MRP planning query

Hi experts,
What are difference between transaction MD01,MD02,MD03 and MD04 in MRP ???
What is significance and ipurpose of these transaction codes ??
Thanks

hi,
MD01:Total planning...Planning is carried out for many plant, many MRP areas etc...ie. the bulk run you can say..
MD02 : single item multiple level planning....here planning is carried not only jus for the material but also for its components...and req. procurement is generated for them as well...
MD03 : Single item single level planning, the planning is carried out for the single material or product group, but the no components are planned...
MD04 : It is a stock req. list which shows the stock situation after/before the MRP run...but this data is passive(shows only till last MRP run) ...if you wanna see the updated data then use MD05...ie. MRP list...
Regards
Priyanka.P

Similar Messages

  • Query MRP Planning (MD02)

    Hi
    During MRP planning with T code MD02 after all the necessary entry when i want to proceed the erroe message is MRP PARAMETER FOR PLANT **** HAVE NOT BEEN MAINTAINED.
    ERROR MESSAGE NO. IS 61273
    Inputs awaited
    Thanks in advance
    Rupesh

    Dear Rupesh,
    maintain plant parameters for ur plant in OPPQ
    do one thing, take the existing plant 1000
    use compy function to copy 100 plant to ur plant
    the monent u enter OPPQ, down u can find copy
    here give from plant as 1000 & to plant as ur plant
    Regards
    kumar

  • Not getting 'actual data' in the planning query

    Hi all,
    I am debug other's query. This cube stores 'actual' and 'plan' data and I loaded 'actual' and can see it in the cube. But I cannot see 'actual data' when I run the planning query.
    I checked all restrictions in the KFs and CHARs and fliters in the query. There are only 'value type 10', 'fiscal year variant Z1', and 'currency CAD' restricted and actual data does contain those values in all line items.
    Can someone point it out what it could be the issue? Thank you.
    R.

    Hi,
    if you enter some data (plan data) you cannot see it again. Is that correct?
    are you using the same query to enter and to see plan data?
    Because if you are entering data in an aggregate level and you are executing your query over the infocube you will not see the data from the yellow request. If you execute query over the aggregate you should be able to see all data in the cube (yellow and green requests).
    Also check if your query is defined as per note 1136163.
    I hope this helps.
    Lucimar

  • Help with Planning Query - 0CALMONTH not showing up

    Hi, I have a simple planning query where I am trying to allow users to input or change an Amount by Material/Month.  The User inputs a Version and a Date Range to maintain.  The selected dates should show up going across the screen even if there is no existing data.  These Variables are in the Query Filter along with a few other characteristic Filters.  So in my query I have 0MATERIAL in the Rows and I have 0CALMONTH and my Key Figure.  Under advanced for the characteristic 0CALMONTH it is set as Master Data.
    When I run the query for some reason the 0CALMONTHS do not show up going across.  If I run the query and put in one value then the 12 months show up.  Seems like a bug.  I have another similar query where this works.  Can anyone take a look at the screen shots and help me figure this out?
    [Query Def Screen 1|http://i35.tinypic.com/1h8con.png]
    [Query Def Screen 2|http://i36.tinypic.com/1f781c.png]
    [0MATERIAL Def|http://i36.tinypic.com/xefq8i.png]
    [0CALMONTH Def|http://i35.tinypic.com/ej8qpv.png]
    Thanks!
    Edited by: Kenneth Murray on Nov 5, 2009 3:12 PM

    Dear  Kenneth,
    I think its a bug.  If we post the value without the drilldown on 0CALMONTh then its open for the input, and after that if we drill down it with 0CALMONTH for same selection, it opens for input.  but for new selection of month it not opens.
    Have you solved the problem?
    Regards,
    V B Udani

