SWCV from one system to another one which does not have corresponding SWCV maitained in SLD, import is success, no error reported.
Nice to see you raise the question, I do not have definite answer either. To see what other expert respond.
Regards
Liang

Similar Messages

  • Fetch data from a table present in production system

    Hello Gurus,
    I want to get data from a table which is present on production system. And i cannot create RFC. Can anybody tell me any other way of getting the data?
    Thanks in advance!!
    Regards,
    Kumail

    Hi,
    if it's just a one time requirement to get the data from the table into an excel sheet e.g. for some error analysis or for making a development decision, why bothering with development? Just run se11 or se16 display the whole content and save it as excel sheet via the menu. This would be the fastest solution in my opinion.
    If you do not have the permissions to see the table in production ask a admin or super user. Creating a program to dump data from the system you are not really allowed to see usually brings you in a lot of trouble :o).
    Kind Regards
    Roman

  • Webapp (requires payment) creating multiple/duplicate products

    Each time someone submits a new Webapp that requires payment, a new Ecommerce product is created.  Is there a way to have the Webapp use the same product?  I also have an online shop, and it's making the product management overwhelming.

    I have tested all sorts workarounds for this problem. My situation was that we had a single payment webform set up and we were using this same form to accept payment for multiple events (the web form HTML code was inserted into the event detail and used to submit the event booking).
    Here's what was happening:
    A product was automatically created by Business Catalyst. Product code is the WebFormID of the webform used to submit the order. Product name is a concatenation of {web form name}/{event name}
    An order was created in the CRM referencing the new product.
    BC will create a new product when an order is placed unless the combination of Product Code + Product Name already exists. This is patently stupid since the Product Code is the primary key here. In fact, BC even warns you that this is bad as soon as you view the product page in admin.
    I searched everywhere I could think of to find a way to tell the web form which product to use when creating the order. No joy. There does not seem to be a way to override the automatic creation algorithm. I posted a question about this in the forum here and never got a response.
    As Shannon points out, these ARE real products as far as the database, OneSaas etc are concerned. We use OneSaas to synchronise to Saasu and this synchronisation process repeatedly failed due to missing product codes in Saasu (which is the product master by the way).
    So, the only solution I could find was to duplicate our payment WebForm so that there is a unique and distinct form for every event our customers could purchase. I then modified each event so that it used the corresponding WebFormID of it's dedicated WebForm in the action URL query parameters. I didn't need to modify anything else in the event (since every webform is exactly the same - the HTML is identical. Hooray for code re-use ... NOT!).
    In Saasu, I then create an Item to represent each event booking using the WebFormID as the Item code. There's no need to run around and create the products on BC. It will create diabolical looking product names using the WebFormID and if you create these manually you NEED to make sure that the name you enter is EXACTLY as BC will create it ... or you'll get a duplicate product ... again.
    OneSaas now works correctly as we have it set up to pull in products from Saasu. It can pick up the new orders and relate these to Saasu products/items and then sync the invoices to Saasu.
    Problems With This Approach
    Your WebForm code is duplicated across multiple events. If you want to, say, change the payment methods that you accept you'll need to change each and every webform as well as modify the HTML code in the event.
    You get a unique product for every event that you offer. This may not be what you want (my client didn't). At least it will synchronise.
    You MUST remember to create products in Saasu any time you offer a new event. At least you can use a sensible Item name in Saaus (rather than the auto-created BC garbage) as matching is only done on the code.
    If you have an external process that extracts Items from Saasu so that you can create matching products in BC you'll need to be careful not to overwrite the product names for your webform related products. Or you'll get a duplicate product created on the next order.
    If anyone has a better approach I'd be happy to hear it.

  • 451 4.4.0 Primary target IP address responded with: ""501 5.5.4 Required arguments not present.""

    Hi,
    I have a strange problem, I have installed Exchange Server 2013 CU1 as First Exchange server into my Server 2012 AD environment on a separate server. My problem is:
    I cannot send mail to myself or any internal users. I can send external mail.
    --When I send mail in delivery reports
    Delivery Report for user  ‎(user@)‎
    Submitted
    5/15/2013 12:20 EXCHANGE
    The message was submitted to exchange
    Pending
    5/15/2013 12:20 exchange
    Message was received by exchange from EXCHANGE
    5/15/2013 12:20 exchange
    The message has been queued on server 'exchange' since 5/15/2013 12:20:43 PM (UTC+02:00) . The last attempt to send the message was at 5/15/2013 12:17:43 PM (UTC+02:00) and generated the error '[{LRT=};{LED=};{FQDN=};{IP=}]'.
    --Also in my smtp logs;
    451 4.4.0 Primary target IP address responded with: ""501 5.5.4 Required arguments not present.""
    451 4.7.0 Temporary server error. Please try again later. PRX4 ,
    My settings are default settings. I cannot figure the problem, any suggesstions?

