Process and Human task deployment version difference.

Hi,
I have a small issue in deploying the process and taskform. Problem is my BPEL Process deploys fine and shows the version 1.0 my TaskForm also deploys fine but somehow the version of this shows as 2.0. When I check the App Server the TaskForm shows as 2.0. Now when I log into worklist and go to task details I see an error saying /1.0/TaskForm.jsp not found. It's because the TaskForm is deployed as /2.0/TaskForm. Now if I manually go and change the context of the task form in default.xml file to 1.0 worklist shows the jsp form. Before deploying the Process I tried deleting the output directory, undeployed the form for the server, undeployed the BPEL Process and restarted everything but some how the form is always deployed as 2.0.
When I manully force the BPEL Process to deploy as 2.0 also all works fine.
Can someone please tell me what might be the issue. I believe it's something JDev. do when deploying the process that somehow incremenst the TaskForm version.
I even installed a fresh JDev. version but nothing works. Is something cached in the process and if so where to look and fix it.
If I create any new process with Human task it works fine. It's something with my current process that's not right.
Thanks

Hi All,
The problem was caused by the JDev version I used.
I used the version 10.1.3.4., but found a thread which suggested that I should use 10.1.3.3. instead. And it works!
Here is the thread where I found this info:
SOA Order Booking build properites - BindWebApp error: javax.management.Ref
Peter Neumann

Similar Messages

  • Process with Human Task (Deployment problem)

    Hi Every1,
    I'm a rookie BPEL developer who ran into a problem. I'm using a separate machine as SOA server, because I couldn't install it on my dev machine for some unknown reason. In the beginning, after setting up the necessary connection settings in Jdev everything worked fine. But when I use a Human task in my process flow and auto generate a task form for it then I can't deploy my process to the server anymore. I've found this problem in other topics, but none of the solutions worked in my case. There are mainly two reasons mentioned: 1. RMI settings - Tried to set it in build.properties, but nothing changed. 2. JDK version differs on dev machine and server - In my case, both the dev machine and the server has exactly the same version (1.5.0_06). Is there any other ideas what could be wrong?
    Thanks,
    Peter Neumann
    Finally, here is the Ant log:
    Buildfile: C:\oracle\JDev\jdev\mywork\BioTest2\BioBPELProcess2\build.xml
    [java] Java Result: 1
    validateTask:
    [echo]
    | Validating workflow
    [validateTask] url is file:/C:/oracle/JDev/integration/bpm/support/files/WorkflowTaskDefinition.xsd
    [validateTask] Validation of workflow task definitions is completed without errors
    deployProcess:
    [echo]
    | Deploying bpel process BioBPELProcess2 on ipds-np-laptop, port 8888
    [deployProcess] Deploying process C:\oracle\JDev\jdev\mywork\BioTest2\BioBPELProcess2\output\bpel_BioBPELProcess2_1.0.jar
    [deployProcess] Successfully deployed the process "BioBPELProcess2" on server "ipds-np-laptop" and port "8888"
    deployTaskForm:
    [echo]
    | Deploying workflow form for BioBPELProcess2 on ipds-np-laptop, port 8888
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Uploading file default_BioBPELProcess2_1_0_HumanTask1.ear ...
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Application Deployer for default_BioBPELProcess2_1_0_HumanTask1 STARTS.
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Undeploy previous deployment
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initialize D:\product\10.1.3.1\OracleAS_1\j2ee\home\applications\default_BioBPELProcess2_1_0_HumanTask1.ear begins...
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initialize D:\product\10.1.3.1\OracleAS_1\j2ee\home\applications\default_BioBPELProcess2_1_0_HumanTask1.ear ends...
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Starting application : default_BioBPELProcess2_1_0_HumanTask1
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initializing ClassLoader(s)
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initializing EJB container
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Loading connector(s)
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Starting up resource adapters
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initializing EJB sessions
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Committing ClassLoader(s)
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initialize workflowform begins...
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Initialize workflowform ends...
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Started application : default_BioBPELProcess2_1_0_HumanTask1
    [deployTaskForm]
    [deployTaskForm] 09/02/06 11:17:35 Notification ==>Application Deployer for default_BioBPELProcess2_1_0_HumanTask1 COMPLETES. Operation time: 453 msecs
    [deployTaskForm]
    [deployTaskForm]
    [deployTaskForm] BindWebApp error: javax.management.ReflectionException
    [deployTaskForm]
    BUILD FAILED
    C:\oracle\JDev\jdev\mywork\BioTest2\BioBPELProcess2\build.xml:97: Error while deploying the form on server "ipds-np-laptop" Error message :
    java.lang.SecurityException
         at oracle.ide.IdeCore$7.checkExit(IdeCore.java:177)
         at java.lang.Runtime.exit(Runtime.java:88)
         at java.lang.System.exit(System.java:868)
         at oracle.oc4j.admin.deploy.cmdline.Oc4jAdminCmdline.executeCommand(Oc4jAdminCmdline.java:141)
         at com.collaxa.cube.ant.taskdefs.DeployForm.deployIAS(DeployForm.java:818)
         at com.collaxa.cube.ant.taskdefs.DeployForm.deployForm(DeployForm.java:578)
         at com.collaxa.cube.ant.taskdefs.DeployForm.deployForms(DeployForm.java:849)
         at com.collaxa.cube.ant.taskdefs.DeployForm.execute(DeployForm.java:875)
         at org.apache.tools.ant.UnknownElement.execute(UnknownElement.java:275)
         at org.apache.tools.ant.Task.perform(Task.java:364)
         at org.apache.tools.ant.Target.execute(Target.java:341)
         at org.apache.tools.ant.Target.performTasks(Target.java:369)
         at org.apache.tools.ant.Project.executeSortedTargets(Project.java:1216)
         at org.apache.tools.ant.Project.executeTarget(Project.java:1185)
         at org.apache.tools.ant.helper.DefaultExecutor.executeTargets(DefaultExecutor.java:40)
         at org.apache.tools.ant.Project.executeTargets(Project.java:1068)
         at oracle.jdevimpl.ant.runner.AntLauncher.launch(AntLauncher.java:321)
         at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
         at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:39)
         at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25)
         at java.lang.reflect.Method.invoke(Method.java:585)
         at oracle.jdevimpl.ant.runner.InProcessAntStarter.runAnt(InProcessAntStarter.java:295)
         at oracle.jdevimpl.ant.runner.InProcessAntStarter.mav$runAnt(InProcessAntStarter.java:43)
         at oracle.jdevimpl.ant.runner.InProcessAntStarter$1.run(InProcessAntStarter.java:71)
    Total time: 19 seconds

