No interfaces listed for ECC Business System in PI 7.1 for intrf. Detrm

Hi all,
I have come across this situation earlier, did some settings in SLD ..tech system...(Don rembr it nw....)
I am not able to see the list of interfaces for an ECC Bus.System during Interface determination,
I manually have to key in the name of the BAPI instead of the values appearing in the value list....
I am sure that the is something missing while havin created the BS and TS in the SLD,
Can someone guide me what my approach would be.
Replies much appreciated. Thanks

Hi
Please assign the software component(Product) in which you have imported your BAPI in IR to your
Business System in SLD.
Then you can see all the interfaces of that software component in your Business System(ECC) in ID.
So just add the software component to your Business System in SLD then you can get the interface in
ID.
Check the following link for the same issue.
Re: No interface Idoc in Business system Receiver
Thanks
Prasad Nemalikanti

Similar Messages

  • Integration directory : select IDOC interface for WAS business system

    Hi,
    While adding a receiver determination for an WAS business system, I do not get any IDOC based message interface from the design repository proposed for my business system in the popup dialog.
    The only interfaces that appear are for the non SAP standard SWCV that we added to the business system. But no interface for the APPL 5.0 SWCV ( or BASIS 7.0 ) appears.
    In the SLD this component is correctly listed for that WAS .
    If I remove all the default search criteria , eventually, the in terface appears but after selecting it I get a message saying :
    "Message Interface does not exist in any software components installed on this business system "
    Since everything looks ok in the SLD I'm puzzled. How does this look on other systems ?
    Any ideas
    ( The business system was updated from APPL 4.70 / BASIS 6.40 to APPL 5.0 / BASIS 7.00 some time ago but I don't know how it look before the upgrade of the business system )
    rgds
    Dirk

    Hi Bavesh,
    Yes, It's correctly listed.  I did not manually link these components to the technical/business system. This happened automatically by the SLD data collector service. I also cleared the SLD cache several times,
    rgds
    Dirk

  • Naming changes for SAP business systems

    Hello
    I have developed my interfaces in which most of them are from SAP to third party. We have SAP configured with its SID as the business system (e.g. DC1). Now we are planning to change the name of all the business systems in SLD. I deleted the previous business system from the SLD and created the new one according to newer standard and configured receivers based on it.
    My problem is when I am posting the message through ABAP proxy its still taking the SID as the sender. As a result its not finding the receiver. Do I need to configure the sender in my source ECC system?
    Thanks in advance.
    Regards
    Rajeev Patkie

    Hi Rajeev,
    The Business system details like the client and logical system etc, help the proxy to know where it has to go.
    Not for the sender system from where you are executing the PRoxy will have a Business system .Please check if the information is for the Business system can be seen correctly in the ID>BS>service-->Adpater specific identifiers.
    Also you sender XI adapter is attched to this Business system.
    No what is your receiver? You haven't specified that?
    Also, you can just reactivate the PROXY once.
    Cache refresh??
    Regards
    Vijaya

  • Can there be more than one transport targets for a business system in sld

    Hi All,
    I have a question about transport targets in sld for sap xi 3.0 sp19.
    We have a requirement where a business system needs to have two transport targets.In SLD i see that only one transport target can be assigned. Is there any way to assign more than one transport target to a business system?
    I know that there can be more than one source for a business system where more than one  different business systems have the same business system as the target.
    I am not sure if a business system can have more than one transport target .If yes , what is the way to add more than one ?
    Please help .
    Thanks,
    Padmaja

    Hello,
    I know that there can be more than one source for a business system where more than one different business systems have the same business system as the target.
    As far as I know, you would have to change the target everytime you will transport it to a different target e.g 3 target systems = 3 times you change the transport target in SLD.
    Regards,
    Mark

  • Logical System for RFC-Business system?

    Hi,
    I want use RFC adapter for my scenario like File to RFC.
    The query is like, is there any importance to use Logical system for my Business System which is using for my RFC Adapter in my communication channel.
    Regards
    Gopi

    logical system name is relevant only for Idocs, but it is always a good idea to maintain the technical and business systems with all the information you can provide.
    you can check the logical system names of ABAP application servers at bd54 tx code.
    Regards,
    Henrique.

  • How to change R/3 System ID & Client values for a Business System in ID

    I am a beginner in PI or XI. I am trying to modify R/3 System ID & Client# under Adapter Specific Identifiers of a Business System in ID. But both are in output mode and I tried to modify in SLD and then resynch at ID level, but I could not find a place where these parameters are specified for that Business System in SLD.
    Please help me!

