Hi,
My scenario is like the below.
I have one operation in my operation in my master recipe.So all the materials with the requirement quantity wll be assigned to that operation. Now I have created a order with 20 FG quantity.But I have RMPM according to FG quantity of 10 as per BOM.I want that the system will allow me to release the order partially for that 10 Fg quantity.
Waiting for your kind reply.
regards,
kaushik
Hi,
Partial conversion is already considered but the issue with the same is explained below.
Suppose you have an order for 50.the minimun lot size is 30.You have RM in stock for 35.Now according to you my planned order should be partially converted and the remaining planned order will be of 15 kg which is unconveratble.Now i can change the error msg of conversion of planned order lower than lot size maintained in production version.But this will violate the business requirement.
I think the problem is clear with you now.
regards,
kaushik
Similar Messages
-
FEFO logic in batch determination for process order release
Batch determination for a particular material in a process order was following FIFO logic . We needed to change it to FEFO hence we made the necessory changes in COB1 how ever the process order relase is still taking the batch whihs is not the first expiry batch
Kindly help in batch determination with FEFO for process order release.Rk
The blw explation for inventory side, i don't have idea for prod order side
If Batch Management is active for the materials then use following process;
First create characteristic in CT04 for Batch Creation Date, under "Addnl data", enter Table Name MCH1 or MCHA (As per Batch Class 022 or 023) and Field ERSDA and save it.
Assign this characteristics in CL02 in your Batch Class.
CU70 - Create a Sort Rule and specify the Characteristic of Batch Creation Date and activate "Ascending" indicator.
Now assign the Sort Rule in MBC1 and keep Selection criteria as "O" for the Strategy type.
Now do batch determination in MIGO. -
Re: Internal Batch Generation for Process Order while release
Hi All,
While releasing the Process Order I intend that the system should create a Internal Batch. But this is not happening.
I have checked all the necessary configs for this purpose. Still Invain.
Please Advice,
Vivek>
Prasobh Karunakaran wrote:
> Vivek,
>
> Please check in transaction OMCZ, whether radio button is active for "Active". Also check whether your material is assigned with a suitable production scheduling profile in work scheduling view. You can check the production scheduling details in CORY transaction, here in Batch management section for Automatic batch creation in order should be with value "2".
>
> Regards,
> Prasobh
Vivek,
Did you check the points mentioned by me.
1. OMCZ
2. Check whether you have assigned that production scheduling profile to your material?
Regards,
Prasobh -
User exit/BADI to for Purchase requisition through release of Process order
Hi ,
i need to add some text to the Pur Req. The Pur Req will be created through the release of PROCESS order. Please let me know any exits are available for the same.
regardsHi,
check the below enhancements in transaction SMOD.
CCOWB001 Customer exit for modifying menu entries
COIB0001 Customer Exit for As-Built Assignment Tool
COZF0001 Change purchase req. for externally processed operation
COZF0002 Change purchase req. for externally procured component
PPCO0001 Application development: PP orders
PPCO0002 Check exit for setting delete mark / deletion indicator
PPCO0003 Check exit for order changes from sales order
PPCO0004 Sort and processing exit: Mass processing orders
PPCO0005 Storage location/backflushing when order is created
PPCO0006 Enhancement to specify defaults for fields in order header
PPCO0007 Exit when saving production order
PPCO0008 Enhancement in the adding and changing of components
PPCO0009 Enhancement in goods movements for prod. process order
PPCO0010 Enhancement in make-to-order production - Unit of measure
PPCO0012 Production Order: Display/Change Order Header Data
PPCO0013 Change priorities of selection crit. for batch determination
PPCO0015 Additional check for document links from BOMs
PPCO0016 Additional check for document links from master data
PPCO0017 Additional check for online processing of document links
PPCO0018 Check for changes to production order header
PPCO0019 Checks for changes to order operations
Thanks
Sandeep
Reward if helpful -
User exit/BADI for Purchase requisition through release of Process order
Hi ,
i need to add some text to the Pur Req.