    Hi All,
    The problem was caused by the JDev version I used.
    I used the version 10.1.3.4., but found a thread which suggested that I should use 10.1.3.3. instead. And it works!
    Here is the thread where I found this info:
    SOA Order Booking build properites - BindWebApp error: javax.management.Ref
    Peter Neumann

  • BPM process and manage task  option should avaible at Portal

    Hi Expert,
    Assigned User will see BPM  process and manage task option in  directly in portal not required to login as NWA.
    Please help me on this.
    Thanks,
    Padmindra

    Hi Mithileshwar,
    Start BPM Process Trigger - Read timed out
    Regards,
    V Srinivasan

  • Date transfer between 11g BPMN Process and Human Workflow task

    I'm creating a small BPMN process in SOA Suite 11g. Pretty simple: Holiday Request where one enters name, start date, end date and leave type (e.g. annual). The odd thing is, any dates I enter into the process end up losing one day when viewed in the BPM Worklist.
    So, to be clear:
    * The BPMN process receives a message like this (note the +10:00 -- I'm running this in Australia):
    <RequestData>
    <name>JohnJames</name>
    <startDate>2010-06-21+10:00</startDate>
    <endDate>2010-06-21+10:00</endDate>
    <leaveType>annual</leaveType>
    </RequestData>
    * It does some minor processing, then passes this onto a Human Workflow task (exactly the same):
    <RequestData>
    <name>JohnJames</name>
    <startDate>2010-06-21+10:00</startDate>
    <endDate>2010-06-21+10:00</endDate>
    <leaveType>annual</leaveType>
    </RequestData>
    * When I open the task in the BPM Worklist app I see this:
    name : JohnJames
    startDate : 20/06/2010
    endDate : 20/06/2010
    leaveType : annual
    So, why? My processing code doesn't alter the dates in any way at all before passing them to Human Workflow. I figure this has something to do with locales used by HW but I can't figure out where or what to change. Any clues? Comments? Ideas?

