Process speed necessary for real time livetype & Motion

Does anybody remember the minimum processor speed necessary to
run LIVETYPE and MOTION from WITHIN FCP5...not as seperate apps?
The online spec sheets indicate the speeds necessary for running as seperate apps,
but not for real time from withing FCP5...at least, not the ones I can find.
Thanks.

Where did you encounter the promise of real time in FCP?
Can't be done AFAIK.
Even if possible, you'd only get a few misleading preview frames.
We've got our new biga$$ Macs arriving in a few weeks. I'll let ya know if anything happens real time in FCP.
bogiesan

Similar Messages

  • Desing requriment for processing the IDOC in real time

    hi Gurus,
    we have a requirement to design for processing the IDOC in real time i.e.all the IDOC must be store and process for give time line with out using BPPM tool.we have suggested to use cache storage or storing the files in file adapter.
    please suggested good process with out compromising the Performance of PI.
    regards
    shankar

    hi Raj,
    Please find the example below for your reference
    let say
    System A-->PI--
    >system B
    system A sends multiple files based on time(daily or weekly) and real time( as an when the record created) to systerm B (CRM) in the form of IDOC Via. PI
    we needs to club the real time files and send it to system B.How best we can do without using BPM.
    regards
    shankar

  • "Waiting for real-time target (RT PXI target) to respond" error when the program waits interrupts

    Hi there,
    I have developed an application to detect interrupts generated by a electronic card and act in consequence. The program has been developed in labview but it calls a dll; that was created with labwindows. The dll is programmed to open the visa communication, enable events and install the interrupt handler and when an interrupt is detected, it reads the value of the different registers of the card and returns it to labview to visualize them. 
    The problem is that when the program waits for an interrupt, a prompt appears with the message "Waiting for real-time target (RT PXI target) to respond" and the only option I have is to click on the button to disconnect from the pxi or just wait. If I wait and I generate an interrupt, the prompt disappears and the application visualize the data like it was expected. 
    To wait for the interrupt the following code has been programmed in the function:
                    while (flag == 0)
                                    Sleep (1000);
    When an interrupt occurs, the value of flag changes to 1 and the function continue without any problem. I am not really sure, but probably here is the problem and probably this is not the best way to wait for an interrupt because the sleep function suspends the thread for the configured time, but at least the computing load in the PXI is between 0% and 1%. I was wondering if somebody knows how to wait for an interrupt without "lost" the communication with the PXI and if there is a better way to do it. 
    Any answer will be welcome and thanks for them,
    Jaime
    Solved!
    Go to Solution.

    Hello Naity,
    First of all, in which thread runs the waiting process? Is it scheduled in another thread than the function setting the flag?
    It scheduled in the same thread that I use to configure the communications and configure the card. Anyway, here is the pseudo code of the function interrupt that I programmed under labwindows,.
    char* interrupt(void)
    1. Open visa communications
    2.Install handler interrupt --> status = viInstallHandler (instr, VI_EVENT_PXI_INTR, IntrHandler, VI_NULL);   // the function IntrHandler will be called when an interrupt occurs
    3. Enable event PXI interrupt
    4. Wait
    while (flag == 0)
                  Sleep (1000);
    5. Visualize the data coming from the interrupt (registers and values measured with the card)
    6. Uninstall handler interrupt
    7. Close visa session
    The interrupt handler function IntrHandler is called immediately when an interrupt occurs and the pseudo code is like this
    ViStatus _VI_FUNCH IntrHandler(ViSession instr, ViEventType etype, ViEvent event, ViAddr userhandle)
    1. Disable some functions of the card to avoid damages. 
    2. Read registers and put them in a buffer
    3. Change the value of flag ---> flag = 1;
    In labview, I call the function interrupt with a call library function node (see the capture attached) and the program reads and saves the data from returned from the function.
    Secondly, I am not sure this method is the most elegant. You could for example register an event with the function and, insteand of setting a flag to 1, trigger the event and schedule it in another thread (if the function is thread safe). This could reduce your CPU Load even more and seem a bit cleaner to me.
    I've never used events before in labwindows but I will try to do it in this way. But anyway, I suppose that I should; somehow, wait the event to occurs in labview while the waiting for the event is programmed inside the dll...and probably the same prompt that i am trying to avoid is going to appear again, because I am not returning the "control" to labview (I mean, labview executes the dll and waits for the event to occur. Then the execution of the labview program is stopped in the call library function node executing the dll)
    Third point, which environment of development are you using?
    I am working with LV 2010 sp1 and Labwindows cv 10.0.1 and with the real time module.
    I did also another test, I divided the program in different functions, one to initialize the communication, another to wait until a interrupt has been detected and the other to obtain the data from the interrupt and close communications. With labview I call first with the call library function node the function to initialize, later I call inside a while loop the wait function like this
    int waitAseconds (double seconds, short stop_waiting)
    if(flag==1 || stop_waiting == 1)
    flag = 1; //to detect the stop_waiting button
    printf("flagAA =1 stop waiting = %d time = %d\n", stop_waiting, clock());
    return flag;
    else
    SleepUS(seconds*1000000);
    //a++;
    printf("flag a= %d stop waiting = %d time = %d\n", flag, stop_waiting, clock());
    return flag;
     and when the program detects an interrupt, the function returns to labview the flag and stops the loop. Finally, it reads the values and close communications. 
    In this way, the prompt appears but after running the application for 10 or 20 minutes and also i checked that there is a time gap between the executions in the loop.
    Thanks for your reply and your help,
    Jaime
    Attachments:
    capture.png ‏40 KB

