Hi every body,
I have a multimaster advance replication environment and we have less than 10 transaction per day. I am not sure what is the correct set up for my case.Could you please help me?
My first question is:I want to propagate data as soon as possible like sync if I setup the schedule push to propagate transaction every 5 seconds as below
BEGIN
DBMS_DEFER_SYS.SCHEDULE_PUSH(
destination => 'orc2',
interval => 'SYSDATE + (5/60*60*24)',
next_date => SYSDATE,
parallelism => 1,
delay_seconds => 10);
END;
is it correct approach?
in other hand ,book(I mean Advance Replication) has written that for simulating continuous push we should setup it as below so it will propagate transaction every 1 minute.
My second question is:I know interval >= 'SYSDATE + (1/144)' means every 10 minutes a job will start and delay_seconds => 1200 means each job remain aware for 20 minutes,
but I can't understand why it can simulate 1 minute propagation? anybody knows?
BEGIN
DBMS_DEFER_SYS.SCHEDULE_PUSH(
destination => 'orc2',
interval => 'SYSDATE + (1/144)',
next_date => SYSDATE,
parallelism => 1,
execution_second >= 1500,
delay_seconds => 1200);
END;
My thrid question is :Which of the above setups is a better solution for my environment?I mean 5 second interval (interval => 'SYSDATE + (5/60*60*24)') + delay_second = 10 and parallel or 10 minute interval (interval => 'SYSDATE + (1/144)') + delay_second = 1200 and parallel + execution_second =>1500)
Thank you in advance.
Mery

With a "delay" of 20minutes, the push job will "hang around" for 20minutes waiting for new transactions. If it receives no new transactions to push, it will go to sleep. However, with the job interval at 1minute, it will "wake up" one minute later and push
transactions that were created in that last 1 minute. Again, it will "hang around" for the next 20minutes.
This is what I see from the 9i documentation (for advanced replication not using streams, I find the 8i and 9i documentation better
than the 10g documentation)
Delay Seconds
Though not directly a performance mechanism, properly configuring the delay_seconds parameter can give you greater control over the timing of your propagation of deferred transactions.
When you are pushing deferred transactions, you set the delay_seconds parameter in the SCHEDULE_PUSH procedure or the PUSH function. When you are purging deferred transactions, you set the delay_seconds parameter in the SCHEDULE_PURGE procedure or the PURGE function. These procedures and functions are in the DBMS_DEFER_SYS package.
The delay_seconds parameter controls how long a job remains aware of the deferred transaction queue. The effects of the delay_seconds parameter can best be illustrated with the following two examples:
delay_seconds = 0 (default)
If a scheduled job with a 60 minute interval wakes up at 2:30 pm and checks the deferred transaction queue, then any existing deferred transactions are propagated. The propagation takes 2 minutes and therefore the job is complete at 2:32 pm.
If a deferred transaction enters the queue at 2:34 pm, then the deferred transaction is not propagated because the job is complete. In this scenario, the deferred transaction will be propagated at 3:30 pm.
delay_seconds = 300
If a scheduled job with a 60 minute interval wakes up at 2:30 pm and checks the deferred transaction queue, then any existing deferred transactions are propagated. The propagation takes 2 minutes and therefore the job is complete at 2:32 pm.
If a deferred transaction enters the queue at 2:34 pm, then the deferred transaction is propagated because the job remains aware of the deferred transaction queue for 300 seconds (5 minutes) after the job has completed propagating whatever was in the queue. In this scenario, the deferred transaction is propagated at 2:34 pm.
Why not just set the job to execute more often? Starting and stopping the job has a greater amount of overhead than starting the job and keeping it aware for a set period of time. In addition to decreasing the overhead associated with starting and stopping these jobs, using the delay_seconds parameter can reduce the amount of redo logging required to support scheduled jobs.
As with most performance features, there is a point of diminishing returns. Keep the length of the delay_seconds parameter in check for the following reasons:
Parallel Propagation: Each parallel process that is used when pushing the deferred transaction queue is not available for other parallel activities until the propagation job is complete. A long delay_seconds value may keep the parallel process unavailable for other operations. To use parallel propagation, you set the parallelism parameter to 1 or higher in the SCHEDULE_PUSH procedure or the PUSH function.
Serial Propagation: If you are using serial propagation (not parallel propagation), then the delay_seconds value causes the open session to "sleep" for the entire length of the delay, providing none of the benefits earlier described. To use serial propagation, you set the parallelism parameter to 0 (zero) in the SCHEDULE_PUSH procedure or the PUSH function.
Precise Purge: If you specify the purge_method_precise method when using the DBMS_DEFER_SYS.PURGE procedure and you have defined a large delay_seconds value, then you may experience performance degradation when performing the specified purge. Using purge_method_precise is more expensive than the alternative (purge_method_quick), but it ensures that the deferred transactions and procedure calls are purged after they have been successfully pushed.
As a general rule of thumb, there are few viewable benefits of setting the delay_seconds parameter to a value greater than 20 minutes (which is 1200 seconds for the parameter setting).
Additionally, if you are using serial propagation by setting the parallelism parameter to 0, then you probably do not want to set a large delay_seconds value. Unlike parallel propagation, serial propagation only checks the queue after the duration of the delay_seconds value has elapsed. If you use serial propagation and set delay_seconds to 20 minutes, then the scheduled job will sleep for the entire 20 minutes, and any deferred transactions that enter the deferred transaction queue during that time are not pushed until 20 minutes have elapsed. Therefore, if you are using serial propagation, then consider setting delay_seconds to a value of 60 seconds or lower.
If you set a value of 20 minutes for parallel propagation, then the parallel push checks once a minute. If you can afford this resource lock, then the relatively high delay_seconds value of 20 minutes is probably most efficient in your environment. If, however, you cannot afford this resource lock, then consider setting the delay_seconds value to 10 or 20 seconds. Although you will need to execute the jobs more often than if the value was set to 1200 seconds, you still gain many of the benefits of the delay_seconds feature (versus the default value of 0 seconds).