    OK, I have a solution that works for me: YMMV. There's two parts to it:
    1) To have the dates interpreted correctly, I changed the fields on the generated forms for the Human Tasks. The Start Date and End Date fields were created as Input Text fields with the "Converter" property set to <default>. I changed the fields to Input Date fields instead, and the dates were interpreted correctly (i.e. May 21 showed up as May 21 rather than May 20) But they still showed up in US date format: 5/21/2010.
    2) To have them formatted for my locale, I added a "formatting-locale" entry to the "trinidad-config.xml" file: <formatting-locale>en-AU</formatting-locale>. The dates then showed up as 21/5/2010.
    This solution doesn't give you dates automatically formatted for your own locale, or different locales based on browser, but it does give me what I want for now. Thought some folks might be interested.

  • Create entity and human task

    Hello,
    I have a really simple process which includes a create entity activity. It works perfectly fine as data is inserted into the table and i can see everything is completed in the flow trace. Now, when i insert a human task after the create entity activity, things start going wrong. While i don't see any errors in the flow trace and all tasks are completed as planned, the BPEL component's state is showing as running and at the end of the flow i got the message "The transaction was rolled back. The work performed for bpel instance "123456" was rolled back to the previous dehydration point, but the audit trail has been saved...." It seems like it's waiting for something from the human task (even though it was completed successfully). As long as I leave this running, the process would try everyday from 12:00 AM to 4:00 AM every five minutes. That's another issue that i can't figure out. Can someone shed some light on this? Thank you.

    Hi,
    its best to post this question to the SOA forum. The answer on this forum would be to use a  page template, a parametrized bounded task flow and then add the bounded task flow to each page that has the template. However, the task flow in the HT case is generated, which means that you re-build it all the time (meaning you don't work with the same task flow but multiple). If you know how to just use the HT API to access the information to display, you could write a generic bounded task flow for this. Check on the SOA forum if they can come up with a template approach for your use case.
    Frank

  • Error while deleting instances and Human Tasks arent deleted

    Hi,
    The Error:
    Cannot delete instances.
    The process domain was unable to purge the instances from the datastore. The exception reported is: [POL-5130] table or view SYSTEM.WI_FAULT not found
    Please check that the machine hosting the datasource is physically connected to the network. Otherwise, check that the datasource connection parameters (user/password) is currently valid.
    sql statement: DELETE FROM wi_fault WHERE domain_ref = ?
    When I query tasks over a jsp i also get the uncompleted human tasks from the deleted instances ( the try to delete them, i think they are there, but in the BPEL Console i cant see them anymore).
    The Error occured since i patched my oracle soa suite 10.1.3.1 to 10.1.3.3.
    What can I do?
    I hope someone can help me.
    My best Regards

    I think you didn't ran the upgrade-script when you've installed the patchset 10.1.3.3 to your bpel environment.
    Check the readme file of the patchset and you will see in the post-installation tasks you need to run the upgrade-script to patch your database environment as well.
    Kind regards,
    Nathalie

  • Configure Active directiory and WLS and Human Task form

    Hi Guys,
    We are using SOA Suite 11.1.6 for the current project and like to configure Active Directory as the identity provider. I know this is not a new question and did several searches in the forum and online, but not all our questions are answered. At this moment, in the WL security realm, we can see users and groups from AD. But there are still outstanding issues:
    1. Authentication with AD users
    We still cannot configure AD user to login WLS.
    2. Email users
    AD user is not showing up in the email lookup in jdeveloper. Currently, there are only two users returned: weblogic and oraclesystemuser. I believe that they are the default users.
    3. WorkList Application (Human Task)
    This is similar to #1, but not all. We like to configure AD users to login to the Worklist application.
    Any suggestion are appreciated.
    Thanks
    Steven
    Edited by: sw12345 on Apr 27, 2012 11:49 AM

