Problems with the link between PXI chassis and PC via MXI-4

MAX display the chassis with a yellow exclamation point, and the MXI-4 conection monitor indicates taht the connection to the chassis has timed out.
Under the windows device manager appears PCI std PCI-to-PCI bridge and MXI-4 connection monitor working properly.
The system has bben working properly for one year and suddenly start to fail.
I've tried to uninstall fromn device manager and reinstall again, and teh problem continues. When the PC starts detect new hardware and reinstall from CD with MXI-4 software for windows v 1.0
Only the led PWR lights. The link indicator remains always off, from power up continuously. The cable connection has benn checked ok.
The chassis is powered up in the proper sequence, first the PXI chassis, and the the PC.
Operating system windows XP service pack 2; latest update KB835732 30/12/2004 (V 6.2)
labwindows/cvi (fds) 7.0
ivi compliance oackage 2.1.2
max 3.1
ni-daq 7.3
visa 3.1
chassis pxi-1000b with PXI-8331.

Hello,
it could it be an incompatibility with the desktop PC (maybe?). I know of cases in which the PCI board can be incompatible with a certain PC for various reasons (PCI bus not 100% compliant to PCI standards, PCI power rails, PCI bus-master capabilities, motherboard/chipset issues, etc..).
I mean, has the PC been changed?
Wich PC model/brand is it?
Have you tested it on another of PC (another model)?
In case you have already tested your mxi-4 in other PCs and the behavior is the same, I suggest you to contact your local NI office for assistance.
Regards,
Jorge M.

Similar Messages

  • Problems with Dinamic Link between Premiere pro CC and After Effects CC

    I'm having serious problems with dinamic link between premiere pro and after effects, really serious problems that have 2 big projects in trouble (a documentary and a video clip) and I had to redo all the work pipeline to the consumer.
    The documentary for a spanish TV was made on CC 2014 and a video clip was made on CC. Both of them with a lot of after effects composition in the premiere pro timeline. Render freeze, a lot of playback issues, and many more problems... Until I decided to remove these links between premiere and after effects and render out all the after effects compositions one by one and insert as clips in premiere pro. 1 week working away with back and fourth.
    I've got a huge workstation:
    i7 4990
    32Gb ram
    GTX780 3gb
    256 gb system ssd
    2 Tb project storage
    *All my hardware and software are update.
    I know that a lot of folks are on the same huge problem and I want to ask everyone:
    How do you save this?
    What is your pipeline?
    Are there any solution?
    Best practice to use dinamic link in a huge project?
    Thanks,
    Ruben Gimenez.
    R&D iceblink.es
    www.rambot.es

    Thank You, Jim -
    Unfortunately that specifically did not work.
    Based on another comment sent to me, here is what did.
    In PProCC
    File > Adobe Dynamic Link > New After Effects Composition
    In AECC
    From that composition created from PPro, I imported the project (aep) initially created in AECC from another team member. Saved the file.
    Back in PProCC
    File > Adobe Dynamic Link > Import After Effects Composition
    Magic.

  • I have a problem with the sync between iTunes and ipad2. I can not see the files in iPad. Help me please.

    I have a problem with the sync between iTunes and ipad2. I can not see the files in iPad. Help me please.

    Cannot see what files ? Music (synced music should appear in the iPod app), films/TV shows (Videos app), documents ... ?

  • I  have a problem with the synchronisation of my iPhone and iPad with Outlook 2007 on my 64-bit Windows 7  PC. For several years, I have had no problems with the synchronisation by cord connection and iTunes between these programmes. However, a few months

    I  have a problem with the synchronisation of my iPhone and iPad with Outlook 2007 on my 64-bit Windows 7  PC. For several years,
    I have had no problems with the synchronisation by cord connection and iTunes between these programmes. However, a few months ago I decided to use Mobile Me. However, there were problems with duplication of calendars and then “rogue events” – which could not be deleted – even if deleted on Outlook and on the iPhone (or both at the same time) – they would just reappear after the next synchronisation.  All other synchronisation areas (eg Contacts, Notes etc) work fine.
    I have looked for help through the Apple Support Community and tried many things.  I have repaired my Outlook. I have repaired my .pst file in Windows. I have re-installed the latest version of iTunes on my PC. I have re-installed the firmware on my iPhone. I have tried many permutations on my iPhone. I have closed down all Mobile Me functions on the iPhone. I have spent upwards of 24 hours trying to solve this problem.
    What am I left with? Outlook works seamlessly on my PC. My iPhone calendar now has no events from  my calendar, but does not synchronise through iTunes. Nor does it send events initiated on the iPhone to the Outlook. I am at the point of abandoning iPhones and iPads altogether.  I need to have a properly synchronising calendar on my phone.  Do you have any suggestions?