    Hi,
    How about OWA and other machine ? Does only one user occured this issue ?
    "451 4.4.0 Primary target IP address responded with: ""501 5.5.4 Required arguments not present"
    Please check your NIC setting.
    Wendy Liu
    TechNet Community Support

  • "An error has been detected with a required application library and the product cannot continue. Please reinstall the application.

    I have received the following error message from my Adobe Acrobat Pro X1 after installing the CS6 package :, "An error has been detected with a required application library and the product cannot continue. Please reinstall the application.
    I am now unable to open any pdf?
    Any words of advise here how to fix this problem?
    Thanks!

    ** Moved to Acrobat Forums for quicker and accurate resolution steps ***

  • An error has been detected with a required application library and the product cannot continue. Plea

    I am getting the following error each time I open Adobe Acrobat 7.0 Professional...
    "An error has been detected with a required application library and the product cannot continue. Please reinstall the application."
    I have tried uninstalling and then reinstalling the program. It didn't help, got the same error shortly after opening the program.
    What is strange is that the problem just suddenly appeared therefore, I believe that it may have been malware related causing this problem. And I have had this program and have been using it without any problems now for over 3 years.
    It appears that a vital part of the program is being blocked.
    Can anyone please help and offer a detailed solution to this problem? Maybe someone has already encountered it.
    Thank you!
    -Dan Sacapano

    Anoop,
    Upon re-reading that information, I am curious as to why your believe that this will solve my issue. That is not related to my error message: "An error has been detected with a required application library and the product cannot continue. Please reinstall the application."
    I have not received any such message as the one seen on that page.
    Please explain why I wouldn't have gotten that partcular message and instead got the one I quoted above?
    Thank you,
    -Dan

  • Required Overlapping VS Continuos Flow Production

    Hi SAP Experts,
    I have a few questions regarding the overlapping indicator in routing as below:
    1. What is the difference between "Required Overlapping" & "Continous Flow Production" indicator in routing? I have tested with both indicator but still cannot see the logic behind on how APO scheduled the orders based on these indicators.
    2. Is it a must to maintain both "overlap time" & "Send ahead quantity" in the routing if I select either "Required Overlapping" or "Continous Flow Production"? Or, I can just maintain either of them?
    3. If my planned order's quantity is less than the send ahead quantity set in the routing, there will be a gap between 0010 Produce End Time with 0020 Setup Start Time. Is this a APO standard behavior?
    4. Refer to question (2), if the answer is yes, is there any way so that the APO will schedule the operation back to back if the planned order quantity is less than the send ahead quantity without any gap in between?
    Thanks.
    Regards,
    Hooi Chia

    Hi Santosh.A,
    Yes, overlaps in routing is integrated with APO. The changes on overlap indicator in ECC routing is reflecting in APO PDS. I have tested the overlap scenarios for both "Required Overlapping" & "Continous Production Flow" and both are working in APO. But, I do not understand the difference of these 2 indicator. Moreover, there is a gap between my 1st operation Produce End Time & 2nd operation setup start time if my order quantity is less than the send ahead quantity set in the routing.
    Please help to clear my doubts.
    Below are the examples of scheduling result for overlapping, overlapping set at operation 0010:
    1.
    Overlapping: Required Overlapping
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 500m
    Result:
    0010S: 03/01/2011 10:28:54 to 03/01/2011 15:06:59
    0010P: 03/01/2011 15:06:59 to 03/01/2011 16:51:28
    0020S: 04/01/2011 11:36:52 to 04/01/2011 15:06:52
    0020P: 04/01/2011 15:06:52 to 04/01/2011 15:48:47
    2.
    Overlapping: Required Overlapping
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 10,000m
    Result:
    0010S: 03/01/2011 10:45:19 to 03/01/2011 15:23:24
    0010P: 03/01/2011 15:23:24 to 05/01/2011 02:03:26
    0020S: 04/01/2011 19:16:20 to 04/01/2011 22:46:20
    0020P: 04/01/2011 22:46:20 to 05/01/2011 12:40:59
    3.
    Overlapping: Continous Flow Production
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 500m
    Result:
    0010S: 03/01/2011 14:25:55 to 03/01/2011 19:04:00
    0010P: 03/01/2011 19:04:00 to 03/01/2011 20:48:29
    0020S: 04/01/2011 15:33:53 to 04/01/2011 19:03:53
    0020P: 04/01/2011 19:03:53 to 04/01/2011 20:38:34
    4.
    Overlapping: Continous Flow Production
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 10,000m
    Result:
    0010S: 03/01/2011 14:25:55 to 03/01/2011 19:04:00
    0010P: 03/01/2011 19:04:00 to 05/01/2011 05:44:02
    0020S: 04/01/2011 15:33:53 to 04/01/2011 19:03:53
    0020P: 04/01/2011 19:03:53 to 06/01/2011 02:28:54
    Thanks.
    Regards,
    Hooi Chia

