Port priority or path cost on equal 1gb links

We have 6509A and 6509B connected to each other on 1gb links on port 4/1 and port 5/1.  By default, 5/1 is blocking all vlans, and 4/1 is forwarding all vlans.  How can I change 6509B config to forward vlans 2-5 on 4/1, and vlans 6-10 on 5/1, should I use the port priority commands, or the path cost commands on those interfaces?
Thanks.

You probably have a reason not to but why not create an etherchannel with both ports and then have them forwarding for all vlans ?
In answer to question though I would use port priority commands. If you use path cost this can have an affect on other switches because now the cost to root could have changed .
Port priority is local to the switches themselves.
Remember that with port priority you make the change on the other switch ie. if you are trying to influence how 6509B forwards traffic you set the port priority commands on 6509A.
Jon

Similar Messages

  • STP path cost

    How to specify STP path cost? Or the only way is to modify bandwidth of the interface, so the STP path cost will be modified?
    1.11

    In STP if you change to the faster physical interface, STP will automatically take that cost. You can also modify the port cost using commands. I am not sure which switch you are using. Here is a link which explains STP technology as well as catOS commands to change port cost. Probably if you are using an iOS based switch commands will be different

  • [svn:bz-3.x] 20443: back porting bug fix BLZ-570/ BLZ-620 Double linked list with lot of objects result in BlazeDS Error deserializing error  : StackOverflowError  We put hard limit to the max object nest level to prevent StackOverFlowError .

    Revision: 20443
    Revision: 20443
    Author:   [email protected]
    Date:     2011-02-23 21:19:22 -0800 (Wed, 23 Feb 2011)
    Log Message:
    back porting bug fix BLZ-570/BLZ-620 Double linked list with lot of objects result in BlazeDS Error deserializing error : StackOverflowError  We put hard limit to the max object nest level to prevent StackOverFlowError. the default max object nest level is 1024 and it can be configured in the endpoint/serialziation section in service-config.xml. This needs documentation.  Checkintests pass
    Ticket Links:
        http://bugs.adobe.com/jira/browse/BLZ-570
        http://bugs.adobe.com/jira/browse/BLZ-620
    Modified Paths:
        blazeds/branches/3.x/modules/common/src/java/flex/messaging/errors.properties
        blazeds/branches/3.x/modules/core/src/java/flex/messaging/endpoints/AbstractEndpoint.java
        blazeds/branches/3.x/modules/core/src/java/flex/messaging/io/SerializationContext.java
        blazeds/branches/3.x/modules/core/src/java/flex/messaging/io/amf/Amf0Input.java
        blazeds/branches/3.x/modules/core/src/java/flex/messaging/io/amf/Amf3Input.java
        blazeds/branches/3.x/modules/core/src/java/flex/messaging/io/amf/AmfIO.java

  • Convert file path in application server as link

    How can we convert file path in application server as link to send email.
    Thanks
    Suresh

    Your app server folders have a mappable location on your network, e.g,
    server\path\filename.  Use an HTML anchor tag and build the link with code.  You'd be better off storing files on a file server (write to a mapped location from the app server) and link to there (same process).

  • I'm wanting to mark a path with 397 equal sections (in length)- Help?

    Hi,
    I'm working with a somewhat complex path (the Circuit De La Sarthe Track Map 2010) that I'm wanting to plot points on (to make an infographic of the 24hrs of Le Mans).
    So I need to create marks around the path to indicate each lap (there were 397 laps).
    I don't want to split/separate the path - just need to be able to clearly see 397 sections of equal length.
    By length, I mean the length of the path if it was a straight line…
    I've had a look at scrips and adding anchor points but am pretty in the dark about it all.
    Can anyone help me here?
    Cheers,
    Jordan.

    Hi Jacob,
    Brilliant! That looks exactly what I'm after!
    I'm in the process of executing the script, it's kind of crashed Illustrator (it currently isn't responding), I'm assuming it's just because 397 is a lot of sections… I might try it on a more powerful Mac and see if it works then.
    Will keep trying.
    Edit:
    Okay so it does execute the script after some time, however there are sections of the path that aren't of equal distance, and it looks like it's just plotting too many points… Any ideas?
    When using the script I just selected the whole path (with the regular cursor). Even when I input a lower number (eg. 50), it still gives some inconsistent areas within the path.
    Message was edited by: oxborough
    Edit:
    Figured out the script was plotting 397 points into each 'side', so the line between each bezier point… It doesn't actually say on that link how to split the entire path - only each segment, which unfortunately doesn't solve the problem…
    Message was edited by: oxborough

  • Luxadm -e port showing 1 path to hba however no hba connected on the server

    Hi All,
    When i did luxadm -e port on my sun server 280R with solari 5.9 it is showing found 1 hba path,however there are no physical hba connected on the server..
    what could be the reson.
    luxadm -e port
    Found path to 1 HBA ports
    Error opening the path. - /devices/pci@8,600000/SUNW,qlc@4/fp@0,0:devctl.
    Please help me in this.
    Thanks,
    vinay

    That device path is to the internal hard drives of your computer.
    The systemboard has an integrated Qlogic disk controller for those FCAL disks.
    [Glance at the archived copy of an old Sun InfoDoc 21216.|http://sunsolve.sun.com/handbook_pub/validateUser.do?target=Systems/Example/documents/21216]
    The SF280R systemboard is also used in Sunblade 1000, Sunblade 2000, and Netra 20 systems.

