Iterative price calculation

Hi All
This is my problem after i run the iterative price calculation.
Diagnosis
The activity quantities planned for cost center ABP1-4504, activity SETM45 are not reconciled for period(s) 1 - 12. The plan activity for activity type SETM45 is less than the plan activity input for this activity type through the receivers (scheduled quantity).
System Response
This can lead to incorrect activity prices in iterative calculation. In particular, a divergence in iteration might occur. To prevent this from happening, the scheduled quantity is used as the activity quantity. Because this is a serious error, however, the results of activity price calculation are not posted.
Procedure
Check planning for activity type SETM45 in cost center ABP1-4504 and the corresponding activity input for period(s) 1 - 12.
I went into Activity Output/prices to change the mistake over the Plan Act qty , but even when i save and re-run the schedule acitivity still remain the previous figure and does not update into the new one!! Any idea what is wrong ?
Regards
Happygal

Hello Manish,
I am encountering the same issue. Have you found solution on this.
BR,
Zulfikar

Similar Messages

  • Purely iterative price in controlling area setting

    Dear Experts,
    Please let me know the use and implication of a tick " Purely iterative price" coming in Version setting of controlling area fiscal year wise (Txn Code OKEQ).
    Thanks in Advance for co operation
    Regards
    Rohit

    HI Waman,
    Thanks for the reply.
    I want to clarify some more doubts as follow:
    1)  How this iterative price is calculated means by which transaction code, Is it calculated at the time of automatic plan price calculation means thru KSS4 & KSPI..
    2) What is formula system uses to calculate this price, like plan price may be calculated based on Planned Cost /Planned Activity.
    3) Where we can see this price means in which Txn Code.
    4) As you have said that this cannot be used for revaluation, then what is the use, Is it only for Analysis purpose.
    5) Is there any other settings we have to do in activity master or any other,  to calculate the same.
    Thanks in advance for your cooperation.
    Regards
    Rohit Goel

  • Actual activity price calculation for production order

    Hi
    Can any one guide me in how many ways we can assign actual activity price calculation for production order?
    I knew only one way by assigning PPP2 costing variant?
    I have another doubt is: if we don't mention any material valuation indicator (moving average, standard) in valuation variant, how system will calculate material prices? is there any other way, to recognize the prices by system?
    regards,
    Ramesh B

    Dear,
    Costing variant PPP2 is linked to some valuation variant inn OPL1
    System will check the valuation of material and activity according to this valuation variant
    For material valuation there are many stg acceding to which system will take the price the raw material,
    Valuation strategy for material component
    Strategy sequence that determines the valuation of the materials used in the cost estimate.
    Use
    The materials are valuated using the price in the material master record or the values calculated in a material cost estimate.
    Procedure
    You can enter a single strategy, or you can enter multiple strategies in the form of a strategy sequence. If you enter multiple strategies, the priority of the strategy determines what price or what values are selected.
    Examples
    Assume that the following strategy sequence is entered for material valuation:
    1. Planned price 1
    2. Standard price
    3. Moving average price
    If the system finds a value in the Planned price 1 field (costing view), this value is taken as the value for valuating the material.
    If the system does not find a value, the value in the Standard price field (accounting view) is used.
    If the material does not have a standard price, the system uses the value from the Moving average price field.
    if you have not mentioned, then system will give error that "valuation stg not found"
    Valuation strategy for internal activities and processes-
    Strategy sequence that determines how internal activities and processes are valuated in costing.
    Use
    The activities and business processes used are valuated with the prices from Cost Center Accounting or Activity-Based Costing to determine the production costs or process costs. The prices can either be calculated iteratively through price calculation, or entered manually by the user.
    Procedure
    You can enter either a single strategy or more than one strategy in the form of a strategy sequence. If you enter more than one strategy, the priority of the strategy determines which price is selected.
    Examples
    The following strategy sequence is entered:
    1. Actual price of the previous period
    2. Plan price of the previous period
    3. The most current plan price
    If the system finds a price for the activity type, this price is used for valuating the internal activities. If no price was calculated for the previous period, the plan price from the previous period is used to valuate the activity type.
    If the system cannot find a plan price for the previous period, it looks for a future plan price, using the next price in the posting period to valuate the internal activities. For example, if plan prices have been entered for periods 2 and 3, and a plan price is calculated in period 1 for period 4, the system uses the price from period 3 in accordance with the valuation strategy Most up-to-date plan price.
    Again if you have not mentioned, then system will give error that "valuation stg not found".
    You can use any costing variant for actual (PPP2)and planned(PPP1) according to your requirement.. check in OPL1

