New Year 2010

Dear Mr. New Year 2010!
All I want is to lose 40 pounds.
I don't want to be Mr. Big This and That.
All I want is to lose 40 pounds.
What I say doesn't mean what you think I want.
I don't want to be Mr. Big This and That.
All I want is to lose 40 pounds.
So please no one wants to be misunderstood.
I don't want to be Mr. Big This and That.
All I want is to lose 40 pounds.
So please let me remind you
I don't want to rule the world.
All I want is to lose 40 pounds.
Happy New Year!

HAPPY WAPPY NEW YEAR TO ALL OF SCN !!!!!!!!!!!!!!!!!!!!
HAVE A SUCCESSFUL 2010 !!!!
Regards,
Dinesh

Similar Messages

  • Happy New Year-2010

    To the Entire Hyperion Family,
    I wish you a very happy new year-2010.
    Regards,
    tvmk
    Edited by: tvmk on Dec 31, 2009 11:11 AM

    Hi All,
    Wish you a Very Happy and Prosperous New Year 2010 to entire Hyperion Colleagues.
    Have a Nice Time..
    Cheers,
    UB.

  • Happy New Year In Advance To All

    Hi Friends,
    It's time to celebrate New Year with all forum members.
    Welcome *2010* in advanced and be a part of this wonderful family. ;)
    !http://crazywebsite.com/Website-Clipart-Pictures-Videos/New-Year-Graphics/Animated-Walking-Monkey-Happy-New-Year-2010-Champagne-Bottle-01.gif!
    Keep posting good threads and make this forum more lively like never before. ;)
    Regards.
    Satyaki De.

    Almost stepping into 2010 as well over here:
    !http://www.latenightwithjimmyfallon.com/silly-walk.gif!
    Thanks a lot everybody, I've learned a hellufolot over here over the past 8/9 months!
    Yes, Satyaki, let's all keep it up and keep on rocking this forum ;)
    I wish all of you all the best and 4 |-|4xx0r N3w `/34r !
    !http://oraclespeak.files.wordpress.com/2009/11/fireworks.jpg!

  • KSII new year

    we define lab and machine overhead in splitting structure, lab use cost element group lb(from cost element 540000 till 549999)
    machine overhead use cost element group OHD (from cost element 570000 till 579999), in Jan 2010, the sum of 540000 to 549999
    in KSS2 is 300K, the sum of cost element 570000 till 579999 is 700K, so in KSII, under cost center 9201/activity type Z001, the amount of actural rate* actual quantity is 1000K,
    now we have the requirement that in KSII, we want the amount of actural rate* actual quantity to be 300K(only consider labour)? can it be done?
    for new year 2010, besides we maintain the controlling area version for 2010, do we need to maintain 2010 for OKES, because I check the consistency in OKES, it is only shows 2009 for cost center 9201. how to maintain year 2010 in OKES version ?
    before we run KSII, is it mandatory to run KSS2? thanks

    Hi,
    Use T.code OKEW. Give your version & fiscal year, go to change mode & assign it.
    Thanks

  • A New Year, a New Challenge! Become the FIRST SharePoint 2010 Guru of 2015!

    Happy New Year!
    "Guru 2014" is so 'last year'!
    The real glory is to be the first Guru of 2015! :D
    The birth of a new year, and a new hero?
    Or the stamp of authority from long established Guru leaders?
    The challenge is on, all eyes are watching, anyone could win this month.
    The prize? Glory! Honor! Virtual medals! Unashamed love and worship from those within the community and those bloging about it (article spotlights,
    weekly awards).
    Published interviews and the chance to climb the TechNet social ladder. Become a true TNWiki Ninja and
    advance through to black belt... and beyond!
    All you have to do is add an article to TechNet Wiki from your own specialist field. Something that fits into one of the categories listed on the submissions page. Copy in your own blog posts, a forum solution, a white paper, or just something
    you had to solve for your own day's work today.
    Drop us some nifty knowledge, or superb snippets, and become MICROSOFT TECHNOLOGY GURU OF THE MONTH!
    This is an official Microsoft TechNet recognition, where people such as yourselves can truly get noticed!
    HOW TO WIN
    1) Please copy over your Microsoft technical solutions and revelations to
    TechNet Wiki.
    2) Add a link to it on
    THIS WIKI COMPETITION PAGE (so we know you've contributed)
    3) Every month, we will highlight your contributions, and select a "Guru of the Month" in each technology.
    If you win, we will sing your praises in blogs and forums, similar to the
    weekly contributor awards. Once "on our radar" and making your mark, you will probably be
    interviewed for your greatness, and maybe eventually even invited into other inner TechNet/MSDN circles!
    Winning this award in your favoured technology will help us learn the active members in each community.
    Feel free to ask any questions below.
    More about TechNet Guru Awards
    Thanks in advance!
    Pete Laker
    #PEJL
    Got any nice code? If you invest time in coding an elegant, novel or impressive answer on MSDN forums, why not copy it over to
    TechNet Wiki, for future generations to benefit from! You'll never get archived again, and
    you could win weekly awards!
    Have you got what it takes o become this month's
    TechNet Technical Guru? Join a long list of well known community big hitters, show your knowledge and prowess in your favoured technologies!

