Oc4j scheduled jobs management

We have an application deployed under oc4j server and that launches scheduled jobs.
When we restart the oc4j server, old jobs are relaunched automatically which generate exception. Is this behavior logical? How we can remove these jobs.
Thanks for collaboration

Hi,
Some diagnostic things to check
- are there any crashes reported in the alert.log ?
- are any jobs running
select * from dba_scheduler_running_jobs;
- is the job coordinator running
on UNIX
ps aux |grep cjq
select program from v$session; -- look for CJQ
- are job slaves running
on UNIX
ps aux |grep j0
select program from v$session; -- look for J0*
- on UNIX what process is consuming the CPU (check output of top and then grep the output of "ps aux" for the process ID)
- what is MAX_JOB_SLAVE_PROCESSES set to ?
select * from all_scheduler_global_attribute where ATTRIBUTE_NAME='MAX_JOB_SLAVE_PROCESSES';
- what is job_queue_processes set to ?
select value from v$parameter where lower(name)='job_queue_processes';
- what is the status of all enabled jobs
select job_name, state, next_run_date, last_start_date from dba_scheduler_jobs
where state!='DISABLED';
If scheduled jobs are not running and there are no jobs running, there is really nothing to "reset", it's just a matter of figuring out why jobs are not running. If you provide answers to the questions above, it should become clearer what is happening.
One thing you can try is disabling all jobs and reenabling them one by one to see if they run.
The purge_log job running more than a day is extremely unusual, but it shouldn't step on itself as it will just skip the next run if it is already running.
Hope this helps,
Ravi.

Similar Messages

  • Error while running scheduled job fromEnterprise Manager--Please help ASAP

    BEGIN
    Hi,
    I have created a scheduled job using the below code.
    BEGIN
    sys.dbms_scheduler.create_job(
    job_name => '"M2RT6"."INCR_REFRESH_M2RT6"',
    job_type => 'PLSQL_BLOCK',
    job_action => 'begin
    REFRESH_REPORTS_POETIC(''M2PT6'',''INCR'');
    end;',
    start_date => systimestamp at time zone 'US/Eastern',
    job_class => 'DEFAULT_JOB_CLASS',
    auto_drop => FALSE,
    enabled => TRUE);
    END;
    And I tried to execute this job from Enterprise Manager.
    I got the below error:
    java.sql.SQLException:
    ORA-02800: Requests timed out
    ORA-06512: at "SYS.DBMS_ISCHED", line 150
    ORA-06512: at "SYS.DBMS_SCHEDULER", line 441
    ORA-06512: at line 2
    Help needed urgently. Thanks for the resolution inadvance.
    Thanks,
    Sudheer.Vempali

    Hi,
    This is the bug in Oracle. Most of the times, restarting Oracle database may fix the issue.
    Basically, an existing bug needs the oracle database restarts in a regular basis.
    Restarting oracle database will flushes the database buffer cache.
    Thanks,
    Sudheer.Vempali

  • Scheduling job perodically vs schedule manager

    Dear SAP expert
    I would like to run the report fbl1n(PRogram  RFITEMAP ) and email to users.
    I have 2 option:-
    1.Schedule the job periodically and email it through SM36.
    2. customise the report in schedule manager in flow definition and email to users.
    option 1 i am able to execute.
    option 2 i am not fully through. Please clarify how option 2 can be done.
    How i should decide pros and cons of schedule the job periodically through SM36 OR THROUGH SCHEDULE MANAGER
    PLS CLARIFY
    thanks
    S AP

    Hello Santosh,
    the link that you already got is good. Perhaps you also want to check out [http://wiki.sdn.sap.com/wiki/display/SM/FAQJobSchedulingManagement|http://wiki.sdn.sap.com/wiki/display/SM/FAQJobSchedulingManagement] and [SAP is first vendor to provide a comprehensive Job Management Suite |SAP is first vendor to provide a comprehensive Job Management Suite] for further information.
    In short SAP CPS is an advanced scheduling tool like which competes against other like UC4, Control-M from BMC etc. But all these tools do not provide any real job documentation or job request functionality in order to get the process governance right. That's where the SolMan gets into the game.
    Best Regards
    Volker

  • Report Queue Manager  - Scheduled Jobs

    Question: How/where does the Queue Manager store info for scheduled jobs?