  • Defining Account Determination for Real-Time Integr

    Dear all,
    I haven't understood yet about Account determination for the real-time integration of Controlling (CO) with Financial Accounting (FI).
    Please tell accounting process that use this account. And give me a detail example.
    Thanks so much
    Minhtb

    Hello
    This is the new feature in New GL accounting
    During allocations in Controlling, most of the postings created do not affect Financial Accounting. These postings do not update any G/L account transaction figures; they are postings within Controlling. If, however, an allocation in Controlling leads to a change in the functional area or any other characteristic (such as Profit Center or Segment) that is relevant for evaluations in Financial Accounting, a shift occurs between the affected items in the profit and loss statement. For this reason, this information has to be transferred to Financial Accounting. This reconciliation between Controlling and Financial Accounting takes place by means of real-time integration.
    As a result of real-time integration, all Controlling documents that are relevant for General Ledger Accounting are transferred from Controlling to General Ledger Accounting in real time. This means that Financial Accounting is always reconciled with Controlling.
    A document is created in Financial Accounting for each posting in Controlling. This means that the detailed information contained in the CO documents is always available in reports in New General Ledger Accounting. This information can be sorted by the following, for example:
    ●     Functional area
    ●     Cost center
    ●     Internal order
    Real-time integration replaces the reconciliation postings from the reconciliation ledger. Consequently, you do not need a reconciliation ledger.
    If, however, you do not set the Reconciliation Ledger Active indicator in Customizing for the controlling area, you cannot use the reports belonging to report groups 5A* (5AA1-5AW1). You set this indicator in Customizing for Controlling under General Controlling ® Organization ® Maintain Controlling Area. The reconciliation ledger serves as the data source for reports belonging to the report groups 5A*. You find these reports in the SAP Easy Access menu under Accounting ® Controlling ® Cost Element Accounting ® Information System ® Reports for Cost and Revenue Element Accounting.
    Replacement reports are available as follows:
    ●     You find the reports in the SAP Easy Access menu under Accounting ® Controlling ® Cost Element Accounting ® Information System ® Reports for Cost and Revenue Element Accounting (New).
    ●     You can create additional reports in report group 5A21. You can assign the report group to any drilldown report of New General Ledger Accounting using the report-report interface.
    ●     From the report Financial Statements Actual/Actual Comparison, you can call up the report Cost Elements: Breakdown by Company Code. You find the report Financial Statement: Actual/Actual Comparison in the SAP Easy Access menu under Accounting ® Financial Accounting ® General Ledger ® Information System ® General Ledger Reports (New) ® Balance Sheet/Profit and Loss Statement/Cash Flow ® General ® Actual/Actual Comparisons.
    You can define account determination for each controlling area. You do this in Customizing for Financial Accounting (New) under Financial Accounting Global Settings (New) ® Ledgers ® Real-Time Integration of Controlling with Financial Accounting ® Account Determination for Real-Time Integration. In this way, you use the same account determination as for the reconciliation ledger (transaction OK17). You can then use the reconciliation ledger reports to compare FI balances with CO balances.
    Prerequisites
    If you use real-time integration in at least one company code, you need to have activated company code validation for the related controlling area. You do this in Customizing for Controlling under General Controlling ® Organization ® Maintain Controlling Area ® Activate Components/Control Indicators. Otherwise, the reconciliation between Financial Accounting and Controlling at company code level is not possible.
    In Customizing for Financial Accounting (New), you have processed the IMG activities under Financial Accounting Global Settings (New) ® Ledgers ® Real-Time Integration of Controlling with Financial Accounting.
    Activate real-time integration for all company codes between which you want to make CO-internal allocations.
    In the IMG activity Define Variants for Real-Time Integration, do not select all CO line items for transfer. If the same line items are to be transferred as through the reconciliation posting from the reconciliation ledger, select the following line items:
    ●      Cross-Company Code
    ●      Cross-Business Area
    ●      Cross-Functional Area
    ●      Cross-Fund (if you use Public Sector Management)
    ●      Cross-Grant (if you use Public Sector Management)
    Features
    Value flows within Controlling that are relevant for General Ledger Accounting – such as assessments, distributions, confirmations, and CO-internal settlements – are transferred immediately. The FI documents are posted with the business transaction COFI. They contain the number of the CO document. This means that you can call up the CO document from the FI document, and vice versa.
    Activities
    If a document could not be transferred because the posting period was blocked in Financial Accounting or no account was found, for example, the document is included in a postprocessing worklist. You need to check this worklist regularly and process any documents in it. From the SAP Easy Access menu, choose Accounting ® Financial Accounting ® General Ledger ® Corrections ®Post CO Documents to FI.
    Example
    An internal order for business area 0001 is settled to a cost center of business area 0002. The document from this allocation is transferred in real time to Financial Accounting.
    Reg
    assign points if useful

