New to Logistics Execution module?

Hello Guru's,
I am New to LE module,  will anyone share your exp in providing, sap std Business process used for LE module with T-Codes and STD config settings needed.  How it differs with WM.

Hi PV
Pl see following links
(1) http://help.sap.com/saphelp_47x200/helpdata/en/ec/b657385287390ce10000009b38f8cf/frameset.htm
(2) http://sap-img.com/sap-le.htm
Rewards are helpful

Similar Messages

  • Can I register operation breakes in Logistics execution module of SAP

    Good Morning,
    We are making a SAP implementation in our company, there is a logistics operation covering on this implementation and so far we have not found how to record this breakes in the logistics operation in logistics execution module, we need to record a reason for the break, the beginning date-time and the end date-time and have a text field for further information.
    As an operation break i mean any topic that stops the logistic operation of the company it could be rain, damage of equipment, accident or any other.
    We've been searching and we've found something in the maintenance module and the production module but we need it in the logistics execution one.
    Thanks a lot for any answer that can help us.
    Luis.

    Hi
    In the definition of routes and stages (tcode 0VTC) you can set the transit duration in days for each route.
    I hope this helps you
    Regards
    Eduardo

  • Interview Questions in Logistics Execution

    Dear Expert SAP Guru,
    Please let me know the List of  Interview Questions and Answers of LE (Logistics Execution) module.
    With Regard
    Vijay Kumar

    Hi Vijay,
    Please post your query in the correct topic space in SCN.  For help, see this document:
    Find Topic Spaces on SCN (Forums)
    Thanks,
    Kristen

  • New Sections for SCM Logistics Execution ??

    Would just like to make a suggestion as to some sub-headings that i think would be very useful under the Logistics Execution Forum:
    General WM (WM and SUM).
    Handling Unit Management (HUM).
    Task and Resource Management (TRM).
    Extended Warehouse Management (EWM).
    SAP Radio Frequency (SAP RF).
    RFID.
    Decentralised Warehouse Management.
    .. anyone any other suggestions?!
    thanks,
    A

    Hi PV
    Pl see following links
    (1) http://help.sap.com/saphelp_47x200/helpdata/en/ec/b657385287390ce10000009b38f8cf/frameset.htm
    (2) http://sap-img.com/sap-le.htm
    Rewards are helpful

  • What are the functionalities provided by SAP ECC 6.0 (Logistics Execution) for inward and outward transportation?

    The Transportation Module provides a very detailed functionality to capture & control the transportation both inward and outward. However there is a set of transaction codes in SAP ECC 6.0 which may provide some functionality on transportation.
    Can Logistics Execution provide some basic control in the absence of Transportation Module? Also what are the advantages Transportation Management module provides over Logistics Execution in SAP ECC 6.0?

    Hello Prasad,
    For ESS and MSS you do not require special data from the backend side, If a person has master data maintained in PA30, He can see his personal details in ESS, For that employee should maintain the Portal user id in Infotype 0105 , subtyp0001.
    With that userid he can able to enter the portal and maintain his details. Same is the case for MSS , Manager should have maintained 0105 subtype 0001. and he can see the details of his employees in MSS application.
    For ESS you need to have Portal
    SAP_ESS
    PCUI_GP
    BP for ESS
    You can check the following link :
    http://wiki.sdn.sap.com/wiki/display/ERPHCM/HOWTOGETRIDOFSPSTACKMISMATCHISSUES
    about the compatibility of Support Packages..
    All the above mentioned package should be deployed on Eneterprise Portal.
    You can search on various blogs also about this information.
    Best Regards,
    Deepak..

  • Logistics execution

    hi,
    sap gurus,
    Transportation Mangement:
    (1). Frieght Charges Happens Frequently Basing On The Seasons/distance/cargo weight/volume etc...
    How Do You Handle That?
    (2). Can You Block A Particular driverVendor In Transportation Module?
    (3). How Can We Define Delivery Priority To Deliver The Material For A Paticular Customer?
    (4). How Can We Know That Material Delivered By Us Is Achieved The Despatch Target Or Not.
    (5). List Of Black Listed Truck Should Be Blocked By The System Automaticlly.
    (6). Frieght - Should Compare By Which Mode I.E. Optimisation
    (7). List Of Pending Orders Given To Frieght Forwarding Agent To Deliver The Goods And Services.
    (8). As Well As List Of Pending Sales Orders From The Systempoint Of View.
    my id is [email protected]
    regards,
    balaji.t
    09990019711.

