Multiple Plants sharing 1 shippinh point

Hi Gurus,
I have a requirement that multple plants of different company codes needs to Share 1 shipping point( same address)
Actually these 3 plant have 3 PL ware house, so these will have only 1 shipping point.
What would be the implicaitons if they share 1 shipping point because of different company codes.
OR
Do we need to change the description of the shipping point and put the same address and configure 3 different shipping points with the same address?
Thanks
Vivek

Unless you are using transportation with shipping cost functionality, having plants of different company codes using the same shipping point shouldnt be a problem. Make sure the shipping point determination configuration is correct and that you assign the multiple plants to the same shipping point in enterprise structure configuration.
Regards,
Aroop

Similar Messages

  • Release strategy is not getting Trigerred for Multiple Plants in PO.

    Dear gurus,
    I have a Release strategy which is working Fine when I create a PO with Same Plant in line items.
    But My release strategy is not getting trigerred when I have Different Plants in Line items.
    I have Maintained all the Plants in the characteristic Values of Plant.
    Why does the RS work for Single Plant & doesn't work for Multiple Plants in the same PO.
    Is there any SAP Note applicable to this? Pl Suggest.
    Thanks guys
    SN

    i got your point but i will again say the same thing that for item level field system is not  able to block the po if there are multiple line item in RS and that too with different values against same char as system picks only 1 value and it sends that value in RS to cross check wheteher this po needs to be blocked or not .
    now in your case system is getting multiple values against 1 field that is plant so now system is not able to send 1 in backend and hence it sends blank value in back end so system dosent blocks the po
    even if you use material group or any other item level field system is going to behave that way only that is it will not be blocking the po

  • Material Ledger activation (COML) - multiple plants in single company code.

    Hi -
    Material Ledger activation (COML)- multiple plants in single company code.
    In large mfg plant - process industry (proposed to dived into number of production plants), Matrial 'a'  is produced in plant 'a'.Material 'a' is input to procude matl 'B' in plant 'B"..so on and so forth.
    We are activating Material Ledger (COML) for actual costing purpose. Question -During multi level price determination, will the variance of lower level materials ( produced in lowerlevel /other plants in our case) be rolled up to higher level materials (in a different plant). please let me know if it really works, if yes what are the guidelines (if any) .
    Please advise ASAP.
    Thanks
    Chris
    Edited by: Chris Farr on Oct 23, 2008 11:12 AM

    Hi Chris,
    from a business point of view there is a  difference that you might take into consideration: The valauation level will always be on material and plant combination. That means, the division into several virtual plants will usually lead to different actual prices for the same material in each plant. That might happen for example when you carry over stocks from last month into the current month in one plant, while the other plant has only receipts from the current month.
    That might me desired, but often it is not. If the mutiple plants are in reality only one location it might be hard to explain why the prices differ between plants.
    best regards,  Udo

  • APO gATP vs R/3 ATP - To check sales order ATP across multiple plants

    Hi There,
    I am trying to evaluate gATP functionality for SD sales orders.
    The primary requirement is to have sales order ATP checking take place across multiple plants.
    E.G.
    Sales order line is entered for qty 100
    60 is available in plant A, 40 is available in plant B
    System checks both plants and creates 2 lines - one for delivery from plant A and one for delivery from plant B
    (we are currently heading down the road of writing ABAP to do this 'multi-plant' check in R/3 but the more complex the requirements get the more interested I am in understanding more about APO/gATP)
    I would like to understand the benefit of implementing APO / gATP as opposed to using standard R/3 ATP and perhaps writing custom ABAP code to search for inventory across multiple plants.
    I would appreciate any insight regarding what is required to setp gATP to perform such checking and any other feedback regarding this issue - especially if you have had to implement something similar at your company.
    I have looked here but not much clear help:
    http://help.sap.com/saphelp_scm50/helpdata/en/26/c2d63b18bc7e7fe10000000a114084/frameset.htm
    Thanks,
    Niall

    Hi Niall
    you are probably looking at RBATP (Rule based ATP). Look at transaction /sapapo/rba04 in APO where you develop your own location and product substitution rules. Going down an ABAP road in R/3 may work short-term but not long-term as the requirements may get more complex.
    Regards
    Srinivas

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Creating a PO Using BAPI For Multiple PLants Or Multiple Line Items

    Hi All
        Can you please suggest me how to create a Purchase Order Using BAPI_PO_Create1 for Multiple Plants Or for Multiple Line items. The Requirement is like the PO is for single material for single vendor but for mulple stores i.e plants
    NOte:  Suggest me the  Creation of PO for MUltiple Line items or for multiple plants Using BAPI . Hope you people will give me the needful.
    Regards
    Shivakumar Bandari

