Manual/Autometic creation of cost elements in chart of accounts field

Dear Friends,
While creation of Chart of accounts (OB13) under  Controlling Integratiion tab
thers is two options are there.
1 manual creation of cost elements
2 autometic creation of cost elements.
While creation of cost elements if we select
(MANUAL CREATION OF COST ELEMENTS) what will happen???
(AUTOMETIC CREATION OF COST ELEMENTS) what will happen?
What is the main difference between about two fields?
Thanks in advance,
   Mallika

Hi,
MANUAL CREATION OF COST ELEMENTS -  Cost elements maintained manually. A push button is available for
this purpose, with which you can go directly to the related cost
element.
AUTOMETIC CREATION OF COST ELEMENTS - Cost elements maintained automatically. When you save a new G/L
account, the related cost element is automatically created. A prerequisite is that a default value for the cost element category
has been set up for this cost element. If no default value is found, the system will not create a cost element.
You can make default settings via :
Cost Element accounting --> master data --> cost element --> automatic creation of primary and secondaru cost element --> make default settings
Dhara.

Similar Messages

  • Automatic creation of cost elements

    Dear All,
    The automtic creation of cost elements functionality is not working for some GL accounts in production. When new GL accounts are created, the same are not created as cost elements. All the standard settings viz 'selection of automatic creation' in controlling area configuration, creation of number ranges in OKB2 etc are in place. We posted in OSS and they are not able to find reasons why this is happening.
    Has anyone faced a situation like this? Please post your valuable thoughts and share your inputs. We currently have a log created by user on this and pending for quite sometime.
    Thanks in advance
    Venkatesh

    Hi,
    Yes. We do face problem like this often. We wriggle out by updating through manually when we are very nearer to go-live date. Otherwise, we can create an abap program and meet the deficiency.
    Trust this helps much!
    Cheers!

  • Creation of cost elements automatically

    Hi,
    When I selected "manual creation of cost elements" in OB13, Then we can create a group of cost elements in OKB2 followed by OKB3 and SM35.
    Even I need to do same thing  I when I select " automatic creation of cost elements" ??
    I tried selecting " automatic creation of cost elements".  and I checked in KA03 whether it had created any cost element automatically. but it didnt created any thing...
    Please suggest..

    Dear Santosh Dharana,
    Good Question.  i can clarify you. this question
    1. when you select in ob13 create cost elements manually
    when your are using in obk2  we have to maintain here Acc from no. to Acc to no. ranges for Gl's and cost element categeory.
    after we can run batch in put in obk3 & SM 35 it's updated successfully.
    Note: After execute, *when you are try create another GL account with cost element we have to give cost element categeory by manually.
    2.when you select in ob13 create cost elementsAutomatically
    when your are using in obk2  we have to maintain here Acc from no. to Acc to no. ranges for Gl's and cost element categeory.
    after we can run batch in put in obk3 & SM 35 it's updated successfully.
    Note: After execute, when you are try create another GL account with cost element we don't have to give any cost element categeory here  system automatically give .
    Please try it.  i worked for this one
    Thanks & Regards
    shankar

  • Creation primary cost elements

    Primary cost elements can be generated in batch for creation, but then it seems to me it's all of them or nothing.
    Is this also possible for 1 year for instance or for a limited number of cost elements, via another transaction for instance.  MASS create?

    Hi Walter,
    First of all you have to select automatic creation of cost elements for your chart of account in OB13.
    Next in OKB2, you have to specify the cost element category for the range or single cost elemets.
    Next create batch input session in OKB3, here you can give from and to valid date.
    You have to execute the created batch input session in SM35.
    Rgds
    Murali. N

  • Creation of cost element or not for GBB-VAX,GBB-INV and UMB

    Dear Experts,
    I have few doubt regarding creation of cost element. Whether i will create Cost element or not.
    1) GBB-VAX - used in PGI(Vl02n)We have costing based COPA .whether we will create cost element or not.If i will create cost element then need to be bydefault in okb9 with PSG tick.
    2) GBB-INV- Used for Material taging(MI01,MI04,MI07)whether we will create cost element or not.If i will create cost element then what will be my cost object and how i will charge from my product costing.
    3) UMB- is used whenever standard price is changed. Shall i create cost element for the same
    If yes hen what will be my cost object and how i will charge from my product costing.
    Request you to help me on the same.
    regards
    RR

    1) GBB-VAX -  No, Goods Issue for sales order with no assignment object and hence without Cost Element
    2) GBB-INV- Yes to post expenditure/income from inventory differences
    3) UMB- Yes
    Regards
    KS

  • Restrict Creation of Cost Elements

    Hi All,
    I have a situation in which I have to restrict creation of Cost Elements for some of my P&L GL accounts. Is there any way I can restrict them. Any help would be appreciated.
    Thanks
    MKR