    Hi Steven
    1. What you want is totally possible BUT you can have your Users only in one Security Provider. To access bpm/workspace, all the users will be referred in the first top most security provider. So make sure, your AD Authenticator is in the Top Most and also all these providers should be set to SUFFICIENT / OPTIONAL.
    Below these 2 posts should give more details:
    Weblogic administrator account is inactive after enabling DB Authenticator
    Re: BPM 11g workspace not show user from OVD - top most authentication provider
    Thanks
    Ravi Jegga

  • Human tasks deployment

    All,
    We have 5 human tasks in our BPEL 10.1.3.3 projects and out of those 5 tasks, 2 tasks are having payload input.
    Now my question is do all these 5 human tasks runs as j2ee applications or only tasks having input payload will run as j2ee applications ?
    because when I see production instance we have only few human tasks are available under applications in EM console.
    but actually there are many human tasks created in the instance.
    Regards,
    Praveen

    Hi Anirudh,
    But that seems to be wrong.
    When I observed in our client production. There are actually many human tasks being created but when I login to EM I see only few j2ee applications under ->
    +oc4j Instance
    +Middleware Services
    + BPEL
    +orabpel
    Please advice.
    Thanks,
    Praveen

  • Error while deploying the ADF task flow project based on a SOA human task

    Hi,
    I created a SOA project with a BPEL process containing Human task, deployed it and could able to test it successfully. I created ADF task flow project based on the Human task created in the earlier project and tried to deploy it. It is giving the following error. The idea is to display the task details in BPM worklist.
    [04:10:53 PM] [Deployer:149034]An exception occurred for task [Deployer:149026]deploy application RevisionApprovalMgmtTaskFlow [Version=V2.0] on soa_server1.: null.
    [04:10:53 PM] Weblogic Server Exception: weblogic.application.WrappedDeploymentException
    [04:10:53 PM] See server logs or server console for more details.
    [04:10:53 PM] weblogic.application.WrappedDeploymentException
    [04:10:53 PM] #### Deployment incomplete. ####
    [04:10:53 PM] Deployment Failed
    The server log shows this detailed error.
    java.lang.IllegalArgumentException
         at oracle.xml.xpath.JXPathExpression.evaluate(JXPathExpression.java:178)
         at oracle.xml.xpath.JXPath.evaluate(JXPath.java:288)
         at oracle.security.jps.internal.config.xml.XmlConfigurationFactory.initialize(XmlConfigurationFactory.java:425)
         at oracle.security.jps.internal.config.xml.XmlConfigurationFactory.getConfiguration(XmlConfigurationFactory.java:149)
         at oracle.security.jps.internal.config.deploy.CredentialStoreDeployer.getCredentialStore(CredentialStoreDeployer.java:56)
         at oracle.security.jps.wls.listeners.CredentialDeployment.migrate(CredentialDeployment.java:83)
         at oracle.security.jps.wls.listeners.JpsApplicationLifecycleListener.migrateAppCredential(JpsApplicationLifecycleListener.java:137)
         at oracle.security.jps.wls.listeners.JpsApplicationLifecycleListener.preStart(JpsApplicationLifecycleListener.java:78)
         at weblogic.application.internal.flow.BaseLifecycleFlow$PreStartAction.run(BaseLifecycleFlow.java:277)
         at weblogic.security.acl.internal.AuthenticatedSubject.doAs(AuthenticatedSubject.java:321)
         at weblogic.security.service.SecurityManager.runAs(SecurityManager.java:121)
         at weblogic.application.internal.flow.BaseLifecycleFlow$LifecycleListenerAction.invoke(BaseLifecycleFlow.java:194)
         at weblogic.application.internal.flow.BaseLifecycleFlow.preStart(BaseLifecycleFlow.java:57)
         at weblogic.application.internal.flow.HeadLifecycleFlow.prepare(HeadLifecycleFlow.java:279)
         at weblogic.application.internal.BaseDeployment$1.next(BaseDeployment.java:609)
         at weblogic.application.utils.StateMachineDriver.nextState(StateMachineDriver.java:37)
         at weblogic.application.internal.BaseDeployment.prepare(BaseDeployment.java:185)
         at weblogic.application.internal.EarDeployment.prepare(EarDeployment.java:53)
         at weblogic.application.internal.DeploymentStateChecker.prepare(DeploymentStateChecker.java:154)
         at weblogic.deploy.internal.targetserver.AppContainerInvoker.prepare(AppContainerInvoker.java:60)
         at weblogic.deploy.internal.targetserver.operations.ActivateOperation.createAndPrepareContainer(ActivateOperation.java:197)
         at weblogic.deploy.internal.targetserver.operations.ActivateOperation.doPrepare(ActivateOperation.java:89)
         at weblogic.deploy.internal.targetserver.operations.AbstractOperation.prepare(AbstractOperation.java:217)
         at weblogic.deploy.internal.targetserver.DeploymentManager.handleDeploymentPrepare(DeploymentManager.java:747)
         at weblogic.deploy.internal.targetserver.DeploymentManager.prepareDeploymentList(DeploymentManager.java:1216)
         at weblogic.deploy.internal.targetserver.DeploymentManager.handlePrepare(DeploymentManager.java:250)
         at weblogic.deploy.internal.targetserver.DeploymentServiceDispatcher.prepare(DeploymentServiceDispatcher.java:159)
         at weblogic.deploy.service.internal.targetserver.DeploymentReceiverCallbackDeliverer.doPrepareCallback(DeploymentReceiverCallbackDeliverer.java:157)
         at weblogic.deploy.service.internal.targetserver.DeploymentReceiverCallbackDeliverer.access$000(DeploymentReceiverCallbackDeliverer.java:12)
         at weblogic.deploy.service.internal.targetserver.DeploymentReceiverCallbackDeliverer$1.run(DeploymentReceiverCallbackDeliverer.java:45)
         at weblogic.work.SelfTuningWorkManagerImpl$WorkAdapterImpl.run(SelfTuningWorkManagerImpl.java:516)
         at weblogic.work.ExecuteThread.execute(ExecuteThread.java:201)
         at weblogic.work.ExecuteThread.run(ExecuteThread.java:173)
    Apart from these, I have Model and View Controller projects in the application. If I create the ADF task flow based on a Human task in another sample application, it works fine. Only in this application, it does not work. Not sure what this error is. Any ideas?
    Thanks,
    Manoj