  • Is vision development module in labview 8.6. sufficient for real-time image acquisition and analysis using a webcam

    Hi, 
    I'm new to labview and trying to develop an eye-tracker using labview 8.6. It has the vision development module and i was wondering if this was sufficient for real-time image acquisition and processing or would i be needing any other software tools.
    Solved!
    Go to Solution.

    Hello, certainly it is possible and sufficient for real-time tracking!
    About eye tracking - if you need an example, you can find the code here:
    https://decibel.ni.com/content/blogs/kl3m3n/2013/10/08/real-time-face-and-eye-detection-in-labview-u...
    The code uses OpenCV functionalities along with the LabView UI (and some other functions like overlay).
    Hope this helps a bit.
    Best regards,
    K
    https://decibel.ni.com/content/blogs/kl3m3n
    "Kudos: Users may give one another Kudos on the forums for posts that they found particularly helpful or insightful."

  • Pxi 1042 configuration for Real-Time

    I have purchased
    PXI-1042
    controller 8187
    one module for data capturing.
    I want to configure the said pxi for Real-Time purposes,
    so what steps should I follow?
    thanks
    Abbas
    Solved!
    Go to Solution.

    The Real-Time Deployment License is different from the LabVIEW RT module.
    When you purchase a PXI controller, part of what you are buying is the operating system that is installed on it.  If you purchased the controller with Windows on it then you purchased the copy of Windows that came with it.  Now that you want to put the real-time operating system on it, you need to purchase the license for it.
    But that's all legal stuff.
    And you are correct that there is a copy of the RTOS on the controller.  But if your controller has its disk formatted as NTFS you will not be able to use it.   The RTOS requires that the hard drive be FAT32. 
    If your controller is FAT32 then you can boot into BIOS (hit delete while booting), and select Real-Time in the Boot Configuration to make your controller boot into Real-Time.
    If you controller is not FAT32 then you will need to format the controller first, using the disks I have previously mentioned.
    Please let me know if you have any questions.
    Justin Parker
    National Instruments
    Product Support Engineer

  • MAX support of SNTP for Real-time controller​s

    Hey everyone,
    I have some PXI systems that allow me to enter a Time Server IP address directly into the MAX setup for the device but I have some other PXI chassis that don't. Does this have to do with the version of Real-time they are running? Can anyone tell me what version of RT and MAX started supporting Time Servers natively through MAX for real-time controllers?
    Thanks,
    Craig