    It is possible (IN 9iAS) to configure the Reports Server to store all requests in a database table. The Table(s) / View(s) are created by the script rw_server.sql located in $ORACLE_HOME/reports/admin/sql
    To configure this options, create the table and view with the rw_server.sql script, then add these lines in the
    <reports server name>.conf file <jobStatusRepository class="oracle.reports.server.JobRepositoryDB"> <property name="repositoryConn" value="user/password@tnsalias" confidential="yes" encrypted="no"/> </jobStatusRepository> The "value" attribute of the property "repositoryConn" should be a user/password@tnsalias that will be used to connect to the database. The account must have access to the tables created by the script rw_server.sql The combination confidential="yes" and encrypted="no" will provoke the encryption of the value attribute once the Report Server is re-started : After the Reports Server has started you will find: <jobStatusRepository class="oracle.reports.server.JobRepositoryDB"> <property name="repositoryConn" value="ihjFFBFD3jk5Xfrd5HeX5w3dE/E=" confidential="yes" encrypted="yes"/> </jobStatusRepository> Description of the rw_server_queue view columns can be found in the script rw_server.sql itself.
    Thanks,

  • BO4 - Lifecycel Management Console to export all content via scheduled job

    Hi,
    We wish to export the entire content of our repository to a lcmbiar file via scheduled job every week.
    Whilst could do this manually, want this to be a periodic refresh.
    The purpose of this is to have a developemnt system which has the content of the production system as of a week ago.
    So would want this job to be dynamic, exporting entire content including any new content on weekly basis at week-end during quiet time on servers.
    Anybody know if this can be done via lcmbiar file automatically?
    I'm thinking say sales folder week 1 10 reports, week 2 somebody creates another 2 reports, would want lcmbiar file to automatically pick up the new reports which have been added in week 2.
    Is this possible via lifecycle management console?
    Can't simply export cms database to development system as contains the production host embedded within it and don't want the development system to have reference to the physical production host.
    Many Thnaks

    Hi,
    Yesterday ASUG conducted webinar on LCM 4.0 FP3. URL for webbex session
    http://www.asug.com/Default.aspx?tabid=124&vp_url=http://jive.asug.com/docs/DOC-32206
    summary:
    1. We can not schedule to export LCMBIAR file in 4.0 SP2
    2. When ant file added to folder, automatically scheduled job do not pick the file in 4.0 SP2
    But above two options are good and working in FP3 as per SAP.

  • ADF_FACES-60097 error while opening a random schedule job

    Hello,
    recently i'm facing a error in oim while i open the schedule job
    When i logeed in with xelsysadm
    click on advanced.then click on System management
    search all the scehdule jobs
    open a random schedule job
    error occured!!
    Error: An error Occurred while retrieving trigger for the schedule job.
    ADF_FACES-60097
    please help
    regards
    tp

    Hi Frank,
    Thanks for the reply. I am using it as an inline popup. I am trying to create command links dynamically in an iterator. When a link is clicked a popup window opens. The text of the link is passed to the popup window by creating a variable in the session scope ( I even tried request scope) by an action listener in the backing bean.
    I tried to create another simple application with a static command button which passes its text to popup window through a session scope variable. It worked fine. I am not sure why the same procedure is not working in my original application. Can you give me a hint what could possibly go wrong according the exception stack trace ?
    Thanks,
    KK

  • How to schedule job V3 unserialised Update job for Inventory

    Hi gurus,
    How to schedule job V3 unserialised Update job for Inventory management
    What are the things need to be configured
    Thank you