  • KSS2 KSII  Actual activity price calculation

    Dear Grus !
    I want to carry out actual activity price calculation.    I assigned activity type act 100 to act500 to different cost element, and also assigned splitting rule 12.
    also entered activity plan price in KP26. cost element planning in KP06.
    When I carry out KSS2, system distribute cost of one cost element to activity types according to the target cost maintained in KP06.   I want the result that cost distributed as maintained in the splitting rule.
    is there any specific configuration that i missed?
    Thank you all ~
    Lynn

    Check whether you have maintained the Equivalence number for the activity type and cost center combination in KP26.
    Also you have to run the KSPI before running KSII, because KSII result is the iterative one.
    Hope this will help you.
    Kamlesh

  • Activity Price calculation

    Hi all
    Can anybody tell me how to do the Activity price calculation.
    we are doing the activity type planning by using T code KP26
    but that has to be done manually,my client want system should calculate the price automatically
    First of all can it possible,if yes please let me know the configuration
    Thanks
    Ansuman

    hi
    Calculating Actual Activity at Actual Prices
    Because you carry out actual price calculation at period-end closing, no actual prices exist at the time of the actual activity posting. For this reason, the initial valuation of actual activity uses plan prices. If no plan price exists (as is the case with pure actual cost calculation), you can post the activity without a valuation. During period-end closing, the system calculates the actual prices iteratively and, provided you have made the required settings recalculates the difference between the plan and actual prices (see the example in Actual Price Calculations).
    The procedure for the actual price calculation does not differ from plan price calculation (see: Plan Price Calculation). You can calculate a purely iterative price in the actual, just as for plan price calculation. To do so, select Purely iterative price in the fiscal year parameters of the version.
    To calculate the purely iterative actual price, the system uses the actual costs and actual activity for all cost centers/activity types or business processes. The plan prices (whether calculated iteratively or entered manually) are treated by the system like manual settings and are ignored during the calculation of the purely iterative price in the actual. Actual activity inputs are initially valuated with the relevant plan price. This may result in large variances between the purely iterative actual price and the calculated actual price; activity inputs are valuated with plan prices, whereas the credits on cost centers and business processes are based on activity valuated with iterative actual prices.
    In the price report (see: Price Report) you can compare the purely iterative prices with the prices calculated through the manual settings. In this way, you can analyze the effects of price changes (in actual, the manually-set prices and the iteratively calculated plan prices) on the complete pricing framework.
    for furthur notes
    http://help.sap.com/search/search_overview.jsp
    nagesh

  • Open PO LSMW Quantity conversion error in net price calculation

    Hi gurus,
    I encountered an error as I was tring to upload purchase orders - "Quantity conversion error in net price calculation". What does this mean and how do I fix this?
    Please help
    Thanks

    Hi Jürgen,
    Where in the Material Master can I find the conversion ratio between both units?
    Also, I am trying to upload POs for Spare Parts and that's when I get the error. But when I try to use other materials like FGs, everything is ok. I can proceed with the upload without any problem
    Please help

  • Function Module or BAPI for Sales price calculation and Pricing worklist

    Hi Retail experts,
    We frequently change purchase conditions, but not that frequently for cases like perishables, so sales price calculations needs to be done each time. This means pricing worklist generation and release is done often and then sales price recalculation is done each time article wise and for various organization level.
    We have 15000 articles for which purcahse conditions changes, it is impossible to generate and release pricing worklist and do sales price calculation for each article
    So solution may be to find a FM/BAPI for the following transactions and automate them.
    Do you know FM/BAPI for VKP5/VKBP or VKP6, WVN0, WVN1 transactions.
    Regards
    Bob

    HI Madhu,
             Thanks for the reply,
    I am looking for BAPI or FM which will check all pricing condition types( like MRP of the Material(table A304), discounts(A800,A802,A803,A804) for that customer and Tax) and give me the value(KONP-KBETR).
    I can only pass Customer, material, quantity etc.. so that BAPI or FM has do all standred checks/ validation and give the
    KONP-KBETR for all condition types like MRP, discounts, Tax. we are developing the custom program for sales order creation so we require the all this before saving the sales order.
    Regards,
    Nagesh
    Edited by: nageshdb4u on Mar 5, 2011 12:05 PM

