Need the report  for staged materials in production order

Hi
My user is staging the materials multiple times for the one production order.Due this reason multiple TR were generated .Because of Multiple TR , user is generating  multiple TO for issuing the material to a production order.
Is there any way to stop the  staging process for the materials already staged.I would like to know whether there is any report which give the details of staged materials and corresponding TR & TO for a production order.
Thanks
Sankar

Hi
Warehouse activity Monitor is best tool/ report , which give the details of staged materials and corresponding TRs & TOs, to stop/cancle you have to use related WM transactions.
To setup WM moniter user below document
http://help.sap.com/printdocu/core/print46c/en/data/pdf/LEWM/MMWM.pdf
Thanks
Madhu

Similar Messages

  • Standard Report for missing parts at production order operation level?

    Hi PP Gurus,
                We have standard report for missing parts at production orders level.
    For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
    Please help.
    Thanks,
    Reddy.

    Hi Arvind,
          Thanks for for your response.
    1. List: Components,  Layout: Standard layout          set the Missing part
           It shows the component requirement/withdrawn  quantity for each operation of production order. It is not showing the commit quantity.
    2. List: Components,  Layout: Pick list          set the Missing part
           It shows the component requirement/withdrawn  quantity for each production order.
    3. List: Components,  Layout: Missing Parts List-Material View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
    4. List: Components,  Layout: Missing Parts List-Order View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
          We are unable to get the solution from all these 1 to 4 reports from COOIS.
    Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
    If avilable, what is the procedure to be followed?
    Thanks,
    Reddy.

  • Deleting the reservations for components of a production order without TECO

    Dear Gurus,
    I forgot to activate the backflush indicator in the beginning. I activated the backflush indicator in between. But for the confirmations already made I had to issue the material as unplanned consumption for the order. This is not clearing the reservations for the material.
    How to delete the reservations for components of a production order without TECOing the production order? My order is not completed.
    Thanks and Regards,
    Raghu

    Hi Kumar,
    I have a production order for 1000 header (A) qty. My control key is PP03 (auto goods receipt from confirmation in CO11N).
    For this order the component B qty is 1000 (BOM consumption is 1:1)
    Without doing GI, the confirmation is done for 300 A qty. I realized that auto GI is not done for the 300 qty of component B as there was no backflush indicator.
    Now the backflush indicator is activated in the production order for component B.
    In the next confirmation for another 300 A qty, automatic GI is posted for 300 B qty because of backflush now.
    Now my confirmed and GR qty for A in two rounds is 300 + 300 = 600.
    GI of component B done is only 300 (through backflush).
    Qty yet to confirm = 400.
    So I did GI of 300 B qty through MB1A (which is an unplanned issue). This does not update the withdrawn qty in the production order. Also the reservations for component B for this 300 qty are not reduced in the system.
    Now the reservations against the order for component B = 1000 - 300 = 700 (which is 300 more than the qty yet to confirm).
    Now when I run MRP for another 2000 qty of A, the procurement proposals for B will be 2000 + 300(undeleted reservations) = 2300. Though the system is behaving properly, this 300 is additional and unwanted.
    For this reason I need to delete these reservations before the MRP run. As order is still open, I cannot TECO the order. Nor can I clear all open reservations from CO11N.
    Thanks and Regards,

  • Report for comparing Variances of production order types

    Hi All,
    I want a report in which i can see variances of production order type wise and can compare that with other types also.
    means my input should be as follows
                1) Company Code/controlling area
                2) Plant
                3) Order type 1
                4) Order type 2 and so on.......
    like wise I want to develop a report.
    I have created summerization hierarchy  but it show order type wise data.
    i want data from multiple order type in a single report.

    Hi Sachin,
    I have attached screenshot for your reference. Please find it.

