MB5B - Stock on Posting Date, Specification for data base accec

Hi,
  I am facing some problem with MB5B Transaction as when we login with t. code MB5B  at the bottom of screen there is radio button selection for specification of database access for best runtime and the default the first radio button is selected i.e Database determines optimum access    but with this report is coming very very slow we have to wait for 4 minuts for each material  and same if we execute by selectting the second radio button i.e start off with material number  i am getting data very fast  with in 5 second  so i want to know what is diffference between these radio buttons if we select first second or third radio buttons
  one more thing we are facing problem from last 4 days only .
regards,
  zafar

I dont have these 3 buttons in my MB5B in ECC6 system.
But I saw OSS Note 1005901 - MB5B: Performance problems
it explains why it is that slow.

Similar Messages

  • MB5B stock on posting date

    Hi experts,
                            For a material XX which was  zero stock on 15/11/2008.Goods receipt(MIGO 101) done on 15/11/2008 of qty 100kg. So stock was 100kg. I have issued material XX of qty 75 kg to cost center and entered posting date 3/11/2008. My system allowing me to issue that material on 3/11/2008 without any warning or error msg. But at that there was no stock. So that if i check the report MB5B stock on posting date my closing stock showing in negative for 3/11/2008. Our requirement is how to stop this back dated posting? System should not allow me if i am posting on back date?
    Thank you
    SAP

    hi Rehan,
    I have checked all settings also enhancement  but there is no as such control to restrict backposting within current period
    I think its self disipline action not to post backdated GI when GR is done on later date
    Vishal...

  • MB5B - Stock on posting date show in other Unit of measure

    Dearl All,
    Pls support me this case: I would like to see this report (MB5B - Stock on posting date) in other Unit of measure.
    This report shows stock in Basic Unit only.
    E.g
    Material A, base unit = M, other unit = ROL
    Report needs show stock in ROL.
    How can I do that?
    Thank you vry much!
    Cao Huy.

    Hi,
    In your case, order unit as ROL and material basic unit of measure is M.
    PO created only for the order unit ROL, and goods have received from the vendor based on the PO order unit.
    So,this MB5B stock on posting date is displayed only the total stock received based on the received GR order unit qty .
    stock also managed only ROL unit of measues. it is not possible to list based on the M stock unit.
    Regards,
    thiru

  • MB5B - Stock on posting date doesn't show Storage Location field

    Hi All,
    I run report MB5B - Stock on posting date with Stock Types = Storage Loc/Batch Stock, but the report doesn't show
    Storage Location field in result.
    How can I see it in this report?
    Thank you very much for your kind support!
    Cao Huy.

    hi
    what i think i sthis report is only for the OPENINGand CLOSING stock for the period or day
    now whenu give SL field then system will only concider stock from that SL
    the filed of SL will not be viewable in report as it is just opening and closing balance
    regards
    kunal

  • Post Calculation Computation for Date/Timestamps

    Hello,
    I would like to know how to apply Post Calculation Computation for Dates/Timestamps?
    I had trouble trying to add this to the Post Calculation Computation area:
    TO_CHAR(:P1_TARGETDATE, :DEFAULT_DATE_TIME_MASK);
    or should it be something more like:
    SELECT
    TO_CHAR(:P1_TARGETDATE, :DEFAULT_DATE_TIME_MASK) FROM DUAL;
    What would be the correct code to allow me to format a date/Timestamp where a Application Variable of DEFAULT_DATE_TIME_MASK could be used as well. (I dont want to use the existing Format Mask.)

    Just a hunch, but you might be having a problem because of the double quotes. Oracle likes single quotes. You also might want to forgo the quotes entirely.
    As for an invalid number, is it possible that one of the values that you are adding might be NULL. You can't add NULL to a number or you get an error. There are two solutions to that. One would be to do an NVL around each number you are adding (changing it to zero if the value is NULL). The second option (and easier option) is to use the SUM function. Mathematical functions like SUM and AVG ignore those values that are NULL.

  • How to set a date range for date field ?