    Hi craige,
    It looks like SNTP synchronization is not fully supported for PXI systems:
    http://forums.ni.com/t5/LabVIEW/Configuring-PXI-81​84-controller-to-synchronize-to-SNTP-server/td-p/1​...
    However, for CompactRIO, synchronization with SNTP servers began with LabVIEW Real-Time 8.6:
    http://digital.ni.com/public.nsf/allkb/F2B057C72B5​37EA2862572D100646D43
    The forum post I linked above does have some links to customer created examples relating to NTP and SNTP Time Servers.
    Please note that those examples are both unsupported and a little bit on the older side.
    Regards,
    Joel I.
    Applications Engineer
    National Instruments

  • FI CO Integation: Document type for real-time integration with FI not there

    Dear Gurus,
    This is the error message that I got and I am looking for a solution could anyone help me please.
    I was doing simultaneous costing and doing Product Cost Collector reports.[KKBC_PKO]
    This is IDES 6.00 ehancement package 4,
    How do I define a document type for real-time integration with FI?
    Message no. FAGL_COFI003
    "Diagnosis: For CO documents to be transferred into Financial Accounting in company code 1000, -the system requires a document type".
    How do I go about with this, need steps to resolve this please
    Thank you
    Saleem

    Hi,
    1. Check which variant is assigned to your company code '1000' using this IMG path
    IMG->Financial Acctg (New)->Financial actg global settings (New) ->Real-Time integration of Controlling with Financial Actg ->Assign variants for Real-time Integration to Company codes.
    2. Check if document type is assigned to the variant assigned to your Company code in this path:
    IMG->Financial Acctg (New)->Financial actg global settings (New) ->Real-Time integration of Controlling with Financial Actg -> Define Variants for Real-Time Integration.
    Hope this helps.

  • How configure Define Account Determination for Real Time Integration

    Hi All,
    I am doing configure of new company just know about how do i configure for Define account determination for real time intergration. what is the use? Pleaes give me some clarity with example.
    Thanks
    Pankaj

    Hi,
    Please go through the below link:-
    http://help.sap.com/saphelp_erp2004/helpdata/en/22/c2cf4031288131e10000000a1550b0/content.htm
    Regards,
    Gaurav

  • How to identify the Stanadard Extractor  will support for Real time Data

    How to identify the Stanadard Extractor  will support for Real time Data  Acquisation . Enabled

    Hi
    In the ROOSOURCE table you can find the extract structures, go through all the fields of the extractor and if you find all of your equired fields exist ok else try to enhance for teh needed fields and go with user exit to populate the data for that fields'

  • Process Chain for Real Time Demon

    Please help I am stuck I followed the step by sdn but this is missing in step. how to create now process chain.
    I created the below
    DSO CONNECTED TO dATASOURCE via Trans,
    Real Time IP
    Real Time DTP
    assigned to Datasource and assigned the DS, IP, DTP to Deamon in RSRDA. NOW I started also manually via start all IP. but How to set the process chains now.
    PLEASE HELP ME STEP BY STEP TO PROCESS CHAIN SINCE i am new to this daemon in process chains
    Thanks
    Soniya
    null