    Hi,
    Here is the sample code to do that...
    *---> po header data
      wa_poheader-vendor    =  your vendor..
      wa_poheader-doc_type  =  Your doc type..check with Functional contact....
      wa_poheader-purch_org =  Purchasing Org..
      wa_poheader-pur_group =  Purchasing Group
    *---> po header data (change toolbar)
      wa_poheaderx-vendor    =  'X'.
      wa_poheaderx-doc_type  =  'X'.
      wa_poheaderx-purch_org =  'X'.
      wa_poheaderx-pur_group =  'X'.
    *---> poitem data
    data: item like ekpo-ebelp.
    item = '0010'.
    loop at t_parts.
      it_poitem-po_item  =  '00010'.
      IT_POITEM-PLANT    =  Plant..
      IT_POITEM-STGE_LOC =  Sloc...
    *---> poitemx (item data change toolbar)
      it_poitemx-po_item  =  '0010'.
      it_poitemx-po_itemx  =  'X'.
      IT_POITEMX-PLANT    =  'X'.
      IT_POITEMX-STGE_LOC =  'X'.
    *---> add record's to internal table
      APPEND:  it_poitem,
             it_poitemx.
    endloop.
    *call bapi_po_create1
      CLEAR v_ebeln.
      CALL FUNCTION 'BAPI_PO_CREATE1'
        EXPORTING
          poheader         = wa_poheader
          poheaderx        = wa_poheaderx
        IMPORTING
          exppurchaseorder = v_ebeln
        TABLES
          return           = it_return
          poitem           = it_poitem
          poitemx          = it_poitemx.
    *---> check the return table for error message
      READ TABLE it_return WITH KEY type = 'E'.
      IF sy-subrc NE 0.
        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
          EXPORTING
            wait = 'X'.
      endif.
    Thanks,
    Murali

  • Materials with multiple plants and wm views

    Hello,
    we are migrating materials to an environment where we have multiple plants, sales org., warehouse numbers. When we create the WM view we set a plant and warehouse number. As WM view is not really connected to a plant (table MLGN) we have the problem that when the users wish to mantain a material WM view, they see different combinations of plants and warehouse numbers, what is not really correct, as they are in different countries.
    Country 1: plant 0001, warehouse number 001
    Country 2: plant 0002, warehouse number 002
    Country 3: plant 0003, warehouse number 003
    In country 1, with MM02, the user can open the material in plant 0001 and in any warehouse, ie. 001, 002, 003. This user should only be able to open plant 0001, warehouse nr. 001.
    Is there a way in customizing, authorizations, etc. to avoid this?
    Thanks for your comments.

    Hi
    THis can be contolled via authorisation to the users. Please check with Basis consultant.
    [http://help.sap.com/saphelp_45b/helpdata/en/91/1a39516e36d1118b3f0060b03ca329/content.htm]
    Karthik
    Edited by: Karthik on Jun 29, 2011 5:59 PM

  • MRP planning components at multiple plants

    I would like to present a unique scenario, we have a plant and a warehouse both are created as two different plants in SAP.
    When we run MPS/MRP at a Finished product (FERT) level at the mfg plant, I would like to
    1) Consume inventory of components (Packaging material - VERP) at the plant first
    2) It should then consume inventory of packing material from warehouse
    3) Only then it must creates a procurement proposal for the remaining qty at the mfg plant.
    4) There shall not be procurement proposals created at a warehouse, all proposals should be directed to the plant.
    Most of them would advice to create the warehouse as a storage location within the manufacturing plant but that is not possible due to financial reasons.
    Flood me with ideas.

    Hi Manoj
    The standard MRP cannot consider stock in different plants for the same material.
    Please observe that this issue has been already discussed on several thread on this forum. Check  for example my answer on the thread below:
    MRP Run considering Stocks for Multiple Plants and Requirement maintained for Plant Cluster
    BR
    Caetano

  • Restrict PO creation for multiple plants for same company code

    Hi Gurus,
    We want to restrict PO creation for multiple plants in the same company code. Based on Standard SAP settings for Purchasing organization assignment with multiple Plant and multiple Plant assignment with single company code, this is happening. Is there a way that we can restrict by doing some customization change.
    Any thoughts or ideas will be highly appreciating.
    Thanks and Best regards,
    Karun Kumar

    Hi,
    Said functionality is not available in SAP standard.
    To avoid the same ,i can suggest implement release strategy for PO,and then higher authority / commercial team can check created PO,if multiple plants available in single po then they have the option of rejection for the same.
    Or else check BADI-ME_PROCESS_PO_CUST,take the help from abapor and apply the restriction to select multiple plant in PO.
    Hope this will resolve your query,
    Thanks & Regards,
    Sandesh Sawant

  • Availability Check at Multiple Plants for the Sales Order line Item.