    I have a Client 500 and R3 Server EN3 now these two things were already there on a Business System, but Admn did some thing on my test system and now we have another Business System pointing to TS of type WEBAS-ABAP and Admin assigned this same client 500 and EN3 server name in SLD to this new Business system, but as you know these changes will not reflect in my ID scenario automatically unless we do it manually with synchronization button under Adapter Specific Identifiers.
    So my requirement is now to remove those values from the old BS and keep them or get them through synch for my new BS in my ID scenario, which I am not able to do it. The new BS is pointing to WEBAS-ABAP type TS but the old one I think it is now not pointing to any TS any more, it just left like a orphan with no technical System, I think Admn did some magic with bad practice, I believe.
    HOw do I handle this situation?

  • ** Unable to see message interfaces in ID under Business Systems

    Hi Friends,
    When I create sender / receiver agreement in ID by choosing the respective Business Systems I am not able to see my message interfaces. Then, I checked the SLD, our SWCV under Products are not assigned in the Business Systems.
    Then, I have assigned our SWCV (by selecting the product, be selecting the SWCV) in tehcnical system and business systems, saved and log off from SLD.
    But, still those message interfaces are not appeared while select the Business systems. Those interfaces are abstract interfaces.  I tried to close the IR and ID, open it again, still the same problem.
    What could be the reason ? Reply friends,
    Thanking you
    Jegathees P.

    Hi,
    a new import of the Business System is not necessary.
    1) Important is to activate the interface in the Integration Repository.
    2) Checking in SLD that all installed check boxes are selected. In the Business System -> Installed Software -> select the Product and check that the SC is selected.
    In IR it's enough to close the Business System and reopen it to see the new interfaces.
    Regards
    Patrick

  • 3rd party tech systems for multiple business systems...

    I think this might a very stupid question but still would like to post it..:).. In a 3parties involved scenario, can 1 technical system be assigned to multiple business systems , if all business systems refer to the same 3 party..or does each 3rp party business system needs its own technical system..
    Also I need to move only 1 product and the SWCV assigned to the product to QA..I do not want to export entire SLD..By exporting this single product and importing into the SLD of QA, I hope it will not overwrite the SLD components of the QA box but add this new product as delta.
    -Teresa

    Hi Teresa,
    >>>Also I need to move only 1 product and the SWCV assigned to the product to QA..I do not want to export entire SLD..By exporting this single product and importing into the SLD of QA, I hope it will not overwrite the SLD components of the QA box but add this new product as delta
    I believe you can only do an incremental export/import
    sld does not allow importing/exporting one product...
    Remember to do a backup of your QA SLD
    (from the SLD - administration)
    then if you make a mistake nothing will happen
    about the second question:
    <i>"Business systems, which name the logical receiver independently of technical properties. For example, a business system might be a client of an SAP system.
    Technical systems with which the hardware of the system is specified in more detail (server data, and so on)."</i>
    this should be possible not only for SAP systems
    Regards,
    michal
    Message was edited by: Michal Krawczyk

  • Change the Releated Integration Server for all Business Systems

    Hello,
    follow Scenario:
    We export the SLD entries from a Development System in a file.
    Now we want to import the Entries in our Prod.-System, and we
    have to assign (or change) to other Related Integration Server.
    e.g. the esported Business System has in Development the
    Related Integration Server D12, but in the Productive System we
    need P12.
    Is there a other possibility as  to change first things first.
    Thanks for your help.

    Hi Stephan,
    I think this is not the correct approach because development and productive systems are different. You must register your technical systems by means of RZ70 transactions. If you have two different landscapes (DEV, PROD) you must register on two SLD servers.
    Doc about SLD: https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b09fe69e-46be-2a10-9fb0-9c11aeaa3557

  • Empty Receiver and Sender tab for a Business System

    Hi,
    I imported a few RFC's in the Enterprice Services Builder Repository.
    Then I opened in the intergration directory, the business system for where I had imported the RFC's.
    On the sender and Receiver tab, I don't see the RFC's. What goed wrong ?
    The Cache is up to date. We have a systemconfiguration with one SLD. But when the system was installed we had two SLD's. Later on we decided to have one and configured that.
    Thanks,
    Remco