    Hi
    refer to this
    CREATION OF PROCESS CHAINS
    Process chains are used to automated the loading process.
    Will be used in all applications as you cannot schedule hundreds of infopackages manually and daily.
    Metachain
    Steps for Metachain :
    1. Start ( In this variant set ur schedule times for this metachain )
    2.Local Process Chain 1 ( Say its a master data process chain - Get into the start variant of this chain ( Sub chain - like any other chain ) and check the second radio button " Start using metachain or API " )
    3.Local Process Chain 2 ( Say its a transaction data process chain do the same as in step 2 )
    Steps for Process Chains in BI 7.0 for a Cube.
    1. Start
    2. Execute Infopackage
    3. Delete Indexes for Cube
    4.Execute DTP
    5. Create Indexes for Cube
    For DSO
    1. Start
    2. Execute Infopackage
    3. Execute DTP
    5. Activate DSO
    For an IO
    1. Start
    2.Execute infopackage
    3.Execute DTP
    4.Attribute Change Run
    Data to Cube thru a DSO
    1. Start
    2. Execute Infopackage ( loads till psa )
    3.Execute DTP ( to load DSO frm PSA )
    4.Activate DSO
    5.Further Processing
    6.Delete Indexes for Cube
    7.Execute DTP ( to load Cube frm DSO )
    8.Create Indexes for Cube
    3.X
    Master loading ( Attr, Text, Hierarchies )
    Steps :
    1.Start
    2. Execute Infopackage ( say if you are loading 2 IO's just have them all parallel )
    3.You might want to load in seq - Attributes - Texts - Hierarchies
    4.And ( Connecting all Infopackages )
    5.Attribute Change Run ( add all relevant IO's ).
    Start
    Infopackge1A(Attr)|Infopackge2A(Attr)
    Infopackge1B(Txts)|Infopackge2B(Txts)
    /_____________________|
    Infopackge1C(Txts)______|
    \_____________________|
    \___________________|
    __\___________________|
    ___\__________________|
    ______ And Processer_ ( Connect Infopackge1C & Infopackge2B )
    __________|__________
    Attribute Change Run ( Add Infobject 1 & Infoobject 2 to this variant )
    1. Start
    2. Delete Indexes for Cube
    3. Execute Infopackage
    4.Create Indexes for Cube
    For DSO
    1. Start
    2. Execute Infopackage
    3. Activate DSO
    For an IO
    1.Start
    2.Execute infopackage
    3.Attribute Change Run
    Data to Cube thru a DSO
    1. Start
    2. Execute Infopackage
    3.Activate DSO
    5.Further Processing
    6.Delete Indexes for Cube
    7.Execute Infopackage
    8.Create Indexes for Cube

  • Is there an 8.2 version of the local executeable for real-time?

    Hi all.
    Been working on some new software for LabVIEW real-time, using 8.2.  Our users like the way things were built around here circa v7.1 when we would build an executeable on the local PC.  When we ran it, it brought up the target selection dialog and would download and then run the application to the real-time station, displaying the user interface in the application instance on the local PC. 
    Is there an equivalent to this build type in 8.2, or is it all remote panels nowadays?  Many of these old-school applications are being ported over to 8.2 so a rewrite to split the application into real-time and user display executeables would be a bit much.  I'm also hoping to avoid needing additional remote panel licenses in the frequent case where they have more than 5 windows open at once.
    Thanks,
    Dan

    Hi Dan,
    Thank you for contacting National Instruments.  In the more recent versions of LabVIEW, 8.0 to 8.5, this process is integrated with the project.  Therefore, there isn't an equivalent build type to that you have described in LabVIEW 7.1.  In this format a target VI along with a host VI is commonly used in Real-Time applications.  The host VI is not necessary, however if you desire to have a user display/interface, or significant data storage this should be done on a host VI to maintain determinism. 
    If you do want to have a basic Front Panel on the Real-Time target, this can be accessed via Remote Front Panels.  However, from a built executable only one instance of this can be opened at a time.  Therefore, if you have a need to view this Front Panel from multiple points at a time, you can do this if the target VI is not a built executable, but merely run manually from the host computer. 
    I hope this helps.  Let me know if you have related questions or need additional clarification.  Have a great day!
    Jason W.
    National Instruments
    Applications Engineer

  • Need your help !!! -- Authorization error for Real-Time Bex query

    Dear experts:
    I have a Bex query built on a multiprovider, this multiprovider is consist of one standard cube and one real-time cube(virtual provider). When I run this query, I can retrive the data and no error occured, but when others execute this query, they will get the error message below:
    Operation Generate a Request could not be carried out for DTP DTP_D7JVT8DGBQWPWL13VIUITNODG
    You do not have authorization for the data transfer process
    Errors occurred during parallel processing of query 2, RC: 3
    Error while reading data; navigation is possible
    Row: 54 Inc: WRITE_MESSAGES Prog: CL_RSDR_AT_QUERY
    I used tcode rsecadmin to track the authorization, when I execute as user XXX, I can get the same error above, but when I go to "Display Log", no error showed there.
    Did anybody meet the same error before? How to resolve that?
    Any post would be appreciated and thank you all in advance!
    Tim

    I think there is some missing authorization,here
    the user has no access to execute the DTP.
    You can analyse it in rsecadmin or also see
    which object you are getting in su53.
    Thanks,
    Saveen

  • How can i understand the Process Chain management in real time!!!