    What I suggest is go into EM and undeploy this composite and all versions. (Only if you don't want the existing ones). Then redeploy your process. This will avoid the version conflict and create a new version. 1.0. Then the next time you try and deploy you need to either specify a new version or check the box to say the version can be over written.
    cheers
    James

  • How to open and navigate between human task forms in a same page?

    Hi
    I use Oracle BPM 11.1.1.5
    I have a question about taskflows in BPM Application.
    In ADF web application, I create a sipmle task flow and insert view id and bind these to jspx pages, my pages are opend in same page when
    return an outcome.
    For exapmle I have three pages like A,B,C.
    In task flow, insert three view ids and bind to A,B,C.
    My first pages is A, and when outcome is B navigate to B, when my outcome is C then navigate to C in a same page not separate pages.
    But my problem is here.. in BPM Application when create task forms, every task has a separate task flow that there exist a single view id and a wild card flow in it.
    In BPM workspace when initiate human task form is closed, I should press refresh button to see next human task form in task list table.
    I tried to create a simple task flow and insert human task forms in it and navigate between these.. but show human task form in wrong display and don`t show some component and human task payload.
    Now, my question : How to open and navigate between human task forms in a same page like software installation?

    Having a separate Data Control for each human task is normally the case. There is a way to assign multiple human tasks to a single data control (and one task flow), but I don't think that this is going to help you with what I think you're trying to do.
    If your human task is called "EmployeeDetail", then you'd use the data control associated with this for the UI pages in the task flow diagram that is associated with this human task. For example, you might have a first page that has just the basic employee information - the fields (at least the ID field) would come from the EmployeeDetail data control. When the end user clicks "Next", you might have this UI page flow to a second UI page in the task flow diagram that has the employee's address information. You might place the address fields from the EmployeeDetail data control onto this second UI page.
    You might be asking how the work item instance can automatically flow to the next interactive activity in the process while staying inside the first interactive activity's human task's task flow diagram. This is not how it works - the task flow diagram models the end user interaction while inside a single human task that is tied to a specific interactive activity in the process. If you want a the end user to be able to move the instance through multiple interactive activities in the process in one interaction, look at "Activity Guides". Activity Guides do a nice job of this.
    Dan

