MSProject ODBC calls to Oracle 8i
I use MSProject to connect to Oracle via ODBC.
There are two calls that are provided to save and retrieve projects:
FileOpen _
Name:=strFilePath, _
UserID:=strUsername, _
DatabasePassword:=strPassword, _
ReadOnly:=PrivilegeLevel, _
FormatID:="MSProject.ODBC"
FileSaveAs _
Name:=strFilePath, _
UserID:=strUsername, _
DatabasePassword:=strPassword, _
FormatID:="MSProject.ODBC"
When run against Oracle 7.3 all is well. Whan run against Oracle 8i I get the following error:
[Microsoft][ODBC driver for Oracle][Oracle]ORA-01026:multiple buffers of size>4000 in the bind list
Are there settings in 8i to accomodate this error? Unfortunately I cannot alter the two commands from MSProject. I am using the current ODBC driver for MSProject (2.573.5303.00).
Because of the MSProject calls I was told that I must use the Microsoft ODBC driver. I tried the Oracle ODBC drivers (2.00.03.01 for 7.3 and 8.00.05.00 for 8i) but they do not work for the two MSProject calls.
Thanks for any help.
Mike
I believe Oracle7 was the last release that included a 16-bit ODBC driver. Oracle7 was desupported, IIRC, Dec 31, 2000. It may be possible to connect to an 8i database from an Oracle7 client using the 16-bit ODBC driver, but this isn't a supported configuration.
Justin
Similar Messages
-
ODBC connectivity between Oracle 11G and MSSQL Server on Solaris 10
When we were running in 10G, I was able to successfully configure hsodbc using unixODBC and freeTDS to allow for an ODBC connection between Oracle and MSSQL Server.
A few weeks ago we upgraded to 11G and I've been struggling to get the connectivity (dg4odbc) working.
In our 10g environment unixODBC and freeTDS were compiled as 32-bit. I have recompiled them as 64-bit and switched over to an 11G listener and I am getting the following error:
ERROR at line 1:
ORA-28500: connection from ORACLE to a non-Oracle system returned this message:
here are my configuration files:
/usr/local/unixODBC/etc[PPRD]> more odbc.ini
[ODBC Data Sources]
identipass = MS SQL Server
[identipass]
Driver = /usr/local/freetds/lib/libtdsodbc.so
Setup = /usr/local/freetds/lib/libtdsodbc.so
Description = MS SQL Server
Trace = 1
TraceFile = /export/home/oracle/ODBC/odbc.trace
Server = stormwind
QuoteID = Yes
AnsiNPW = No
Database = identipass
Port = 1433
TDS_Version = 8.0
[Default]
Driver = /usr/local/freetds/lib/libtdsodbc.so
/usr/local/unixODBC/etc[PPRD]> more odbcinst.ini
[TDS]
Description=FreeTDS driver
Driver=/usr/local/freetds/lib/libtdsodbc.so
Setup=/usr/local/freetds/lib/libtdsodbc.so
Trace=Yes
TraceFile=/tmp/freetds.log
FileUsage=1
UsageCount=2
tnsnames.ora
identipass =
(DESCRIPTION =
(ADDRESS = (PROTOCOL = tcp)(HOST = localhost)(PORT = 1522))
(CONNECT_DATA =
(SID = identipass)
(HS = OK)
listener.ora
LISTENERODBC =
(ADDRESS_LIST=