    Hi MKR,
    I would recommend not to have any validations for this.. This is the heart of the whole system and needs to be maintained in a very disciplined way
    If you put hard stops for such things, people will never understand the relevance of things and slowly the mind set evolves like "Unless the system gives a hard stop, any thing and every thing can be done"...  So, they go on creating nuisance in the system till the system stops them
    Moreover, there is no logic by which you can control this even if you try for an ABAP check... If you do still, it will propose probs in future...
    Provide the authorization for creating/changing cost elements to one single person who understands the system well and have a central control...
    Regards
    Ajay M

  • Auto generate cost elements while P&L accounts created

    Hi,
    Please tell me is there a way for cost elements create automatically after P&L accounts created.
    ( Config or Enhancement ).
    Thanks in advance.
    Regards
    Sam

    Dear,
    There is a standard functionality in SAP.....Follow below steps..
    1. Select Automatic Creation of Cost Element in the field Controlling Integration in transaction OB13.
    2. Use transction OKB2 and enter your chart of accounts.
    3. Maintain seperate or range of account with cost element category they should be created.
    Now as soon as you create a P&L account, cost element will be created automatically in controlling...
    Regards,
    Chintan Joshi

  • COPA- Cost-Based Chagning KSTAR(Cost Element) from technical to fixed field

    In the PA module-
    What are the implications with modifying the COPA field catalog in table v_tkef. That is changing a technical field (T) into a fixed characteristic or alternatively modifying the function module rke_external_data_get to allow technical fields to do the same functionality as B, S, U, or V.
    B- Basic key figure
    D- Dimension (characteristic)
    F- Fixed characteristic
    K- Key figure
    S- Fixed basic key figure
    T- Technical field
    U- Unit
    V- Fixed unit
    Details of Issue-
    We are using Cost-based COPA and there a requirement to post actual and plan documents by cost element in PA. However Cost element (KSTAR) is a technical field in cost based COPA.
    We would like the implications of modifying the field characteristics of KSTAR from technical to Fixed characteristic and setup the KSTAR as a characteristic within the Operating Concern.
    Your answers will be helpful in knowing the implications, feasibility and recommendations.
    Thanks,
    Krishna

    Hi,
    YOu are making that kink on CJIC where you can assign fix asset to WBS , before doing that you needs to check procured items agaist that particular WBS(on CJI3) & get create fix asset. To my knowledge that is the standard way to link fix asset & WBS rather than having ABAP validation.
    Regards,
    SL

  • Service activity creation & automatic cost element picking up

    Dear All,
    We are facing a peculiar problem while creating a service activity in Project creation - CJ20N (Project Builder).
    1)     Created a project definition. ( say u2013 X200)
    2)     Created parent WBS element.
    3)     Created one Network.
    4)     Assigned one service activity to the network.
    5)     While assigning service master to the service activity, system is asking for a cost element. In other words, the cost element is not automatically picked up for the particular service master. Actually, while creating earlier project (say X100) & assigning service activity, system is correctly defaulting the Cost element.
    6)     Here the service number which we are using is the same as used in the earlier project (X100). In X100, based on the valuation class in the service master & settings maintained in the transaction code OBYC, correct GL account is getting picked up. 
    7)     We can give the cost element manually. If we do this, system is giving another message u2013 u201CSystem could not determine a consumption account for service 2000000202u201D, though it is maintained for the valuation class in OBYC.
    Why the cost element is not getting defaulted? Pl advice in this regard.
    Thanks & regards,
    Gov

    Check out the Network profile & Plant of of both the project
    Case 1 X100   May be getting defaulted from  network profile
    Case2 X 200   You might be using different network profile where you would have not maintained  CE.
    With Regards
    Nitin P.

  • Creation of Cost Element in trading Company

    Hi,
    Ours is Trading company. We do not manufacture any products and hence we don't have production or process orders.
    Should we create price difference (due to difference in goods receipt and invoice receipt) and Cost of goods sold G/Ls as cost elements?
    Please reply.
    Regards,
    Bijay

    Hi,
    If you are using controlling, you can create those accounts as cost elements. It is all depends upon the requirement. Is this price difference account effect your cost reports?  i mean if you use this account for management accounting reports you can create this account as a cost element.  In the same cost of goods sold acocunt also. 
    The rule for creating an account as cost element is .. is that account effect your controlling/management accounting or not. If yes, create as a cost element otherwise no need.
    Regards
    Radha

  • Creation of cost element

    Hi,
    I set up my discount received account as a cost element. This was a BIG mistake now i cant pay any of my vendors, how do i proceed, i cant delete the cost element
    plzzz help

    Hi Mohammed,
    Have you looked transaction code <b>KA04</b>?
    For more information, please check this link.
    http://www.copacustomhelp.state.pa.us/infopak/content/fico_ka04_deletecostelement/cc/html/index.htm
    Hope this will help.
    Regards,
    Ferry Lianto
    Please reward points if helpful.