  • MRP Planning

    Hi,
    We have an issue where the part created the purchase requistion and gets rescheduled daily and thus the Release date in the purchase requistion gets Changed daily.As of result of which, the PR is not falling within a varint which is used to convert PR into PO.
    Part is not used in any BOM and there are no open orders or sales orders for this part. MRP considered this part and created a PR as the safety stock has been consumed. Now whenever MRP runs(MRP runs daily), the requirement date gets Changed automatically, though there is no entry observed in planning file.Backward scheduling is applied in this case.
    Your thoughts on this issue is appreciated!
    MRP type for the part is PD - MRP
    Safety stock is in negative
    Planning mode 1 - Adapt Planning data (Normal) in MD03.
    Planning file entry - no MRP planning type is checked
    let me know if I am missing anything!
    Thanks

    Hello
    On the tab "Quantities/dates" you should check the flag "Fixed ID" so that MRP won't change the requisition anymore.
    BR
    Caetano

  • Daily Production Plan query changes

    Dear Experts,
    I was tried  to do a daily production plan query,  but i need to add one more feild in the below query, (ie) In sale order Document, Row level feild of Quantity ( RDR1,Quantity) should be in that query,
    SELECT T0.[ItemCode],T1.[ItemName], T0.[PlannedQty] as 'Planned Qty', T0.[DocNum] as 'Doc No', T0.[PostDate], T0.[OriginNum] as 'Sale Order No', T0.[CardCode], T0.[CmpltQty] as 'Completed Qty' FROM OWOR T0 join OITM T1 on T0.Itemcode = t1.ItemCode WHERE T0.[PostDate] >='[%0]' and T0.[PostDate] <='[%1]'
    Plz help me.
    Thanks and Regards,
    Manikandan

    Hello Manikandan,
    You can add the sales order into the production order, but you should now: there is no connection defined between sales order lines and production order, only the item code can be used as reference to sales order lines
    I mean:
    *if you have the same item in sales order lines in different position the query always multiplies the result. *
    So you can join the sales order header for Origin Number and DocNum, and sales order lines by Itemcode
    SELECT
         T0.[ItemCode],T1.[ItemName], T0.[PlannedQty] as 'Planned Qty', T0.[DocNum] as 'Doc No', T0.[PostDate],
         T0.[OriginNum] as 'Sale Order No', T0.[CardCode], T0.[CmpltQty] as 'Completed Qty',
         T3.[Quantity] [Sales order Qty], T3.LineNum [Sales order Postion]
    FROM
         OWOR T0 join OITM T1 on T0.Itemcode = t1.ItemCode     
         left outer join ORDR T2 on T0.[OriginNum] = T2.[DocNum]
         left outer join RDR1 T3 on T2.[DocEntry] = T3.[DocEntry] and T3.[ItemCode] = T0.[ItemCode]
    WHERE T0.[PostDate] >='[%0]' and T0.[PostDate] <='[%1]'
    Regards
    J.

  • Issue creating planning query on cube partitioned by fiscal period

    I have a cube that is partitioned by fiscal period (0FISCPER).  This requires that there is a constant value for fiscal year variant (0FISCVARNT).  When I try to create an agg level on this cube 0FISCVARNT is automatically pulled into the agg level.  However, because 0FISCVARNT is set to a constant value it is not available in query designer to add into a planning query...as such, I cannot create a planning query on this cube.
    I can repartition the cube (i.e. remove the partitioning), but does anyone know of any other work arounds?
    Thanks.

    We resolved this.

  • User Exit or BADI For MRP Planning

    Dear all ,
               I want to Control the MRP Planning ( MD01 ) only for Demand Orders..
    Tell me any User exits / Badi for that Issue..
    i checked in this enchancement M61X0001, this is correct or wrong ,,,,
    With Regards ,
       GJ

    HI
    Possible exits
    LMDR2001  User exits restr. profiles of opt. pur.ord.-based load bldg
    LMDZU001  User exits in additional planning.
    I hope there are no BADi's for this try for implicit enhancements if u r using ECC 6.0
    Regards
    Edited by: Rasheed salman on Dec 20, 2008 9:54 AM