    In the control panel goto the "Lenovo - Power Manager" and click the battery tab, there is a maintenance button in there that will let you change the charging profile for your battery.   (from memory, so exact wording may be off)
     The lower the numbers you use there, the longer the battery *should* last.    These batteries degrade faster at higher charge levels, however storing them at too low of levels is also not good for them... I've read that 40% is optimal, but just not realistic if you use your computer.
    --- ThinkPad T61 / Win 7 / Core 2 / 4gb RAM / Nvidia / Still used daily --- ThinkPad Edge 15/ i5 / Win 7 / TrueCrypt / 8gb RAM / Hated it, died at 1 yr 1 mo old --- ThinkPad T510 / Win 7 / TrueCrypt / i5 / 8gb RAM / Nvidia / Current primary machine --- ThinkPad X220 / i7 / IPS / 4gb / TrueCrypt / My Road Machine

  • What is the link between 2lis_03_bf,2lis_03_bx and 2lis_03_uM

    HI,
    what is the link between 2lis_03_bf,2lis_03_bx and 2lis_03_uM.is these datasources to be loaded in the order.can anybody explain me

    Hi
    These three datasources are related to inventory. BF is for opening stock, BX is for material movements and UM is valuations. Before loading this data into BW you need to maintain some settings in R/3 side.
    According to  SAP NOTE:315880.T-code BF11.Activate the flag NDI will reflect in table  "TBE11" For the entry "NDI".
    2. set the application indicator 'BW' to active using Transaction 'BF11' . which will make tick mark(x) for the field AKTIV for the APPLK ='BW' in table TBE11.
    3. Activate the PROCESSKEY under "Maintain Industry Sector"
    4. Generated "STOCK INITIALIZATION" for 2LIS_03_BX.
    5. Filled setup tables for "INVENTORY CONTROLLING"
    6. Scheduled the InfoPackage for 2LIS_03_BX with update mode "GENERATE INITIAL STATUS.
    then load BF and UM
    There is a PDF available how to load inventory..just search for it in SDN.
    REgards
    Ram

  • How to remove the link between Profile name and corp net account after their disassociation

    Hi there,
      How do I  remove the link between Profile name and corp net account after their disassociation ?
    I would like to make remove the link between 'Viv Lingaiah' and
    [email protected] Also, I would like to keep 'Viv Lingaiah' and associate with my outlook id and corpnet account.

    Logon to your live account here
    https://account.live.com/summarypage.aspx then under aliases you can add an alias and promote it to primary.
    Regards, Dave Patrick ....
    Microsoft Certified Professional
    Microsoft MVP [Windows]
    Disclaimer: This posting is provided "AS IS" with no warranties or guarantees , and confers no rights.

  • With my i phone 4 , the Push notifications doesn't work for apps like (fb viber , whatsapp etc ) it only works for the official apps like message  even when im using the phone, has  this probleme with the iOs 6.0.1 and also with the iOs 6.1

    With my i phone 4 , the Push notifications doesn't work for apps like (fb viber , whatsapp etc ) it only works for the official apps like message  even when im using the phone, has  this probleme with the iOs 6.0.1 and also with the iOs 6.1

    This isn't an issue. Notice the screen prior to the one that shows usage has an iCloud section and a Manage Storage button. For this button to activate ios needs to download a few kb from icloud. Switching back to this screen forces ios to download those few kb.

  • Problem with the fiells MEINS(PO Unit ) and MENGE(Quantity) .