(ADDRESS=(PROTOCOL=tcp)(HOST=localhost)(PORT=1522))
(ADDRESS=(PROTOCOL=ipc)(KEY=PNPKEY)))
SID_LIST_LISTENERODBC=
(SID_LIST=
(SID_DESC=
(SID_NAME=identipass)
(ORACLE_HOME=/u01/app/oracle/product/11.2.0/db_1)
(ENV="LD_LIBRARY_PATH=/u01/app/oracle/product/11.2.0/db_1/lib:/u01/app/oracle/product/11.2.0/db_1/hs/lib")
(PROGRAM=dg4odbc)
And finally, output from the trace file:
/u01/app/oracle/product/11.2.0/db_1/hs/log[PPRD]> more identipass_agt_1381.trc
Oracle Corporation --- THURSDAY NOV 18 2010 16:00:16.010
Heterogeneous Agent Release
11.2.0.1.0
Oracle Corporation --- THURSDAY NOV 18 2010 16:00:16.008
Version 11.2.0.1.0
Entered hgogprd
HOSGIP for "HS_FDS_TRACE_LEVEL" returned "Debug"
Entered hgosdip
setting HS_OPEN_CURSORS to default of 50
setting HS_FDS_RECOVERY_ACCOUNT to default of "RECOVER"
setting HS_FDS_RECOVERY_PWD to default value
setting HS_FDS_TRANSACTION_LOG to default of HS_TRANSACTION_LOG
setting HS_IDLE_TIMEOUT to default of 0
setting HS_FDS_TRANSACTION_ISOLATION to default of "READ_COMMITTED"
setting HS_NLS_NCHAR to default of "AL32UTF8"
setting HS_FDS_TIMESTAMP_MAPPING to default of "DATE"
setting HS_FDS_DATE_MAPPING to default of "DATE"
setting HS_RPC_FETCH_REBLOCKING to default of "ON"
setting HS_FDS_FETCH_ROWS to default of "100"
setting HS_FDS_RESULTSET_SUPPORT to default of "FALSE"
setting HS_FDS_RSET_RETURN_ROWCOUNT to default of "FALSE"
setting HS_FDS_PROC_IS_FUNC to default of "FALSE"
setting HS_FDS_CHARACTER_SEMANTICS to default of "FALSE"
setting HS_FDS_MAP_NCHAR to default of "TRUE"
setting HS_NLS_DATE_FORMAT to default of "YYYY-MM-DD HH24:MI:SS"
setting HS_FDS_REPORT_REAL_AS_DOUBLE to default of "FALSE"
setting HS_LONG_PIECE_TRANSFER_SIZE to default of "65536"
setting HS_SQL_HANDLE_STMT_REUSE to default of "FALSE"
setting HS_FDS_QUERY_DRIVER to default of "TRUE"
HOSGIP returned value of "FALSE" for HS_FDS_SUPPORT_STATISTICS
Parameter HS_FDS_QUOTE_IDENTIFIER is not set
setting HS_KEEP_REMOTE_COLUMN_SIZE to default of "OFF"
setting HS_FDS_GRAPHIC_TO_MBCS to default of "FALSE"
setting HS_FDS_MBCS_TO_GRAPHIC to default of "FALSE"
Default value of 64 assumed for HS_FDS_SQLLEN_INTERPRETATION
setting HS_CALL_NAME_ISP to "gtw$:SQLTables;gtw$:SQLColumns;gtw$:SQLPrimaryKeys;gtw$:SQLForeignKeys;gtw$:SQLProcedures;gtw$:SQLSt
atistics;gtw$:SQLGetInfo"
setting HS_FDS_DELAYED_OPEN to default of "TRUE"
setting HS_FDS_WORKAROUNDS to default of "0"
Exiting hgosdip, rc=0
ORACLE_SID is "identipass"
Product-Info:
Port Rls/Upd:1/0 PrdStat:0
Agent:Oracle Database Gateway for ODBC
Facility:hsa
Class:ODBC, ClassVsn:11.2.0.1.0_0008, Instance:identipass
Exiting hgogprd, rc=0
Entered hgoinit
HOCXU_COMP_CSET=1
HOCXU_DRV_CSET=873
HOCXU_DRV_NCHAR=873
HOCXU_DB_CSET=873
HOCXU_SEM_VER=112000
Entered hgolofn at 2010/11/18-16:00:16
HOSGIP for "HS_FDS_SHAREABLE_NAME" returned "/usr/local/unixODBC/lib/libodbc.so"