    Hi,
    Thank You for the answers
    I checked all your input :
    The problem occurs only with the QAS business system. The DEV system is working fine.
    Iu2019ve tried to import a new RFC for the DEV software component. When I open in the Integration directory the business system DEV. The RFC is shown there in the Sender and receiver tab. If I do the same steps for QAS , I canu2019t see the RFCu2019s
    I checked the software component versions and compared the SLDconfig for DEV and QAS. There where no differences. Then I checked in the integration Directory the Software components of the business system. (tab Other Attributes) all software components where present. I did a Compare with SLD and there where no differences.
    >>It does not get assigned to your Business System in ID automatically.
    While assigning RFC (or IDOC...in the pop-up window) try to keep the System as Any and then click refresh.
    If I import an RFC to the DEV business system. The RFC is shown automatically in the sender and receiver tab, when I restarted my web browser.
    I did a Clear SLD data cache. The RFCu2019s where not shown.
    Regards,
    Remco

  • Port number while mentioned the RFC for reciever business system

    hi
      Could somebody tell me what is the port number to be mentioned while specifying the RFC for reciever busines system in the integration builder)configuration phase

    Hello..
    This might point to an unhanded exception. There should be a backend dump (ST22) available and that would help in more analysis. You might need a ABAPer to look into the dump. You may paste the dump here for more analysis.

  • Hello,i have changed the access of library and system files in macintosh HD through get info option.i changed the access to write only access for library and system files to no access for everyone.then mac stopped working..nothing opening now.

    hello
    i have changed the access of library to WRITE ONLY and also i changed the access of system files to NO ACCESS FOR ANYONE in macintosh HD.then,suddenly it stopped working.i tried it shut down.then it didnot shut down.then i pressed ctrl+command+power button.then it was shut down.
    NOW, nothing is opening in macbook pro.it is opening and only apple logo is shown.what should i do now.i knew nothing in mac.please help me.operating system is 10.7

    hello CT,
    it showed
    permissions differ on library: should be drwxr-xr-r
    repaired "library"
    permissions differ on system: sholud be should be drwxr-xr-r;they are d-wx-----------
    repaired "systems"
    like this many steps occured.
    then next step is permissions repair complete.

  • HT4623 I'm new to using apple products, recently was asked to consider using a ipad mini for my specific business needs. Does anyone use the mini for their business?  How does it work for you?

    I'm new to using the apple OS.  Recently had business partner buy an ipad mini, was thinking of buying more for our businesses.  I'm used to using Windows Office products for my reports, wanted to know how apple's Pages, Keynote and Numbers compared and whether they could be used on the ipad mini. 

    I have asked a moderator to provide assistance, they will post an invite on this thread.
    Once you get a reply, if you click on their name, you will see a screen like this. Click on the link as shown below.
    Please do not send them a personal message, as they may not be on duty for a long time, and your message will not be tracked properly.
    There are some useful help pages here, for BT Broadband customers only, on my personal website.
    BT Broadband customers - help with broadband, WiFi, networking, e-mail and phones.

  • I keep trying to install firefox for mac 10.4 and keep getting msg stating not good for this operating system. i downloaded the one for mac

    I had firefox on my mac for the longest time and woke up one day and it was gone...poof. I am trying to install it again and each time i try to download it and install i get an error message stating it is not the right browser for this operating sysytem....help me please. I did of course download the firefox for mac system

    *Firefox 4 versions and later do not run on a PowerPC Mac.
    *Firefox 4 and later require at least OS X 10.5 and an Intel Mac.
    * http://www.mozilla.com/firefox/5.0/system-requirements/
    For an unofficial Firefox 4 compatible version (TenFourFox) that runs on PowerPC Macs with OS X 10.4.11 or OS X 10.5.8 you can look at:
    * http://www.floodgap.com/software/tenfourfox/
    Firefox 3.6.x (Mac OS X 10.4 and later) can be found here:
    * http://www.mozilla.com/en-US/firefox/all-older.html

  • To Monitor inbound and outbound messages for ECC 6.0 business system

    Hi Guys,
    I am working on ABAP proxy. I want to monitor the flow of Inbound and Outbound messages for my Business system (ECC 6.0).
    XI server is on a different system.
    I understand that SXMB_MONI is used for tracking XML messages. What kind of tracking can we do by this transaction in our Business system and the XI system?
    And how do I know whether the outbound XML message sent is lying in the Sending Business system or in the XI system?
    When I am testing my interface, there is a fault message generated. How do I know whether the fault message is being sent to XI?
    Thanks,
    James.

    James,
    Go to SXMB_MONI in your sending system.
    Here you will find a message ID fro your Message.
    Go to XI, --> SXMB_MONI -->Monitor For Processed XML messages --> Advanced Selection Crieteria and use the Message ID here to see if the Message has hit XI or not.
    Likeiwse it can be traced in the target system as well.
    The basic point,  The messages will have same Message Id on your R3 and on XI.
    Regards
    Bhavesh