PI sheet : CO54 messages

Hi Experts,
We have a z Function module for a PI sheet process message. The functionality coded in this FM is to post a GR
(material document).
We have a event driven job which is triggering this Z fm.
We are facing the issue, in some cases there are 2 material documents posted. that means that FM is processed two times.
The log of co54 does not show any error.
Kindly let me know if any one has faced any issue like this.
Thanks,
Rohan

Hello
if you do not want to sign every table line in the production reporting instruction creating your PI_PROD message, you might want to consider "table line close". In the browser based pi-sheet, you should be able to execute table line close on right click. You might also start this automatically with a PPPI_COMMAND. It would then look as follows:
PPPI_DATA_REQUEST_TYPE     REPEATED
PPPI_MESSAGE_CATEGORY     PI_PROD
PPPI_INPUT_REQUEST               Report
PPPI_VARIABLE                          VAR
PPPI_REQUESTED_VALUE         ZPPPI_REPORT (allowed values are 1= Yes and 0=No)
PPPI_COMMAND                        "Table line close"
PPPI_ACTION                              EXECUTE
PPPI_FORMULA                          VAR = 1
In the Pi-sheet it mean that you have one more column on the right side. You use the tab after entering the quantity produced to get into the Report-column. Then hit Y to choose Yes, then <enter> and the table line is closed and the PI_PROD message is created.
Good luck
Eivind

Similar Messages

  • CO54: Message is not sent to any destination: Commit Work is getting failed

    Hello,
    While processing the Messages from XFP to SAP Update is getting terminated due to the use of Commit Work. SAP Note 147467 - Update termination when sending process messages has been referred which is for 4.6C, but we are in ECC6.0.
    While processing the message in second iteration Commit Work triggres and Update happens in the data base.
    Following Issue is only concerned with Nested HUs
    T-Code used CO54
    Following are the analysis:
    it looks like u201CCreate and Post a Physical Inventory Docu201D is failing in the initial processing because the inventory doc is created when the Transfer Order to the PSA (or the TO from the PSA) is not yet completed (quant is still locked somehow).
    CO54, process message category=ZHU_CONS: HU to be consumed is a nested pallet (unpacking/ repacking and TOs to/from) and qty to consume is greater that HU qty in SAP (creation of a physical inventory doc is required).
    1. The error occurs while clearing the inventory posting for the physical inventory document.
    2. The surprising factor is the u201CProcess Messageu201D is not processed correctly for the first time.
    3. Indeed it is successfully processed without any error if you do process it second time.
    Error Log from C054 T-Code.
    02.08.2010                                         Dynamic List Display                                                1
    Type
    Message text
    LTxt
    Message category: ZHU_CONS ---    Process message: 100000000000000621   "Send to All Destinations" Is Active
    Message to be sent to destination:
    ZHGI ZPP_0285_XFP_GOODSISSUE Individual Processing Is Active
    => Message will be sent to destination (check log for destination)
    Message category: ZHU_CONS ---    Process message: 100000000000000621   "Send to All Destinations" Is Active
    Message destination ZPP_0285_XFP_GOODSISSUE triggered COMMIT WORK
    Input parameters OK, passed to source field structure
    Step 0: Now checking if scenario with HU
    Step 2: Scenario with HU, Now checking if HU nested
    Step 3: HU nested, checking if HU in repack area
    Step 4: HU not in repack area, moving it to repack area
    HU moved to repack area, TO number 0000000873
    Step 5: Depacking nested HU...
    Nested HU depacked, HU pallet n°: 00176127111000461994
    Steps 6-7: Moving back HUs to supply storage type / bin...
    HU 00376127111000462001 moved back to original area with TO number 0000000875
    Steps 6-7: Moving back HUs to supply storage type / bin...
    No need to move back HU 00176127111000461994 (not in table LEIN)
    Step 8: Checking if HU fully used and quantity matches HU system quantity
    HU not fully used but picked quantity > HU quantity: inventory necessary
    Step 9: Inventory needed, creating physical inventory document...
    Physical inventory document 0000000126 created
    Step 10: Adding weighted quantity on inventory document...
    Weighted quantity entered in document 0000000126
    Step 11: Posting rectification in inventory document 0000000126...
    Physical inventory document 0000000126 rectified
    Error: rectification for doc 0000000126 not updated in DB!
    => Destination ZHGI ZPP_0285_XFP_GOODSISSUE can currently not process the message
    => Message is not sent to any destination
    The errors in SM13 for this contain the program SAPLZPP_0285_HUINV_ENH (creating/changing the HUM physical inventory doc). WM Function module L_LK01_VERARBEITEN is also involved.
    From SM13, it displays the following piece of code in include LL03TF2M (read the LEIN table=Storage Units table):
    WHEN CON_LK01_NACH.
           IF (LEIN-LGTYP = LK01-NLTYP AND         
                 LEIN-LGPLA = LK01-NLPLA) OR
                  NOT P_LEDUM IS INITIAL.
           ELSE.
    Das ist der Fall einer TA-Quittierung wo Von-Hu = Nach-HU ist und sofort die WA-Buchung erfolgt. Dann steht die HU noch auf dem Von-Platz, daher darf hier kein Fehler kommen, sondern es wird ein. Flag gesetzt, daß verhindert daß die LE fortgeschrieben wird.
             FLG_NO_LE_UPDATE = CON_X.
            MESSAGE A558 WITH P_LENUM.
           ENDIF.
    Translation in English of the German text via Google:
    "This is the case where confirmation of a TO source-HU = destination-HU, and now the WA (Good Issue?)- made book. Then, the HU is still on the From-space may therefore come here not a mistake, but it sets a flag that prevents that the LE is updated."
    Thanks and Regards,
    Prabhjot Singh
    Edited by: Prabhjot  Singh on Aug 2, 2010 4:39 PM