  • Few questions regarding requirements in context of SAP products

    Hello!
    I have few questions regarding Relational Database, Network Archtecture and Platform Support requirements in context of SAP products. Can someone help by answering the questions, if possible with Yes/No (and short explanation)
    a) Does your system run native to the Oracle 10g RDBMS (RAC) and database tools? If not, please explain the databases and tools supported (Yes/No)
    b) database accept binary-large-objects (BLOBs) and be referenced via the relational engine (Yes/No)
    c) standard pre-defined SQL queries and related calculations provided for use with industry standard reporting tools
    d) Deployable without using any fixed IP addresses (taking advantage of DHCP address resolution) (Yes/No)
    d)software supported on HP-UX 11.i V2 (r6) on Itanium. (Yes/No)
    e) Software supported on OS clustered servers (If mutliple products, please indicate if all are support or list areas where clustering may not be recommended and why) (Yes/No)
    Thank you!
    Regards
    A. Henke

    Hi Axel,
    I've just found your question by accident and would like to know whether you have already implemented 10gRAC in SAP environment?
    regards
    Barthez

  • Development and Production SLDs

    We have completed Development and testing of XI objects and are at a stage to transport the objects to Production. We have two SLDs for XI, one for Non-productive systems and another for the Prod system. As regards to SLD entries for transport to Production, I though the following is the process 
    1.     Create Production Business systems in DEV-SLD  putting them in the right Business group
    2.     Export DEV-SLD entries
    3.     Import the  file into PROD-SLD
    4.     After go-live only delta SLD entries would be exported and imported into PROD-SLD
    In the following Weblog, /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation, Yuvaraj talked about SLD data supplier bridge  from Dev SLD to Production SLD. Is this absolutely necessary?  With the bridge operating, what happens if  somebody deletes a business system by mistake in Dev SLD?
    Any inputs would be appreciated and rewarded

    Bhavesh,
    <i>My reason for not having prod entries on Dev SLD is that if Prod Entries are going to be on dev SLD, then why have a separate SLD for Prod itself?</i>
    My logic for this would be during development, create all the Production Business Systems in DEV-SLD and transport them  to PROD-SLD. At runtime system uses Prodcution-SLD. I guess the differernce is design time vs Runtime. 
    <i>But once again, SAP recommends a single SLD and so when the landscape contains multiple SLD's there are no rules on how to go about this and so either way things will work fine :-)</i>
    SAP's recommendations seem to have changed off late. Though in online help they have again and again mentioned that <b>one SLD</b> is recommended, I do know that some internal SAP Consultants recommending separate SLDs for non-productive and productive purposes. There are also documents on Service market place providing information on how to set-up two SLDs for productive and non-productive purposes.

  • Production SLD in solution manager

    Hi,
    I have small doubt regarding SLD (System Landscape Directory) in Solution Manager.
    We have an Production SLD in Solution Manager dual stack system, and our Production System (Portals, BI, ERP, PI) was configured to Production SLD in Solution Manger.
    We are planning to apply patches for our live production Solution Manager System, I know that SLD will stop while doing the Patches on Solution Manager and this will make our production systems stop working.
    Therefore I need to know the correct way around this to allow us to patches for our Solution Manager system.
    Thanks and Regards
    Pavan Morishetty.