    Dear Experts,
    Scenario:
    I have a query in validating the date field in my BSP application. My application is for maintain infotype 0023 Other/Previous Employers online by employees in the company.
    As per our design we are maintaining the all employment details of the employee both ( with in the current company / previous employment outside the company) in the same infotype.
    Every employee will have a hiring date within the SAP HR system. We consider this date as the cutoff date between current and previous employment in our application. When the employee updating the details wia BSP page I need to check the following.
    Record inside current company: Validation that, the user should only able to enter BEGIN DATE (BEGDA)  greater than or equal HIRING DATE and END DATE(ENDDA) should be greater than FROM  DATE (BEGDA).
    Record outside current Company: Validation that, the user should only able to enter BEGIN DATE (BEGDA)  less than or equal HIRING DATE and END DATE (ENDDA) should be greater than FROM  DATE (BEGDA) and less than HIRING DATE.
    Technical Requirement:
    How to set a date range for date field, i.e. how we can limit the date range in a HTMLB date field? Can this it be achieved via standard functionality of HTMLB?
    Following is the code to describe date field in my application.
        <htmlb:inputField id= "ENDDA_NEW_IN"
                          type= "date"
                    doValidate= "TRUE"
                      showHelp= "TRUE"
                      disabled= "FALSE"
                         width= "183"
                         style= "cssTextAreadate"
                         value= "<%='99991231'%>"/>
    Thanks a lot in advance for your assistance and help.
    Cibinu2026
    Edited by: cibin kuruvilla on Nov 12, 2008 11:13 AM

    Hi,
    This functionality is known to be very important and is a key part of the next major release of the JRC planned for the first half of 2008.
    Regards,
    <p>Blair Wheadon</p>
    <p>Product Manager, Crystal Reports</p>

  • Data validation for Date Field in Web Dynpro ABAP

    Hi ,
    In my WDA i want to perform data validation for date filed. (i.e. While creating a new record i have to check the Start Date should be always lesser than End Date.)
    If u ll enter the wrong date it should validate the Date and throw an error message.
    Please Reply soon its urgent.
    Thanks,
    Deepika

    Hi,
    First read the two attributes start date and end date.
    Then write the following condition.
    IF item_start_date > item_end_date.
    Error message.
    Endif.
    For pop up error message you need to use Create_window method of the Interface if_wd_window.
    Thanks.

  • Data binding for date chooser

    Hey Just wondering if its possible to use actionscript variables for a HTTPservice, [not having to use httpservice via actionscript]
    eg
    <mx:HTTPService id="req"  showBusyCursor="true" method="POST" url="http://localhost/flex1/add.php" useProxy="false">
    <mx:request xmlns="">
    <day>{dates.selectedDate.getDate()}</day>   //instead of this have something like <day>{day.value}</day>  ??????
    <month>{dates.selectedDate.getMonth()}</month>
    <year>{dates.selectedDate.getFullYear()}</year>
    </mx:request>
    </mx:HTTPService>
    <mx:Script>
            <![CDATA[
                [Bindable] private var dateString:String;
                public var day:int;
                public var month:int;
                public var year:int;
                public function onClick():void
                    day = dates.selectedDate.date;
                    month = dates.selectedDate.month;
                    year = dates.selectedDate.getFullYear();
            ]]>
        </mx:Script>
        <mx:DateChooser id="dates" x="25" y="26" width="221" height="208" allowMultipleSelection="true" showToday="true" change="onClick()"/>

    Are you getting an error? Maybe you just need to make the other variables Bindable?
    If this post answers your question or helps, please mark it as such.
    <?xml version="1.0"?>
    <mx:Application xmlns:mx="http://www.adobe.com/2006/mxml">
      <mx:Script>
        <![CDATA[
          [Bindable] public var day:int;
          [Bindable] public var month:int;
          [Bindable] public var year:int;
          public function onClick():void{
            day = dates.selectedDate.date;
            month = dates.selectedDate.month;
            year = dates.selectedDate.getFullYear()
        ]]>
      </mx:Script>
      <mx:DateChooser id="dates" x="25" y="26" width="221" height="208"
        allowMultipleSelection="true" showToday="true" change="onClick()"/>
      <mx:TextArea id="txt" text="{dates.selectedDate.getDate() + ' ' + dates.selectedDate.getMonth() + ' ' + dates.selectedDate.getFullYear()}"/> 
    </mx:Application>