Entered hgolofns at 2010/11/18-16:00:16
symbol_peflctx=0x7a715450
hoaerr:0
Exiting hgolofns at 2010/11/18-16:00:16
Exiting hgolofn, rc=0 at 2010/11/18-16:00:16
HOSGIP for "HS_OPEN_CURSORS" returned "50"
HOSGIP for "HS_FDS_FETCH_ROWS" returned "100"
HOSGIP for "HS_LONG_PIECE_TRANSFER_SIZE" returned "65536"
HOSGIP for "HS_NLS_NUMERIC_CHARACTER" returned ".,"
HOSGIP for "HS_KEEP_REMOTE_COLUMN_SIZE" returned "OFF"
HOSGIP for "HS_FDS_DELAYED_OPEN" returned "TRUE"
HOSGIP for "HS_FDS_WORKAROUNDS" returned "0"
HOSGIP for "HS_FDS_MBCS_TO_GRAPHIC" returned "FALSE"
HOSGIP for "HS_FDS_GRAPHIC_TO_MBCS" returned "FALSE"
Invalid value of 64 given for HS_FDS_SQLLEN_INTERPRETATION
treat_SQLLEN_as_compiled = 1
Exiting hgoinit, rc=0 at 2010/11/18-16:00:16
Entered hgolgon at 2010/11/18-16:00:16
reco:0, name:identipass, tflag:0
Entered hgosuec at 2010/11/18-16:00:16
Exiting hgosuec, rc=0 at 2010/11/18-16:00:16
HOSGIP for "HS_FDS_RECOVERY_ACCOUNT" returned "RECOVER"
HOSGIP for "HS_FDS_TRANSACTION_LOG" returned "HS_TRANSACTION_LOG"
HOSGIP for "HS_FDS_TIMESTAMP_MAPPING" returned "DATE"
HOSGIP for "HS_FDS_DATE_MAPPING" returned "DATE"
HOSGIP for "HS_FDS_CHARACTER_SEMANTICS" returned "FALSE"
HOSGIP for "HS_FDS_MAP_NCHAR" returned "TRUE"
HOSGIP for "HS_FDS_RESULTSET_SUPPORT" returned "FALSE"
HOSGIP for "HS_FDS_RSET_RETURN_ROWCOUNT" returned "FALSE"
HOSGIP for "HS_FDS_PROC_IS_FUNC" returned "FALSE"
HOSGIP for "HS_FDS_REPORT_REAL_AS_DOUBLE" returned "FALSE"
using identipass as default value for "HS_FDS_DEFAULT_OWNER"
HOSGIP for "HS_SQL_HANDLE_STMT_REUSE" returned "FALSE"
Entered hgocont at 2010/11/18-16:00:16
HS_FDS_CONNECT_INFO = "identipass"
RC=-1 from HOSGIP for "HS_FDS_CONNECT_STRING"
Entered hgogenconstr at 2010/11/18-16:00:16
dsn:identipass, name:identipass
optn:
Entered hgocip at 2010/11/18-16:00:16
dsn:identipass
Exiting hgocip, rc=0 at 2010/11/18-16:00:16
Exiting hgogenconstr, rc=0 at 2010/11/18-16:00:16
Entered hgopoer at 2010/11/18-16:00:16
hgopoer, line 233: got native error 0 and sqlstate ; message follows...
Exiting hgopoer, rc=0 at 2010/11/18-16:00:16
hgocont, line 2753: calling SqlDriverConnect got sqlstate
Exiting hgocont, rc=28500 at 2010/11/18-16:00:16 with error ptr FILE:hgocont.c LINE:2772 ID:Something other than invalid authoriza
tion
Exiting hgolgon, rc=28500 at 2010/11/18-16:00:16 with error ptr FILE:hgolgon.c LINE:781 ID:Calling hgocont
Entered hgoexit at 2010/11/18-16:00:16
Exiting hgoexit, rc=0
Can anyone help me see what I'm missing?Thank you for your response.
I modified the envs LD_LIBRARY_PATH parameter in my SID_LIST_LISTENERODBC to be:
(ENV="LD_LIBRARY_PATH=/usr/local/freetds/lib:/usr/local/unixODBC/lib:/u01/app/oracle/product/11.2.0/db_1/lib:/
u01/app/oracle/product/11.2.0/db_1/hs/lib")
and bounced the listener, but I'm still getting the same error.
