Quality Intergrtion with other Modules

Dear Gurus,
I have activated quality inspection for all the incoming raw material.
GRN is carried out in two step i.e.103+105. At 105 inspections lot are generated.
1.     When the Material is accepted what is effect on the MM+FI Module?
2.     When the Material is rejected (Moved to Block stock) what is effect on the MM+FI or other module?
3.     Can I block the payment to vendor due to Quality Reason?
Regards
Shoib

Dear Gurus,
Thank for the Replying.
I am having small clarification.
1. When the Material is accepted what is effect on the MM+FI Module?
*At 105 MM+FI Documents are getting updated,But when i accept move to Unrestricted Stock at the back end  321movt for this mvt type what is the Effect on MM+FI*
2. When the Material is rejected (Moved to Block stock) what is effect on the MM+FI or other module?
When i Reject stock is moved to Block Stock 350 for the what is effect on MM+FI.
3. Can I block the payment to vendor due to Quality Reason?
*Can i make Automatic Payment Block for 2 step Movement Type i,e at 105*
4. Can i make the payment on the basis of Quantity accepted from Quality Department
( eg  When lot is partially accepted 100kg =60kg Accepted + 40Rejected )?
A waiting for Reply...!
Regards
Shoib

Similar Messages

  • PM Integrations with Other Modules

    Dear Experts,
    Can u all pls list out what are all the major INTEGRATION of Plant Maintenance module with other modules?
    And how it can be done?
    Regards,
    Rajesh

    Hi Rajesh,
                Let us consider one practical issue of Spare Parts purchase.
    We prefer to inspect incoming material for compliance of our requirement.
    1.While creation of material master, tick the 'Post to insp. stock' box in the Purchasing Tab.
    2. If we do not want a task list / Result recording oriented inspection, in Quality tab, choose appropriate selections,
    3.When that Spare is received, it will go to Quality Stock.
    4. Maint. person can check it and transfer the stock to "Unrestricted Stock" through MB1B via 261 movement, giving a reason as Accepted after Inspection or Rejected.
    5. Above procedure is a practical example of PM QM integration.         
    Integration between PM and PP
    In the equipment Master, under the location tab, mention the PP work center, and in the task list under the Header give the system condition "0" ie M/C not in operation, before doing this in the custimosation under Maintennace and service order-general data-- "Create System Conditions or Operating Conditions" check the box for PM reservation.so when ever a maintenance order is raised against that equipment, it will block the prod.
    The integration aspects of MM-PM are:
    1) for non stock materials requirement, purchase requsition can be created from the plant maintenance order. PR is converted to the Purchase order. when ever goods receipt is done , the cost is directly booked to the plant maintenace order.
    2) for stock materials requirement,,reservation can be created from the plant maintenance order and the material can be issued to the order against the reservation.
    3) Like materials , for services also PRs can be created from the plant maintenace order.
    Another integration is BOM - Bill Of Material.
    With Equipment BOM, you can create a list of material through which equipment is created or in othre words you can mention the spares that you may require during the maintenance of the equipment. 
    FICO-MM-PM Integration 
    the integration points between PM and MM/FICO during the PM configuration.
    Below are some integration aspects:
    Integration with MM:
    1.Material master record for Batch Managed material as Equipment
    2.Reservations and Goods Issue for Maintenance Order
    3.Material valuation class/types for refurbishment materials as equipment
    4.Triggering PR from Maintenance Order
    Integration with FICO:
    1.Asset/Sub-Asset numbering in Equipment Master Data
    2.Activity based costing for Operations performed through Maintenance Order
    3.Settlement of accrued costs in Maintenance Order to G/L Account,Cost Center, Asset etc.,
    If it is reallyuseful to you pls reward me with points
    Regards
    Satish
    Edited by: P.Shanmuga Satish Kumar on Jan 24, 2008 6:57 AM

  • MM Integration with other modules

    Hello & thanks for being so quick in responding me ,
    Can someone help me with the integration of MM-PP,MM-QM, is there anymore modules apart from these 4 which interact with MM i mean SD FI QM & PP.

    hi
    FI-SD-MM Integration
    http://www.sap-img.com/financial/integration-of-fico-with-other-modules.htm
    http://www.sap-img.com/sap-mm.htm
    http://www.sap-img.com/sap-pp.htm
    http://www.sap-img.com/sap-qm.htm
    http://www.sap-img.com/sap-sd.htm
    nag

  • Oracle Sales Integration with other modules - Flow Diagam

    Hi,
    Where can i find a flow chart showing Oracle Sales Integration with other modules?
    Thanks,
    Hari