Similar Messages

  • Problem in schedule push

    Hi every body ,
    I configured my schedule push to
    BEGIN
    DBMS_DEFER_SYS.SCHEDULE_PUSH(
    destination => 'orc1.mydomain.com',
    interval => 'SYSDATE + (1/1440)',
    next_date => SYSDATE,
    parallelism => 1,
    stop_on_error => FALSE,
    delay_seconds => 0);
    END;
    to check that if my tables become updated every one minute and test the environment
    but i don't know why it does not push it and i can still see that in oem(DBMS JOBS tab)
    I did also check my links and also the timing on that is periodic and have been set.
    my job_queue_process is also equal to 10
    I would be grateful if you help me.
    Mery
    Edited by: user643323 on Sep 10, 2008 4:48 PM

    Thanks for the quick respond and follow up
    well why purge I thought it should be propagated with schedule_push as I read the below paragraph in book:
    " At scheduled intervals or on-demand, the deferred transactions in the deferred
    transaction queue are propagated to the target destinations. Each destination
    may have a different interval."
    and purge just remove the successfully pushed transaction after the designated time as I read the below paragraph:
    "When a deferred transaction has been successfully pushed to all remote master
    sites, it is not purged from the deferred transaction queue at the originating site
    immediately. It may be purged later by a purge job, which runs at a
    user-defined interval."
    So why a setting lazy purge (because i set in for every one day)makes problem?Shouldn't it be propagated with schedule push?
    When i insert 1 record schedule_push works but for 16000 bulk insert it doesn't??!!!!!!
    Thank you
    Mery
    Edited by: user643323 on Sep 12, 2008 10:00 AM
    Edited by: user643323 on Sep 12, 2008 10:01 AM
    Edited by: user643323 on Sep 12, 2008 10:01 AM

  • Unable to install the GEAR driver set at this time.The GEARAspiWDM service used bz the GEAR driver set is scheduled to be deleted during the next system reboot.Please reboot the system and run iTunes again.help me..I understand this problem..thanks

    Unable to install the GEAR driver set at this time.The GEARAspiWDM service used bz the GEAR driver set is scheduled to be deleted during the next system reboot.Please reboot the system and run iTunes again.help me..I understand this problem..thanks

    Hi there, i had the exact same problem and posted a thread a few above yours, and these forums wasnt much help nobody replied, so i did a bit of research and followed all the intructions on this site: http://www.gearsoftware.com/cfknowledgebase/articledisplay.cfm?articleid=296
    If you follow the steps very carefully and do as each says, this will solve your problem.. Now i am very happy i can actually install iTunes and use it for my iPod.
    Remember to be carefully with the steps as the things you will be deleting are very important to your comp.
    Hope this helps.
      Windows XP  

  • Deduplication error: there was a problem retrieving data deduplication schedule

    Hi,
    After changing dedup schedule once we are receiving this error and not able to change it any more.
     there was a problem retrieving data deduplication schedule