    Joshi,
    Thanks for your quick reply.
    But in our company we don't want to change our Production SLD from Solman system to any other System (eg. PI, Portal).
    If you any other suggestion please update me for applying the patches in Solman System.
    Thanks and Regards
    Pavan

  • Requirement strategy : PIR reduction with Production Order GR

    Hello,
    I'd like to manage in APO a requirement strategy reduced by Goods receipts of production order.
    I'v tried to manage a specific strategy but I don't know wich Category Group setted in the customizing.
    Could you help to:
    - first confirm that we could reduce the PIR with GR from a production order?
    - Then which category or category group should I select ?
    thank you for your help
    Renaud

    Hi Renaud,
    Below you have the strategies that are supported by APO. For your requirement you have to create a new strategy in APO that support your needs. The steps are described in my first replay. I don't think that you will find exactly the same logic that you have in ECC but something similar yes. In APO we can't do moving type!
    For example you can modify strategy 10 and change the category group to FP1 (production fixed). So, it's clear that you will have in stock the quantity of the confirmed pl.order!
    Thanks, Marius    

  • Transfer of requirements from sales order to production.

    hi 
    how are the requirements transfered from sales order to MRP.
    if a sales order is created how is the reqirement getting tranfered to MD04.
    is it through requirement class and requirement type.

    Hi Friend,
    Basically the requirements are transfered based on the requirement types
    Priority 1: Strategy group...Every strategy group is assigned with reqt type...depending on the strategy selected the assigned Requirement type is triggered and it will behave as per the configuration.
    if Strategy group is not mentioned in material master then it will pick the requirement type which is assigned to Item Category group in sales Org 2 of material master.
    if Item category group is not mentioned then it will look for MRP group.
    Thanks
    Satya

  • CS6 is installed on this machine. Photoshop, Illustrator, and InDesign were added at a later time. Now everytime one of these 3 are opened a menu pops up saying "Sign in Required". All the other products in the Master Collection open normally. Is this a l

    This is what pops up when Illustrator, Photoshop, or InDesign are opened.

    Smsbc was Photoshop, Illustrator, and InDesign installed using the custom installation option in Master Collection?  Have you tried de-activating your current license to reapply the Master Collection license?  You can find details on how to deactivate at Activation & deactivation help - http://helpx.adobe.com/x-productkb/policy-pricing/activation-deactivation-products.html.

  • JSP JSF template no more present in production release

    In Beta version of jdev there was a menu to make a JSP JSF template page.
    Is this option available in production release and how to access this feature ?

    It has been disabled at the moment since JSP already has many standard mechanisms for reuse - includes, segments, or tiles, e.g. http://www.oracle.com/technology/oramag/oracle/04-may/o34dev_struts.html to name a few. However, we'll be interested to know whether it's useful enough to be restored.

  • Reinstall requires serial number from qualifying product, but it won't work

    I'm reinstalling from hard drive failure.  Acrobat says serial number is valid but can't find qualifying product on hard drive and it needs earlier version serial number.
    I've had a full version from earlier versions but it won't take the serial number.
    Waiting for support on phone lines and chat is brutal.  Any ideas??

    Hello everyone.
    Ended up there was some sort of glitch, as when I reinstalled the complete suite of Adobe products there was no trace of anything on the new hard drive.  From the drop down menu it only had a choice for serial numbers as far back as Acrobat 8.  My original FULL version was well before that and that serial number would not work.
    I contacted Customer support and after they verified all of my Adobe products including my older full version of Acrobat Pro, and they had to issue a new serial number.
    I then was instructed to uninstall Acrobat, then reinstall with the new serial number.
    All is now fine.
    It certainly pays to have your software properly registered with Adobe
    TG

Maybe you are looking for

  • PC hangs after upgrade Windows 8 PE to Windows 8.1

    Couple of days after upgrading to Windows 8.1 I received the error message File: \BCD Errorcode: 0xc0000098 Press ESC for UEFI-firmware-settings. PC doesn't boot any longer. I ran following commands successfully : bootrec /fixmbr bootrec /fixboot boo

  • Asset report related table and fields

    Hi , I need table name and field  ( Asset related ) for  - a)  GL A/C P&L b)  ASSET DEPRECIATION SCHEDULED c)  FORCASTED DEPRECIATION d)  PLANNED EXPENSES VERSES ACTUAL EXPENSES e)  GAP DEPRECIATION CATEGORY e)  MANUAL ENTRIES  MADE BY USER  TO BOOK 

  • New Norton Anti-Virus for Boot Camp Mac & XP partitions

    Has anyone tried this new Anti-Virus from Symantec? It has caught my attention, but I am not sure about infecting my Mac OS with a Norton product. Does anyone have any experience with, or comments about, it? Thanks!

  • How can I change the icons in Mail?

    I recently upgraded to Yosemite. I hate how the icons in Mail are REALLY BIG which causes me to have to scroll a lot to see my lists of folders. Is there a way to make them smaller?

  • Green tint in imovie export

    iMovie turned our video green when we exported it. Not sure what caused this or how to fix it. You can see what it looks like below--sort of.  The *whole video* plays green, not just the green frames. The video is of a screen capture from a DELL usin