    Is this program initiated by Microsoft or ....?
    Ahsan Kabir Please remember to click Mark as Answer and Vote as Helpful on posts that help you. This can be beneficial to other community members reading the thread. http://www.aktechforum.blogspot.com/
    Yes. It's co-run by Microsoft and the TechNet Wiki Community Council, which includes amazing Partners and collaborators like XAML guy.
    Ed Price, Azure & Power BI Customer Program Manager (Blog,
    Small Basic,
    Wiki Ninjas,
    Wiki)
    Answer an interesting question?
    Create a wiki article about it!

  • Problem in opening new year in AJRW

    Hello Sap Guru,
    I have executed depreciation run for two year - 2009 & 2010. For 2009, i executed depreciaton run on monthly basisi & for 2010 on yearly basis.
    Now when i m going for year 2011, i am not able to open new year 2011 in t.cdoe AJRW while i have closed old year 2010 in AJAB & has also done balance carry forwrd in t.code F.16 & F.07.
    Its giving me error" target fiscal year specifications 2011 wrong for co.code"
    Message no. AA709
    Diagnosis
    You have requested a fiscal year change for the year 2011.
    In company code 0409, this is not the fiscal year which directly follows the current, or just completed, fiscal year.
    System Response
    Company code 0409 will not be processed.
    Procedure
    Correct your entry.
    Please suggest what to do.

    Hi deepak,
    The process is, you need to do first asset fiscal year change then asset year end closing., so execute the steps accordingly and also check in the safer side the TABA table, it contains the posted dep. figures periodwise.
    Regards
    Anuj

  • Problem in opening new year in FA in t.code AJRW

    Hello Sap Guru,
    I have executed depreciation run for two year - 2009 & 2010. For 2009, i executed depreciaton run on monthly basisi & for 2010 on yearly basis.
    Now when i m going for year 2011, i am not able to open new year 2011 in t.cdoe AJRW while i have closed old year 2010 in AJAB & has also done balance carry forwrd in t.code F.16 & F.07.
    Its giving me error" target fiscal year specifications 2011 wrong for co.code"
    Please suggest.
    Thanks & Regards
    Deepak Garg

    Hi,
    I think system is confused due to the fact, that you are closing year, which is beyond the current calendar year.
    Regards,
    Eli

  • The year 2010 bug !

    Hi,
    We did not have a year 2000 bug but SAP invented the year 2010 bug for us !
    Check note 1422843 Wrong Deletion date in spool request
    All ABAP releases from 4.6c up to 7.1 are affected.
    Currently our TST03 table is filling up very fast and the corrected kernal is not yet available....
    Happy new year !

    We patched our 7.10 kernels 2 weeks ago and 7.00 1 week ago and it solved the problems (see the related notes as well).
    We delete spool entries based on creation date for 30 days so that the attached report was not required.
    For those interested, see also http://en.wikipedia.org/wiki/Year_2000_problem#Year_2010_problem
    Cheers,
    Julius
    ps: The note is only current not available as it is being edited. Should appear again soon.
    Edited by: Julius Bussche on Jan 15, 2010 4:27 PM

  • Asset You can only post in new  year after closing the previous year

    Hi Experts,
    I am getting below error while running the depriciation:
    You can only post in new  year after closing the previous year.
    Message no. AA687
    Diagnosis
    You want to post in a new fiscal year. However, a posting must have been made in the last period in the previous fiscal year before you can do this.
    Procedure
    Post to the last period in the previous year first.
    Note : I closed FY09, even though there were no assets in it at the time.  The first  asset was capitalized on 12/29/09 (clearly in FY10).  I tried closing FY09 again and got the messege  No year-end close is necessary for company code XXXX .
    Could you please any one help me on this.
    Thanks In Adwance
    Regards,
    Saritha.

    Hi Saritha,
    Please check the following settings:                                                                               
    o Is there one ore more years since the last depr. run?                                                                               
    Solution: in this case an entry must be made into the table TABA. 
                      Note 144441  gives a solution to make a "Dummy-entry".                                                                               
    o If there was never a depreciation run, the there must be 000/0000 in
      TABA and T093D.                                                                               
    Solution: please take the report from the note  Note 144441           
                      and put the values  000/0000 in this fields.                                                                               
    o Do you  have a non-calendar fiscal year (e.g. 2009/10)? In this case
        you should have in the field T093D-AFBLG the year 2010.             
        Solution: Correction with note 26073                              
    regards Bernhard

  • Happy new year to all

    HAPPY NEW YEAR!!! ITS 12:00AM Jan 1, 2010 here now :D

    Hi ;
    To all forum ppl :)
    *˛°.˛*.˛°˛.*★2011★ Happy New year * 。*˛.
    ˛°_██_*.。*./ ♥ \ .˛* .˛。.˛.*.★*Welcome*★ 。*
    ˛. (´• ̮•)*.。*/♫.♫\*˛.* ˛_Π_____.♥2011♥ ˛* ˛*
    .°( . • . ) ˛°./• '♫ ' •\.˛*./______/~\*. *。
    *(...'•'.. ) *˛╬╬╬╬╬˛°.|田田 |門|╬╬╬╬╬*˚ .˛ ...★..*
    Regard
    Helios