  • Human Task : assign task to user at runtime based on some conditions

    HI ,
    I have a requirement that is, Assign task to users/ groups at runtime for approval based on material qty. please help me in design approach to achieve the same.
    thanks in advance.
    Guru

    Hi Guru
    You can achieve this with and without business rules. I am assuming you have a payload with element like "qty". In task details page or somehow, this gets filled. Now later on you can have like this:
    1. Without Business Rules:
    a) Lets assume you have human tasks like ApproverDefault, Approver100, Approver200, ApproverAll etc.
    b) After your first Task, add a XOR Gateway. Default path of XOR goes to ApproverDefault. Then you have like 3 more paths with Conditions like qty between 0 and 100 goes to Approver100. Qty between 100 and 200 goes to Approver200. Qty more than 200 goes to ApproverAll.
    Quantity
    No conditions (Default) -> ApproverDefault
    qty < 100 -> Approver100
    qty > 100 and qty < 200 -> Approver200
    qty > 300 -> ApproverAll.
    2. With Business Rules
    a) This needs some learning. Please do refer detailed online docs. I am just giving brief steps. Create extra fields of type Boolean in payload like AutoApproved, NeedApproval100, NeedApproval200, NeedApprovalAny etc. Have more meaningful names as per your requirement and human task though.
    b) You need to drag and drop Business Rules component and edit it in JDeveloper.
    c) First create a Bucket set with Range of Values for Qty field like -infinity to 0, 0 to 100, 100 to 200, 200 to infinity. You just enter rows like 0, 100, 200, and rest is taken care to add these Ranges.
    d) Now create Decision Rules. For each range, create a action and set the flag(s) appropriately.
    e) See hello world example for exact steps and full understanding.
    http://www.oracle.com/webfolder/technetwork/tutorials/obe/fmw/obpm/11g/r1/firstProcess/firstprocess_obpm11g.htm
    Pros & Cons:
    a) Without Business Rules is very simple and straight forward. Quick and easy to develop and test. But if you want to control the range of values for qty, you need to modify the process and redeploy. Its kind of tight.
    b) Business Rules gives more flexible. You can change qty at run time, provided you use BPM Composer. But takes some learing and needs some debug if it fails like that.
    There are many differences and pros and cons. But above are the main ones.
    If you are a beginner, go with First Approach for now.
    Thanks
    Ravi Jegga

  • ADF Human Task Form

    Hi all,
    I created a BPEL process with Human task activity and Auto generated a Human task form(ADF Form).
    after deploying the process ,in the work list console im able to see the task details and task form is also displayed.
    if isome values are upadted in ADF task form it does not get dispalyed in the form.once if i refersh manually i m able to see the changes.
    how can i make the task form refersh automatically say for example after each and every minute.
    Any suggestions?
    Thanks,
    karthik

    Hi Frank,
    i was looking into this document : http://download.oracle.com/docs/cd/E12839_01/integration.1111/e10224/bp_designtf.htm#CACFCJFE
    26.3.2 How To Create an ADF Task Flow Based on a Human Task.
    Here ADF pages are auto generated...
    Any suggestion from you where i can go and edit the auto generated task forms so that it can refersh itself automatically.
    Regards,
    karthik

  • How to specify stylesheet for attachments in Human task

    Dear Experts,
    I can able to add an attachment from BPEL process to Human Task. So from Worklist I can able to download the attachment. Here, I am attaching an XML payload, and I am receiving .xml file from worklist. Now I want to do xsl mapping with my attachment. To do that we have an option when creating Human Task from BPEL . In .task form, under advanced settings--> specify style sheets for attachments, specify wordML for attchments. I have used those options. But not yet my .xsl file mapped with .xml. Is there is any other way to do xsl mapping. Please suggest me.
    Thanks,
    Rajesh