I do not have a lib64 directory in my Freetds installation, but all the files in the lib directory are 64-bit.
Here is a listing of my DG4ODBC init file:
/u01/app/oracle/product/11.2.0/db_1/hs/admin[PPRD]> more initidentipass.ora
# This is a sample agent init file that contains the HS parameters that are
# needed for an ODBC Agent.
# HS init parameters
HS_FDS_CONNECT_INFO = identipass
#HS_FDS_TRACE_LEVEL = 0
HS_FDS_TRACE_LEVEL = Debug
HS_FDS_SHAREABLE_NAME = /usr/local/unixODBC/lib/libodbc.so
HS_FDS_SUPPORT_STATISTICS=FALSE
HS_LANGUAGE=AMERICAN.AMERICA.WE8ISO8859P15
# ODBC specific environment variables
set ODBCINI=/usr/local/unixODBC/etc/odbc.ini
# Environment variables required for the non-Oracle system
#set <envvar>=<value>
Thanks for your help with this!
Catina -
How to execute STP with Named type table as parameter through ODBC calls.
Hi All,
I am using Oracle 10g release 2. I am having a Stored function which takes Named Type Table as its parameter.
For example
CREATE OR REPLACE TYPE tblName is table of someUDT.
CREATE OR REPLACE function nestfunction(t tblName)
return NUMBER
as
//function body here.
end;
Now, I want to call this Stored function nestfunction through ODBC calls. Also want to add multiple rows in tblName parameter.
But am unable to perform the above mentioned task. If you have answers please, reply.
Thanks and regards
ftil555Hi Arik,
Thanks for the reply. I got the solution by configuring a NonXA data source. The problem was with internal commits of the fnd_global.initialize api.
If the DB adapter is calling aPL/SQL procedure (written inside a pakcage) using the data source configured to support XA, will expect not to have any commits in side the procedure or anywhere, the XA driver will take of the commits and whole transactions. By default the FND_GLOBAL.INITIALIZE(...) procedure will have the internal commits, so it was throwing the errors.
The solution was configuring the a NonXA Data source in the databae adapter configuration will allow the commits inside the callings procedures. So we created Two data sources one for XA and another for NonXA and we are using the NonXA datasource whereever we are calling the EBS APIs which have the internal commits.
-- Khaleel -
I'm calling a oracle stored procedure using ODBC Call method
{call testSP(?)}"¶ms
The parameter read from the SP is VARCHAR2. On this call, the 2001th character gets replaced by chr(0). The same SP called with Begin, End block does not reproduce the error. Can someone please point me to a document which explains this? please feel free to ask any questions to clarify the issuemaybe you can try another theme. You can download hundreds of themes. There is surely one that displays the time during the "incoming call" screen.
The search box on top-right of this page is your true friend, and the public Knowledge Base too: -
ODBC call fails under userwith no admin rights
I installed the Oracle 9i client, like I always do, while logged in with admin rights. I install the basic client, and the ODBC driver, version 9, I believe.
When the user logs on and tries to setup a link to some oracle odbc tables she gets the following error:
ODBC - call failed
Specified driver could not be loaded due to system error 5(Oracle in ORaHome92). (#160)
Unless I am installing a different ODBC driver on other people's machiens, this is the way I have done it for all of the users in my building, and they don't seem to have a problem. And some of them do not have admin rights on their boxlet me add that the DSN is listed as a system DSN. And it is version 9.0.1 as the ODBC driver.
Perplexed -
How to call an Oracle Procedure and get a return value in Php
Hi Everyone,
Has anyone tried calling an Oracle procedure from Php using the ora functions and getting the return value ? I need to use the ora funtions (no oci)because of compatibility and oracle 7.x as the database.
The reason why I post this here is because the ora_exec funtion is returning FALSE but the error code displayes is good. Is this a bug in the ora_exec funtion ?
