Link between Delivery Line Item to DTR Line Item to Freight Unit Number?

Dear All,
I am creating DTR with reference to delivery from ECC. As per my logic in FUBR, I am creating separate Freight Unit for every DTR line item.
Now how to identify (At Table Level) that which DTR line item belongs to which Delivery Line Item?
Also how to determine which Freight Unit belongs to which DTR Line item?
Request to please share the above flow at table level in SAP TM System.
Regards,
Vibhu Gupta

Hi Vibhu,
First, you know which DTR item you have on hand and then you can find the corresponding FU item by association(TOR ITEM from TRQ item to FU item), after retrieving the data of FU item you can find the root key of every result data entry(FU item data) and you can also get the DTR item key/FU item key pair(which DTR item/which FU item), actually the root key is the FU root key, then you can user service manager to retrieve the root data of corresponding FU root key.
Hope this helps.
BR, Dawson

Similar Messages

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

  • Link between Delivery schedule line counter from PO and the material docume

    Dear Gurus,
    I have one PO with single line item having delivery schedule -
    Material 1 -
    delivery schedule 01.01.2009     2000
                                                         01.03.2009    5000
    I have received quantity against this Po
    I want to know where I can find the link between Delivery schedule line counter from PO and the material document
    Best regards
    Sar

    There is no link from the MAterial document line item (Table Mseg) to the PO Schedule Line (EKET).
    If this is for Evaluating an on time delivery or GR, you may consider the following approach.
    PO details Po Date  QTY
    Sch1   01Jun2009   200   
    SCH2  08Jun2009   100
    GR Details
    GR1   01Jun2009   180
    GR2   07Jun2009   110
    GR3  09Jun2009      10
    Calculate a *** total qty for the PO Line.
    PO details Po Date  CUMUL QTY
    Sch1   01Jun2009   200   
    SCH2  08Jun2009   300
    Calculate a *** total qty for the ontime GR.
    PO details Po Date  CUMUL PO QTY  CUMUL GR on time
    Sch1   01Jun2009   200                180
    SCH2  08Jun2009   300                 290 (180+110)  the 3rd GR was too late
    Evaluate the PO SChedule Lines as follows:
    Po SCL qty + CUMUL GR QTY - CUMUL PO QTY = ADJ GR ON Time Qty
    SCH1 01Jun2009
    200 + 180 - 200 = 180 on time for 01Jun2009 date ( 90% fill rate)
    SCH2 08Jun2009
    100 + 290 - 300 = 90 on time for 08Jun2009 date (90 % fill rate) the first 20 of the GR on 07Jun2009 went to fill the late, early date.
    Best of luck !
    SCH2 100 +290 - 300 = 90 on time for 07Jun2009 date

  • Link between Delivery Header & Sales Order Item for extraction to 2nd level

    Hi Guys ,
    I am having a requirement that need to pull the following data to 2nd level DSO
    1.  Delivery Header Data
    2. Sales Order Item data. ( Sales Document, Item, Item RDD, Material)
    So I am planning create a 2nd level DSO on top of Delivery header and need to pull the sales order ITEM level data ( Sales document , Order ITEM, ITEM RDD date , Material)  through start routine u2026
    How can I pull the Sales Order Item data through start routine?  i.e I need the link between Delivery Header & Sales Order Item Data .
    or I need the link between LIKP ( Delivery Header) Vs VBAP ( Sales Document Item).
    Thanks
    Edited by: krismady on Sep 22, 2010 2:26 AM
    or I need the link between LIKP ( Delivery Header) Vs VBAP ( Sales Document Item).

    Hi Krish,
    You can use VBLEN (Sales Document) to link Delivery header DS (2LIS_12_VCHDR) and Delivery item DS (2LIS_12_VCITM). Now In delivery item DS (2LIS_12_VCITM) you have VGBEL (Reference doc.) and VGPOS (Reference item) which is nothing but sales order document number and sales item in Order item DS (2LIS_11_VAITM) .
    So you need to link in above way to get other values in your DSO.
    It is proven method.
    Thanks,
    Uday Shankar.