    Hi
    You can refer to my publishing in this site which might help you to some extent
    http://apps2fusion.com/at/sk
    Hope this helps
    Regards
    Sivakumar

  • Integration of PM with other modules (PP, MM, FICO, QM)

    Hi Experts,
    I am new to PM module and would like to know about the integration of PM module with other modules.
    1. Integration of PM module with PP module.
    2. Integration of PM module with MM module.
    3. Integration of PM module with FICO module.
    4. Integration of PM module with QM module.
    Are there any other modules which have integration with PM?
    Please let me know any extra information in-addition to the above, regards to integration. Thanks In Advance for your answers.
    Thanks & Regards,
    Supriya

    Hi
    simple search with google you can find variouts hits
    https://scn.sap.com/thread/1752858
    http://scn.sap.com/thread/838452
    http://www.erpgreat.com/plant/sap-pm-integration-with-other-modules.htm
    Regards
    Thyagarajan

  • Time dependency in HR & Diff betn BW HR with other modules

    Hi BWers,
    Could you please let me know the Time Dependency in HR and what is the major difference between BW HR with other modules.
    Points will be awarded.
    Thanks,
    Abhi

    hi abhi...
    check
    BW HR Docs
    BW-HR Implementation
    Please go through following links for information on HR-BW
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/174b9990-0201-0010-2abe-86a515869fbe
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/7e3f9990-0201-0010-9a97-e971112aa2b2
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e1cba990-0201-0010-43ae-af579aee7a73
    For HR related scenarios, go to link
    http://help.sap.com/bp_biv235/BI_EN/html/bw.htm
    Here under, "Human Capital Management" , you will find HR scenarios.
    Also go through SAP help link
    http://help.sap.com/saphelp_nw04/helpdata/en/2a/77eb3cad744026e10000000a11405a/frameset.htm
    hope this helps..

  • Integration Of SD With Other Module

    Dear All
    Plz tell me the integration of Sale & Distribution module with other module and thier impact

    The link between SD and MM :-
    1. When you create sales order in SD, all the details of the items are copied from Material master of MM.
    2. MRP and availibility check related data is also taken from MM although you control this data in SD also.
    3. While you create inbound/outbound delivery with reference to a sales order,the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.
    4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.
    There are many such links between SD and MM.
    Now the link between SD and FI :-
    1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the bacgground. eg. In case of standard sales order, you create an outbound goods delivery to the customer.
    Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account.
    2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI
    3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM
    SD Integration points with other modules
    SD module is highly integrated with the other modules in SAP.
    Sales Order u2013
    Integration Points                      Module
    u2022Availability Check             -       MM
    u2022Credit Check                   -       FI
    u2022Costing                        -       CO/ MM
    u2022Tax Determination              -       FI
    u2022Transfer of Requirements       -       PP/ MM
    Delivery & Goods Issue u2013
    Integration Points                      Module
    u2022Availability Check             -       MM
    u2022Credit Check                   -       FI
    u2022Reduces stock                  -       MM
    u2022Reduces Inventory $            -       FI/ CO
    u2022Requirement Eliminated         -       PP/ MM
    Billing -
    Integration Points                      Module
    u2022Debit A/R                      -       FI/ CO
    u2022Credit Revenue                 -       FI/ CO
    u2022Updates G/ L                   -       FI/ CO
      (Tax, discounts, surcharges, etc.)
    u2022Milestone Billing              -       PS
    Return Delivery & Credit Memo -
    Integration Points                      Module
    u2022Increases Inventory            -       MM
    u2022Updates G/ L                   -       FI
    u2022Credit Memo                    -       FI
    u2022Adjustment to A/R              -       FI
    u2022Reduces Revenue                -       FI
    thanks
    G. Lakshmipathi

  • Integration of SD with other modules

    Hi experts,
      Can somebody kindly tell me some good links or documents regarding the integration of SD with other modules, with respect to STOCK TRANSFER, CROSS COMPANY FUNCTIONONG, PROCESSING OF COMPLAINTS, SPECIAL ORDER TYPES and BASIS IN INTEGRATION (project experience or participation in case study)
    Thanks,
    Viji