    Hope you have carried out following things in Production ( Please refer to SAP help before actually doing it in production).
    1. Transport the predefined characteristics from the SAP reference client (000) to your logon client.
    2. Adopt Predefined Message Categories - In this step, you copy the process message categories supplied by SAP from internal tables as Customizing settings in your plants.

  • While opening Planning Sheet Error message came like : Invalid Offset ....

    Hi ,
    I uploaded the data and when we are trying to open planning sheet Its showing error message :
    Invalid offset for {XYZ-ITEM: Supplier_DM : CP1_Yield:2012-Q2]
    We encountered a problem performing your request.
    Please notify Oracle , referring to error tag [gdpdjn].
    And error Tag and ITEM change with every trial.
    Please let us know your thoughts. And I would be grateful if somebody can help to decipher that error tags eg.[gdpdjn] also.
    Thanks
    Lokesh Rathi

    When Base data is updated using Uploadable Report instead of updating aganist scenario we got this error.Oracle recommened not updating base data using uploadable reports.
    Thanks,
    Hari Devarapalli
    Edited by: Hari Devarapalli on Jun 13, 2011 11:46 AM

  • Cannot open my excel sheet, the message saying  library not loaded, image not found therefor the icon is showing on the screenrey

    For the first time I cannot open my Excel. The report is saying:image not found, therefor the icon is showing on my desktop.
    Before my Mac open with excel sheet, now it is not there anymore. I guess it it hiding somewhere. How to find it? As you can see I am not an IT . Please try to avoid hight tech wording.
    Many thanks,
    Eva

    Hi Eva,
    Open Console in Utilities & see if there are any clues or repeating messages when trying Excel.