My code after the connection call is as follows:
$cur = ora_open($this->conn);
ora_commitoff($this->conn);
$requestid = '144937';
echo $requestid;
$rc = ora_parse($cur, "begin p_ins_gsdata2
(:requestid, :returnval); end;");
if ($rc == true) {
echo " Parse was successful ";
$rc2 = ora_bind ($cur, "requestid", ":requestid", 32, 1);
if ($rc2 == true) echo " Requestid Bind Successful ";
$rc3 = ora_bind ($cur, "returnval", ":returnval", 32, 2);
if ($rc3 == true) echo " Returnval Bind Successful ";
$returnval = "0";
$rc4 = ora_exec($cur);
echo " Result = ".$returnval." ";
if ($rc4 == false) {
echo " Exec Returned FALSE ";
echo " Error = ".ora_error($cur);
echo " ";
echo "ErrorCode = ".ora_errorcode($cur);
echo "Error Executing";
ora_close ($cur);
The Oracle procedure has a select count from a table and it returns the number of records in that table. It's defined as:
CREATE OR REPLACE procedure p_ins_gsdata2 (
p_requestid IN varchar2 default null,
p_retcode OUT varchar2)
as
BEGIN
SELECT COUNT (*) INTO p_retcode
FROM S_GSMRY_DATA_SURVEY
WHERE request_id = p_requestid ;
COMMIT;
RETURN;
END;
Nothing much there. I want to do an insert into a table,
from the procedure later, but I figured that I start with a select count since it's simpler.
When I ran the Php code, I get the following:
144937
Parse was successful
Requestid Bind Successful
Returnval Bind Successful
Result = 0
Exec Returned FALSE
Error = ORA-00000: normal, successful completion -- while
processing OCI function OBNDRA
ErrorCode = 0
Error Executing
I listed the messages on separate lines for clarity. I don't understand why it parses and binds o.k. but the exec returns false.
Thanks again in advance for your help. Have a great day.
Regards,
Rudiretcode=`echo $?`is a bit convoluted. Just use:
retcode=$?I see no EOF line terminating your input. Your flavour of Unix might not like that - it might ignore the command, though I'd be surprised (AIX doesn't).
replace the EXEC line with :
select 'hello' from dual;
and see if you get some output - then you know if sqlplus commands are being called from your script. You didn't mentioned whether you see the banner for sqlplus. Copy/paste the output that you get, it will give us much more of an idea. -
Re: 32 Bit ODBC Driver for Oracle 11g 11.2.0.1.0
Hi,
Were you able to resolve the problem with these troubleshooting measures ?
Please let me know since i am facing similar issues like yours.
I am using a Windows 7 64 bit and from QTP installed on this machine , i am trying to connect to Oracle database.
Now initially i installed a 64 bit ODBC for Oracle . But when i did that and ran the Script below :
Set objDatabase = CreateObject("ADODB.Connection")
Set rs=createobject("adodb.recordset")
objDatabase.open "DRIVER={Oracle in OraClient11g_home1} ; DATA SOURCE=Oracle; SERVER= xyz ; DATABASE=abc1; UID=abc ; PASSWORD= abc123;"
rs.Open "select * from tablename", objDatabase
'result1 = objDatabase.Execute("select * from tablename")
'msgbox result1
Do while not rs.eof
print rs.fields("columnname")
rs.movenext
Loop
print rs.fields("columnname")
it gives me an error
“[Microsoft][ODBC Driver Manager] The specified DSN contains an architecture mismatch between the Driver and Application”
So i am assuming that i need to install the 32 bit ODBC drivers for Oracle as well in addition to the already installed 64 bit drivers ..
Any thoughts on this ?64 bit apps need 64 bit Oracle client software.
32 bit apps need 32 bit Oracle client software.
You should be able to tell the bit-ness of the app by checking the Process tab in task manager to see if it has *32 next to it.
You can install both 32 bit and 64 bit Oracle client software on the same box, but you need to do it into different homes, and different oracle_base should also be used.
There isnt an Oracle client install bundle that installs both, you'll need to do each separately.
Hope it helps,
Greg -
C# DLL Calls in Oracle Forms 6i
Dear all,
I want to call a C# ( C Sharp) functions in Oracle Forms 6i , How it is possible , If any body knows give me a suggestion...