    Hi,
    After changing dedup schedule once we are receiving this error and not able to change it any more.
     there was a problem retrieving data deduplication schedule
    Take a look @ PowerShell cmdlets for dedupe here:
    PowerShell dedupe cmdlets
    http://technet.microsoft.com/en-us/library/hh848450.aspx
    Of your interest are Remove-DedupeSchedule and New-DedupSchedule ones. Try removing set schedule
    you have now, making sure the status is "no jobs" and then create new schedule to see would it make the difference. 
    Good luck!
    StarWind VSAN [Virtual SAN] clusters Hyper-V without SAS, Fibre Channel, SMB 3.0 or iSCSI, uses Ethernet to mirror internally mounted SATA disks between hosts.

  • Problem with Set/Get volume of input device with single channel

    from Symadept <[email protected]>
    to Cocoa Developers <[email protected]>,
    coreaudio-api <[email protected]>
    date Thu, Dec 10, 2009 at 2:45 PM
    subject Problem with Set/Get volume of input device with single channel
    mailed-by gmail.com
    hide details 2:45 PM (2 hours ago)
    Hi,
    I am trying to Set/Get Volume level of Input device which has only single channel but no master channel, then it fails to retrieve the kAudioDevicePropertyPreferredChannelsForStereo and intermittently kAudioDevicePropertyVolumeScalar for each channel. But this works well for Output device.
    So is there any difference in setting/getting the volume of input channels?
    I am pasting the downloadable link to sample.
    http://www.4shared.com/file/169494513/f53ed27/VolumeManagerTest.html
    Thanks in advance.
    Regards
    Mustafa
    Tags: MacOSX, CoreAudio, Objective C.

    That works but the the game will not be in full screen, it will have an empty strip at the bottom.
    I actually found out what's the problem. I traced the stageWidth and stageHeight during resizing event. I found out that when it first resized, the stage width and height were the size with the notification bar. So when I pass the stage into startling, myStarling = new Starling(Game,stage), the stage is in the wrong size. For some reason, I can only get the correct stage width and height after the third resizing event.
    So now I need to restart Starling everytime a resizing event happened. It gives me the right result but I am not sure it is a good idea to do that.
    And thanks a lot for your time kglad~I really appriciate your help.

  • Problem with SET GET parameters

    Hi all,
    I am facing a problem using SET and GET parameters.
    There is a Z transaction(Dialog program) where some fields of screen are having parameter ID's. That transaction is designed to diaplay/change status of only one inspection lot at a time.
    Now I need to call that transaction in a loop using BDC. I mean i need to update the status of multiple inspection lots(one after the other). Before calling the transaction I am using
    SET PARAMETER ID 'QLS' FIELD lv_prueflos.
    Unfortunately the transaction is only changing the first inspection lot. When I debugged I found that the screen field is changing in PAI. Even though in PBO it shows the next value, when it goes to PAI it is automatically changing to the first value(inspection lot).
    Example: Inspection Lots : 4100000234
                                               4100000235
                                              4100000236
    Now first time when the call transaction is being made the status of insp lot 4100000234 is changed. For the second time when insp lot 4100000235 is being passed in PBO ican see this. But the moment it enters PAI the screen field changes to 4100000234.
    Could you pls help me in solving this issue.
    Thanks,
    Aravind

    Hi,
    Problem with SET GET parameters
    Regarding on your query. Follow this below link.
    It will help you.
    Re: Problem with Set parameter ID
    Re: Problem in Set parameter ID
    I Hope it will helps to you.
    Regards,
    Sekhar

  • A problem regarding set up of Oracle Lite 3.6.0.2.0 on Win 95, with JDK 1.1.8 &java 2