  • Planned order for MPS items can be unfirmed in MRP plan

    Hi All,
    I'm using SCP functionality (not ASCP) in MRP module. I run a global MPS first and then use it as supply schedule to drive mrp plans. I noticed that some planned orders (for MPS items) loaded into MRP from MPS can be unfirmed in MRP and I can enter new quantity and new date for them, whereas other planned orders for MPS cannot be unfirmed.
    What is the logic behind it? How to control it?
    thanks in advance,
    Tom

    Hi Ram,
    I don't think that there should be any issue due to the planned order created in the system against the PIR for the next month ....& it will not lead to improper planing even if the demand changes still we are not going for the firmed planned order....... if the PIR changes during the next MRP run then it will adjust the planned order accordingly .....
    Still you want to  restrict the planning to the current month then the simplest way that  I can think of is planning horizon....
    Thanks
    Kaushik

  • Planning query donu2019t show current data

    Hello,
    I have an input ready query over an aggregation level of a real time cube. Whenever the yellow request is closed and a new request is opened, the input ready query does not show the old data. And sometimes it shows incorrect data. We found that the issue is with the Cache.
    In RSRT when opening the input ready query in debug mode with "Do not use cache setting", the query returns correct data. But the surprise thing is that, the input ready query has Cache setting as inactive (0) in RSRT. So we had to generate the Delta buffer query <infoprovider>/!!1<infoprovider> in RSRT where <infoprovider> is the name of the real time cube.
    This solved our problem and the query brought in correct data. But again when I close the second request, the input ready query again shows me no data or shows me wrong data. So again we need to generate the delta buffer query in RSRT <infoprovider>/!!1<infoprovider>.
    This is very annoying when considering the fact that you have to generate the delta buffer query every time the request is closed. This could be a overhead in maintenance and will not go well with people.
    Does anybody have any solutions for solving this issue. Is there any setting by which we can turn off cache altogether or delete cache when a request is closed etc? or worst conditions how to automate the generation of delta buffer queries every time the request is closed?
    Any help is really appreciated.
    Regards,
    Anand

    please check the below;
    Delta buffer query in RSRT for BI-IP ("<infoprovider>/!!1<infoprovider>)
    Planning query donu2019t show the current data
    Edited by: Hymavathi Yanamadala on Sep 9, 2009 5:47 AM

  • No auth error while executing BI integrated planning Query

    Hi to all,
    I have created integrated planning Query in Bex Query designer.
    But while executing BI integrated planning query in portal, its giving errror.
    1.     No authorization for query "IP"
    2.     You are not authorized to edit this aggregation level CUBE_IP
    3.     Cannot load query u201CIPu201D (data provider u201CDP_1u201D: No authorization for requested service)
    Can any one tell me the solution for that.
    Regards
    Pavneet Rana

    Hi.
    For to check the authorization errors, you have to use the transaction  ST01 (System Trace) The Steps are:
    ST01 -->  Trace ON  --> In Trace Components, active "Authorization Check" --> Execute the query with the user --> Trace Off > Analysis> In User Name, put the user that execute the query --> F8
    You can see the authorization errors  in Dark Green.
    Regards !!!

  • MRP planning improved delivery date

    Hello you all,
    I have a question regarding the MRP planning of improved delivery dates. Let me schedule the scenario.
    As material is ordered, the expected delivey date is indicated by delivery rules. If for some reason the supplier can deliver earlier, this is mentioned in the PO tab Confrmations confirmation catagory AB.
    As we run the MRP via transaction V_V2, the updated delivery date is not shown in MD04.
    What do i need to do to see the correct data in MD04?
    If this is all a bit fuzzy, please ask for further details. I am not a SD consultant.
    Thanks in advance for your reply.
    Best Regards,
    Peter Lans

    Hi,
    Run the program SDRQCR21 in SA38.
    This will correct the data in MD04.
    Hope this helps.
    Regards

  • MRP plans sales orders outside planning horizon

    MRP plans Sales order for Finished Goods Outside planning horizon even when using NETPL. Strategy 40 is in use with 3 level BOMs. Planning horizon - 200 day. How could it be prevented?