  • Over head Costs splitting equally

    Dear All,
    I have created 8 activity types,but I want to split the Ovrehead Costs among 3 activity types only,but the system is splirring the costs on all the 8 activity types.
    In my splitting structure,I have given activity type group by assigning the 3 activity types for which splitting is to be done.
    Can sombody throw any light on this issue.
    Regards
    SU

    hi
    IN OKES, please create an assignment line, select the assignment line for the particular splitting structure. create activity  type group for which the costs to be splitted and update them in selction for assignments.
    in the activity group selct only those three activity types.
    with out creating the splitting structure also the costs will be split  that is they will be split equally. but where as if you properly assign it to the cost center then only the cost will be split as u like
    krishna

  • Activity Independent Costs -Splitting Equally

    Dear All,
    When I try to split the Activity Independent Costs among various activity types ,Independent costs are being splitted equally among the activity types,even though I have selected splitting method as 12 (i.e. Activity Quantity) while configuring the splitting structure.
    Actually the system should have splitted the independent costs based on Activity qty instead of splitting the costs equally.
    Please help me out as how get the splitting of costs based activity qty.
    Regards
    Su

    Hi
    Your splitting structure has 2 parts
    1. Where in you define rule.. here you defined rule based on 012 (Qct Qty)
    2. You create Assignments and assign your splitting rule here... I hope you have assigned the splitting rule here in the assignments
    3. I hope the fiscal year from which you assigned cost centers to splitting rule in OKEW is also in line
    4. Also check if you defined your target cost version in case you are doing splitting based on actual cost (KSS2)
    5. Also, in splitting rule, I hope you have assigned  a cost element group containing all your cost elements to this group and also your activity types between whom the costs are to be split up (In the tab "Selection for assignment)"
    Once you do this, activity indep costs split based on act qty only... (KSS2/KSS4)...
    Regards
    Ajay M

  • TS2002 using a multi-port adapter to increase the number of USB ports - affects system functioning?  Port priority?  In advance, I send my thanks!

    Hello.  I've never "started a discussion" before.  Ah well I've always had good luck with the communities so here goes.  Today I plugged a Belkin multi-port adapter into my MacBook Pro running OS X Version 10.6.8  This enabled me to plug in my keyboard; mouse and printer.   Yes after two years I wanted to be back to an independent full keyboard and mouse.  BUT ALAS!  Now the little spinning wheel keeps appeariing while I'm on the Internet and I learned through my "Help" app that I have "slow start-up, pausing at Initializing network or "Configuring network time"  (sounds like some of the men I've dated).
    Could it be the multi-port adapter?  Should I use a different model?  The abiltiy to have the printer; keyboard and mouse all connected at the same time is important to my work. 
    In advance, I send my thanks!
    Jeannie-Marie

    I think it is the server socket which controls the number of client sockets to be opened. The number of connections that are accepted by the server socket is called the backlog of server socket. By default its value is 50. (See java.net.ServerSocket class in java docs)...
    we can specify the backlog in the constructor of server socket...
    ~pacific

  • How to hide the URL path on click of an link to URL element,from user

    Hi All,
          I have an link to URL element, on click of the link it opens the specified url in a new window. But in new window the user is able to see the entire URL path. I want to hide this path from the user. Can any one please suggest me how to do it.
    Regards,
    lakshmi.

    hi,
    just check this help
    http://help.sap.com/saphelp_nwce10/helpdata/en/f7/f289c67c759a41b570890c62a03519/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/7d/fdc99ab37a8d42892e0d39bbd23be8/frameset.htm
    Link to URL Question

  • Cost center and floc link

    Hiiiiiii Experts,
    I have a query.there is one floc and below that equipments attached to it.There are some electrical eqp and some are mech.We have already cost centers created for mech and elec seperatly.Now if i assign respective cost center to elc and mech eqp, it will work for eqp.But cost center will be assigne to floc.Do i need to create a new cost center for that.Or should i leave it blank.If i wont give any cost center to floc then will the accumalated cost of all eqp below it will be summerized at floc level.
    One more thing what sap best practice suugest.Shpuld we assign cost center at floc level or eqp level.
    Can u help me out to make the cost center allocation clear in sap pm.
    Regards
    Brijesh

    Hello Brijesh,
    There is no issues if you leave blank the Cost center field blank, all the report will work fine and also the cost will be displayed at the below hierarchy.
    The problem will arrive when you will create any Order over this function location. At that time you will have to create settlement rule manually.
    Regards
    Naveen

  • Cost Center & Company Code Link.

    Hi,
    All Experts.
    I am having query, I am posting transactionfor company code 1001 ( USD ), and for CO Object I am taking 1101 Company code cosr center ( CAD ).
    Still system accpeting this. How ?
    Ideally it should give error or at least warning message ?
    Can any one explain how this behavious is ?
    Regards,
    Sharvari Joshi.