    the integration of SD with other modules, with respect to STOCK TRANSFER, CROSS COMPANY FUNCTIONONG, PROCESSING OF COMPLAINTS, SPECIAL ORDER TYPES and BASIS IN INTEGRATION
    <a href="http://www.sap-img.com/sap-sd/link-between-sap-sd-mm-and-fi.htm">SD MM FI integration</a>
    <a href="http://www.sap-img.com/sap-sd/configure-intercompany-stock-transport-order.htm">STO</a>
    <b>Complaints Processing</b>
    Implementation Considerations
    You can process complaints in the following ways:
    Example 1: The customer returns the goods. You create a return to process the transaction.
    - If the customer wants a refund for the amount, enter a credit memo with reference to the return.
    - If the customer wants a replacement product, enter a free-of-charge subsequent delivery with reference to the return.
    Example 2: The customer does not send the goods back.
    - If the customer wants a refund, you enter a credit memo request with reference to the sales order or the invoice.
    - If the customer wants a replacement product, you create a free of charge subsequent delivery with reference to the sales order.
    Example 3: The price is wrong.
    For example, the discount was forgotten or the scaled prices were miscalculated. You then enter an invoice correction request with reference to the invoice.
    Example 1
    You sent the customer 100 pieces. The customer sends 30 back because they were damaged during transport. You create a return for 30 pieces and then either a credit memo or a free-of-charge delivery with reference to the return.
    Example 2
    The customer reports that a further 10 units were so damaged that they threw them away. You enter either a credit memo request or a free of charge subsequent delivery with reference to the sales order or invoice.
    Example 3
    100 units were calculated at 10 USD per unit for the customer. However, due to a promotion they should have been calculated at 9 USD per unit. You enter an invoice correction request with reference to the invoice and enter the price as 9 USD per unit.
    Prerequisites
    Process Flow
    You decide which one of the above scenarios is most similar to the type of complaint you are processing.
    Enter the appropriate sales document, with or without reference to an order or invoice.
    You can change the settings in Customizing so that the sales document is automatically blocked for a delivery or billing. This means that the system does not create a free-of-charge delivery or a credit memo until you have had the opportunity to check the goods or clarify the complaint.
    Once you have checked the goods or clarified the situation, you can:
    - Approve the complaint by releasing the sales document.
    - Reject the complaint by entering a reason for rejection in the sales document.
    If you do not need any release procedures for credit memo requests, you can also create a credit memo with reference to an invoice. In this case, you do not need either the credit memo request or its release.
    <b>Result</b>
    Once you have released the sales document, you can create a delivery or a credit memo.
    <b>Special Order types</b>
    <b>Cash sales</b> is an order type for when the customer orders, picks up and pays for the goods immediately. The delivery is processed as soon as the order has been entered. A cash invoice can be printed immediately from the order and billing is related to the order. Receivables do not occur for the customer as they do for rush or standard orders, because the invoice amount is posted directly to a cash account.
    In a <b>rush order</b> transaction, the customer picks up the goods or you deliver the goods on the same day as the order is placed. In the standard system, when you save this sales document type, a delivery is automatically created and billing is related to the delivery.
    <b>Basis</b> guys help in configuring the landscape, moving the request, scheduling and maintainence of batch jobs which run in the background, server maintenance. Basis is kind of heart for any project and they work 24*7 continuous.
    Hope you have the required info now. Pl reward if helpful.
    Thanks,
    Sadhu Kishore

  • CO with other module integration

    Hi Experts
    Kindly provide CO with other modules integration point details like CO -SD, CO-PP,CO-MM etc.,
    Thanks & Regards
    Vinod

    Hi,
    As suggested by Juan and Ruchit you can restrict the things by roles.
    It is not needed to go for a new system or new client.
    Going for a new client would again occupy more space then again you need to maintain the master data and all the other stuff. I think you should use the same client and restrict  the users with the authorization mostly we restict the users using the auth object p_orgin.
    Regards,
    Vamshi.

  • Interation of HR module with other modules

    Dear Expert,
    how can i interate HR module (may be it TM or PA or any other sub-module) with other modules e.g PP, MM, FICO etc
    Is there any setting for it or these are already interated?
    Thanks,
    Amol

    Hi,
    All in One is something different.
    as far as i know the related site for SAP All in One is
    [This Link|http://www.sap.com/solutions/sme/businessallinone/solutionoverview/index.epx]
    lg David

  • QM Touch Point with other modules

    Dear Gurus,
    I am new to QM and have to work on Qm with Pm. Please help me with touch pionts with other modules, List of T- Codes, Config Doc and user mannual.
    regards,
    PMAddi

    HI,
    QM is linked with PM in only one concept. 
    Calibration of Equipments 
    Inspection type is the main to generate inspection lot for all modules.
    In Material master, QM view the inspection type is assigned.
    For Ex: 01  will generate inspection lot for Goods receipt for PO
               05  for Goods receipt for others 501 mvt type
               10, 11  - for SD sales order delivery
                03,04 - PP Module
    In PM customizing, 14 insp type is to be maintained for order type .
    Create inspection plan for that equipment - QP01
    Create maintenance order
    Then it will  generate  inspection lot for orders
    Select the inspection lot from QA32 tcode.
    Check the status of lot. It should be released status. If not assign the inspection specification (task list, plan) with correct usage
    Then record the results and do usage decision via QA32.
    Regards,
    Alagesan