    Dear,
    Please check have you assigned any MRP group to your material masters in MRP1view? Then check the planning horizon maintain in MRP group in OPPR also check same for your plant in OPPQ.
    If you define it as 200 days then system will only plan the requirement which falls under 200 days with processing key as NETPL.
    If we set planning horizon as 200 days then in the material in which MRP relevant changes happened in last 200 days will only be planned. Planning horizon is the period beyond it, requirements don't generate planned orders
    Please check and revert back.
    Regards,
    R.Brahmankar

  • MRP: Planning horizon & opening period

    hi MM Experts,
    please, explain what is "MRP planning horizon" and what is the impact on MD03 ?
    please expalin elso "the MRP Opening  period" and what's his utility ?
    both of them are in the OMI8 tcode.
    thanx in advance.
    SDA

    Hi. Hope this helps.
    Planning horizon is the Time period in days, MRP will consider the requirements for Planning. We can define this in number of days in OPPQ and/or in OPPR.
    Simply it is = Cumulative lead time + Longest batching period.
    You can define the Planning horizon in OPPQ/OPPR as mentioned above
    & under MRP group then we assign this MRP group to material master in MRP1 view.
    NETPL ( Net change planning in planning horizon) you will get it in MD02, MD01: With this processing key only material where the indicator NETPL has been set in planning calendar are planned.For example if we set planning horizon as 30 days then in the material in which MRP relevant changes happened in last 30 days will only be planned. This planning restricts the scope of planning or number of material which reduces the runtime of planning run. Planning horizon is the period beyond it, requirements don't generate planned orders.
    Opening Period is...
    Opening period is like a "release window". The length of the opening period is the window of opportunity a planner has to convert the planned order to a purchase req.
    For example - Component A has a lead time of 14 days and opening period of 5 days. Requirement on 12-22-03
    Opening Date - 01/12/09
    Start Date - 08/12/09
    Finish Date - 22/12/09
    Now the planner can convert the order starting Dec. 1st, instead of Dec. 8. It basically is a buffer in the lead time to get things on order a little sooner than needed.
    Thanks.

  • MRP Plan Error

    Dears All
    I'am testing the MRP to Release a PO as follows:
    1.  Create sourcing rule
    2.  Assign sourcing rule 
    3.  Create quotation or create blanket PO
    4.  Create Apporve Supllier List 
    5.  Set MRP: default Sourcing Assignment Set
    6.  Run MRP and release planned order
    The MRP plan is going well.
    But as soon as i set the sourcing rule separately(ex. supplier A:60% rank 1,supplier B:40% rank 1),  the MRP launch concurrent process(Memory-based Snapshot) is performed with errors.
    And when i set the sourcing rule with whole one back(ex. supplier A:100% rank 1, or supplier B:100% rank 1),  the MRP launch concurrent process is performed well again.
    So i am do sure that this error is related with sourcing rule.
    Can someone help to resolve this?
    Best Regards
    Leno