    Hi,
    In R/3 go to SBIW > Settings for Application-Specific DataSources (PI) > Logistics > Managing Extract Structures > Logistics Extraction Structures Customizing Cockpit
    UIn this Screen you can define delta type, and the jog usign the control job option.
    Regards,
    Dani

  • Problem with variable in scheduled job

    I'm trying to get the following scheduled job to run:
    switch(config)# scheduler job name backup_job
    switch(config-job)# cli var name timestamp $(TIMESTAMP) ; copy running-config bootflash:/$(SWITCHNAME)-cfg.$(timestamp) ; copy bootflash:/$(SWITCHNAME)-cfg.$(timestamp) tftp://1.2.3.4/
    switch(config-job)# exit
    switch(config)# scheduler schedule name backup_timetable
    switch(config-schedule)# job name backup_job
    switch(config-schedule)# time daily 1:23
    switch(config-schedule)# exit
    switch(config)# exit
    This job is taken directly from multiple Cisco MDS and Nexus documents. From what I can tell, the purpose of this job is to save the running configuration to a file on bootflash with date & time in the file name and then to copy the file from bootflash to tftp server.
    I can create the job and schedule successfully:
    switch(config)#show scheduler job name backup_job
    Job Name: backup_job
    cli var name timestamp $(TIMESTAMP)
    copy running-config bootflash:/$(SWITCHNAME)-cfg.$(timestamp)
    copy bootflash:/$(SWITCHNAME)-cfg.$(timestamp) tftp://1.2.3.4
    ==============================================================================
    switch(config)#show scheduler schedule name backup_timetable
    Schedule Name       : backup_timetable
    User Name           : admin
    Schedule Type       : Run every day at 10 Hrs 48 Mins
    Last Execution Time : Tue Mar  6 10:48:00 2012
    Last Completion Time: Tue Mar  6 10:48:00 2012
    Execution count     : 1
         Job Name            Last Execution Status
    backup_job                        Success (0)
    ==============================================================================
    The scheduled job runs successfully but the files that are created have the variable $(TIMESTAMP) in the file name instead of the actual date and time e.g. switch-cfg.$(TIMESTAMP)
    The logfile contains the following:
    Schedule Name  : backup_timetable                  User Name : admin
    Completion time: Tue Mar  6 10:59:26 2012
    --------------------------------- Job Output ---------------------------------
    `cli var name timestamp $(TIMESTAMP)`
    `copy running-config bootflash:/PEN-9509-2-cfg.$(TIMESTAMP) `
    Copy complete, now saving to disk (please wait)...
    `copy bootflash:/PEN-9509-2-cfg.$(TIMESTAMP) tftp://1.2.3.4 `
    Trying to connect to tftp server......
    Connection to server Established. Copying Started.....
    It looks to me that the $(timestamp) variable is being created successfully and is being replaced with the $(TIMESTAMP) variable but this is not being replaced with the actual date and time.
    The thing I don't get is that this looks to me that we're trying to nest variables and the same Cisco documents from which I get this configuration also state that nested variables are not allowed.
    I have tried this on different hardware - MDS9500, MDS9100, Nexus 5000, Nexus 7000 and different software - SAN-OS 3.3, NX-OS 4.1, NX-OS 5.2 but cannot get it to work. I have also tried to put the commands in a script and run with the run-script command but it still does not work.
    There is probably another method to achieve what this configuration is trying to achieve (and I would like to know if there is) but I want to know if this particular configuration will work.
    Can anyone tell me if they have got this working or can see what I'm doing wrong or can try running this in a lab please?

    I managed to get this resolved with a bit of a workaround. If I put the copy commands in a script and pass the variable to the run-script command as part of the scheduled job then it works ok. Trying to create the variable within the script (or as a separate scheduled job command) still doesn’t work.
    So, creating a script file (script) as follows:
    copy running-config bootflash:/$(SWITCHNAME)-cfg.$(timestamp)
    copy bootflash:/$(SWITCHNAME)-cfg.$(timestamp) tftp://1.2.3.4
    and creating a scheduled job with the following command:
    run-script bootflash:script timestamp=”$(TIMESTAMP)”
    achieves the desired result.