C# Codes
using System;
using System.Collections.Generic;
using System.Text;
namespace MathFunctions
public class AddClass
public static int Add(int a, int b)
return (a + b);
same codes I want to call using Oracle Forms 6i . ... ( AddClass.Add(10,20) ) value should return 30.
C# Developer created the DLL file and given to me , I am not able to attach the DLL , anybody interest I can send the DLL through E-mail ,
Regards,
Veera.
[email protected]The Forms Builder Help is the best source of information. It has plenty of examples too, like this one I copied from the Help:
/* Find foreign library handle for
a given library name */
BEGIN
libhandle := ora_ffi.find_library
('mylib.dll');
END; -
ODBC problems with Oracle 8.1.5 on Windows 2000
Hi,
I have got a problem when i configure ODBC on Windows 2000.
When I test the driver with ODBC test driver, the programs doesn't respond when i use Oracle ODBC Driver first but responds when I use Microsoft Driver For Oracle first and then Oracle ODBC Driver.
Then I have a system 5 error when I use ODBC with ASP.
Is it Oracle 8.1.5 which is not compatible with Windows 2000 or a problem in Windows 2000 configuration ?
Best regards
RonanI think I was having the same problem; programs attempting to connect w/ODBC (including ODBCTest) would hang. After downloading and installing a newer ODBC driver from oracle (for me 8.1.5.5 worked), I was able to connect. Hope this helps!
<BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by Duclos Ronan ([email protected]):
Hi,
I have got a problem when i configure ODBC on Windows 2000.
When I test the driver with ODBC test driver, the programs doesn't respond when i use Oracle ODBC Driver first but responds when I use Microsoft Driver For Oracle first and then Oracle ODBC Driver.
Then I have a system 5 error when I use ODBC with ASP.
Is it Oracle 8.1.5 which is not compatible with Windows 2000 or a problem in Windows 2000 configuration ?
Best regards
Ronan<HR></BLOCKQUOTE>
null -
ODBC connection to Oracle 7 will not reset
We are using Oracle JDBC drivers for all but one of our
datasources which is an old Oracle 7 database. The ODBC connection
to this database will not reset when the database is bounced or the
database server is rebooted. We have to restart the ODBC service to
reset the connection. Is there another way to do this automatically
or perhaps another driver out there we can use? We are running
ColdFusion MX 6.1 Enterprise.Wow, I can't believe that you are still using Oracle 7. In
fact, unless you are on 7.3.4 you aren’t even Y2K compliant.
Of course, I'm not even sure if there is an upgrade path from 7.x
to 10g, but I would consider migrating off of 7 to anything else.
Otherwise, you are going to have more and more compatibility
problems. In fact, you can no longer even get ODBC drivers from
Oracle for versions older than 9i.
Good luck.
Phil -
Call to Oracle stored procedure that returns ref cursor doesn't work
I'm trying to use an OData service operation with Entity Framework to call an Oracle stored procedure that takes an number as an input parameter and returns a ref cursor. The client is javascript so I'm using the rest console to test my endpoints. I have been able to successful call a regular Oracle stored procedure that takes a number parameter but doesn't return anything so I think I have the different component interactions correct. When I try calling the proc that has an ref cursor for the output I get the following an error "Invalid number or type of parameters". Here are my specifics:
App.config
<oracle.dataaccess.client>
<settings>
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursor.P_RESULTS" value="implicitRefCursor bindinfo='mode=Output'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursorMetaData.P_RESULTS.Column.0" value="implicitRefCursor metadata='ColumnName=WINDFARM_ID;BaseColumnName=WINDFARM_ID;BaseSchemaName=PGDATA_WC;BaseTableName=WORKORDERS;NATIVEDATATYPE=Number;ProviderType=Int32'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursorMetaData.P_RESULTS.Column.1" value="implicitRefCursor metadata='ColumnName=STARTTIME;BaseColumnName=STARTTIME;BaseSchemaName=PGDATA_WC;BaseTableName=WORKORDERS;NATIVEDATATYPE=Varchar2;ProviderType=Varchar2'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursorMetaData.P_RESULTS.Column.2" value="implicitRefCursor