  • Need the report for database fragmentation

    HI,
    Is there any script to get database defragmentation report
    Thanks

    Hi;
    Please also check:
    http://www.orafaq.com/node/1936
    Script to Report Extents and Contiguous Free Space [ID 162994.1]
    Script to Report Tablespace Free and Fragmentation [ID 1019709.6]
    Regard
    Helios

  • Need to run the report for All Values when Null is passed in parameter

    Hi All,
    In my BIP report, I am using a parameter :asset with Type as Text, which means user will type the values for the parameter in the text box.
    Now, this parameter can take multiple comma separated values. I have a requirement to run the report for All Values when user doesn't enter any value in the parameter text box and if user enters any value(s) then the report will run for those values . The way, I tried to handle that in the query using couple of ways was :
    IMP : My Database is SQL Server
    where
    (table.asset = isnull((:asset), table.asset) or table.asset in (:asset))
    Now this works fine when I give a single asset number but when I give multiple values separated by comma like 123, 345 in the text box, then the statement fails saying 'encountered ,'
    I also tried simply
    table.asset in isnull((:asset),table.asset) -- but this doesn't work as it doesn't allow me to use in operater while using isnull and if i will use = operater then it won't work in case of multiple values
    Any suggestions on how can I handle this? Any help would be highly appreciated.
    Thanks,
    Ronny

    thanks for replying, but i tried this option too, it did not work for me, neither isnull nor coalesce. I mean, the solution work for single value but when i pass multiple values then separated by a comma then it doesn't work and shows me an error like "Incorrect Syntax ','". I am using SQL server as DB and bip is 10.1.3.4.1
    also please share the SR number, so i can also check the same.
    can there be any other work around to this?
    thanks,
    ronny

  • Report for consignment materials

    Hi SAP Gurus,
    Is there a report for consignment materials that can show us the opening balance, receipts, Usage, and ending balance (of the stock) for a given time frame?
    thanks
    Anusha

    This doesn't do any good. it just gives the vendor information. I'm not looking for this. I'm looking for a report or a t code which gives what the opening stock levels, receipts of stock, usage of stock and ending balance of stock for consignment materials for a given time period for a plant
    thanks
    Anusha

  • Need a report for actual cost by WBS element by month

    Hello all,
    I am looking for a report that will give me the total costs charged to a series of of WBS elements by month. Does anybody know if such a report can be run and what the transaction number of this report would be?
    Thanks

    Hello Stacy,
    Thank you for your help.
    I tried the S_ALR_87100185 report as you instructed but I cant get it to display as I would like to see it. What I need the report to do is display actuals by month and WBS elemnts from January through August. However the report cuts off at the May period. Does anybody have a workaround so I can see the charges from January through August?
    Thanks

  • I bought Adobe Photoshop Elements 13 They sent me the one for Windows and I need the one for Macbook Pro!!!

    The download that adobe sent me is for Windows. I have a Mac and I need the one for Macbook Pro. I have been looking for a contact with customer service and even the chat is not working. Help please! I haven't use the product they sent me

    Please open link
    Contact Customer Care
    Then click on still need help, you will get the chat option

  • TS1307 The port I'm using is 465. Not working. Just need the setting for outgoing mail. Incoming is still working.

    The port I'm using is 465. Not working. Just need the setting for outgoing mail. Incoming is still working.

    "Well Known" TCP and UDP ports used by Apple software products
    http://support.apple.com/kb/TS1629?viewlocale=en_US

  • How can I run the report for different input values at the same time?

    Reports version: Report Builder 6.0.8.13.1
    Oracle version: Oracle8i Enterprise Edition Release 8.1.7.0.0
    I want to run the same report for different input parameter values and spool each o/p to different file and ftp to a server. For this, as a first step, I am spooling different input values in to a file, reading those values through a loop and calling the report for that input values. Each report run/execution is taking 15 minutes. Total report execution is taking approximately 4 hours (assuming 16 different input values) to complete. So I have to wait 4 hours to see ALL outputs.
    I would like to run the report parallel for ALL the input values and I should be able to see the ALL outputs with in 15 or 16 minutes.
    In my shell script, I added & symbol at the end of the report call to start/run the job in the background. Due to this the control passed to the next step after the report call. At this place I have an ftp command to send the output file to a different server and it is giving error some thing like “o/p file is not available/created yet". This is due to the fact that report writer is NOT yet completely started/initiated or it is NOT completed the spooling.
    How can I run the report at the same time for all the input values and save the time?
    Thanks in advance.
    Kishore.