  • Link Between delivery and material document

    Dear All,
    how do we link between delivery document,
    and between delivery document and accounting document,
    with regards
    Mohammed Raees

    Hi there,
    Material doc is the PGI document which is created whenever there is material movement either GR or GI. In VL02N --> document flow, select the GD goods issue & click on display document. It will take you to the material doc. There is a field called material slip in that. The value stored in material display is the delivery num. That is how you link the delivery & material doc.
    From the material doc if you click on accounting docs, it will give you the A/c document num & the costing doc num (if available).
    From the material doc, select the item & click on details from ityem, it will give you the GL account for which the GI is posted.
    Regards,
    Sivanand

  • Link between delivery schedules in purchase order and GR document

    Dear all,
    Can you provide link between Delivery schedules in po and gr document. for which schedule gr is done etc.
    With Regards,
    prasadbabu

    i want fields mblnr and eindt in one table.
    With Regards,
    PrasadBabu.

  • Link between delivery line item and sales order item schedule line.

    Hello friends,
    This is a continuation of my earlier query - for which I got half the solution, and this is the remaining problem.
    I want to know: from delivery document line item, how to link it to sales order line item's schedule line (when there are multiple schedule lines with identical quantities).
    Thanks for your help.
    - Chetan

    This is the code which i used for the same purpose and its working.
    Hope this will help you too....
    ****it_itab  is my final internal table.
    *Internal table for manupulating the Delivery balance when
    *its used in more than one schedule line
    TYPES: BEGIN OF ty_new,
           vbeln TYPE vbep-vbeln," so no
           posnr TYPE vbep-posnr," so line no
           etenr TYPE vbep-etenr," schedule line
           delno TYPE lips-vbeln,"delivery no
           delposnr TYPE lips-posnr,"del item no
           totval TYPE vbep-wmeng," total del wise value
           val   TYPE vbep-wmeng," del wise used value
           sdval TYPE vbep-wmeng,"schedule wise  del used value
           sdtotval TYPE vbep-wmeng," total Schedule value
         END OF ty_new.
    DATA:it_new TYPE ty_new OCCURS 0,
         wa_new TYPE ty_new.
    DATA: it_vbepvb TYPE TABLE OF vbepvb,
            wa_vbepvb LIKE LINE OF it_vbepvb,
            fvbfa TYPE TABLE OF vbfa,
            fvbup TYPE TABLE OF vbup,
            fvbap TYPE TABLE OF vbapvb.
      LOOP AT it_vbak INTO wa_vbak.
        LOOP AT it_vbap INTO wa_vbap
                WHERE vbeln = wa_vbak-vbeln.
      SELECT * FROM   vbfa INTO TABLE fvbfa WHERE vbelv = wa_vbap-vbeln
                                             AND  posnv = wa_vbap-posnr.
      SELECT * FROM   vbup INTO TABLE  fvbup WHERE vbeln = wa_vbap-vbeln
                                             AND  posnr = wa_vbap-posnr.
      SELECT * FROM   vbap INTO TABLE fvbap WHERE vbeln = wa_vbap-vbeln
                                             AND  posnr = wa_vbap-posnr.
      SELECT * FROM   vbep INTO TABLE it_vbepvb WHERE vbeln = wa_vbap-vbeln
                                             AND  posnr = wa_vbap-posnr.
      CALL FUNCTION 'RV_SCHEDULE_CHECK_DELIVERIES'
        EXPORTING