The Pur Req will be created THROUGH the release of PROCESS order. Please let me know any exits are available for the same.
regardsHi
Check the following Exits and BADI for Pur Requisition
Enhancement
MEVME001 WE default quantity calc. and over/ underdelivery tolerance
MM06E001 User exits for EDI inbound and outbound purchasing documents
MM06E003 Number range and document number
MM06E004 Control import data screens in purchase order
MM06E005 Customer fields in purchasing document
MM06E007 Change document for requisitions upon conversion into PO
MM06E008 Monitoring of contr. target value in case of release orders
MM06E009 Relevant texts for "Texts exist" indicator
MM06E010 Field selection for vendor address
MM06E011 Activate PReq Block
MMAL0001 ALE source list distribution: Outbound processing
MMAL0002 ALE source list distribution: Inbound processing
MMAL0003 ALE purcasing info record distribution: Outbound processing
MMAL0004 ALE purchasing info record distribution: Inbound processing
MMDA0001 Default delivery addresses
MMFAB001 User exit for generation of release order
MRFLB001 Control Items for Contract Release Order
AMPL0001 User subscreen for additional data on AMPL
LMEDR001 Enhancements to print program
LMELA002 Adopt batch no. from shipping notification when posting a GR
LMELA010 Inbound shipping notification: Transfer item data from IDOC
LMEQR001 User exit for source determination
LMEXF001 Conditions in Purchasing Documents Without Invoice Receipt
LWSUS001 Customer-Specific Source Determination in Retail
M06B0001 Role determination for purchase requisition release
M06B0002 Changes to comm. structure for purchase requisition release
M06B0003 Number range and document number
MEQUERY1 Enhancement to Document Overview ME21N/ME51N
MELAB001 Gen. forecast delivery schedules: Transfer schedule implem.
MEFLD004 Determine earliest delivery date f. check w. GR (only PO)
MEETA001 Define schedule line type (backlog, immed. req., preview)
ME590001 Grouping of requsitions for PO split in ME59
M06E0005 Role determination for release of purchasing documents
M06E0004 Changes to communication structure for release purch. doc.
M06B0005 Changes to comm. structure for overall release of requisn.
M06B0004 Number range and document number
Business Add-in
ME_PROCESS_REQ_CUST Enhancements for Processing Enjoy PReqs: Customer
ME_PROCESS_REQ Enhancements for Processing Enjoy PReqs: Internal
ME_PROCESS_PO_CUST Enhancements for Processing Enjoy Purchase Order: Customer
ME_PROCESS_PO Enhancements for Processing Enjoy Purchase Order: Intern.
ME_PROCESS_COMP Processing of Component Default Data at Time of GR: Custome
ME_PO_SC_SRV BAdI: Service Tab Page for Subcontracting
ME_PO_PRICING_CUST Enhancements to Price Determination: Customer
ME_PO_PRICING Enhancements to Price Determination: Internal
ME_INFOREC_SEND Capture/Send Purchase Info Record Changes - Internal Use
ME_HOLD_PO Hold Enjoy Purchase Orders: Activation/Deactivation
ME_GUI_PO_CUST Customer's Own Screens in Enjoy Purchase Order
ME_FIELDSTATUS_STOCK FM Account Assignment Behavior for Stock PR/PO
ME_DP_CLEARING Clearing (Offsetting) of Down Payments and Payment Requests
ME_PURCHDOC_POSTED Purchasing Document Posted
SMOD_MRFLB001 Control Items for Contract Release Order
EXTENSION_US_TAXES Extended Tax Calculation with Additional Data
ARC_MM_EKKO_WRITE BAdI: Enhancement of Scope of Archiving (MM_EKKO)
ARC_MM_EKKO_CHECK BAdI: Enhancement of Archivability Check (MM_EKKO)
MM_EDI_DESADV_IN Supplementation of Delivery Interface from Purchase Order
MM_DELIVERY_ADDR_SAP Determination of Delivery Address
ME_WRF_STD_DNG PO Controlling Reminder: Extension to Standard Reminder
ME_TRIGGER_ATP Triggers New ATP for Changes in EKKO, EKPO, EKPV
ME_TRF_RULE_CUST_OFF BADI for Deactivation of Field T161V-REVFE
ME_TAX_FROM_ADDRESS Tax jurisdiction code taken from address
ME_REQ_POSTED Purchase Requisition Posted
ME_REQ_OI_EXT Commitment Update in the Case of External Requisitions
ME_RELEASE_CREATE BAdI: Release Creation for Sched.Agrmts with Release Docu.