  • Get "Error in Net Price Calculation" error while creating a Purchase Order

    I am getting a error when i try to create a PO. Says "Error in Net Price Calculation item 00010(Please correct)"
    I have defined conditon records with the price for the material  and have also created info record.However the price in the info record (including currency i.e USDN is different than the one defined in the conditon records currency is USD).
    However the price is different from the one defined in info record and in material master.
    Where is it picking the price from also is there any way to edit the price in material master or info record ?
    Also when i view the condition records by using Tcode MEK1 i get the following error
    "Access Pricing Purchasing Z00q 20 contains no fields"
    I know Z001 is the access sequence
    Can any one tell me wht is this error message about ?
    Edited by: Dspsac on Jan 29, 2008 4:31 AM

    how can u maintain the condition record as well as info record for a vendor -material in the same time frame
    it is not possibe
    as info record is also 1 of the condition table
    if u have maintained the info record then system is going to fetch the data from there but point top notice is it depends on the validity of record
    system fetch the price from info record
    and the currency used is fom vendor master

  • Error in net price calculation In PO

    Dear all,
    I created a new pricing procedure where i am getting an error message in PO i.e.
    "Error in net price calculation, item 000010". Message no. 06213
    Please advise me how to overcome the error.
    Thanks
    Prasant

    Dear Prasanth,
    Check the condition schma -> Control data
    here Condition Type NETP-Net Price
    this condition type were it is applied in total condition how it reflecting to total pricing scema
    hope this will helps you
    Prem

  • Message no. 06211 Currency translation error in net price calculation

    Hi,
       When i am creating purchase order i am changing currency from INR to JPY for FOB condition type only, And system issuing error message Currency translation error in net price calculation. Document currency is INR.
    When i am using USD i am not getting this error.
    I have checked table OB08 and both conversion maintained INR to JPY AND JPY to INR valid from 01.01.2012
    Any solution for this please.
    Thanks in advance.

    Hi, Check in T-code M/08 for your import prizing procedure,what have you maintained for subtotal for gross price condition (PBXX,PB00), Maintain over there as '9', also for JPY currency there is issue with decimal also, ratio maintained in 100:1 ratio.
    Edited by: tej yadav on Jan 6, 2012 1:29 PM

  • ME21N--Quantity conversion error in net price calculation

    Hi MM experts,
    Issue: while creating PO, when attempting to add the net price for line item. but system removes the cost and gives the follow error message says "Quantity conversion error in net price calculation".
    The system was not able to convert the order unit into the purchase order price unit. Possible reasons:
    i) the conversion results in a net price that is too high, or
    ii) the conversion factor for the units has not been properly maintained.
    iii) Check whether the units of measure and their conversion factor are correct.
    I have checked material master>unit of measure> 1 PL = 22 KG maintained.
    Can you please tell me how to resolve this issue?
    Appreciated early response.
    Thanks in advance.
    Suresh

    Hi Suresh,
    Please check on Material Master Data - Accounting 1 tab - Price Unit
    Moshe

  • Quantity Conversion Error in Net Price Calculation

    We are currently using SRM 5.0 ECS where we created a material PO and had a problem with the product not having the language E maintain in the material master. This caused the PO to have status of "error in process"  Once we fixed this issue and tried to reprocess the PO we're not getting the following error message in the Application Monitor:
    No Instance of Object type PurchaseOrder has been created. External Reference
    Puchase Order still contains faulty Items
    Quantity Conversion Error in Net Price Calculation
    Has anyone seen this or know what we can do to resolve this so that the PO gets replicated in R3?
    Thanks in advance.

    Hi Robert,
    Regarding this backend error E 212 06 Quantity conversion error in net
    price calculation.         
    This error is because in the PO Order price unit is empty. And          
    quantity is null. So, please enter the quantity and order price unit          
    for this PO and order the PO again. Or you can retransfer the      
    PO manually using the FM BBP_PD_PO_TRANSFER_EXEC. (for this fm you need       
    to input the PO header guid, which you will get it from tx.BBP_PD             
    by providing PO number and object type as BUS2201).
    This has worked for other customers.
    Hope this helps,
    Kind Regards,
    Matthew

  • Quantity conversion error in net price calculation in BAPI_PO_CREATE1

    I'm creating PO from BAPI_PO_CREATE1 .here i'm getting follwing error
    quantity conversion error in net price calculation.
    plz guide me to remove it.