    Hi experts
    I am having problem with the fiells MEINS(PO Unit ) and MENGE(Quantity) of the datasource 2lis_02_acc .
    I have created custom cube and have mapped the fiels MEINS to infoobject 0PO_UNIT and MENGE(Quantity) to infoobject 0CPQUAOU.
    Now the data is successfully loaded in the cube but the values of the above 2 fields are getting changed.
    In r3 the value for MEINS is "AU","EA" , "H" etc but this field value is getting converted to "LE" in the cube and also the field  MENGE(Quantity
    ) in r3 is for example "1"  it is getting converted to 3 in the cube. do u have any idea what is the problem.
    The rule type is direct assingment and there is no routine .
    Any clues.
    Thank you.

    holy devilz wrote:
    Hi experts
    > I am having problem with the fiells MEINS(PO Unit ) and MENGE(Quantity) of the datasource 2lis_02_acc .
    >
    > I have created custom cube and have mapped the fiels MEINS to infoobject 0PO_UNIT and MENGE(Quantity) to infoobject 0CPQUAOU.
    > Now the data is successfully loaded in the cube but the values of the above 2 fields are getting changed.
    > In r3 the value for MEINS is "AU","EA" , "H" etc but this field value is getting converted to "LE" in the cube and also the field  MENGE(Quantity
    > ) in r3 is for example "1"  it is getting converted to 3 in the cube. do u have any idea what is the problem.
    > The rule type is direct assingment and there is no routine .
    > Any clues.
    > Thank you.
    Hmm, your system should consider the alternative UOM maintain in the material master.
    Each material in SAP has its standard, base unit of measure (stored in MARA-MEINS). To allow using alternative units, those can be maintained per material in table MARM. So, assuming the Base UoM is only considered (for LE), it converts material quantity from one unit to another, most likely from alternative units to the base one. So, changing that settings must solve. http://goo.gl/JuZlm
    Alternative steps:
    1.Goto MM42 (Assuming there's no BAPI req?)
    2. change po unit from basic unit to other -> save OK
    3. change po unit from other to basic unit -> save OK
    Also, MD63 shows all data in the base unit of measure.
    If you want to explore basic steps, goto RSD1 > Additional > Alternative UoM.
    Best Regards, @{

  • HT201210 i have problem with the firmeware file...and I do not know what is that

    i have problem with the firmeware file...and I do not know what is that

    Make sure you are updating your phone the correct way, by connecting to iTunes and clicking Check for Updates on the Summary tab of your iTunes sync settings.  Do not try to download the firmware file from the internet first.  Also be sure iTunes is up to date before updating.
    Delete the existing firmware (.ipsw) file and try again.  You will find it at one of the following locations:
    Mac OS X: ~/Library/Application Support/MobileSync/Backup
    Windows XP: %AppData%\Apple Computer\MobileSync\Backup
    Windows Vista: %AppData%\Roaming\Apple Computer\MobileSync\Backup
    Windows 7: %AppData%\Roaming\Apple Computer\MobileSync\Backup

  • Facing problem with the code for sending an .xls attachment via email, a field value contains leading zeros but excel automatically removes these from display i.e. (00444 with be displayed as 444).kindly guide .

    Facing problem with the code for sending an .xls attachment via email, a field value contains leading zeros but excel automatically removes these from display i.e. (00444 with be displayed as 444).kindly guide .

    Hi Chhayank,
    the problem is not the exported xls. If you have a look inside with Notepad or something like that, you will see that your leading zeros are exported correct.Excel-settings occurs this problem, it is all about how to open the document. If you use the import-assistant you will have no problems because there are options available how to handle the different columns.
    Another solution might be to get familiar with ABAP2XLS-Project. I got in my mind, that there is a method implemented, that will help you solving this problem. But that is not a five minute job
    ~Florian

  • What is the link between schedule lines and delivery document item level

    Can any one please explain me what is the link between the schedule lines of the order/scheduling agreement and the item level of the delivery.
    Is there any link between VBEP and LIPS ?