  • Event based scheduler job - 2 events at the same time only 1 run

    Hi,
    i converted our dbms_job - jobs to the newer package dbms_scheduler.
    It is a 10.2.0.4 patch 23(8609347) database on an windows server 2003 R2 Enterprise x64 Edition SP2.
    The Jobs(about 130) are nothing special ... only some statistics, matview-refreshes and so on.
    For the notification of failed jobs and jobs which run over the max_run_duration i downloaded and installed the job notification package.
    The jobs are assigned to different departments and the corresponding developer teams in our company.
    I created a notification job for each department and if a job fails we (the database administrators) and the corresponding deverlopers will be informed.
    Now i ascertained that only 1 email will be send if 2 jobs of the same department fails at the same time.
    The emailer-jobs are auto-generated by the job notification package. I only modified them to look after all jobs of special department and not only after one job. (--> event_condition ... object_name LIKE 'XXX%')
    example for dba-jobs(copy of the script output of TOAD):
    SYS.DBMS_SCHEDULER.CREATE_JOB
           job_name        => 'DBA_JOBS_EMAILER'
          ,start_date      => NULL
          ,event_condition => tab.user_data.object_name LIKE ''DBA%'' AND tab.user_data.event_type in (''JOB_FAILED'',''JOB_OVER_MAX_DUR'')'
          ,queue_spec      => 'SYS.SCHEDULER$_EVENT_QUEUE, JOB_FAILED_AGENT'
          ,end_date        => NULL
          ,program_name    => 'SYS.EMAIL_NOTIFICATION_PROGRAM'
          ,comments        => 'Auto-generated job to send email alerts for jobs "DBA%"'
        );I thought that a queue is used to manage all events from the scheduler jobs. So i made a test with 2 dba jobs and simulated a failure at the same time but i received only one mail.
    So what is happend with the second event? I looked for the events in the qtab(SCHEDULER$_EVENT_QTAB) which belongs to the event queue(SYS.SCHEDULER$_EVENT_QUEUE) and no event was missing.
    So i think the emailer job has to run 2 times.
    Is anyone able to explain or to find my mistake?
    I know that the easiest way is to create one emailer job for each normal job but i think this is a little bit costly because all the arguments are the same for one department.
    Thanks & Regards

    Thanks for your fast answer.
    You are right with the "enabled => TRUE;" part and i only forgot to post it.
    So the Job is enabled (otherwise it would not send any mail). Because it is sending one mail i think it is also not necessary to hand over a job_type.
    Additionally the job starts a program ... so it is right to set the job_type='STORED_PROCEDURE' isn't it?
    And also right ... i already added the agent as subscriber to the queue.
    Anyway i think the whole thing do what it have to do. So in my oppinion there are no big mistakes in creating the job or at adding the subscriber.
    There are also no problem in raising the events by itself and enqueue them in the scheduler event queue.
    There is only a problem when 2 jobs fails (or run out ouf max duration) at exactly the same time.
    If i understand it right:
    The agent/subscriber will find the "JOB_FAILED"-event for the first Job in the queue and starts the emailer Job.
    The agent will also find the "JOB_FAILED"-event for the second Job and wants to start the emailer Job again.
    I don't know if this is really the problem but perhaps the emailer-job can not be started in consequence of the second event because ist is already running.
    I also don't know if this is a mistake of the agent or of the emailer-job by itself.
    I only want that it runs two times (one run for each event). I my case it also doesn't matter which email is send at first.