    Hi,
    now i am learning BW concepts. now i would like to know the real time scenarios regarding Process chains. can any body help me in this matter?.
    thanks,
    stikanth.ch

    Hi,
    A process chain is a defined sequence of interdependent processes required to perform acomplex task in an SAPBW environment. Data maintenance tasks in SAPBW are notrestricted to uploading data. Aggregate rollups, index maintenance, master data and ODS activation, and a variety of other jobs are required to update data, guarantee best-possible performance, and maintain data integrity. Typical SAPBW implementa-tions have complex interdependent networks of jobs in place that run every night, week,or month.Previous releases of SAPBW did not provide an integrated solution for scheduling and monitoring those kinds of job networks. This has changed with the introduction of process chains in release 3.0. Process chains allow you to define complex job networks consisting of standard SAPBW jobs, as well as custom jobs; they support visualizing the job network and centrally controlling and monitoring the processes.
    (from "Mastering the SAP BIW")
    New Features in BI 2004s Process Chains
    /people/mallikarjuna.reddy7/blog/2007/02/08/new-features-in-bi-2004s-process-chains
    Designing
    /people/vishvesh.bahirat/blog/2006/11/29/bw-process-chain-design
    Process chain creation in 2004s - step by step
    /people/juergen.noe/blog/2008/01/11/process-chain-creation--step-by-step
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
    http://help.sap.com/saphelp_erp2005/helpdata/en/87/13843b74f7be0fe10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/67/13843b74f7be0fe10000000a114084/content.htm
    Process Chain Errors
    /people/mona.kapur/blog/2008/01/14/process-chain-errors
    Common Process chain errors
    process chain issues or errors
    Try Searching in SDN for this Topic and you will find much detailed info as this is discussed very frequently.
    Hope this helps.
    Thanks,
    JituK

  • Launch activities for real-time + GR + GI.

    Hi, Gurus.
    Iu2019m new to SAP market and I'm posting here first time. I would like your help as well as they can count on me for anything. I would like to use BAPI_REPMANCONF1_CREATE_MTS to confirmation of the REM GR + (131) + GI (261) but without taking planned hours to CO. These activities must be put at real time, and not by the rate routing. It is possible to carry out this process through this same BAPI_REPMANCONF1_CREATE_MTS?
    N.B.: Must then launch the real-time activities. Does anyone have any idea how to do?
    Tks.
    Armando Theophilo.

    Hi, Gurus.
    Iu2019m new to SAP market and I'm posting here first time. I would like your help as well as they can count on me for anything. I would like to use BAPI_REPMANCONF1_CREATE_MTS to confirmation of the REM GR + (131) + GI (261) but without taking planned hours to CO. These activities must be put at real time, and not by the rate routing. It is possible to carry out this process through this same BAPI_REPMANCONF1_CREATE_MTS?
    N.B.: Must then launch the real-time activities. Does anyone have any idea how to do?
    Tks.
    Armando Theophilo.

Maybe you are looking for

  • How can I transfer music from my ipod to a mac?

    I have just over 1000 songs on my 4th generation ipod touch. When I try transfering my ipod purchases onto my mac, it says I need to authorize my computer. So I authorize it, and then transfer the purchases. An error comes up saying there are 91 prob

  • Finding and deleting "others"

    Is there anyway I can find out what the "other" is that is taking up a bunch of room on my ipod nano? Because it's taking up more room that it ever has before and I'm tired of not being able to add songs without having to delete songs. Sam

  • How to use ADF in a team

    Can somebody please suggest a team collaboration model for working with ADF? Because JDeveloper manages all the changes via the visual-graphical tool, what is a good way to divide work in a team, without having the work (or changes thereof) of one te

  • Time Machine Stopped Working After Update

    I updated the most recent OSX 10.6.3 and disk utility etc. then suddenly my time machine stopped backing up to external disk attached to Airport Extreme. I have a Seagate drive attached to the AE. I can see the drive and I can see the time machine fo

  • How to turn off demo mode in Xeperia Z1

    Hi, How to turn off demo mode in Xeperia Z1, Please help on this. Solved! Go to Solution.