    A problem regarding set up of Oracle Lite 3.6.0.2.0 on Win 95, with JDK 1.1.8 and Java 2 SDK ( Ver 1.3 Beta)
    After the installation of Oracle Lite 3.6.0.2.0 on a laptop (with WIN 95 OS), When I run Oracle Lite Designer from start menu, I receive following error message :
    ====================================
    Invalid class name 'FILES\ORA95_2\LITE\DESIGNER\oldes.jar;C:\PROGRAM'
    usage: java [-options] class
    where options include:
    -help print out this message
    -version print out the build version
    -v -verbose turn on verbose mode
    -debug enable remote JAVA debugging
    -noasyncgc don't allow asynchronous garbage collection
    -verbosegc print a message when garbage collection occurs
    -noclassgc disable class garbage collection
    -ss<number> set the maximum native stack size for any thread
    -oss<number> set the maximum Java stack size for any thread
    -ms<number> set the initial Java heap size
    -mx<number> set the maximum Java heap size
    -classpath <directories separated by semicolons>
    list directories in which to look for classes
    -prof[:<file>] output profiling data to .\java.prof or .\<file>
    -verify verify all classes when read in
    -verifyremote verify classes read in over the network [default]
    -noverify do not verify any class
    -nojit disable JIT compiler
    Please make sure that JDK 1.1.4 (or greater) is installed in your machine and CLASSPATH is set properly. JAVA.EXE must be in the PATH.
    ====================================
    My ORACLE_HOME is c:\program files\ora95_2 and Oracle Lite is installed under the ORACLE_HOME in LITE\DESIGNER directory.
    JDK version is 1.1.8 which is greater than 1.1.4 installed in c:\program files\jdk1.1.8, My PATH, and CLASSPATH are set in AUTOEXEC.BAT as follows:
    set CLASSPATH=c:\Progra~1\jdk1.1.8\lib\classes.zip;c:\progra~1\ora95_2\lite\classes\olite36.jar;c:\progra~1\ora95_2\lite\designer\oldes.jar;c:\progra~1\ora95_2\lite\designer\swingall.j ar
    PATH=C:\Progra~1\Ora95_2\bin;.;c:\Progra~1\jdk1.1.8\lib;c:\Progra~1\jdk1.1.8\bin;C:\Progra~1\Ora95_2\lite\Designer;C:\WIN95;C:\WIN95\COMMAND;C:\UTIL
    And, I can run JAVA.EXE from any directory on command prompt.
    With JAVA 2 SDK (ver 1.3 Beta) instead of JDK 1.1.8 I'm getting a different Error message as follows:
    =============================
    java.lang.NoClassFoundError: 'FILES\ORA95_2\LITE\DESIGNER\oldes.jar;C:\PROGRAM'
    Please make sure that JDK 1.1.4 (or greater) is installed in your machine and CLASSPATH is set properly. JAVA.EXE must be in the PATH.
    ==============================
    the PATH and CLASSPATH were set accordingly, as with JDK1.1.8, and there was no classes.zip in classpath
    also the class file or the jar file looks weird or wrapped in the error message : 'FILES\ORA95_2\LITE\DESIGNER\oldes.jar;C:\PROGRAM'
    Another interesting thing I noticed is if I run oldes.exe from Installation CD, the Oracle Lite Designer runs fine, and without error, I'm able to modify tables in the database of my laptop also.
    Could someone shade some light on what am I doing wrong here ?
    Thanks for help in advance .
    Regards
    Viral
    null

    On 07/20/2015 06:35 AM, Itzhak Hovav wrote:
    > hi
    > [snip]
    > [root@p22 eclipse]# cat eclipse.ini -startup
    > plugins/org.eclipse.equinox.launcher_1.3.0.v20120522-1813.jar
    > --launcher.library
    > plugins/org.eclipse.equinox.launcher.gtk.linux.x86_64_1.1.200.v20120913-144807
    >
    > -showsplash
    > org.eclipse.platform
    > --launcher.XXMaxPermSize
    > 256m
    > --launcher.defaultAction
    > openFile
    > -vmargs
    > -Xms40m
    > -Xmx512m
    > [snip]
    Try this: http://wiki.eclipse.org/Eclipse.ini. You should have read the
    sticky posts at forum's top for getting started help.

  • Error "No entry in table T551A" while creating set work schedule rule.

    Dear Team,
    I am getting following error while creating set work schedule rule.
    Error "No entry in table T551A" for key 22 BBB [ here BBBB is my period work schedule]
    The actual prob is i configured all the necessary steps but when i tried to create work schedule rule im getting this error. Also, in the same screen there is one field DWS grouping initially value in this is 00 and gread mode. But after giving ES grp, holiday calander ID etc etc when i try to save that screen that value is chainging to 22 from 00.
    My ES grop=2 and PS grop=2 . Is that value is my ES and PS grouping..?? or some other thing.
    Request you to please help me out.
    Regards
    Shab.