ME_DEFINE_CALCTYPE Control of Pricing Type: Additional Fields
ME_CHANGE_OUTTAB Enrich ALV Output Table in Purchasing
ME_CHANGE_CHARACTER Customer-Specific Characteristics for Product Allocation
ME_CCP_DEL_DURATION Calc. of Delivery Duration in CCP Process (Not in Standard)
ME_CCP_BESWK_AUTH_CH BAdI for authorization checks for procuring plant
ME_CCP_ACTIVE_CHECK BAdI to check whether CCP process is active
ME_BSART_DET Change document type for automatically generated POs
ME_BAPI_PR_CREATE_02
ME_BAPI_PR_CREATE_01
ME_BAPI_PO_CREATE_02
ME_BAPI_PO_CREATE_01
ME_BADI_DISPLAY_DOC BAdI for Internal Control of Transaction to be Invoked
ME_ACTV_CANCEL_PO BAdI for Activating the Cancel Function at Header Level
MEGUI_LAYOUT BAdI for Enjoy Purchasing GUI
ME_CHECK_ALL_ITEMS Run Through Items Again in the Event of Changes in EKKO
ME_COMMTMNT_REQ_RE_C Check of Commitment Relevance of Purchase Requisitions
ME_COMMTMNT_REQ_RELE Check of Commitment Relevance of Purchase Requisitions
ME_COMMTMNT_PO_REL_C Check for Commitment-Relevance of Purchase Orders
ME_COMMTMNT_PO_RELEV Check for Commitment-Relevance of Purchase Orders
ME_COMMITMENT_STO_CH BadI for checking if commitments for STOs are active
ME_COMMITMENT_RETURN Commitment for return item
ME_CIP_REF_CHAR Enables Reference Characteristics in Purchasing
ME_CIP_ALLOW_CHANGE Configuration in Purchasing: Changeability Control
ME_CIN_MM06EFKO Copy PO data for use by Country version India
ME_CIN_LEINRF2V BADI for LEINRF03 excise_invoice_details
ME_CIN_LEINRF2R BADI for CIN India - Delivery charges
ME_CHECK_SOURCES Additional Checks in Source Determination/Checking
ME_CHECK_OA Check BAdI for Contracts
Reward points if useful
Regards
Anji -
Hi,
Can any buddy tell me the Bapi used for Process order change
with following scenarios:
Quantity change
Resource change
Rescheduling
Control key change
RM Change
Recipe change
TECO
REVOKE
Material shortage check
Best Regards,
Sheetal.Hi,
BAPI_PROCORD_CREATE for process order create
BAPI_PROCORD_CHANGE - Change Process Order
BAPI_PROCORD_CLOSE - Close Process Order
BAPI_PROCORDCONF_CANCEL for Cancel Process Order
Confirmation.
BAPI_PROCORD_COMPLETE_TECH - Complete Technically
BAPI_PROCORD_RELEASE - Release Process order
BAPI_PROCORD_SET_DELETION_FLAG - Deletion Flag
BAPI_PROCORD_REVOKEUSERSTATUS - Cancel User Status
BAPI_PROCORD_SCHEDULE - Carry Out Scheduling
pls refer below link
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/200dd1cc-589e-2910-98a9-bb2c48b78dfa
http://help.sap.com/saphelp_nw04/helpdata/en/e0/9eb2370f9cbe68e10000009b38f8cf/frameset.htm
Regards,
Sankaran -
Problem with ATP check in release of process order
Hi gurus,
I have next problem in automatic release of process order:
No checking group is maintained for product 000000000791104015, plant VFMX in matl master.
Situation:
I've some materials without MRP views in material master data but apparently this doesn't affect to release order. In this case, this material hasn't this views and it's impossible to release the order. I'm supposing the problem is not related with the fill up of this views or the field in material master data, because for other materials with the same situation the release is running.
Anybody has any idea?
Thanks a lot,
RegardsDear ,
You are facing this error because :
- you have activated avaialbility check, but checkingb group is not maintained in material master of the component
- if maintained in material master, in configuraion checking group and checking rule combination is not maintained
- if above both are maintained then in the checking control for the order type is maintained, but in the control you maintained the setting that - release not possible if no availability, hence change it to user control option.
*So Goto MM02- material master -MRP3 view -Maintain the Availability check field as 01/02 as applicable for components in the production *
For more clarification , you can investigate the below : For production order avilablity check and release u have should following settings.
1. Define checking Group - SPRO
2. Define checking Rule- SPRO.
3. Define scope of check - OPJJ - Scope of the avilabilty check is defined for the Combination of Checking group and Checking rule. Check contol is defined for each comination of checking group and checking rule.