  • DPM 2010 Scheduled Jobs Disappear rather than Run

    I have a situation where I have a DPM server that appears to be functioning fine, but none of the scheduled jobs run.  No errors are given, there are no Alerts, and there is nothing in the Event log (Application and System) which indicates a failure. 
    All my Protection Groups show a green tick to indicate that they are fine, but the last successful backup for all of them is Friday the 8th of February.
    If I go to Monitoring and Jobs I see the jobs scheduled, but when the time comes for the job to run, it does not go into the "All jobs in progress", it just merely disappears, like thus:
    And a few minutes later,
    As you can see, the jobs disappear from the queue, and the total number of jobs decreases accordingly.  These jobs do not go into any of the other 3 Statusses (Completed, Failed or In Progress), they just disappear without a trace.
    There is some unallocated space, albeit not much (Used space: 21 155,05 GB Unallocated space: 469,16 GB). If space was an issue I would expect to see errors to indicate this.
    DPM 2010 running version 3.0.8193.0 (hotfix rollup package 6) using remote instance of SQL 2008 which is functioning fine.  I have tried stopping/starting the services, and even rebooted the server twice.  The remote instance of SQL server is using
    a domain account as its service account.  There are no pending Windows updates, i.e. it is fully up-to-date.
    The System Center Data Protection Manager 2010 Troubleshooting Guide (July 2010) does not show how to troubleshoot this particular probelm.
    Does anybody know how to resolve this issue or which logs might help me troubleshoot it?

    OK,
    Did you change the SQL Agent user account ?
    If so, DPM enters the SQL Agent account name into the registry and later we check that account each time the DPM engine launches.  The internal interfaces to DPM are secured using this account so the account name needs to match the account the SQL Agent
    is using. 
    Step 1
    In the registry HKLM\Software\Microsoft\Microsoft Data Protection Manager\Setup alter  both
    SqlAgentAccountName and SchedulerJobOwnerName keys to reflect the SQL Agent user account being used.
    Step 2
    Update DCOM launch and access permissions to match what was granted to the Microsoft$DPM$Acct account.
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread. Regards, Mike J. [MSFT]
    This posting is provided "AS IS" with no warranties, and confers no rights.

  • Schedule jobs issue after the upgrade

    We have Data Services jobs scheduled via management console in 4.0 Environment. I upgraded the repository to 4.2 and attach it in CMC and also in Server manager. Both the environments are in different servers.
    Login to Data Services management console. Click on the upgraded repository schedules, scheduled jobs listed there. But there is no Job server atatched to it. When i try to activate or edit the schedule, i am getting below error.
    Schedule:billing_rep Error:Socket is closed] When contacting the server above exception was encountered, so it will be assumed the schedule is not active anymore.
    Am i missing any steps?

    Hi Jawahar,
    Below is my suggestion regarding your query:
    Edit existing Job server and update the details regarding Local reporsitory and save it.
    Now try to map the same job server in scheduled jobs and check it was working or not
    Or Else
    Create new Job server and assign it to local repository.
    In this case you have to update your all real time & batch Job configuration.
    Thanks,
    Daya

  • Business Objects Scheduler Jobs Monitoring

    Hi,
    Is there a management pack available for integration with System Centre (SCOM) such that we can monitor failed scheduled jobs in Business Objects via SCOM?
    Is there any other way to monitor failed scheduled Business Objects jobs straight from the database or via any other method?
    Thanks,
    Chandan

    Hi Chandran,
    I'm not a SCOM expert but I understand it is basically a monitoring tool.
    Normally you would check for failed schedules in Business Objects using the Instance Manager, to filter for failed scheduled reports. Alternatively you could use the Query Builder to report directly against the XI3.1 Repository and return a list of failed instances.
    Above workflows can also be coded into the SDK to provide customised feedback on schedule failures
    The final option would be to simply set up email Notifications on the schedules to simply email the Administrator in the event of a schedule failure.
    With any of the above options it should be possible to link in your SCOM system to read\monitor from this output.
    I hope this helps.
    Kind regards,
    John

  • Edit cycles in Scheduled Jobs for Hyperion 11

    I have created a scheduled job that has several cycles. The job is not running correctly and I can't find where to edit the cycles that I have already built, nor can I find documentation. I am running Oracle EMP with Hyperion 11.1.1.2

    The following instructions assume that you saved your cycle definitions as a set of named parameters, otherwise you'll have to start again.
    So right mouse over your job and choose Manage Job Schedules. Right mouse over the relevant schedule and choose Show Parameters. Right mouse over the parameters and choose Modify. Then you can modify the existing cycle(s) and add more if you so wish.
    Hope that helps.