    Error log :
    +---------------------------------------------------------------------------+
    Master Scheduling/MRP: Version : 12.0.0
    Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved.
    MRCNSP module: Memory-based Snapshot
    +---------------------------------------------------------------------------+
    Current system time is 24-JUL-2013 18:32:03
    +---------------------------------------------------------------------------+
    Page Length = 93, Page Width = 132
    ===================================================================
    Debug Mode :        Disabled
    Output to Terminal : No
    Argument Method :   Database Fetch
    Trace Mode :        Disabled
    ===================================================================
    Argument 1 (ORG_ID) = 141
    Argument 2 (COMPILE_DESIG) = THMS_MRP4
    Argument 3 (LAUNCH_CRP_PLANNER) = 2
    Argument 4 (SNAPSHOT_WORKER) = 0
    Argument 5 (MON_PNAME) = 0
    Argument 6 (MON_REQUEST_ID) = 0
    ===================================================================
    The value of profile option 'MRP_RETAIN_DATES_WTIN_CAL_BOUNDARY' is N
    SELECT  TO_NUMBER(TO_CHAR(MIN(calendar_date),'j')),
    TO_NUMBER(TO_CHAR(MAX(calendar_date),'j'))
    FROM    bom_calendar_dates
    WHERE   calendar_code = :calendar_code
    AND    seq_num IS NOT NULL
    AND     exception_set_id = :exception_set_id
    Loading workday calendar. Please wait ..
    SELECT TO_CHAR(calendar_date, 'j')
    FROM   bom_calendar_dates
    WHERE  calendar_code = :calendar_code
    AND    exception_set_id = :exception_set_id
    AND seq_num IS NOT NULL
    ORDER BY calendar_date
    Loading workday calendar. Please wait ...
    Loading workday calendar. Please wait .                                     0:00
    args->default_demand_class = 
    args->demand_class = 
    args->sched_desig = THMS_MPS4
    args->request_id = 632499
    args->current_date = 2456498
    args->min_date =  = 2456447
    args->max_date = = 2460098
    args->first_date  = 2456447
    args->plan_type = 1
    args->part_include_type = 1
    args->reservation_flag = 1
    args->wip_flag = 1
    args->po_flag = 1
    args->cutoff_date = 2456682
    args->sched_type = 2
    args->demand_tf_type = 2
    args->overwrite_option = 1
    args->operation_schedule_type = 2
    args->plan_safeyt_stock = 1
    args->assignment_group_id = 0
    args->include_mds_days = -23453
    args->category_set_id = 1
    args->user_id       = 1150
    args->snp_worker   = 0
    args->org_id  = 141
    args->in_pipe_name = snp_ORA$PIPE$011611500001
    args->out_pipe_name = mon_ORA$PIPE$011611500001
    args->compile_desig = THMS_MRP4
    args->hour_uom = HR
    args->plan_capacity = 2
    args->unit_eff_enabled = 2
    args->mon_request_id= 
    CONCURRENT MRP MRCMON "ORG_ID=141" "COMPILE_DESIG=THMS_MRP4"             "REQUEST_ID=632499" "IN_PIPE=mon_ORA$PIPE$011611500001" "OUT_PIPE=snp_ORA$PIPE$011611500001"
    APP-FND-01406: Cannot find a printer driver for printer type HPLJ4SI and print style 1099RPORTRAIT
    Cause: A printer driver for printer type HPLJ4SI and print style 1099RPORTRAIT does not exist
    Action: Check that print style 1099RPORTRAIT is supported on printer type HPLJ4SI and a record exists in FND_PRINTER_INFORMATION
    APP-FND-01406: Cannot find a printer driver for printer type HPLJ4SI and print style LANDWIDE57
    Cause: A printer driver for printer type HPLJ4SI and print style LANDWIDE57 does not exist
    Action: Check that print style LANDWIDE57 is supported on printer type HPLJ4SI and a record exists in FND_PRINTER_INFORMATION
    APP-FND-01406: Cannot find a printer driver for printer type HPLJ4SI and print style ERW2Potrait(2001orlater)
    Cause: A printer driver for printer type HPLJ4SI and print style ERW2Potrait(2001orlater) does not exist
    Action: Check that print style ERW2Potrait(2001orlater) is supported on printer type HPLJ4SI and a record exists in FND_PRINTER_INFORMATION
    APP-FND-01406: Cannot find a printer driver for printer type HPLJ4SI and print style W2PAPER(2001orlater)
    Cause: A printer driver for printer type HPLJ4SI and print style W2PAPER(2001orlater) does not exist
    Action: Check that print style W2PAPER(2001orlater) is supported on printer type HPLJ4SI and a record exists in FND_PRINTER_INFORMATION
    APP-FND-01406: Cannot find a printer driver for printer type HPLJ4SI and print style ERW2Paper2001orlater
    Cause: A printer driver for printer type HPLJ4SI and print style ERW2Paper2001orlater does not exist
    Action: Check that print style ERW2Paper2001orlater is supported on printer type HPLJ4SI and a record exists in FND_PRINTER_INFORMATION