    HI, there are 8 steps you need to do below:
    1. Group Personnel Subareas for the Daily Work Schedule
    2. Group Personnel Subareas for the Work Schedule
    3. Define Break Schedules
    4. Define Daily Work Schedules
    5. Define Period Work Schedules
    6. Define Employee Subgroup Groupings
    7. Define Groupings for the Public Holiday Calendar
    8. Set Work Schedule Rules and Work Schedules
    All of them belong to TIME MANAGEMENT. I think you miss some steps above.
    Please check it again.
    Regards!
    Minh

  • Button in Bex Analyser 7.0 - problem with setting up Static Parameters

    Hello,
    I know a similar problem has been discussed here already, but I am still having problems with setting up Static Parameters of my Button in BEx Analyser 7.0, so that I can pass Variable values from that button to my query.
    This is what I do - in Static Parameters of my Button I set the following values:
    Name                          Index          Value
    DATA_PROVIDER        0               DP_1
    CMD                             0               PROCESS_VARIABLES
    SUBCMD                      0               VAR_SUBMIT
    VAR_NAME                 0               0RMA_FIP
    VAR_VALUE               0               004/2010
    As a result, I would like the value 004/2010 to be passed to variable 0RMA_FIP (which is mandatory) and the query to be executed with that value. For some reason, however, the value is not passed correctly, and instead the variable is filled with a blank or not filled at all, and I am getting a message "Specifiy value for variable Fiscal year/period". What do I do wrong?
    Just to give you a broader picture - I would like to later use this logic to pass more than one variables into a query, including a hierarchy node, and read the values from an Excel worksheet - however, after many attempts to do so, I started playing with just one variable to figure out what the problem was.
    I have already seen the following two threads and SAP notes on passing variable values from the button:
    Re: Button in BEx Analyzer 7.0
    Re: How to set variables values via VBA.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0881371-78a1-2910-f0b8-af3e184929be?quicklink=index&overridelayout=true
    Can anyone please advise?
    Cheers,
    AL

    I managed to figure it out myself!
    Instead of VAR_VALUE I need to enter VAR_VALUE_EXT, and it works fine.
    I will mark this thread as "answered".

  • Problem in setting participant in business rule

    Hi All,
    I am facing problem while setting the target participant in business rule. I want to route the task to the target participant for the adhoc routing in serial process .It's not taking the value as participant name.
    I have 5 participant for approve d task .But when I am writing
    If PreviousOutcome.outcome=="'REJECT'"
    then
    call GOTO(participant:"CTU")
    as CTU is one of the participant in the process.
    But it gives the error while deploying the application as unknown participant .Please tell me how come I route to different participant as per the condition in serial routing.
    please help me.
    Thanks & Regards
    Aseet

    Multi-post:
    http://forum.java.sun.com/thread.jspa?threadID=727161&tstart=0

  • Problem with setting Source Level in Sun Studio 2

    I've got problem with setting Source Level to 1.5 in Sun Studio 2. When I try to set it to 1.5 in Project properties and click Ok everything seem to go well, but when I open Project Properties again Source Level is set to 1.4. I need this to work cause I started to lear Java recently and I want to use foreach loop.
    Please help

    I'm just citing an example using Date().
    In fact, whether I use DateFormat or Calendar, it shows the same result.
    When I set the date to 1 Jan 1950 0 hours 0 minutes 0 seconds,
    jdk1.4.2 will always return me 1 Jan 1950 0 hours 10 minutes 0 seconds.
    It works correctly under jdk1.3.1

  • Problem in Set Check for Duplicate Invoices

    Hi,
    I have did all the required setting s for check duplicate invoice , but when i do miro , its not giving any error or warning msge.. i did all the config  as per blw link..
    FYI-  in migo, i have entered the 3434 as a invoice ref # in delveriy note column and while doing miro , i have entered 3434 in ref column and give the 3434 as a dlvery note # in item tab .. but its not giving any error?
    Pls guide, where the mistake has gone wrongly??
    Problem in Set Check for Duplicate Invoices
    Edited by: UJ on May 15, 2009 1:45 PM

    Hello,
    Hope you have done all the required configurations for the checking of double invoice and ticked the vendor for the double invoice checking in vendor master record.
    You have to understand the way the system does the double invoice check.
    As per the configuration, if the system identifies an invoice for a vendor whose double invoice check is activated, at the time of MIRO, system will update a separate table.
    So system will check for the double invoice entry among the invoices entered after making the tick in the vendor master.
    i meant to say that, if you are introducing this double invoice check in between the transactions, the check will be valid only for the invoices entered after the activation of double invoice check.
    Regards

  • Problems with setting up my ISP's mail server in Windows Live Mail and Thunderbird