    Hi Friends,
    We are having two plants, Plant A and Plant B. Plant A is used to issue the orders to the vendors and stock them, while Plant B is used to manufacture the Product and Stock.
    When we create the sales order, we want to check the Current Stock Plus Incomming Purchase order stock for plant A and also check current stock plus Production orders in plant B.
    for ex if the current stock is 100 in Plant A and No physical stock in Plant B but there are some production orders for 400 Qty which will be ready in 1 week.
    If i create a sales order for 500 qty which is scheduled for delivery 10 days later.  then we want to commit to the customer ( Looking at both the plants stock situation )  the system should check the stock availability for both the plants and automatically create two different line items , Line item 1 for plant A and line item 2 for plant b.
    I know there is a user exit for Multiple plant selection USEREXIT_PLANT_SELECTION  in program RV03VFZZ. The Description of the USer exit says ( This user exit may be used to provide a list of plants for which availability is to be checked)  But we have never used this one. Will this user exit do exactly what i want ??
    Did any of you, have used the above User exit in your implementations ? If so please let me know whats the purpose of this user exit
    Your reply is much appreciated.
    Thanks & Regards
    Srinivas

    Hi
    I dont know about the userexit which you are referring about
    But this is not available in R3 The system makes a Availability Check only in the plant which has got determined in the item details shipping tab and stops there
    The same is available in APO
    If there are 2 plants say 1000 and 2000
    In sales order the plant determined is 1000 and there is no stock
    In R3 system stops there
    But in APO  system checks the plant 2000 and if stocks are available it creates an STO in the background automatically from 2000 to 1000 if configured accordingly
    Even if the material is maintained in 10 plants the system will make a  Availability Check at all 10 plants and act accordingly
    Regards
    Raja

  • Checking the stock in multiple plants by creating STO to fulfil an order.

    Hi All,
    The requirement is to do a Stock Transfer from different Plants for fulfillment of Configuration Order(putting together different components to make one product) which always be done at one central plant. When configuration order is created the Order Header requirement is always set to u2018Complete Deliveryu2019, which means that all the line items on the Order be delivered to the Warehouse in one delivery for Configuration completion. 
    There are multiple plants around the Central plant and the suggestion made was to create STO from other plants to the configuration plant whenever there is a shortfalls. Currently in legacy the STO process for meeting shortfall requirement is met through Automated STO. The system looks for inventory in nearby Plant in a Sequence until it finds the inventory in one of the Plant and not external Procurement is done for this configurable materials.
    Is there any way that this can be configured in SAP from MRP or planning perspective to look for the stock in a sequence of plants specified? I know using a Special procurement key u201Cstock transferu201D under the MRP view in Material master but I was not completely clear on this process.
    Can anyone provide me their thoughts on how to resolve this issue. 
    Regards
    Shane

    HI Csaba,
    Thanks for your thoughts. Yes it is not possible to acheive this with in Materials management. It looks like APO has the in built functionality to handle these kind of scenarios.
    Shane

  • Extending the material to multiple plants

    Hello Experts,
    I am trying to extend the material to multiple plants and storage locations based on the source material storage locations.
    I am retrieving the data from mard and marc table to check whether that material is already got extended to the given plant.
    I am putting one check in the program to check the material is extended to given plant or not? If the material is already extended then i need to check whether it got extend to the given plant and storage location combinations.
    Can anyone give me some idea how to go with it...
    Here I am giving piece code where I got stuck.....
      READ TABLE RT_MARC
                   TRANSPORTING NO FIELDS
                   WITH KEY MATNR = LW_DATA-MATNR
                            WERKS = LW_DATA-IBL
                                     BINARY SEARCH.
        IF SY-SUBRC = 0.
          MESSAGE I468 WITH LW_DATA-MATNR LW_DATA-IBL.
          CLEAR : LW_DATA.
          CONTINUE.
        ENDIF.
    In IT_MARC I am getting the storage locations related to the source material for the given plants. How to verify this to check of the target plants with the combination of storage locations.
    In the above code after sy-subrc = 0 I need to check for the storage location combination also. I can't retrive the storage locations related to the target plants intially into IT_MARC.
    Waiting for your response.