4.Define Chek control -OPJK : Checking rule is linked to Ordertype/Plant combination.
while releasing the production order system will do avilability check as per the settings In OPJK for ordertype/plant combination.
Hope this is clear to you
Regards
JH
Edited by: Jiaul Haque on Jun 20, 2010 9:20 AM -
Scheduled finish date for process orders not updating in BW
We are having problems with the scheduled finish date (GLTRS) for process orders. When the process order is already released, changes done in R/3 on the scheduled finish date will not result to a delta hence data in BW is not updated. Table AFKO, where data is coming from, is always updated with the changes though. 2LIS_04_P_MATNR is used in extracting the data.
Has anyone experienced the same problem? We are looking for possible ways on how to have a delta whenever there are changes on the process order even after it is already released.
Any help would be greatly appreciated...Hi Donna,
If I've understood your problem correctly, you can increase the load frequency as Sriee has pointed out.
If you want latest data frequently and if you are on BI 7.0 then you can look at Real Time Data Acquisition(RDA)
Regards,
Tom. -
Material staging for process order
Dear All,
Can we use material staging for process orders.
If possible pls brief the procedure.
Subbu.Using warehouse management /WM) :
- Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
- The resource used in the operation has a reference to the supply area.
- Components have material master views in WM for the selected storage type
Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
Regards -
COR2 release flag(Process Order Release)
HI all,
can we release a work order from cor2
if yes where can we find that release flag
Thanks in Advance,
SureshHi Suresh,
Please find the process for releasing process order .
1. Choose from menu Process order à Functions à Approval à Individual approval.
2. Choose Materials and on the Create Process Order: Material List screen release the order by choosing Release (Ctrl + F6). Batch determination and creation of control recipe are carried out automatically.
3. Save your entries.
For releasing a process order which already exists please use following steps:
4. Access the transaction using:
Menu Logistic à ProductionProcess à Process Order à Process Order à Change
Transaction code COR2
5. On the initial screen, enter the necessary data.
Process order Your PO number
6. Choose Enter.
7. Choose Release (Ctrl + F6).
8. Save your entry.
Result
When the process order is opened, material reservations for the required material components are created automatically or the specifications are transferred from the planned order. Purchase requisitions are created for material components or services that have to be procured externally. Capacity loads occur at the resources where the order is executed. The planned costs are also determined.
The following constraints apply to an opened process order:
· You cannot carry out a confirmation for the order.
· Shop floor papers cannot be printed.
· You cannot generate a control recipe.
· You cannot carry out goods movements for the order; in other words, the components cannot be withdrawn.
These constraints no longer apply when the order has been released.
During releasing the availability of the materials will be checked again. Automatic batch determination is carried out for the materials PH-1710, PH-1720 (or PH-1810, PH-1820, PH-1830 and PH-2700 respectively). In addition to this, the control recipe is created, preliminary costing is carried out, and the process instructions are generated.
Hope This Info Helps YOU.
Regards,
Lakshmi -
Re: Complete steps for process order
Hi Experts,
Please give me complete cycle details with steps for Process orders.
from order creation to order settlement.
Regards,
VivekHi,
Please refer to link below:
http://help.sap.com/erp2005_ehp_03/helpdata/EN/05/603bc6462311d182b50000e829fbfe/frameset.htm
Process order creation
Selecting a master recipe
Creating reservations or copying them from planned orders
Calculating planned costs
Creating capacity requirements for the resources
Scheduling
Starting with the basic order dates, the system automatically schedules the process order when you create it. In addition, it can later be rescheduled automatically or manually whenever changes relevant to scheduling have been made.
Release of process order
Process order execution and process management
Creating and downloading control recipes (optional)
Printing shop floor documents
Carrying out material withdrawals
Withdrawing material components required in the manufacturing process in the form of goods issues from the warehouse.
Recording confirmations
Carrying out in-process quality inspections (optional)
Posting goods receipts
Delivering the manufactured product to the warehouse by posting a goods receipt.
Thanks,
Samuel -
TCODE for Process order creation against Sales order
Hi gurus,
Pls tell me what is the TCODE for Process order creation against Sales order
Eg. CO07 is for production order from sales ordeTypically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
please check and revert back. -
Hi experts,
I need user exit for a process order (COR1). While saving the process order batch number has to generate based on the production version.
I used the exit PPCO0007, but its not working. Is there any other exit available r not?
Can u tell me exit name at process order creation?
NarenThanks for your reply.