    Increase the number of server engines running right now it seems there is only one engine running ,increase it to 4 or 6
    and then atleast 4 or 6 reports will run simultaneously.
    For FTPing the output add to your sript to check whether it is locked and if not then only try to ftp .
    Also for more better functionality read the document (chapter 15 ) for 10g reports for its new fuinctionality.
    http://download.oracle.com/docs/cd/B14099_17/bi.1012/b14048/toc.htm
    Thanks
    Subodh

  • Need a Report for a List of PO's against a Sales Order

    Need a Report for a List of PO's against a Sales Order

    Hi
    We can get through Me2n, with selection parameters with account assignment as C (Sales Order)
    Regards
    Prasanna

  • ABST2 - How to take the report for the previous fiscal year

    Hi,
    For FI-AA reconciliation, my scenario is this: The current fiscal year is 2009 and the system (server) date is 16-Apr-2009. My fiscal year period is: Mar-Apr. In ABST2, it does not accept Fiscal year. When I take the report, it displays for fiscal year 2009, which I don't want because I want it for the fiscal year 2008 to reconcile between FI and AA. The fiscal year 2008 is not yet closed in both FI and AA, so I want the report for 2008 only. But ABST2 always gives the report for the current fiscl year. Is there any way out to get the report for 2008?.
    Thanks,
    Kannan S

    This report is based on the actual values. In the past this report was used for EURO conversions to see if the values are in line. When not it was not possible to do the euro conversion.
    Normal it is a part from the fiscal year closing

  • Hello, had to move to mavericks lost quicktime Pro, Need the feature for looping audio sections repeatedly, I have the install Key from my old QT Pro version, any ideas?

    Hello, had to move to mavericks lost quicktime Pro, Need the feature for looping audio sections repeatedly, I have the install Key from my old QT Pro version, any ideas?

    If QuickTime Player 7 isn't in the Utilities folder automatically, you can install it separately. See:
    http://support.apple.com/kb/HT3678
    Instructions on how to register your QuickTime Pro key can be found in that same document.
    Regards.

  • I need the installer for 10.6.1.7 64, iTunes can you help?

    Pleas advise?... I need the installer for iTunes64 msi, can anyone out there help?..also is there a disk with Itunes on it for an install?

    Download iTunes Here...
    http://www.apple.com/support/itunes/install/
    dueeast47 wrote:
    is there a disk with Itunes on it for an install?
    Not that I am aware of...

Maybe you are looking for

  • Error #1503 with AIR3.4 but not AIR3.2

    I'm working on an Android/iOS app using Adobe AIR. The app appears to work normally both inside Flash Pro and real devices except for the following test: Do Publish Preview inside Flash Pro. Close the preview window. The error appears in the Output p

  • Query LPAR in oracle database.

    Hi Folks I was assigned to query LPAR and user_id in some databases. Based on the info on excel sheet, we are going to match up LPARs with physicals servers, and I'll then determine how many unique database ids exist across each physical server. I kn

  • Index content of a message queue

    Hi, Is it possible to index the content of the message queue. Do we use Correlation ID to reference to some messages?

  • Audition records audible clicks all of a suddden

    This has never ahppened to be before, but all of a suddent , when i record a track in Audtion ( a vocal track in multi track, for example), I get these annoying clciking/opping sounds in the vocal track that I recorded. Any ideas on what to check? An

  • Preserving boot camp option after re-installing Mac OS X

    I have a 1st gen Mac Pro with Vista installed on a second hard drive under boot camp. Recently for reasons that I can't find a solution to, my machine has become rather unstable with numerous crashes and lockups that never used to happen. I want to d