  • Mass creation of Cost elements

    Hello SAPians,
    I am having a issue related to cost elements.
    please find the detials below.
    I need to add new cost elements(may be something like 100 accounts) in cost element groups(KAH2)
    I tried with LSMW session but there is no use of it.
    can anyone please let me know if there is any other way in changing the cost element group for adding these new cost elements.
    I appreciate oyur quick response.
    Thanks in advance
    Regards

    Hello All,
    @ Eli:Can you please let me know how can we proceed further in SE16N,I am confused with that screen.
    please let me know the fields like table and the fields which need to be taken care.Thanks for your support
    @ Divraj:Accounts are not in a particular order and they are very huge in number like few 100's-800's
    @Sangram:can you please let me know if it is accepted in SAP terms for updating using the Program for these 800 accounts or so.
    please let me know if there is any other option in doing.
    Thanks for your valuable time.
    Regards

  • Cost Element and Profit center accounting

    hi to all,
    in my production system,  most of  PL accouts have been created as cost element. but some revenue and COGS accounts have not been created even there existed transaction data.
    now i want to create all PL accounts as cost elements. revenue (category is 11) and COGS(category is 12) accounts link with Logistic, so i am not sure the effluence in the auto posting with Logistics.  if there is any problem?
    by the way, after create all PL accounts as cost element, i want all the transaction data for PL account can flow into profit center accounting because i want to generate profit center PL report.  what shoul i do?  set the profit center field mandatory or set Substitution? or some more reasonable solutions ?
    expect your valuable suggestion/
    thanks in advance
    Ivan

    Hi,
    After creating P/L accounts as cost element when ever you will post to that account it will ask for posting to true CO object it can be a real cost center, real internal order or profitability segment etc.
    If you want all P/L account to post to profit center,  you can  set profit center field mandatory and you can enter profit center  manually.If your CO account assignment  is cost center System can also derive profit center from cost center master data.and OKB9 is more option which u can make use of.

  • COST ELEMENT FOR G/L ACCOUNT [KA01]

    HI,
    KA01 GIVES ERROR
    COST ELEMENT:  SILT
    VALID TO XXXX VALID FROM: XXX
    eRROR: CREATE G/L ACCOUNT SILT FIRST.....

    Hello,
    You need to create a G/L account first. Create a G/L account with transaction code FS00 and give this account as the cost element in cost element creation (KA01).
    If you have any doubt then check the existing cost elements in the system and check the G/L account and try to replicate in FS00.
    Prase

  • Intractive alv report while adding coloums of cost element of G/L account

    Hi guys,
    i have a proble with interactive alv report.
    i did all the things. its working fine also.  now they r asking me to add some coloums
    which are from COSP-KSTAR this is cost element.
    i need to ristrict perticular cost element according to the company code and fiscal year.
    i don't know how we can take the cost elements and how to pass them.
    plz any of u help me to come out of this problem.
    Thanks & Regards,
    Lakshmi..

    so   ,  write   a   select   query to  table   cosp   in to it_cospt   internal table  .
    where  condition   
    WRTTP
    VERSN
    GJAHR .
    the  above   should   hard coded the  data   by asking the   Function consultant   like  version  &   value type   .,
    then    loop at   your   final  internal table    .
    read table   of   it_cospt   where   gjahr  =  gjahr 
    IF   final-KOSTL  CA   it_cospt-OBJNR .  for Costcenter  validate
    because  it stores the  Costcenter  only in the   COSP-OBJNR   , IF you check table data in BSEG  and  COSP  , even AUFNR ( Internal order )  also  to the same  field . so that   the   cost center  gets validated   in the  if  condition   ,   for your information  if they ask   you costelement  then  it  include  internal  order also  if  you want   ask question to  you FI consultant   about   cost center  and  Internal order difference ***************
    <b>move all  your  fresh  data  to  your  new  internal table       your   it_cospt-KSTAR    </b> data  also.
    <b>append   new  internal table  </b> .
    Elseif final-AUFNR  CA   it_cospt-OBJNR .  for INTERNAL ORDER  validate
    b]move all  your  fresh  data  to  your  new  internal table       your   it_cospt-KSTAR    </b> data  also.
    <b>append   new  internal table  </b> .
    ENDIF
    **********like   that  for   project  id    if there is any   PS module  integration data then .********************
    so that your  new  internal table will have all  data   including  cost element   also .
    now after this   , loop you new  internal table  
    hide technque   for drilldown.
    Regards  ,
    Girish
    regard ,
    Girish