I maintained Production scheduling profile in workscheduling view. The number range i used in the user exit is not generating at the time of release. Is there any other user exit is available for process order.
Yesterday i got another problem. While releasing the process order it is giving a message as release rejected. I went to the log details. In that no batch could be determined message came. I deactivated the user exit and tried. The std number range also it is not taking. I went to goods receipt tab and click on the batch creation button. There also it is giving message as no batch could be determined. How to resolve it. I checked everything in material master and as well as settings. I didint get the solution.
Please help me.
Naren -
Checking Rule for Process Order
Hi Guys
I am using the standard checking rule for Process Order while releasing. This rule considers the quality blocked stock also as available stock and thus release the Process Order.
However the client does not want to include the quality block stock for process order. My question is:
1. If I create a checking rule which does not consider quality stock as available, and attach it to release of Process Order, will it make any change in MRP run?
2. Is there a means to show a warning message while release of process order to show the stock is in quality block state?
3. Is there any other means to alarm or warn the user before release of Process order about the material quality block state?
Appreciate you help / suggestion on this
Thanks in advance
RahulHi,
Regards the stocks during MRP run, you can do it in tow areas
1. In OPPI, you can define whether Stockin transfer/blocked/restricted stocks can be taken into account for MRP run.
2. You can exclude storage locations in MRP run and assign the MRP storage location indicator as 1 in MRP 4 view.
Apart from this the MRP will consider all stocks and requirements.
If you don't want to consider QI stock (for ex) then you can convert them as blocked stocks or you can move to a storage location which is not assigned to the MRP.
Thanks,
JK -
GR Cost not updating as Target Cost for process orders
Dear SAPians,
We are facing an issue in Target Vs Actual cost reporting for process orders. We are creating a process order after cost estimate of that material and doing the confirmations for activity cost. After that, GR has been done for the finished goods of that process order. That GR entry is updating the Actuals values but not updating the Target cost. When I am checking the standard report KKBC_ORD, I am getting the following figures.
Cost Elemnt Text | Target Cost | Actual Cost | Target Vs Act
Inventory Chnge FG | 0 | 1,472,205.60- | 1,472,205.60-
Packing Matrl Cons. | 1,148,142.37 | 1,252,752.68 | 104,610.31
Raw Material Cons. | 60,463.91 | 50,688.29 | 224.38
Semi-Fin Matrl Cns. | 181,934.68 | 367,959.56 | 186,024.88
Labour Cost Activity | 39,735.36 | 39,862.80 | 127.44
Machine Cst Activty | 41,611.75 | 43,153.01 | 1,541.26
That 'Inventory Change FG' entry is showing the GR posting updating actuals and not target cost. This is causing huge difference in target vs actual cost that will affect the profit and loss figures ultimately.
What am I missing here? What should I do to update the GR amount in Target cost as well.
ShiraziDear,
Target Cost on Production Order or Process Order is shown only when Variance is Calculated.
So please calculate the Variance, system will show the Total Target Cost.
Br,Vivek
Maybe you are looking for
-
ITunes will not play all music files in music folder
My iTunes music folder is on an external HD. I have 4662 songs in the folder. iTunes plays approx. half of the files though the all of the songs show up in the iTunes player window. When I try to play a "lost" file, nothing happens, no "!" nor window
-
AS2: MDN is not forwarded to PI (Integration Server)
Hello, we still have some problems with the AS2 receiver configuration. FInally the AS2 message is sent out with request for synchronous MDN. We receive the MDN and it shows up in the seeburger message monitor (MDN: Payload state ok, correlation succ
-
Hi Folks, recently my Mac after latest upgrade of Maverics 10.9.2 degraded performance dramatically to the point that when I switch from one app to another i should wait 30-40 seconds to get the response back from the System. The Hard drive is in use
-
Many threads in waitforrequest condition and server in unknown condition
Java version : J2RE 5.0 IBM J9 2.3 AIX ppc-32 build j9vmap3223-20080315 Maximum Java heap size : 2048m Initial Java heap size : 1024m Free Java heap size: 656,758,528 bytes Allocated Java heap size: 1,477,712,384 bytes I have application deployed on
-
OS X DHCP problem for Windows client
I have DHCP server running on my mac OS X Mountain Lion and all my user client (they all are using macbook) are able to access the network by IP address given by this DHCP. Unfortunatly, any Windows 7 or Windows client can't get DHCP. Appreciate a he