          fbeleg                        = wa_vbap-vbeln
          fposnr                        = wa_vbap-posnr
      FVERRECHNUNG                  = ' '
      FS073_ALT                     = ' '
      IF_NO_SORT                    = ' '
        TABLES
       fvbfa                         = fvbfa
       fvbup                         = fvbup
       fxvbep                        = it_vbepvb
      FVBLB                        =
        fvbap                        = fvbap
    EXCEPTIONS
      FEHLER_BEI_LESEN_FVBUP        = 1
      FEHLER_BEI_LESEN_FXVBEP       = 2
      OTHERS                        = 3
      IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
      SORT it_vbepvb BY vbeln posnr edatu.
      LOOP AT it_vbepvb INTO wa_vbepvb
                    WHERE vbeln = wa_vbap-vbeln
                      AND posnr = wa_vbap-posnr.
        to write data of schedule line with no delivery
        MOVE wa_vbepvb-olfmng_flt TO wa_itab-openqty.
        IF  wa_vbepvb-bmeng EQ wa_itab-openqty.
          CLEAR wa_itab.
          PERFORM schedule_data.  "schedule line based data to be displayed
          MOVE: wa_vbap-lgort TO wa_itab-lgort.
          MOVE: wa_vbepvb-etenr TO wa_itab-etenr,
                wa_vbepvb-bmeng TO wa_itab-kwmeng,
                wa_vbepvb-olfmng_flt TO wa_itab-openqty.
          APPEND wa_itab TO it_itab .
          CLEAR wa_itab.
        ENDIF.
        LOOP AT it_vbfa INTO wa_vbfa WHERE vbelv = wa_vbepvb-vbeln
                                            AND  posnv = wa_vbepvb-posnr.
          READ TABLE it_likp INTO wa_likp WITH KEY vbeln = wa_vbfa-vbeln.
          CHECK wa_likp-bldat >= wa_vbepvb-edatu.
    check the Delivery doc date with the schedule line confirmed date
          CLEAR: delbal, deltot,wa_new.
          LOOP AT it_new INTO wa_new WHERE vbeln = wa_vbepvb-vbeln
                                         AND       posnr = wa_vbepvb-posnr
                                         AND       etenr = wa_vbepvb-etenr.
            deltot = deltot  +  wa_new-sdval.
          ENDLOOP.
          delbal = wa_new-sdtotval - deltot.
          CHECK sy-subrc <> 0 OR delbal GT 0.
          MOVE wa_vbepvb-olfmng_flt TO wa_itab-openqty.
          CHECK  wa_vbepvb-bmeng NE wa_itab-openqty.
    ****To check whether this delivery is already fully allocated against
    any other schedule.
    LOOP AT it_lips INTO wa_lips WHERE  vbeln = wa_vbfa-vbeln
                                           AND posnr = wa_vbfa-posnn.
            MOVE: wa_likp-bolnr TO wa_itab-vesname.
            MOVE: wa_likp-vbeln TO wa_itab-delno.
            MOVE: wa_likp-wadat TO wa_itab-wadat.
            MOVE: wa_likp-anzpk TO wa_itab-anzpk.
            MOVE: wa_likp-lddat TO wa_itab-lddat.
            MOVE: wa_likp-ernam TO wa_itab-ernam.
    ******end of code added by IVL1 on sep 27 2007 #3618
            PERFORM schedule_data.
            IF wa_lips-umvkz <> 0.
              tempquant = wa_lips-umvkn / wa_lips-umvkz.
            ELSE.
              tempquant = wa_lips-umvkn. "delivery qty
            ENDIF.
            tempquant = tempquant * wa_vbfa-rfmng.
    ***New logic added to get delivery qty schedule wise****
            MOVE: wa_vbepvb-etenr TO wa_itab-etenr,
                  wa_vbepvb-bmeng TO wa_itab-kwmeng,
                  wa_vbepvb-olfmng_flt TO wa_itab-openqty. "jo
    **if delivery qty is less than or equal to schedule line qty******
            IF tempquant LE  wa_vbepvb-bmeng.
              wa_itab-delqty =  tempquant.