  • Integration of IS Retail with other Modules

    Can any one please tell me
    the integration of IS -Retail modules with other  modules?
    Thanks

    Nalini,
    Please use this link https://websmp201.sap-ag.de/~sapidb/011000358700001895952008E/MasterGuide_Retail_BS_2008.pdf. You will need a S id to access this.
    let me know if you need something more.
    Rgds
    manish

  • Customer Service (CS) module integration  with other modules VERY URGENT

    Customer Service (CS) module integration  with other modules like sd,mm,pm,fi
    documentation very urgent please send to my mail id [email protected]

    This is with regards to Integration of CS module with other modules:
    CS is in very close integration with Plant Maintenance(PM), Sales and Distribution(SD), FI, MM, Costing (CO) and also PP and HR.
    Incase you want to have resource related billing using DIP profile  (PM) you must have Cost element  and Service Products defined in MM etc.
    Itu2019s a very vast area needs to be explored based on the requirement in CS module. Any further assistance needed pls let me know.l.

  • PS integration with other modules

    Hi Experts
    Pl tell me  from configuration point of view how ps integrates with MM , SD and FI. What are all the necessary steps we have to do in integration .
    Thanks in Advance

    Hi Amit,
    PS is integrated with all modules of SAP.
    MM and PS, we can create Purchase requisition in PS itself rather than doing in MM. This PR can be converted into Purchase order. To create PR in PS, we have to use the MM master data.
    SD and PS, we can check the revenues in PS. This can be done while creating the Sale order we have to give the WBS element.
    FI and PS:  We can provide the direct financial entries in FI to post cost to the project in PS by selecting the WBS element.
    I hope i clarified your query
    Regards
    Sankar

  • Integration with other modules

    Hi Sap Gurus.
    Hi,
    Plz explain...
    MM module is integrated with which modules .
    And how it is Integrated??
    How MM module to integrate with CO(Product Costing).
    If thr any material please send me to [email protected]
    Thanks..
    Raju

    Hi,
    FI-MM Integration:
    When you go for transactions like GR,GI,SES,MIRO,STO,Payment then your respective G/L account updated.For updatinging the G/L account, You have to go for Automatic Account determination and steps are as follow;
    1.OMSK: Creation of valuation class and assigning account category refrence,
    2.OMWM: Active valuation Grouping Code,
    3.OMWN: Active movement type with G/L account,
    4.OMWD:Active valuation Area,
    5.OMWB: Active chart of account, transaction key,valuation grouping code,account grouping Code, valuation Class and G/L accounts.
    Data flow to costing in the concept of cost element.
    SD-MM Integration:
    Generally SD is integrating with MM in Stock Transport Order (STO) and Third Party Order.
    Basically STO is divided in to three types,
    A.STO with SD delivery
    B.STO without Delivery
    C.STO with SD delivery and billing.
    FI-SD Integration:
    In T.Code:VKOA
    If helpful then reward.
    Regards,
    Biju K
    Message was edited by:
            Bijay Kumar Barik

Maybe you are looking for

  • When generating WebHelp, "Adobe RoboHelp 8 has encountered a problem and needs to close" appears.

    I'm using RH 8.0.2.208 (both patches applied). This project is a child project in a merged project structure and it is the only one that I am having problems publishing. I've tried deleting the CPD file and creating a new layout, but the error still

  • Windows 7 and Airport Extreme problems

    I've switch the airport extreme a few months ago, from a linksys router. Ever since switch my pc laptop drops/loses the wireless connection. The PC is running Windows 7. I have taken the laptop to another place that has a wireless network and never l

  • RFC returns different data of SE37

    I have a RFC that has a table of exit with two fileds of value (Gross Price and Tax Value). In the transaction SE37 returns the two fileds correctly. In the Web Portal (not SAP) when access the RFC with the same data, returns de same amount records,

  • Undo the "Erase iPhone" action in Find My iPhone

    My iPhone was stolen. Without even thinking about it I went to my computer, logged in to icloud.com and clicked to erase my iPhone in Find My iPhone. The service couldn't locate it because it was offline and it still is. But then I read that once my

  • Tool Bar Blank / In Design CS2 for Mac / Leopard 10.5.2

    I'm opening In-Design and my tool bar appears, but is completely blank...It just shows the tool box, but none of the buttons are visible (or clickable)...Can't work without the tool bar...Any ideas / help. (I've checked other CS2 apps like Photoshop