metadata='ColumnName=ENDTIME;BaseColumnName=ENDTIME;BaseSchemaName=PGDATA_WC;BaseTableName=WORKORDERS;NATIVEDATATYPE=Varchar2;ProviderType=Varchar2'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursorMetaData.P_RESULTS.Column.3" value="implicitRefCursor metadata='ColumnName=TURBINE_NUMBER;BaseColumnName=TURBINE_NUMBER;BaseSchemaName=PGDATA_WC;BaseTableName=WORKORDERS;NATIVEDATATYPE=Varchar2;ProviderType=Varchar2'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursorMetaData.P_RESULTS.Column.4" value="implicitRefCursor metadata='ColumnName=NOTES;BaseColumnName=NOTES;BaseSchemaName=PGDATA_WC;BaseTableName=WORKORDERS;NATIVEDATATYPE=Varchar2;ProviderType=Varchar2'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYWINDFARMID.RefCursorMetaData.P_RESULTS.Column.5" value="implicitRefCursor metadata='ColumnName=TECHNICIAN_NAME;BaseColumnName=TECHNICIAN_NAME;BaseSchemaName=PGDATA_WC;BaseTableName=WORKORDERS;NATIVEDATATYPE=Varchar2;ProviderType=Varchar2'" />
<add name="PGDATA_WC.ODATAPOC.GETWORKORDERSBYID.RefCursor.P_RESULTS" value="implicitRefCursor bindinfo='mode=Output'" />
</settings>
OData Service Operation:
public class OracleODataService : DataService<OracleEntities>
// This method is called only once to initialize service-wide policies.
public static void InitializeService(DataServiceConfiguration config)
// TODO: set rules to indicate which entity sets and service operations are visible, updatable, etc.
// Examples:
config.SetEntitySetAccessRule("*", EntitySetRights.All);
config.SetServiceOperationAccessRule("GetWorkOrdersByWindfarmId", ServiceOperationRights.All);
config.SetServiceOperationAccessRule("CreateWorkOrder", ServiceOperationRights.All);
config.DataServiceBehavior.MaxProtocolVersion = DataServiceProtocolVersion.V2;
[WebGet]
public IQueryable<GetWorkOrdersByWindfarmId_Result> GetWorkOrdersByWindfarmId(int WindfarmId)
return this.CurrentDataSource.GetWorkOrdersByWindfarmId(WindfarmId).AsQueryable();
[WebGet]
public void CreateWorkOrder(int WindfarmId)
this.CurrentDataSource.CreateWorkOrder(WindfarmId);
Here is the stored procedure:
procedure GetWorkOrdersByWindFarmId(WINDFARMID IN NUMBER,
P_RESULTS OUT REF_CUR) is
begin
OPEN P_RESULTS FOR
select WINDFARM_ID,
STARTTIME,
ENDTIME,
TURBINE_NUMBER,
NOTES,
TECHNICIAN_NAME
from WORKORDERS
where WINDFARM_ID = WINDFARMID;
end GetWorkOrdersByWindFarmId;
I defined a function import for the stored procedure using the directions I found online by creating a new complex type. I don't know if I should be defining the input parameter, WindfarmId, in my app.config? If I should what would that format look like? I also don't know if I'm invoking the stored procedure correctly in my service operation? I'm testing everything through the rest console because the client consuming this information is written in javascript and expecting a json format. Any help is appreciated!
Edited by: 1001323 on Apr 20, 2013 8:04 AM
Edited by: jennyh on Apr 22, 2013 9:00 AMMaking the change you suggested still resulted in the same Oracle.DataAccess.Client.OracleException {"ORA-06550: line 1, column 8:\nPLS-00306: wrong number or types of arguments in call to 'GETWORKORDERSBYWINDFARMID'\nORA-06550: line 1, column 8:\nPL/SQL: Statement ignored"} System.Exception {Oracle.DataAccess.Client.OracleException}
I keep thinking it has to do with my oracle.dataaccess.client settings in App.Config because I don't actually put the WindfarmId and an input parameter. I tried a few different ways to do this but can't find the correct format. -
Hi
While calling From Oracle Forms 11g patch set 2(11.1.1.3.0) to Oracle Reports 11g patch set 2(11.1.1.3.0) I found unable to run report error
But its finely working in 10g. The Place of error is in find_report_object
Is any solution to resolve this problem like any registry setting or patches to solve this problem
Please guide me
Regards
Murali N SI was able to download it from this link:
[http://download-llnw.oracle.com/otn/java/jdeveloper/11.1.1.3.0/jdevstudio11113install.exe]
on the general 11g Fusion download page at:
[http://www.oracle.com/technology/software/products/middleware/index.html]
Although the site does appear to be having problems. I got intermittent errors of the page/server not being available. -
Need help !