    The laptop is a G60-535DX with Windows 7  64 bit. I've managed to setup my gmail account fine in Live Mail, but when setting  up my ISP' mail server, it doesn't work. I get the message that the information was entered correctly, and I see the 'connecting' at the bottom of the page, and then 'error', and clicking on it shows a socket error #10061. In Thunderbird, I get a timeout error message. I've entered all the incoming and outgoing server information correctly, (I've done this over 8-9 times now), the ports are the defaults(110,25), no SSL, no authentication. I've talked with my ISP several times. Just a couple of hours ago was the last time. Their only other possibilities were that Live Mail had problems with setting up more than one account, that Live Mail needed updating, that Windows 7 was a new operating system and there were 'kinks'. I removed the gmail account, set up the ISP's mail by itself; didn't help. I checked for Live Mail updates, but found out that they all come from Windows updates(which are current).  The folks on PCQ&A inform me that they have 3 or 4 accounts with Live Mail. I can get my mail, by logging onto my ISP's website, but that' kind of a nuisance. I posted this in Seven Forums and they didn't have any ideas. As I said, I also can't get my mail server to work in Thunderbird, either.  I don't know what else to try. (short of activating the recovery partition and starting from scratch). Any ideas would be more that welcome.
    Thanks,
    Steve

    Stevehiker wrote:
    Nevermind, it's fixed. One of the guys on PCQ&A suggested going to my ISP's website to see if they had a support page. They did and it stated that under certain circumstances that for the login ID the whole email address should be entered. For XP and Outlook Express one only uses the first part of the email address (your name); so just for grins I entered the whole address, name and all and everyting worked. Called my ISP and was told that that wasn't the way it's supposed to work. Well----
    Thanks anyway,
    Steve
    Mine works the same way_must enter full email address as login. AT&T?
    ******Clicking the Thumbs-Up button is a way to say -Thanks!.******
    **Click Accept as Solution on a Reply that solves your issue to help others**

  • Problem with event based scheduling

    Hi,
    We are having a ETL job running everynight, so i need to have daily
    report as soon as my ETL job is finished. For that we have run some
    script to create a event file after completion of ETL job. And by using
    this event file we have scheduled a report that runs after this event
    file is created. Now the problem is that the scheduled report is
    generated before the ETL job is finished. This seems to be working fine
    till last month, but this month we are facing this issue. my question
    is why the scheduler is triggered before the event file is created
    (event file is created after the completion of ETL job)
    Do anybody faced this iss
    FYI
    We are on BO XI 3.1 with no SP's and FP's and on windows environment.
    Do anybody faced this issue?Any advise is appreciated.
    Thanks,

    Hi,
    We are also on BO XI 3.1 with no SP's and FP's. We create Event files after the ETL jobs are completed. These files are used to create BO Events (File), which are used as scheduling criteria before the Reports can run. These files are deleted daily before the next files are created, something you might want check.
    Mike

  • Can I set a schedule for use of the internet with this router?

    can I set a schedule the internet?

    The Airport Express is not a router
    The AirPort Express is most certainly a wireless router, capable of 10 wireless connections. See the lit and specifications for more details on this router.
    AirPort Express
    In addition, using the Timed Access feature on the Express, it is possible to establish daily time limits for all devices that will connect to the network.
    This can be done globally for all devices, or individual time limits can be established for each separate device that connects through the AirPort Express.

Maybe you are looking for

  • Where can you log a complaint/let the developers of Captivate 5 know there is an issue?

    I was on a call with the help desk for 2 hours and they couldn't figure out what was wrong with my project. When I publish it, it seems to publish fine but when I try to view it's just a black screen. I can't tell you everything they were having me d

  • How to debug Abap List in New Debugger?

    Hi All How can we debug the ABAP list in the new debugger? I know that it can be done by switching to old debugger. Or Did SAP by any chance missed this option? Regards, Rupesh

  • Creative Suite 4, Windows 7 64bit will not run second installation disk

    Hello, I hope someone can help me or point me in the right direction. I just upgrade my PC to Windows 7 on a freshly formatted hard drive and I can't seem to be able to install the second installation disc of  CS4. I install the first disc fine but w

  • New Tab Cursor postion change after downloading FF4

    Hi, Under FF version 3, when I opened a new tab, my homepage appears (Google) and the cursor automatically switches to the search box in the page. I am using an extension called New Tab Homepage 0.4.3 to do this. However, after updating to FF4, when

  • AppleTV wireless connectivity

    had an appletv for 3+ years - no problems of any kind. Within the last few days the unit is unable to detect any wireless networks. If I unplug it, plug it back in, let it boot up, it connects no problem. But only stays connected for about 60 seconds