  • Regarding PI Sheet Deviation Check

    Hi PP Gurus,
    This is regarding the Deviation check in the PI Sheet.
    Scenraio:
    In PI Sheet I have an input field which is entered by the user. Say for example I have a Input field to enter the quantity. When I enter the wrong data (this may be because of fat fingering) the system throws a deviation check with the symbol in the corresponding Input field. But even if I correct my entry in the Input field (deleting the previous entry and input the correct entry) the system still shows an deviation which is not the case. The re-entered value is not a deviation as I eneterd the correct value.
    I want to know is there any way where I can avoid this deviation check when I input the correct value?
    I need your thoughts on this.Awaiting for teh response.
    Regards,
    Shyam

    Hi,
    PI sheet is used to give instructions to line operators.
    1: Getting std PI characteristic - o23C
    2: Copying material ID characteristics from 000 - 023C_VHUMI
    3: Copying std setting for process message - 022c
    4: copying message category - 022C_VHUMI
    5: Copying process destination betn plants - o20C
    In routing select phase - detail - process instruction
    drop down & select instruction like INSTR,READ1,READ2,SIGN etc
    Enter all necessary data.Which is master data.
    Check errors, & solve then
    Create production order - release - generate control recipy.
    CO53- send message
    CO60 - enter figures as per process sheet
    CO54 - check the entry
    Try this & revert.
    Regards,
    Suhas

  • How to attach a Process order to a PI-Sheet?

    Hello SAP Experts,
    I've configured a Browser-based PI-Sheet using T.Code O12C. At that time, I've clicked the various input and output parameters like the material withdrawn, UOM, etc. for the GI.
    Thereafter, I'm using transaction CO53 to send the process instructions for a particular process order and to view the PI-Sheet thus generated, we are using the transaction CO60.
    Now I would like to know at which step of this configuration the process order is attached to the PI sheet? Actually, in the last step of O12C, there is a "COPY" button. What is the utility of that button?
    Moreover, when I'm trying to select more than 1 Instruction category e.g. Goods Issue, Confirmation and Goods Receipt (say) in O12C, then system is giving warning "Select only ONE entry".
    So, my question is:- can't we attach all my requirement related to GI,GR and confirmation in ONE SINGLE PI-SHEET, as my company is requiring for that.
    SAP Gurus, please give inputs.
    Thanks and regards,
    Kaushik.

    Hy Kaushik,
    Your question is not clear , but still I am trying to resolve it upto my understanding.
    - First of all PI catagory which you have created is link with Process order via Master Recipe.You have to attached PI catagory in Master recipe to the relavent phases and also to the Conrol Recipe destination
    - How many control recipe genrates for one Process order is depends on Number of Control Recipe destination you have used in your master recipe.
    - So if you want to do GR/GR and Confirmation thorugh One PI sheet then obviously you have to assigne all  that relavent PI catagories under one Control Recipe Destination.
    - Copy button is help you to create new PI catagory by copying any existing PI catagory.
    Transaction Codes:-
    Cretae Control Recipe Destination is O10C
    Create Process Instruction Catagory O12C
    Cretae Process Massgae Catagory O13C
    Control Recipe Monitor CO53
    Maintain PI Sheet CO55
    Find PI Sheet CO60
    Message Monitor CO54
    Pls revert back if requird further help.
    Regards,
    Dhaval

  • Transaction CO60 and CO54

    Hi Guru´s,
    I working with an ECC6.0 and I'm searching the menu for the transaction CO60 - List PI Sheets and CO54 - Message Monitor. Does anyone know where they are ? and why they are moved or not visable ?
    When they are definitely gone, does anyone know, if there any replacements ?
    Thanks in advance.