While running DS job through designer we are getting below error:
ODBC call <SQLDriverConnect> for data source <SErver name> failed: <[>. Notify Customer Support.
Additional notes:
1. Source and Target datastore are getting connected properly as i have imported table's definition using it.
2. Source and target data store pointing to SQL server 2008 R2 express edition DB (64 bit).
3. It seems like server machine has both 32bit and 64bit drivers installed on it. Please refer attached driverdetails.jpg file for more details.
ThanksHi did you referred this :
ODBC call <SQLDriverConnect> for data source <MyComputer\SQLServer2008R2> failed: <[Microsoft][ODBC SQL Server Driver][DBNETLIB]SQL Server does not exist or access denied.>. Notify Customer Support. -
Can't Create the ODBC connection for Oracle 10g
Hi,
I am working with Oracle 10g Database Release 2 in windows XP professional. I am trying to create an ODBC connection for oracle but become failure because its generating the following errors:
system error code 998
could not locate the setup or translator library
Please help me how can I solve this problem and create the ODBC connection for oracle 10g database.
Best Regards,mwz wrote:
I am trying to create an ODBC connection for oracle but become failure because its generating the following errors:
system error code 998
could not locate the setup or translator libraryThe symptom described is typical of an incorrect system env PATH setting (used by the data source admin tool), compared to that of the Oracle Home (specifically, path $OH/bin). The odbc driver config routine will search directories listed in PATH variable for necessary libraries (Client dll's). If some library fails to load (from e.g. oraoci*.dll or oraclient10.dll) it will probably error out, as in your case.
Are you creating the odbc dsn on the databse server host or on some other machine? I.e. are you using the db host as a client or not? -
Where can I download the ODBC driver for Oracle 10g XE?
where can I download the ODBC driver for Oracle 10g XE?
I need the ODBC drivers for windows 7 x64, I installed Oracle Database 10g Express Edition, the use and connects with RazorSQL well, I just want to make a connection THROUGH ConnectionString language using the ODBC driveralready checked these http://www.connectionstrings.com/oracle, I need Help Please.
Maybe you are looking for
-
Missing a single space in html output
Hello to all, take a look at the following code copied from a View <% DATA: eins TYPE STRING VALUE 'ClassEins', zwei TYPE STRING VALUE 'ClassZwei'. %> <span id="Test1" class="<%=eins%> ClassZwei">test it</span> <span id="Test2" class="ClassE
-
I have built a PID controller in labview. Ive been using time domain math, integral and continous calculation. And it works well. But I need a anti wind up. Is there a easy way to build this? I want to build it my self, and not use the PID block. Or
-
After the first few days of operating my new computer, Yosemite began to develop strange glitches. I tried to drag a folder from a Finder window. It zoomed upward on Desktop and stayed where it stopped—and nothing worked. Everything froze. The cursor
-
Regarding problem with new line feed for DME file generation
Hello Experts, I m facing a problem in the DME file generation. we want each record in the DME file should be in new line. for that we have add the new line feed character in the each row end. So in the SAP output it looks ok, But if we download that
-
Camera Raw only offers to open 16-bit raw files in 8-bit mode
I am using a windows CS6 Bridge => Camera Raw (8.2) => CS6 Photoshop (13.0.1 x64) to try to open various 16-bit raw files (.dng, .nef, .arw) which Bridge sees as 16-bit, but only an 8-bit version makes it into photoshop. How do I convince Camera Raw