  • Happy New Year all

    It's 2011 somewhere in the world already - so - here's to a productive and crash free new year.
    May your codecs match, your cores stay fully loaded and your output be acclaimed.
    Cheers,
    x

    Happy New Year! Happy to have 2010 move off into history!
    But, for those of us who live in the GMT-10 timezone, there is still more than 10 hours to go.
    Plus this will be the last year for legal use of fireworks by the citizenry here. . . so I am sedating the dogs (as well as sedating myself), as our neighbors - who are amateur pyromaniacs, have promised to send 2010 out with extra enthusiasm.
    MtD

  • Multiple libraries, projects and reorganizing for the new year

    I have used Aperture since 1.0 and really like it but the growing pains are still present - over time of use, I've ended up with multiple libraries [2 main ones and 2-3 little ones that probably can be safely archived]. I want to start fresh in the new year and have a new Library that is my main one, my only one in fact == is it possible/feasible/desireable to export projects from Library A and B and then import the ones i want into my 2007 Library the way my new organizing system will be? I mainly have images according to geography and people [e.g. people in locations versus family and friends]. Can I consolidate all my Libraries into one new one for use in the future ?? Will exporting each project and then importing into my new master Library work??

    I've been thinking just a little about what features I would like the next rev of aperture to have. Though I haven't thought through the specifics, easier and more efficient use and management of multiple libraries, projects etc would be nice. Whole aperture projects referenced from multiple libraries or some such? (I said I hadn't thought it through!)
    It's over a year since aperture came out, macworld is coming up, and I suspect that 2.0 will be released eventually some time in the future, perhaps with changes (maybe even improvements!) in library and project workflow.
    So while I too am considering how to organize my own aperture materials I am currently holding off for bit just in case there might maybe possibly be (Conjecture Warning!!!) something new announced soon....
    MBP17 2.16 ghz 2gb 120gb   Mac OS X (10.4.8)  
    MBP17 2.16 ghz 2gb 120gb   Mac OS X (10.4.8)  

  • How do I move an account to the top of the column of accounts? I have version 31.3. Thanks for any help you can offer and Happy New Year!

    I see that my Thunderbird account listings (in the leftmost column) are alphabetical. I want to move the bottom listing to the top. Is this possible? I'm using Windows 7. Oh, and did I mention Happy New Year?

    Try this add-on:
    https://addons.mozilla.org/en-US/thunderbird/addon/manually-sort-folders/
    http://www.ramsden.org.uk/3_How_to_install_Add-ons_in_Thunderbird.html

  • "Activity type 420 1002 2393074 in the fiscal year 2010 not valid" PM03

    We have an issue with the PM03 for the year 2010. "When the scheduler tries to schedule the pm..He gets an error "Activity type 420 1002 2393074 in the fiscal year 2010 not valid" The planner will close the work order then re-open it. The error will go away, but when the work order is scheduled there is 0 hours scheduled.. This will be a big issue if there are not any hours assigned to work orders.
    Can you help me?
    Thanks!

    Davison,
      Please maintain the prices for the activity type, Cost center combination for the fiscal year 2010 using transaction KP26. The log generally disappears after you save and leave the transaction. You will see the log again only when you reschedule the order and are in the same transaction.
    Also check whether "scheduling" has been activated for the PM03 control key for scheduling to be taken into consideration for the operation.You can view the same by using the drop down for the control key on the transaction.
    Regards
    Narasimhan

  • How to change the year in a range of column dates to the new year?

    How to change the year in a range of column dates to the new year?

    Depends on the pattern of the dates. The last procedure will work for any pattern, or no pattern at all.
    For examples.the dates are assumed to be in column A, starting at A2
    Sequential dates?
    Enter first updated date in the first cell.
    Enter =A2+1 in cell A3. Copy the cell.
    Select A3 to the end of the list. Paste.
    With the cells still selected, Copy, then go Edit > Paste Values.
    Evenly spaced dates?
    Same procedure as above, but replace +1 in the formula with + and the number of days between dates in the list.
    Randomly spaced dates?
    Select cell B2. Press option-left arrow to insert a (temporary) column to the left of column B.
    Click on the empty cell B2 in the new column. Enter the formula below:
    =DATE(YEAR(A)+1,MONTH(A),DAY(A))
    Copy the cell, then select B2 - Bn where n is the last ow containing a date to be converted. Paste,
    With the cells still selected, Copy.
    Click on A2, then go Edit > Paste values.
    Click on the column B reference tab to select all of column B.
    Hover the mouse over the right end of the reference tab, and click the black triangle when it appears.
    Choose Delete Column from the menu that appears.
    Regards,
    Barry

Maybe you are looking for