  • Open data slice for data entry and close afterwards

    Dear all,
    I have created one data slice for a characteristic combination country xy in order to prevent the data entry within the data entry query for the user. But for some reason I have to run a planning function in order to summarize some values and write a total value in the characteristic e.g. country xy.
    The planning function brings out an error message because this can not be executed due to the fact that this combination is protected.
    Is there a way to open the data slice before the planning function is writing the data in the cube? I have tried to to this in the Data slice exit, but I do not have an idea how to open the DS, save the data and close the DS again.
    We are running NW BI 7.0. Any ideas would be great.
    Best regards,
    Stefan from Munich/Germany

    I did something like this by creating an FM and calling that FM from a FOX function. I think you will have to use three commands to execute three functions one after the other (and not combine them in one planning sequence) - first one will switch off the data slice, next will be your planning function containing the logic, and the last will switch it back on.
    The FM would be something like below:
    FUNCTION Z_SWITCH_DSLICE.
    *"*"Local Interface:
    *"  IMPORTING
    *"     REFERENCE(I_INFOPROV) TYPE  RSINFOPROV
    *"     REFERENCE(I_DSNR) TYPE  RSPLS_DSNR
    *"     REFERENCE(I_STATUS) TYPE  I
    *** This function imports the name of a real-time Infoprovider and a Data Slice number
    ***        and a parameter I_STATUS. If I_STATUS is 1, data slice is activated
    ***        If I_STATUS is -1, data slice is de-activated
    data wa_ds type rspls_ds.
    select single * from rspls_ds
            into wa_ds
            where infoprov = I_INFOPROV
              AND objvers = 'A'
              AND dsnr = I_DSNR.
    if I_status = 1.
       wa_ds-used = 'X'.
    elseif I_status = -1.
       wa_ds-used = ''.
    endif.
    update rspls_ds from wa_ds.
    ENDFUNCTION.
    The Fox code will be like below -
    CALL FUNCTION Z_SWITCH_DSLICE
        EXPORTING
           I_INFOPROV = <infoprov name>
           I_DSNR = <Data Slice Number>
           I_STATUS = <0 or 1>.

  • Data length for Date is 7 in all_tabs_columns

    I am fetching data_length, data_type from all_tabs_columns for a table in my schema. It is returning data_length=7 for data_type='date'. When i am fetching records based upon this information using SQL_EXECUTE package, the date record returned is of format DD-MON-YY. ie for date '01-JAN-1949', it is fetching '01-JAN-49'.
    Please Suggest.

    Dear Francois,
    I might not be able to exlplain it properly but the problem is when i am executing the query in SQL*Plus, I can retrive the correct data(as'01-JAN-1949'). But when when the same query is executed using a EXEC_SQL package of forms 6i, the data returned is incorrect('01-JAN-2049'/'01-JAN-0049'depending upon the format mask-RRRR/YYYY).
    I think there is some issue related to Dynamic SQL being used in EXEC_SQL package may be with EXEC_SQL.DEFINE_COLUMN or EXEC_SQL.COLUMN_VALUE or EXEC_SQL.EXECUTE???
    Please Suggest.

  • Date parameters for Date range

    Hi,
    I got a report with 2 parameters From Date and To Date and i have 2 columns items in the report absence start date and absence end date.
    i have to make sure that the date range satisfies all case's
    what is the best way that I can these validation rules in discoverer on these dates...?
    case's are something like this:
    1 (absence start date > from date; absence end date > to date)
    2 (absence start date > from date; absence end date < to date)
    3 (absence start date < from date; absence end date > to date)
    4 (absence start date > from date; absence end date < to date)
    Any help would be really appreciated.

    Using conditions in Discoverer is just like specifying a where clause in SQL with AND and OR. You should be able to use conditions for what is being described below.
    Are you not able to do that using conditions in your report ?