    Are you using quantities directly entered by the user while calling the function to do the net price calculation? If that is the case, you should use FM CONVERSION_EXIT_ALPHA_INPUT to convert the quantity from the external format into the internal one!
    Another possibility is that some customizing is missing for converting quantities in different unit of measures (like the quantity in pieces is known, but the pricing calculation is being done on kilos.. but the convertion between these 2 unit of measures is missing).
    Good luck!

  • Error in net price calculation, item 000010 (Please correct)

    Hi
    Can you tell me error and correction for the same ? It occurs during creation of Std.PO. whom RM1000 prcing procedure is assigned.
    Error in net price calculation, item 000010 (Please correct)
         Message no. 06213
    Diagnosis
         Possible causes:
         o   The net price is negative.
             Check the prices and conditions entered.
         o   An error has occurred during currency translation.
             Check whether the foreign currency is defined in the system.
         o   The unit of measure of an item is not allowed.
             Check the units of measure entered.
         o   An internal error has occurred during the price determination
             process.
             A mandatory condition type is not defined in the system. Please
    In the analysis under item details condition tab I got message 301 as Acess 0002 12 is missing.
    Acess seq. 0002 is assigned to condition type PB00.

    I know this thread is very old but I had the same issue and found the solution.
    Enter the SubTotal in the pricing scheme for condition P101 (in my Case 9 - Copy values to KOMP-BRTWR (gross value)).
    Than it works for my case.
    Hope this helps.

  • Moving average price calculation logic of material with Price Control "S"

    Dear Gurus,
    As you know that there is a Moving price and standard price icon in the material master.
    I want to understand the calculation logic of the moving average price of the materials having price control "S"
    How the system calculates the MAP for standard price materials? The receipt from the process order I suppose is valuated at the process order cost after settlement, but if the issue has hapened for the material does the system recalculate the issue price also?
    Below is the sample process order receipt and issue scenario:
    Receipt from process order 161000000223
    300 kg and GR at standard cost value is Rs 5892
    Issue to process order 162000000294
    250 kg and GI at standard cost value is Rs 4910.
    Thus the balance at period end is 50 kg and balance at standard cost value is Rs 982.
    Here in process order 161000000223 the actual cost is 10 Rs. Then how will the system calculate the MAP?
    Thanking You,
    Amit Dhanurdhari

    Hi
    Try the following calculations,
    One of them will work depending upon your version and support pack
    Expected MAP calculation ( As with price control V)
    = ((Qty before transaction*MAP + Transaction Qty * transaction
    Price)) / quantity after transaction
    New Method ( when price control is S)
    = Old MAP + (Price Variance w.r.t Standard Price/Qty after transaction)
    Also go through the following notes,
    Note 1225167
    1253944
    518485 FAQ: Valuation of goods movements
    212286 Overview note: Valuation during goods movements
    209864 Moving average price is disproportionately large
    202166 Collective note: Statistical moving average price
    185961 Moving Average Price Calculation
    I have done extensive research on this, let me know if you need to know something specific.

Maybe you are looking for

  • TS2972 why is the import button not showing at the button right hand corner of iTunes?

    why is the import button not showing at the bottom right hand corner of my ITunes page.  I am trying to transfer files from my home share library onto a new computers library.

  • Table /dvsrepro/sepdol not present in ECC 6.0

    Hi, We are planning an upgrade from 4.6C to ECC 6.0. However while doing a preliminary study of ECC 6.0, we find that table /dvsrepro/sepdol, which is present in 4.6C is not present in ECC 6.0. We are using this table to print the output of batch job

  • ASA 5520 : IP address for CSC SSM

    Hi All, I have an ASA 5520 with CSC SSM. I have base and plus license and want to activate it. T he IP address and gateway have to be configured on the CSC SSM. I have configured IP addresses for the INSIDE,OUTSIDE,DMZ and MGMT. The outside is a publ

  • Data size Catagory.

    Hi, In SE11, in Technical Settings, there is a field for DATA size catagory. what significance this field has? i searched forums, most of the replies were it is just an indication and it can be overshot etc. Basically they were telling it was similla

  • Is it possible to install Windows in MacBook Air?

    I want to purchase a MacBook Air as I want to get experienced with Lion and just want to take feel of Mac. But yet I am expereicned with Windows only so will it be possible to install Windows (Dual Boot/Virtual Machine) in MacBook Air?