              LOOP AT it_new INTO wa_new  WHERE  vbeln = wa_vbepvb-vbeln
                                         AND     posnr = wa_vbepvb-posnr
                                         AND     etenr = wa_vbepvb-etenr
                                         AND     delno  = wa_lips-vbeln
                                         AND     delposnr = wa_lips-posnr.
                MOVE-CORRESPONDING  wa_itab TO wa_new.
                wa_new-delposnr = wa_lips-posnr.
                wa_new-val = tempquant.
                wa_new-totval = tempquant.
                wa_new-sdval  = tempquant.
                wa_new-sdtotval = wa_vbepvb-bmeng.
                MODIFY TABLE it_new FROM wa_new .
                IF NOT sy-subrc IS INITIAL.
                  APPEND wa_new  TO it_new.
                ENDIF.
              ENDLOOP.
              IF sy-subrc <> 0.
                MOVE-CORRESPONDING  wa_itab TO wa_new.
                wa_new-delposnr = wa_lips-posnr.
                wa_new-val = tempquant.
                wa_new-totval = tempquant.
                wa_new-sdval  = tempquant.
                wa_new-sdtotval = wa_vbepvb-bmeng.
                APPEND wa_new TO it_new.
              ENDIF.
             wa_itab-delqty =  tempquant.
             CLEAR tempquant.
            ELSE.
        lips qty > so schedule lineqty
              CLEAR deltol.
              LOOP AT it_new INTO wa_new WHERE    vbeln = wa_vbepvb-vbeln
                                          AND      posnr = wa_vbepvb-posnr
                                         AND     etenr = wa_vbepvb-etenr
                                          AND     delno  = wa_lips-vbeln
                                          AND    delposnr = wa_lips-posnr.
                deltol = deltol  + wa_new-val.
              ENDLOOP.
              LOOP AT it_new INTO wa_new  WHERE    vbeln = wa_vbepvb-vbeln
                                          AND      posnr = wa_vbepvb-posnr
                                          AND     delno  = wa_lips-vbeln
                                          AND    delposnr = wa_lips-posnr.
                MOVE-CORRESPONDING  wa_itab TO wa_new.
                wa_new-val = wa_new-totval - deltol.
                wa_itab-delqty =  wa_new-val.
                wa_new-delposnr = wa_lips-posnr.
                wa_new-totval = tempquant.
                wa_new-sdval  = wa_new-val.
                wa_new-sdtotval = wa_vbepvb-bmeng.
                MODIFY TABLE it_new FROM wa_new .
                IF NOT sy-subrc IS INITIAL.
                  APPEND wa_new  TO it_new.
                ENDIF.
              ENDLOOP.
              IF  sy-subrc <> 0.
                MOVE-CORRESPONDING  wa_itab TO wa_new.
                wa_itab-delqty =  wa_vbepvb-bmeng.
                wa_new-delposnr = wa_lips-posnr.
                wa_new-val =  wa_vbepvb-bmeng.
                wa_new-totval = tempquant.
                wa_new-sdval  = wa_vbepvb-bmeng.
                wa_new-sdtotval = wa_vbepvb-bmeng.
                APPEND wa_new  TO it_new.
              ENDIF.
            ENDIF.
            IF NOT wa_lips-lgort IS INITIAL.
              MOVE: wa_lips-lgort TO wa_itab-lgort.
            ELSE.
              MOVE: wa_vbap-lgort TO wa_itab-lgort.
            ENDIF.
            APPEND wa_itab TO it_itab .
            CLEAR wa_itab.
          ENDLOOP. 
        ENDLOOP.
        CLEAR wa_vbepvb.
      ENDLOOP.
        ENDLOOP.
        CLEAR wa_vbak.
      ENDLOOP.