    Hello Andy,
                  If you get any info gathered on Logistics execution plz share with me also
    it will be more help full. I am a procuremnt process guy but Now on words I am working on Logistics execution
    so plz help me in configuration and business process involved. It would be more help full.
    thanks in Advance.
    Vijay

  • Diff between Logistics Execution and General

    Hi ,
             Can anybody tell me what is the basic difference between Logistics Execution and Logistics General
    Thanks
    Bharath

    Logistics Execution
    The entire delivery chain functions in this module.
    Both outbound and inbound deliveries, stock transfers, picking, packing, and all other activities which are supposed to take place during the movement of a material from one place to another place happens here.
    Logistics general
    This link can serve some of the functions of Logistics execution, materials management, and sales and distribution also. This module by itself will not contain certain processes of its own, but it will enable the functions pertaining to all of the logistics modules namely SD, MM, LE etc. In this aspect, this is the module which covers ceratin configurations pertaining to multiple modules like product hierarchy, variant configuration etc.
    Hope this helps.
    Rwd points!!!

  • Creating a new message in adapter module

    Hello,
    I already posted the question in this [Thread|Sending Adapter Module to split messages;, but I now create this new topic so you can get points for your answer
    Jan from this thread wrote "I know how to send a new message using a new instance of the Module Processor and using ModuleProcessor.process()" and I'm now searching for a code example how to create a new message from within an adapter module. I think it must be something like [this|http://help.sap.com/saphelp_srm40/helpdata/en/8d/6ad6409ff68631e10000000a1550b0/frameset.htm].
    Regards
    Markus

    Hi Sippy,
    First of all we need to configure the systems. So that we can transfer data from Outbound system to Inbound system.
    Configure an Outbound Process that uses Message Control
    Step 1: Create a new Message Type
    TCode: We 81
    Path: From the Area menu of EDI, choose Development, IDOC Type/ Message
    Step 2: link the IDOC type to the Message Type
    TCode: We 82
    Path: From the Area menu of EDI, choose Development, IDOC Type/ Message
    Step 3: Create a new Process Code
    TCode: We 41
    Path: From the Area menu of EDI, choose Control,Outbound Process COde
    Step 4: Create or Change a Partner Profile
    TCode: We 41
    Path: From the Area menu of EDI, choose IDOC,Partner Profile
    Configure an Outbound Process for Stand-Alone Programs.
    1. Create a new message type
    2. Link the IDOC type to the Message Type
    3. Add the message to the ALE Distribution Model(use BD 64)
    4. Create or change the Partner Profile
    I think this will be helpful for you.
    Reward points if useful.
    Cheers,
    Swamy Kunche

  • Hi all, Please suggest a case where there is a requirement for new SOAP sender adapter module. I wanted to develop a module but in my current project i am unable to find any such requirement.

    Hi all, Please suggest a case where there is a requirement for new SOAP sender adapter module. I wanted to develop a module but in my current project i am unable to find any such requirement. So please give me inputs for the same..
    Thank you,
    Vinay Kumar A

    You can try converting a synchrnous soap call to asynchronous using a custom module
    Here your module will send a response back to the sender system and make an asynchronous call forward

  • Can anyone plz tell me what is order processing and logistics execution?

    Hi Everyone,
              can anyone please spend there precious time on this quest. its really urgent. 
      1) Functional understanding of Order Processing and Logistics Execution.
      2) Functional understanding of Chargebacks and Billbacks.
      3) please provide me some knowledge about XI administration or provide me with some link
    quick and correct answers will b definately appreciated
    thanx in advance
          xilearner

    Hi,
    See these...
    Chargeback -- http://help.sap.com/saphelp_erp2005vp/helpdata/en/43/03fee2dc6a6e99e10000000a11466f/frameset.htm
    Billback -- http://www.buy-rate.com/glossary/billbacks.cfm
    http://www.vistex.com/Solutions/ip/Billbacks/Demo.html
    XI administration guides..
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/ac6de690-0201-0010-54ac-8923089dcc97
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0b4580be-0601-0010-d3ad-bd6ce51ae916
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0f00c890-0201-0010-beb2-c96050edc426
    cheers,
    Prashanth
    P.S Please mark helpful answers