  • Scheduling Jobs

    I have tried to create scheduling jobs and schedule them. But the error message is 'Server throws in an exception'. My server is O8.0.5. Hope someone can enlighten me.

    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by Justin Cave ([email protected]):
    Are you using an ODBC client to schedule these jobs? I'm not clear what you're trying to do.
    Justin Cave
    ODBC Development<HR></BLOCKQUOTE>
    I used the OEM on my server. It is used also for my routine exporting of tables from my databases. I tried both ways, creating scheduling job on the OEM console, and scheduling on the export dialog box, but the same error message came. Then, it exited my OEM console/data manager, depending on the active window.
    null

  • DPM 2012 R2 Upgrade - Scheduled jobs not running

    Hi,
    We're having an issue after upgrading to DPM 2012 R2 where the scheduled jobs are not running.
    We're running Server 2012 R2 with SQL Server 2008 R2 SP2.
    Looking at SQL jobs, if we run the job step we get an error.
    Message
    [136] Job 18822c3e-8fe 7-47a2-bb6e-0feccecc2952 reported: The process could not be created for step 1 of job 0xA746B176EAD99943A14A57DAF684829F (reason: %1 is not a valid Win32 application)
    However, if we place quotes around the triggerjob.exe path in the SQL default job step:
    "C:\Program Files\Microsoft System Center 2012 R2\DPM\DPM\bin\TriggerJob.exe" 9b30d213-b836-4b9e-97c2-db03c3eb39d7 18822c3e-8fe7-47a2-bb6e-0feccecc2952 server.domainname.com
    It is successful. 
    We've already uninstalled DPM 2012 R2 and re-installed, restored the database and run dpmsync -sync with the same result. We've checked the DCOM Config Launch and Activation Permissions for Microsoft System Center 2012 R2 Data Protection Manager Service
    and has full access.
    Has anyone else had this issue and been able to resolve it?
    Any help would be greatly appreciated.

    Hi,
    The below blog may assist with troubleshooting your issue.
    http://blogs.technet.com/b/dpm/archive/2014/10/08/how-to-troubleshoot-scheduled-backup-job-failures-in-dpm-2012.aspx
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually
    answer your question. This can be beneficial to other community members reading the thread. Regards, Dwayne Jackson II. [MSFT] This posting is provided "AS IS" with no warranties, and confers no rights."

Maybe you are looking for

  • Mail Display PDF Attachment as icon?

    How can you display a PDF attachment in Mac Mail (6.0) running Mountain Lion as an icon.  Right clicking used to offer that option, but not since upgrading to OS 10.8

  • Hello, after a update to ios 6.01, itunes don't find my iphone 4 anymore

    Hello, Sorry for my english, normally write i french, But, i deed a update on my iphone 4 from ios 5.1 to ios 6.0.1 and when it was time to restaure the files, itunes has stopped Actually, Itunes doesn't recognized my iphone, and on the screen of my

  • Why doesn't a saved slide show in PSE-6.0 show in Organizer?

    Two questions: 1-I've created a few slide shows in Photoshop Elements 6.0 (running Windows Vista-64) and until recently have been able to find and reopen/edit them in Organizer.  For some reason none are showing at top of Organizer, even though I can

  • It´s possible deploy ADF Demo in Tomcat 6 ???

    Hi. I deploy the ADF Demo (http://www.oracle.com/technetwork/developer-tools/adf/downloads/index.html), in Weblogic 10.3.3. But I´m triying to deploy the war demo, in tomcat. But i can´t. It´s possible deploy this application??. I Think that is possi

  • BEA Weblogic Application Server

    Hi All, Is or was there an BEA Weblogic Application Server 8.0 version? I believe that there was no such version, but can someone confirm this for me? Thanks Simon