  • Link between OrderDetail and SBO Sales Order Lines

    Hey All,
    can anyone tell me how I can tell which order detail records are linked to which SBO sales order lines? I know I can find the sales order based on the synch id in the ordermaster table. But I don't see  a link between the child orderdetail table and RDR1 in B1.
    Any ideas?

    Hi Curtis,
    This is actually a bug.
    (Fixed in sp1--release date who knows when)
    Way back in the olden days, Webtools (NetPoint) did not allow the same item on multiple lines, so synchid, partno was a unique key.
    When this changed in 5.96, no synchid was added to the orderdetail, resulting in a bug if the following happens:
    1.  order is created in Webtools with the same item on multiple lines
    2.  order is synchronized to B1
    3.  order detail data is editted on the duplicate items
    4.  synch back to Webtools
    The line item data may be incorrect on the duplicate items
    So, the moral of the story is, your best bet is a compound key of ordermaster.synchid/orderdetail.partno-->rdr1.docentry/rdr1.itemcode.  But be warned that there could be synch issues if you end up in the above scenario.

  • SD-How to find table of link between delivery and sales order?

    Hi Experts,
    I have a requirement as below.
    In LIPS table (SD document: Delivery: Item data), in this table has one kind data.
    One record has maintianed 2 fields PSPNR(Project definition (internal)) and PS_PSP_PNR(Work Breakdown Structure Element (WBS Element)).
    How to find sales order number of the above record? Could you tell me which table link the delivery item data and sales order number?
    Thanks a lot,
    Frank

    Hi frank
    Check the following tables  VBAP , VAPMA , VBUP . It may help you
    Regards
    Srinath

  • Link between delivery and handling unit split items

    Hi All,
      I have an delivery wit 4 different line items. While creating the Packing we created the Handling units for the delivery.
    In Handling unit one line item is split into 2 boxes.
    like   handling unit     gross weight
                1                        20
                2                       20
               3                        20
               4                        10  split
               5                         10 split
      so now i want to display the delivery line item and gross weight. For last line item i have to add the both handling unit 4 and 5 and display the gross weight.
    In VEKP table i have only delivery number for the reference for all handling units. but not line item. So how can we find out for which delivery line item of the handling unit was split.
                           Thanks,
    Venkata Pavan Kumar. Chandrapatla

    Hello,
    Use item level table VEPO for all the details.
    I hope this will solve your problem.
    Regards,
    Nabheet Madan

  • Table shows link between delivery no and purchase order no

    Hi All
    For particular delivery no, I want to know the purchase order no. which table stores this info.
    cheers
    AJ

    >
    Karthik D wrote:
    > Hi Anup,
    >
    > If you know the billing number(VBRK-VBELN) you can get the PO number from VBRK-BSTNK_VF.
    >
    > Even if you know delivery number pass it to VBFA table, get the salesorder number and pass it to VBAK and get the po number(VBAK-BSTNK)
    >
    > Revert back if you have any doubts.
    >
    > Regards
    > Karthik D
    And If SO is not derived from purchace order than?

  • Link between sales order-delivery-invoices

    Hi all,
    I need to display an order , the delivery that is based on the order , the invoice based on this delivery...
    I need to find a link property between them ...
    Plz help...
    Ola

    The links between the documents are held at the item line level. 
    The BaseEntry property, BaseLine property, and BaseType property are used to link from one document to another. On your invoice these would contain pointers to the delivery it was based on, on the delivery these would contain pointers to the sales order.
    BaseType contains a BoObjectTypes reference (eg. Sales Order = 17) to let you know what type of document the line was based on.
    BaseEntry contains the document key to the originating document.
    BaseLine indicates which line number on the original document the current line was based on.
    John.

  • API to create a link between Sales order and Requisition

    We are upgrade 11i to R12. We have a custom drop ship process. We have a original SO and through the sales order we create a Reqisition. We send the requisition details to the factory and the factory sends us a flat file with the quantity shipped and dates. There might be multiple lines for each requisition received. We will add the details to the SO and update the Requision with the flat file details for the SO shipment. But We will have to create a link between the SO and the requisition. Is there an API to do the linking between a SO and A requisition line?