    Hi,
    SDNer.
    Thanks for your quick reply.
    Noi cost center having company code 1101. Let me explain some inputs for CO Area.
    1 ) I am having 11 company codes.
    2 ) One controlling area.
    3 ) Cross - company code Cost accounting is ACTIVE.
    4 ) Diff. CCode Currency is TICKED.
    Which of the above factor is affecting this ?
    Any guidance !
    Regards,
    Sharvari Joshi.

  • RemoteApp File Paths do not support Symbolic Links

    Has anyone gotten RemoteApp to work with symbolic links?
    I have an application in C:\app\1.0 . I have a symbolic link C:\app\latest that points to the 1.0 folder. When I publish the application through the GUI, it stores the path as C:\app\1.0 rather than C:\app\latest. If I use a PowerShell Command, it will store
    the symbolic link version of the path, but the application will fail to open.

    Hi,
    Thank you for posting in Windows Server Forum.
    As per my research, I can say that it supports the symbolic link for RemoteApp. But please check that you have placed the correct path links for RemoteApp to use. As when RemoteApp used the symbolic link, we must have the path link correct which will open the
    application.
    Also please see that you have latest version of client RDP installed, RDP 8.1.
    Hope it helps!
    Thanks.
    Dharmesh Solanki
    TechNet Community Support

  • [CS4] Porting plugin from Indesign CS3 to CS4 c++ linking error

    I am hoping to upgrade our current plugin to the latest version of Indesign CS4.
    I've downloaded and unpacked the new Indesign CS4 SDK and have read the porting guide.  I've not seen anything obvious relating to this issue.
    This is using Visual Studios 2005 SP1 with InDesignCS4ProductsSDK_Build578.
    It appears that through the headers that I don't end up with any compile issues.  However in linking my current project is unable to find just a couple of external symbols.
    ItemSelection.obj : error LNK2019: unresolved external symbol "public: void __thiscall K2Internals::K2VectorBase<class IDType<struct PMIID_tag>,class K2Allocator<class IDType<struct PMIID_tag> > >::fill_insert(class IDType<struct PMIID_tag> *,unsigned int,class IDType<struct PMIID_tag> const &)" (?fill_insert@?$K2VectorBase@V?$IDType@UPMIID_tag@@@@V?$K2Allocator@V?$IDType@UPMIID_tag@ @@@@@@K2Internals@@QAEXPAV?$IDType@UPMIID_tag@@@@IABV3@@Z) referenced in function "public: virtual class K2Vector<class IDType<struct PMIID_tag>,class K2Allocator<class IDType<struct PMIID_tag> > > * __thiscall SelectionSuiteCSB::CreateObserverProtocolCollection(void)" (?CreateObserverProtocolCollection@SelectionSuiteCSB@@UAEPAV?$K2Vector@V?$IDType@UPMIID_t ag@@@@V?$K2Allocator@V?$IDType@UPMIID_tag@@@@@@@@XZ)
    Convert.obj : error LNK2019: unresolved external symbol "__declspec(dllimport) public: class PMReal __thiscall PMMatrix::operator[](int)const " (__imp_??APMMatrix@@QBE?AVPMReal@@H@Z) referenced in function "class Ipg3::Matrix __cdecl ConvertMatrix(class PMMatrix const &)" (?ConvertMatrix@@YA?AVMatrix@Ipg3@@ABVPMMatrix@@@Z)
    Does anyone have any ideas of where I should look next?
    Paul Cooley

    Ian,  Thanks.  That did solve the K2Vector problems.
    Are you aware of which .tpp covers the PMMatrix class?  That would probably make this linking error:
    Convert.obj : error LNK2019: unresolved external symbol "__declspec(dllimport) public: class PMReal __thiscall PMMatrix::operator[](int)const " (__imp_??APMMatrix@@QBE?AVPMReal@@H@Z) referenced in function "class Ipg3::Matrix __cdecl ConvertMatrix(class PMMatrix const &)" (?ConvertMatrix@@YA?AVMatrix@Ipg3@@ABVPMMatrix@@@Z)

  • Confirmation costs and work center link

    Hi Experts
    Can we link the costs in CO document along with line item and to a work center after production order confirmations?

    Dear
    You need to utilise tabel :
    1.AFKO - this is for your basic production header info
    2.S022 - this is for your operation header details - operation number, Work centre etc if you are only after the header details such as activity cost based on the activity type assinged at work centre -cost centre ( refer : AFVC or AUFV)
    3.AUFK - this is for your order master data - Order released flag, order complete flag, technically complete date, you'll need this to filter out confirmed order with order staus based on JEST table.
    4.Work Centre : CRCO-Work centre /cost center relation , CRHD-Work Cenre Header .
    5.Discuss with your CO  for CO document number
    -COVBP
    COSS CO Object: Cost Totals for Internal Postin
    COSP CO Object: Cost Totals for External Postin
    COSB CO Object: Total Variances/Results Analyse
    COSL CO Object: Activity Type Totals
    Hope this will be useful
    Regards
    JH

Maybe you are looking for