    APP-FND-01406: Cannot find a printer driver for printer type HPLJ4SI and print style RL1PAPER
    Cause: A printer driver for printer type HPLJ4SI and print style RL1PAPER does not exist
    Action: Check that print style RL1PAPER is supported on printer type HPLJ4SI and a record exists in FND_PRINTER_INFORMATION
    Launched concurrent request 632501 for workers
    Selecting Items                                                        9    0:00
    Flushed all buffers into MRP_SYSTEM_ITEMS                              9    0:00
    Selecting Discrete Job Info                                            7    0:00
    Selecting repetitive schedules info                                    0    0:00
    Selecting line capacity info                                           0    0:00
    Selecting BOM                                                          4    0:00
    APP-FND-01564: ORACLE error 1426 in mrllis_load_item_sourcing
    Cause: mrllis_load_item_sourcing failed due to ORA-01426: numeric overflow
    The SQL statement being executed at the time of the error was: begin :l_sourcing_history := MRP_SOURCING_API_PK . mrp_get_sourcing_hi and was executed from the file 6676358/mrp/lib/mrlnex.pc.
    APP-MRP-22075: An internal error has occurred (mrnspxt, 14, 10005,  )
    @ERRORTEXT            Cause:        The current routine encountered the specified@ERRORTEXT  x        Action:        Contact your customer supportrepresentative.
    APP-MRP-22075: An internal error has occurred (mrnspgpt, 14, 202 , 10005,  )
    @ERRORTEXT            Cause:        The current routine encountered the specified@ERRORTEXT  x        Action:        Contact your customer supportrepresentative.
    APP-MRP-22075: An internal error has occurred (main, 13,  ,  )
    @ERRORTEXT            Cause:        The current routine encountered the specified@ERRORTEXT  x        Action:        Contact your customer supportrepresentative.
    gthsk1=10
    gthsk2=2
    gthsk3=1
    gthsk4=1
    Statement with the error:
    begin :l_sourcing_history := MRP_SOURCING_API_PK . mrp_get_sourcing_hi
    6676358/mrp/lib/mrlnex.pc
    SQL Error Code: -1426
    ***** End Of Program - Memory-based Snapshot *****
    +---------------------------------------------------------------------------+
    Start of log messages from FND_FILE
    +---------------------------------------------------------------------------+
    +---------------------------------------------------------------------------+
    End of log messages from FND_FILE
    +---------------------------------------------------------------------------+
    +---------------------------------------------------------------------------+
    Executing request completion options...
    Output file size:
    0
    Output is not being printed because:
    The print option has been disabled for this report.
    Finished executing request completion options.
    Concurrent program returned no reason for failure.
    +---------------------------------------------------------------------------+
    Exceptions posted by this request:
    Concurrent Request for "Memory-based Snapshot" has completed with error.
    +---------------------------------------------------------------------------+
    Concurrent request completed
    Current system time is 24-JUL-2013 18:32:57
    +---------------------------------------------------------------------------+

Maybe you are looking for

  • Email PDF to Word Document?

    I have been sent a PDF file to apply for a contract that I wish to quote for. Will this program allow me to change it to a word document and allow me to fill in the blanks?

  • Bank details for a customer

    Hi, is there any other transaction to see customer bank details apart from XD03, please ? thank you.

  • Combine Edge JS files

    hi there I've got a tabbed carousel I've built with HTML/JQuery which works fine. I've created a number of small animations in EDGE and I'll embedding these in various slides of the carousel. The problem I'm having is that once I've added about 10 an

  • Oracle EBS r12 - Implementation v/s Installation

    Helllo, I was wondering if there is any way in Oracle r12 to figure out following without having any need to contact those imperialistic Oracle salesreps? 1. How many modules are installed 2. How many modules are licensed 3. How many modules are actu

  • 1.1.4 and problems synchronize my pictures

    everything else works fine. as soon as i want to synchronize a folder with pictures the synchronization is in an endless loop. does anyone has e good idea how to solve the problem? bernd