    Hi
    It shoul be available under process order->Environment ->Process Management ->Message ->CO54 - Message Monitor .
    This is from ECC5.0.No idea abt ECC6.0.
    Try with entering  T code  search_sap_menu
    Gopi

  • Printout of service entry sheet

    Dear users,
    Configuration for printout of service entry sheet has been done with message type NEU and message schema RMBES1 is maintained and assigned to application ES. However when i am running T Code ML83 and executing it for a entry sheet the message  ' No suitable purchasing documents found' is coming.
    Can you kindly suggest me if there is anything else that needs to be done for configuration for print of service entry sheet.
    Thanks in advance
    ads

    Hi,
    Please check below links...
    Service Entry: No message Output
    Service entry sheet print problem
    Kuber

  • Error AC305 and AC306 when customize a balance sheet account

    Dear experts,
    We have several depreciation areas created for a chart of depreciation.
    Some of those depreciation areas do not have account effect but have
    fiscal effect. For that reason we have set for them (in AO90
    transaction) off sheet balance accounts (memorandum accounts).
    The problem is that in the country we are working memorandum accounts are not P&L accounts.
    When we try to customize then as Expense account for ordinary
    depreciation the system displays the following errors:
    Message no. AC305- Account GBCL-6400640010 not allowed to be balance
    sheet account
    Message no. AC306- Account GBCL-6400640010 not defined as
    P6400640010L account
    Our users told us that those memorandum accounts must be B/S
    accounts and never P/L accounts in this country.
    Obviously we could change error messages AC305 and AC306 as warnings,
    but I was wondering if another solution could be possible.
    Thanks in advance.

    Hi,
    U cannot assign a balancesheet account for depreication
    I dont understand why they want B/S account there because it cannot record expenses.
    The only solutionn is changing message as u have said..
    We annot change the accounting rule
    Regards,
    Amit Shinde

  • Balance Sheet Account Balance in COPA Report

    Dear Experts,
         My Client Requirement in COPA is: Working Capital Value should be viewed in COPA Report. So the value fileld balance is CA-CL. these operation will be done by blance sheet accounts.
    So, Is the Balance Account values will flow to COPA?
    Please suggest me with detail.
    Thanking in advance,
    Regards,
    Balaji

    Dear sir,
        I tried with what you said in KA01. But system showing this message...
    G/L account 10000000 is a balance sheet account
    Message no. KS036
    Diagnosis
    G/L account 10000000 is defined in FI as a balance sheet account.
    System Response
    Balance sheet accounts cannot be created as cost elements in cost accounting, except for:
    Asset reconciliation accounts
    Material stock accounts for valuated sales order stock for sales orders or projects.
    Really I  appreciate your response...
    Please give me the soulution...
    Regards,
    Balaji

  • Error while Service Entry Sheet

    Hi All,
    We have created a maintenance order for service. But when the PR get generated there comes an error "Customizing Incorrectly Maintained" and this error keeps on coming till service enrty sheet.
    Message No. SE729
    At times error is IW215, which doesnt come every time. Pls suggest.
    Regards,
    Sanjay Tiwari

    Dear Sanjay,
    This is an SAP Bug and need to apply the SAP Note 1382685 manually.
    Also refer these links for easy solution.
    Re: Customizing incorrectly maintained Message no. SE729 - ML81n
    Re: Cutomizing incorrectly maintained
    Regards,
    MLN Prasad

  • Error Message Style Bug !!!!

    hi every body:
    i want to change the style of an error message ,, i went to CSS file and changed the style of and change its color and size ,, but unfortunately,,,, when i applied this style to the error message ,, no changes occurs ,, and the old styling still appear ,,,
    can anyone plase help me ,,, !!!
    Thanks in advance

    Hi friend
    I see ghenerated HTML code for message group in this component generate a HTML table that your messages are in this HTML table . this HTML table is in the HTML div tag . when i define a style sheet for message group component this style sheet occur in HTML div tag not in HTML table tag .
    i can not solve this problem . i will think about it

  • Authorization Issue : V_VBAK_VKO

    Hi All,
           I have a weired situation here. The PI sheet process message is being process manually via CO54. The FM being called is COCI_CONFIRM_OPERATION . here we have implemented a BADI. There we do a sales order change BAPI which internally checks for the authorization of object V_VBAK_VKO. Now User 'A' when he does the message processing (for phase confirmation of process order) calls the FM COCI_CONFIRM_OPERATION which is calling the BAPI. There the authorization fails. I have checked the auth and it is indeed suppose to fail.
          Now the phase can be confirmed via Tcode CORZ also. This also calls the FM and eventually the BAPI. Again the auth check is performed and this time it passes !! Obviously it should not be the case. The parameters being passed to auth object are all same and I see no reason why it should behave differently from different calling progs. Any ideas ??
    Please help.
    Thanks
    Anuj Sethi

    No Solution Found

  • Change Reconciliation Account for customer.