    Hi Anirudh,
    I am using SOA Server suite 10.1.3.1 and JDeveloper 10g. Also I am not using "Application Server Developer's Guide for Microsoft Office Interoperability" this document, what you have mentioned in your last post. My problem is I am having xsl with me, need to map this xsl to my xml attachment. To do that we are having an option on .task form editor, Under Advanced Settings. We can mention/specify stylesheet for attachment, or we can specify wordML for attachment. I have tried both but I cant able to do xsl transformation. I have seen some code in this link. But I dont know whether this blog is correct one. Please suggest me.
    Thanks,
    Rajesh

  • Fault/Error Handling in Human Task

    Hi,
    We are using Oracle BPM 11.1.1.3.
    1. I create "synchronous" BPM process containing Human Task. Is synchronous process containing Human Task correct? When I invoke this process through EM console, it hangs, i.e. I can not interact with EM console any more. I think the reason is, Human Task activity when executed expects human interaction. I am correct?
    2. I create "asynchronous" BPM process containing Human Task. I invoke it and it runs properly. I login to workspace and work on task.
    My main question is: "Asynchronous" process executes Human Task and waits for Human Interaction. My process is invoked by Java. How will calling Java code know if execution was successful? If any fault/error occurs how can I notify? How will I notify calling Java code if human task encountered any error?
    Please let me know if my question is not clear.
    Many Thanks.

    Hi Anirudh,
    Thanks for quick reply.
    I have a requirement where based on certain condition i need to update the task and reassign it.
    There is a batch that runs and performs the task. While doing so i dont have any info as to whom
    the task is assigned.
    So i am using bpeladmin to perform the task.
    If task is assigned to user and i try to update the task using bpeladmin then am able to do so.
    But if the task is assigned to Group i am getting the error. If task is assigned to user, i am able to
    acquire the task but not able to update the task.
    While updation it shows the task has been acquired by some other user.
    Is there any other way by which i can implement the same ?
    Regards,
    Bhavik

  • Human task Parellel participant issue

    Hi all,
    I am new to SOA BPEL. I have made a process with Human Task. In human task I have used parallel participant option.  One to "Manager" and second to a group "ABC"
    Now once it execute I am getting the workitem assigned to both the participant. But my requirement is once any of the participant "APPROVE" or "REJECT" I want to flow to move ahead and end.
    What is happening as of now is If I approve as a manager still my full workflow waiting somebody from the group "ABC" to respond and then only it is going to END.
    Can anybody tell me what would be the configuration or way to achieve this?
    Thanks in advance.

    What happened when 'ABC' group user approve or reject?
    Also have you configured the option for percentage of outcomes i.e. you can set the percentage of particular outcome if that condition of percentage met the workflow will continue other wise it will wait. By default it is set 50% for any of the outcomes that mean when 50% percent of outcome done out of total assignment the workflow will continue.
    Regards,
    Anshul

Maybe you are looking for

  • In-Browser editing - uploading a PDF as download link?

    Can a client who has access to a Muse site with in-browser editing enabled logo on and add a link to download a PDF for e.g.? Also, I presume the client doesn't have the ability to add new pages to the site? Thanks!

  • Seeburger SFTP Sender Adapter Failure

    Hello, a SFTP sender channel causes the follow error when executing a poll cycle: SFTP Adapter failure Details: while trying to invoke the method com.seeburger.uri.dt.sftp.schema.DtSFTPPollingResponse.setSuccessMessage(java.lang.String) of an object

  • [Oracle 8i] ORA-00932 Inconsistent Datatypes

    Hopefully this is a quick question to answer. In running a query I get the 'inconsistent datatypes' error, and I've narrowed the error down to one part of my query: SELECT     CASE                WHEN     sopn.plan_start_dt < SYSDATE     THEN SYSDATE

  • JDeveloper 11g: Can System.console be used with the JDev debug window

    The version of JDev should not matter for this problem. I am working on a console application that I would like to debug from within JDev. Unfortunately, System.console does not detect the JDev debug window as a valid Console object. Running the foll

  • Is it possible to remove Locks in SQL server 200 using java code...???

    Hi floks, I had i trickey situation in which my application is creating the locks over the tables in the DB(SQL server 2000) . Iam using Struts frame work 1.1 + jsp in our application. Iam bit worried wether the locks can be removed with the java cod