  • Date Dimension for date pull up (Dimension to Dimension)

    Need advise....
    1. I have a person dimension table and sales fact table. Person_id is the foreign key in the fact. I want to be able to pull the date of birth. But the person dimension has only dob_sid that should point to the day dimension to get my the equivalent date. This is the problem...i cannot join person dimension to day dimension, i need to be able to do a join through fact, but the fact table is missing the dob_sid.
    2. Second issue is, person dimension has other dates associated action_date, cancel_date, etc. more than one date field that i need to join to day dimension.
    How will i be able to achieve this in BMM? Physcial layer?

    The key here (no pun intended) is to alias your date dimension for as many date lookups you require, join these aliases directly to your person dimension off the appropriate keys.

  • Dynamic Date Value for Date Range Parameter - Scheduling in BI

    Hi,
    I am New to BO Enterprise XI R3. I want to schedule the Crystal report which takes Date Range as parameter. Is any option available to calculate From Date automatically based on Current Date based on the range required?
    Currently, Parameter option accepts parameters and enterprise process the report for configured parameters. In this case, report always prints only for configured date range eventhough report generated after one month. I am expecting report has to print data for date range (eg. 1 weeks, 4 days, or any range) based on system current date.
    Thanks in Advance,
    Venkateswaran.P

    I'm am in the same situation.  I need to be able to have the date parameter dynamically change based on the current day's date when I schedule a report.  However, because this parameter comes from a Stored Procedure from the database, it cannot be modified in the Report Designer (as far as I know).  I've tried to set a default for it to use "currentdate" but it doesn't seem to take.  Anyone know if this can be accomplished in the scheduler?
    Thanks
    -Tom

  • Customizing JTree data rendering for Dates

    I have a JTree that has different data types in each column that I'm sorting. I'd like to be able to control the String that appears in the table cell(s) based on the value in the model. I'm trying to make it so that if a Date is less than some predeterminded Date value that a custom string is output to the Table cell instead of the normal Date string.
    I thought a JTable took the toString() of the Date object for its value and that I could just subclass the java.util.Date object and override the toString() with a conditional. such as (toString() in my CustomDate subclass that extends java.util.Date):
    public String toString() {
        defaultDate = new java.util.Date();
        if (defaultDate.getTime()>this.getTime()){
            return "Date entered in the past";
        } else { //get the normal Date toString
            return new String(super.toString());
    }I'm not so much asking what is wrong with my code, but how to accomplish this task, the code is simply to show the direction I've taken. Am i close, or way out in left field?
    Thanks for any help guys!

    Zulfi100 needs a BrainCellRenderer.He is strangely disturbing yet amusing at the same time. It worries me that he is going to use the skills he learns here to teach.

  • Add Data Source for Data Load Rule

    I created an ODBC system data source in both the 32-bit and 64-bit ODBC managers (just to be sure), but they're not showing up as options for data sources in the SQL interface in EAS. Is there some step that I'm missing?
    Thanks.

    Have you created the ODBC on the Essbase server or on the server hosting EAS, it should be on the Essbase server.
    Cheers
    John
    http://john-goodwin.blogspot.com/

Maybe you are looking for

  • How can I extract a file name / path from a local path variable in TestStand?

    I have local TestStand string variable, call it 'locals.path', that contains a path to a file including the file name (c:\inputs\input.txt). I need to be able to split up the path (c:\input) and the file name (input.txt) and save them into 2 local va

  • Keys Not Working - Weird?!

    Hi Guys I have a 6 month old black Macbook. Absolutely love it after being a Windows user for many years. However, over the last month or so, a strange problem has appeared. Sometimes (not always) when I log in, for the first 10-20 minutes, the delet

  • Wireless, Network-manager, dbus problem

    Hey, I'm trying to connect to wireless network at school using dhcdbd, gnome-network-manager, nm-applet... and it works but get disconnected constantly. Don't know much about networking so could use some help. Here's some output with lots of dbus err

  • HT1692 how do we move contacts from window mail to ipad?

    We need tp figure out how to move our ccntacts from the computer on windows mail onto the ipad

  • FICO Score Projection

    First wanted to say thank you  to the people who post on these forums.  About 2 years ago I started on my journey with a 589 and am well on my way to what I hope is north of 700.  I would not have been able to get there without the adivce I found her