    Hi , Thanks for the reply.
    But the plants for which data is automatically getting populated , I am selecting only the Foreign Trade view and not all the views.
    Regards

  • Single Subcon Vendor for multiple Plants - CTM

    Dear friends,
    We are planning some materials with Subcontracting scenario using CTM
    Facing issue when same vendor is executing sub-con process of same material for multiple plants
    Total demand of lower level material is flowing to a single plant instead of flowing to the corresponding multiple plants
    Because of which excess planning is happening in one unit & no planning is occuring at other units which is leading to a mess
    In library, it is provided to proceed with 1050 Location type but not clear on how to proceed further
    Kindly guide on this
    Regards,
    Antony

    Hi,
    Now Planning has to happen at dummy location of type 1050 and not at 1011 to transfer demand to correct plant.
    Please check following-:
    1. If you are using PPm create product in new location of type 1050.
    2. Also check whether Tlane is created for components from plant to this new location.
    3. Suggest to retransfer all master data including your subcontracting inforecord post creation of location of type 1050.
    If you are using PDS product should get created in new location automaticaly.
    Regards,
    Santosh

  • Standard Rush Order with multiple plants

    Hello gurus,
    We just upgraded to 6.0 from 31I and when creating a
    rush order with multiple plants the first item's delivery
    does not contain a ship-to party were the second item's
    delivery does.  Table VBPA does not have a record for the
    first delivery but the second delivery is there. This did not happen in 31I.
    Please advice.
    Best Regards.

    hello, Ruben.
    hhmmm.  your table XVBPA looks like a created table that is not SAP standard.  i am not an ABAP person so i could not pretend to give you good advice, but i (my speculation only) suspect that there was a user exit or an ABAP program that made the system do the postings to this table instead of the standard VBPA.
    i further speculate that during the upgrades, some of the enhancements may have been lost or diverted.  (to prevent this, you usually use the 'Z' naming convention, which is to have this letter as the start of any name for an enhancement or definition outside of SAP standard)
    your best bet is to try getting an ABAP consultant (or are you one already?) to help you look at this.
    regards!

  • STO for multiple plants

    Hi,
    I need a help on one issue.
    I have 4 plants say A,B,C,D.(Under 1 Co code)
    I want to configure STO process.I have done it for 2 plants in the past.
    We have to crete internal customer & vendor (acct grp 0007).
    Now in SPRO,I have to do the set up for STO.
    For plant A, cusromers will be B,C,D & similarthing will be for plant B,C,D.
    I can assign only one customer in the STO set up.
    How to do this in case of multiple plants?? I 'm doing this STO with delivery.
    Similarly, how the subcontracting scenario will be there in plant to plant?
    Please throw some light.
    Thanks in advance,
    Piyush

    Dear,
    I think ur confused,
    be clear that u have to maintain in customising that
    the plant u r setting up is which customer code for u.
    say plant XYZ .And u have created the plant XYZ as a customer ABC and Vendor as PQR
    so in Customising u r settings as
    XYZ is my plant which is customer as ABC and selling through the mentioned sales area.
    in vendor master u are maintaining that this vendor PQR is my plant XYZ.
    and in customer master ur maintaining that this customer ABC is my plant XYZ
    regards,
    sujit

Maybe you are looking for

  • Problem saving .dv file to external hard drive

    Hello - I'm trying to copy an old VHS tape to DVD. VCR to camcorder to iMovie 4.0.1 and edits all went smoothly. To create the .dv file I did File > Share > QuickTime tab > compress for Full Quality DV and created a 5.68 GB file movie1.dv - all OK. I

  • My Hard disk is full, and I can't find what did it.

    I just recently purchased a 1080p sony handycam with AVCHD formatting and made a video in iMovie. The video was 30 minutes long and the raw event footage I used to make it up almost filed my hard drive. I went from 200gb to 20gb rather quickly, so I

  • OSA: ESS not visualize all appraisals

    Hello All, One of my clients requirements is that appraisees must be able to visualize/modify some of the appraisal templates received but not all. I have linked the BSP HAP_DOCUMENT to the ESS and stated the start page as: document_received_open2 -

  • Need Help Changing Font Size on Mail Program

    OS X 10.8.3 My mail list under "sort by date" column has a small font which I would like to make bigger. I have gone to Mail>Preferences> Fonts & Colors but none of those cseem to change the font in the second mail column under (Sort by date).

  • Lock the plant so that other user cannot use the same plant.

    Hi Gurus! I ahve this small report which shows the pro-rate factor . In this report I need to block the plant or lock it(a soft) lock witha  message that some other user is using the plant so that other cannot use the same plant to post.Following is