    I created a SO and a requisition
    declare
    p_rsv inv_reservation_global.mtl_reservation_rec_type;
    p_dummy_sn inv_reservation_global.serial_number_tbl_type;
    x_msg_count NUMBER;
    x_msg_data VARCHAR2(240);
    x_rsv_id NUMBER;
    x_dummy_sn inv_reservation_global.serial_number_tbl_type;
    x_status VARCHAR2(1);
    x_qty NUMBER;
    l_inventory_item_id number;
    l_source_header_id number;
    l_reservation_qty number;
    l_error_message VARCHAR2(300);
    l_order_number NUMBER;
    begin
    fnd_global.APPS_Initialize(1131,50654,660);
    p_rsv.reservation_id := NULL;
    p_rsv.requirement_date := to_date('30-JUN-2012','DD-MON-YYYY');
    p_rsv.organization_id := 88; ---ship_from_org_id
    p_rsv.inventory_item_id := 147001; --inventory_item_id
    p_rsv.demand_source_type_id := inv_reservation_global.g_source_type_oe;
    p_rsv.demand_source_name := NULL;-------'SALES ORDER';
    p_rsv.demand_source_header_id := 27005; --- sales order header id
    p_rsv.demand_source_line_id := 29010; --- sales order line id
    p_rsv.primary_uom_code := 'EA';
    p_rsv.primary_uom_id := NULL;
    p_rsv.reservation_uom_code := 'EA';
    p_rsv.reservation_uom_id := NULL;
    p_rsv.reservation_quantity := 200;
    p_rsv.primary_reservation_quantity := 200;
    ----p_rsv.supply_source_type_id := inv_reservation_global.g_source_type_internal_req;
    p_rsv.supply_source_type_id :=inv_reservation_global.g_source_type_inv;
    p_rsv.supply_source_header_id :=18001; -- requisition header id
    p_rsv.supply_source_line_id :=12172; -- requisition line id
    p_rsv.supply_source_name := NULL;
    p_rsv.supply_source_line_detail := NULL;
    p_rsv.autodetail_group_id := NULL;
    p_rsv.external_source_code := NULL;
    p_rsv.external_source_line_id := NULL;
    p_rsv.supply_source_line_detail := NULL;
    p_rsv.revision := NULL;
    p_rsv.subinventory_code := NULL;
    p_rsv.subinventory_id := NULL;
    p_rsv.locator_id := NULL;
    p_rsv.lot_number := NULL;
    p_rsv.lot_number_id := NULL;
    p_rsv.pick_slip_number := NULL;
    p_rsv.lpn_id := NULL;
    p_rsv.attribute_category := NULL;
    p_rsv.ship_ready_flag := NULL;
    p_rsv.demand_source_delivery := NULL;
    p_rsv.attribute1 := NULL;
    p_rsv.attribute2 := NULL;
    p_rsv.attribute3 := NULL;
    p_rsv.attribute4 := NULL;
    p_rsv.attribute5 := NULL;
    p_rsv.attribute6 := NULL;
    p_rsv.attribute7 := NULL;
    p_rsv.attribute8 := NULL;
    p_rsv.attribute9 := NULL;
    p_rsv.attribute10 := NULL;
    p_rsv.attribute11 := NULL;
    p_rsv.attribute12 := NULL;
    p_rsv.attribute13 := NULL;
    p_rsv.attribute14 := NULL;
    p_rsv.attribute15 := NULL;
    inv_reservation_pub.create_reservation
    p_api_version_number => 1.0
    , x_return_status => x_status
    , x_msg_count => x_msg_count
    , x_msg_data => x_msg_data
    , p_rsv_rec => p_rsv
    , p_serial_number => p_dummy_sn
    , x_serial_number => x_dummy_sn
    , x_quantity_reserved => x_qty
    , x_reservation_id => x_rsv_id
    IF x_status='S' THEN --- HARD RESERVATION IS DONE SUCCESFULLY ---
    dbms_output.put_line('reservation succesful');
    dbms_output.put_line('reservation id: || x_rsv_id');
    ELSE
    if(nvl(x_msg_count,0) = 0) then
    dbms_output.put_line('no message return');
    else
    for I in 1..x_msg_count LOOP
    l_error_message := fnd_msg_pub.get(I, 'F');
    end LOOP;
    end if;
    --- HARD RESERVATION API fails ---
    dbms_output.put_line('Reservation API Error Message: '||l_error_message);
    END IF;
    EXCEPTION
    WHEN OTHERS THEN ------------------ In case of any pl/sql error
    l_error_message := SQLERRM;
    dbms_output.put_line('Plsql Error Message: '||l_error_message);
    END;
    but i am getting an error
    "Reservation API Error Message: INV_RSV_DS_SO"
    I am stuck and no idea how to fix this. Any help is appreciated.
    Edited by: 901524 on May 23, 2012 1:26 PM

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • Link between ME28  and ME1P Screen

    Hi anybody,
          I want Link between ME28 Screen and ME1P Screen.
          When I select Material number on ME28 Screen and click button or select menu it will go to ME1P screen and display price details of that selected material number.
         How i will do? if anyone know please tell me this is urgent.
    Thanks
    S.Muthu.

    create view of va01 .

Maybe you are looking for