    Hi All,
    I want to change the Reconciliation Account for customer. it is giving me message that Account has been posted to; hold balance sheet adjustment (Message no. F2067). How do I change it.
    Thanks
    Utpal.

    Hi
    Make the reconciliation account balance nullify by tranferring to new GL Account and the nassing new one
    Assign points if useful,
    Regards
    Raj

  • Changing the Reconciliation Account

    Dear All
    I have made a customer account and assigned Reconciliation Account 101 to it. Then some entries were made. It is also having some open items. Later on it was realized that wrong reconciliation was assigned. In the Customer Master Record, when I tried to change the Reconciliation to 102, I got a yellow warning mesasge which is as follows:
    Account has been posted to; hold balance sheet adjustment
    Message no. F2067
    Diagnosis
    The open item account in which you want to change the reconciliation account has been posted to.
    By changing the reconciliation account in the open item master record the proportionate values from the items open at the time of change are not posted to the new reconciliation account.
    Procedure
    On the balance sheet key date the open items from the old reconciliation account are allocated to the new reconciliation account using adjustment accounts. This allocation is carried out automatically when you create a sorted list of receivables and payables using report SAPF101.
    The postings necessary are only carried out for G/L accounts and are cancelled on the first day of the subsequent month (balance sheet adjustment posting).
    But on the contrary, when see the Customer  Reports, and give the New Reconcilaition 102, I am getting all the transaction as theyb were with the Old Reco Account 101. I also made some dummy entries for sales and payments.
    Please advice.
    Thanks & Regards
    Kanwaljit

    Hi,
    Sub ledger level you'll see all items.
    But GL level, you can't see all items.
    As you have posted few entries with old reconciliation account and remaining entries in new reconciliation account.
    Also you can use program "SAPF101" to transfer the old gl balance to new gl. Please check the documentation in this transaction for functionality.
    Rgds
    Murali. N

Maybe you are looking for

  • I have many Apple IDs some i dont even remember, the problem is one of them still attach to my iphone.

    Hi , i have an iphone and yes i bought it! the problem as described above, is with all my Apple IDs, actual emails and devices i own. after upgrading the iphone to iOS 7 im stucked at the activation lock and im OK with that - i can see my email (i gu

  • Time Machine from one external hard drive to another

    Hi, I just had the dreadful misfortune of spilling water onto my Macbook Pro over the weekend. It shorted immediately and it's currently drying with some rice. Luckily I was able to take the hard drive out! I already checked that all my contents are

  • Tables for Vendor Invoice (Transaction - FV60)

    Hello Experts I am trying to create a Vendor Invoice from Transaction, FV60. I am able to create it successfully.. Header Data is getting stored in the table BKPF but i can not see any entry in the transaction in BSEG. I just wanted to know that wher

  • Zend_AMF, RemoteObject problem

    Hi there, I have strange problem with FLEX 3. I'm using RemoteObject to call PHP script (Zend_AMF) and return array in AMF format. Technically everything works properly but it is slow. 18 000 records take 2 minutes. After few days of "try and fault"

  • Exception while opening content editor

    Hi all, we are getting following exception while opening content editor <Aug 1, 2011 2:56:04 PM IST> <Error> <HTTP> <BEA-101017> <[ServletContext@14211416[app:Oracle Universal Content Management - Content Server module:/ path: spec-version:2.5], requ