  • Transportation Planning in Logistics Execution

    Hi Friends,
    As of now in our company we aren't using transportation planning in Logistics Execution for shipments from mother go-down to Depot (33 in Number) and also from factory to Depot.
    How to dynamically update the Transti time and transit route in SAP R/3 ECC 5.?
    I have defined OVTB,OVTA,OVTD,OVTC in define routes and also OVR1,OVSY etc in route determination in master data.
    How to use those information to get update for tranit time dynamically?
    I'm ready to give more info on this. Thanks in advance.
    Regards,
    Arasu

    Transit time is pre-defined in the route. Based on your route determination (essentially, departure and receiving zones), the pertinent route is selected that invokes the calculation of the dates including the planned GI and delivery date. So, essentially, the transit time is pre-defined so to calculate these dates.
    Not sure what you mean by 'dynamic' calculation of the transit time as oppose to manually entering the time during route creation.

  • Info-structures used in Transportation of Logistics Execution.

    Hi
    Can any one send me notes, information, or any links on Info-structures used in Transportation of Logistics Execution.
    Cheers
    Maruthi

    check this link,
    http://help.sap.com/printdocu/core/Print46c/EN/data/pdf/CAARCLE/CAARCLE.pdf

  • Publish All Templates of Logistice Execution  to ITS

    Hi,
    I want to publish all templates of Logistics Execution to ITS, my question is, which templates or services are related to Logistics Execution? Kindly please advise.
    Thanks a lot.

    We had a very similar issue. We found the reason to be that the user node was being reversed replicated before the profile node was created and profile properties saved. Our solution was to add a property to the user node (e.g. useraction=created) which we added after the user and profile node has been created successfully. Then using a workflow launcher we look for the property being set using the Condition (useraction=created) and a Event Type of Modified, triggering the reverse replication workflow that way.

  • Transportation Module in Logistics Execution ( SAP R/3 ECC 5 version)

    Hi Friends,.
    I want to know how to update the transit route,transit time in SAP. Also route scheduling
    In my company finished products is sent to either mother go-down or any of the 33 depots If it is bulk volume.
    PR is created based on the sales planning. Excise invoice is made at the factory level.
    How to define the routes for this process.I'm ready to give more info on that.How system can display the transit time for each shipment from factory or from mother go-down.
    Forgive my newness in SAP
    Thanks in advance.
    regards,
    Arasu

    Hi
    In the definition of routes and stages (tcode 0VTC) you can set the transit duration in days for each route.
    I hope this helps you
    Regards
    Eduardo

  • Create a new curve in Graph module using vbs

    Hello.
    I am trying to get control over the curves in the Graph module of Diadem 8.1 using vbs. I can change the propoerties of the curves that have been already created, but it is not always the most appropiate. How can I create a new curve in the Graph module?
    I hope someone can help me.
    Regards from Mexico.

    Hi ingluiseflorest,
    The command you're looking for is "GraphObjNew()", which will work in your DIAdem 8.x version.  Here's an example from the DIAdem 9.1 help file:
    Call PicDelete()                            'Deletes all objects
    Call GraphObjNew("2D-Axis","New_2DAxis1")   'Creates a new 2D axis system
    Call GraphObjOpen("New_2DAxis1")            'Opens axis object
      D2AxisTop        =10                      'Sets position
      D2AxisBottom     =10
      D2AxisLeft       =10
      D2AxisRight      =10
      Call  GraphObjNew("2D-Curve","New_Curve") 'Creates a new curve
      Call GraphObjOpen("New_Curve")            'Opens curve object
        D2CCHNX          ="[1]/[1]"             'Defines x-channel
        D2CCHNY          ="[1]/[2]"             'Defines y-channel
        D2CurveColor     ="red"                 'Defines curve color
      Call GraphObjClose("New_Curve")           'Closes curve object
    Call GraphObjClose("New_2DAxis1")           'Closes axis object
    Call PicUpdate()                            'Updates report
    Cheers,
    Brad Turpin
    DIAdem Product Support Engineer
    National Instruments

Maybe you are looking for