    Hi
    Most of the item level data in delivery doc is copied from Schedlue lines in Sales order for eg delivery date
    So u may say that schedule line in sales order becomes the line item in Subsequent doc that is in Delivery doc .
    The table u are talking about i.e VBEP is related to sales doc and it contain data for Schedule line in sales order and the other table i.e LIPS give the delivry doc related data at item level.
    Hope this help

  • Tell me the link between Purchase Requisition and Sales Order Number

    tell me the link between Purchase Requisition(MEREQ_TOPLINE-BANFN_EXT) and Sales Order Number(COBL-KDAUF)

    Hi Puja,
    If you have created sales order  for matrial which has both procurement type,after MRP run you will get
    planned order.This planned order you can convert to purchase requisition for external procurement or
    subcontracting.
    You will find sales order number in details of purchase requisition ( ME52N) in Account assignment tab.
    Hope this help you.
    Regards,
    Raja

  • Table having the link between  Clearing document and the Invoice document

    pls can someone tell me the table that having the relationship between clearing document and the Invoice document.
    Thanx .

    Hi,
    You can try with the following tables: BSE_CLR, BSEG, BSAD, BSAK.
    Regards,
    Svetlin

  • Maintain the link between user status and system status

    Hi friends,
    my requirement is In crm transactions when we change the system status(inprocess) then the relevant user status            (inprocess) is also to be changed automatically. how can we do this? wt r the customisations we can do for this?
    pls suggest me? thanks in advance.

    Hi Madhu Sudan,
    When you create User Status in Status Managment...
    Eg: Inprocess
    You assign User Status Triggers Business Transaction.
    So, This maintain the link between the User and System statuses.
    Reward Points if helpful.
    Srini.

  • Hi!!I have some problems with the synchronization of my system, and I don´t know how I can solve this!

    My system consists of differents vi´s.Some of them are used to read analogic inputs and digital inputs, using the serial port.
    The values that I read, go through differents vi to be proccesed, and at the end, these values are written in a file, all the values in the same file.
    My problems of synchronization are:
    1. I have one vi per input, and all of them use the same serial port. How can I synchronize them to avoid serial port conflicts? (using queues??) And how can I do, to get differents number of samples/sg with every vi? I have to introduce them in differents loops?
    2. The other problem is that, for example, I want to read 8 samples/ s but I only want
    to write two samples every second. How can I do to avoid stoping the data flow?
    Maybe, my problem is that I want to see the system like
    one block, and I am ignoring that, although all the system works like a block, every part works using a different "speed". I don´t know how tools can I use to combine two ideas, working like an only system( data dependence, some vis need the data of others vi to be able to work) and working getting differents numbers of samples/s.
    I have seen that there are synchronization vis. I am going to glance at them, maybe I find something interesting but I amsure that your help will be very useful?
    Thanks in advanced!!
    Graci

    I think you are pretty much on the right track with Queues. I have implemented a very similar system myself using queues. I have even different systems connected to the serial interface, but I can synchronise them all easily using the following method:
    1) Make a VI for opening the serial port and reading the data. The data (parsed to extract the numbers required) are then stored in an array (Shift register). If the pre-determined time delay is reached (say 5 seconds) the values are averaged and written to a Queue with a defined data type. Save the VI as a VI template.
    2) Make a VI which starts an instance of this template VI for every channel you require. You can use VI Server to set values on the new front panel before you set it's property to "running". Setting a timer value for all can help ensure that the X-Axis of your timing values (if you require) are synchronised. The clue here is to define and initiate a QUEUE per channel. (RS-232_1, RS-232_2 and so on). The QUEUE name needs to be passed to the VI Template before running so that each VI running in the background has an individual link to the main program.
    The second part of this VI simply uses an array of QUEUES, polling them one after another with a timeout of, say 5 ms. If data is found, append accordingly to an XY-Graph.
    I also add in some "Auto termination" in the VI template (MAx number of values allowed in the QUEUE for example) to allow for the background processes to find out if the front-VI is still running or not. There are many different ways to do this, shoose the best for your application.
    With this approach, it's not even important what instrument is connected as long as data is written in a specified format into a known QUEUE. I have also developed systems where I can transparently (almost) drop in VI Templates for instruments with similar functionality (output data) from different suppliers.
    I would post an example, but the time it would take me to clean it up is too large. Sorry. If you have any further questions, don't hesitate to ask further questions.
    Shane.
    Using LV 6.1 and 8.2.1 on W2k (SP4) and WXP (SP2)

Maybe you are looking for