Re: Changes in the material master.

Hi guru's,
The vendor supplies the material 1 box which consists of 20 pieces, we known that in the material master the unit of measure for alternate UoM is maintained as 10 pieces (in additional data tab). If I make changes as the receipt from vendor as 20 pieces instead of 10 pieces already maintained, what are the consequences I face. its ur pl.
thanks
tuljasingh.

Hi,
Once you make changes in material master ( from 10 to 20) then when you make the GR then system will make GR for 20 quantities (After makeing changes in MM you have to again change the conversion in PO in quantities tab). 
So after making GR, quantities & stock value will be updated as per data mentoned in PO conversion.
If you make any new PO then system will pick bydefaut the conversion in PO from the material master.(i.e. 20 qty for 1 pc)
Regards,
Umesh Agrawal
Edited by: Umesh Agrawal on Dec 8, 2008 10:59 AM

Similar Messages

  • Availability Check Changed on the Material Master Update Existing Orders

    I need to know if there is a way to update existing orders once changes have been made to the material.  Currently the only way that I know of is to go into individual orders change the plant save then change it back to the original plant on the order then the changes take effect.  How can I achieve this without touching every order individually.  Is there something to mass update existing orders to take a new snapshot of the material master settings for a material.

    Try with t.code VA05 - Open sales order list.
    Execute this list. In the output, sort the data by plant. Then go to menu Edit -> mass change -> new plant. Change the plant for group of sales orders that have similar plants. Then again do the same thing to bring the previous plant in the sales orders.
    This can help reduce the time instead of going one by one.
    Regards,

  • Tracking changes in the material master

    Hi All,
    I have a material master 123456.
    In this I have batch_class  023 type. I have a characteristic COLOUR which is assigned to the batch_class.
    For this characteristic there are 2 options RED and BLACK.
    When I created the material master I had assigned RED colour. I did some transaction also.
    After 2 days when I went inside the material master, I found BLACK insteadof RED.
    I want to know who did this changes? I am not able to track this from the mm03--material master changes.
    How do i track the changes?
    Regards,
    Narendra Bora

    in MM04 i think you may not be able to find the classification changes.
    i wouls suggest you to activate change logs on AUSP table a prerequisite of change logs is activating multi object assignments. This entails running program RCCLUKA2 which converts KSSK and AUSP to internal number (more information on the program/procedure can be found in the documentation of the program).
    this can help you to find the change log on the classificaiton values.
    Pravin Mukkawar
    TCS canada

  • Change of price control from "s" to "v" in the material master

    Dear All,
    Due to business requirement, we would like to change the price control for FERT items in the material master from "S-Standard Cost" to "V-Moving Average Price". This change we would like to do only at sales plants (Non-Manufacturing Locations). Very few materilas are having the stock on the date of the price control change
    I would like to know is there any SAP Note / Any of you are having such experience? Please arrange the same.
    Regards
    Anilkumar

    Hi,
       i am not sure about any program but through MR21 you can change tthe Price in material master.
    If stock is available system will hit to closing stock of the material for price change in case stock is not available it will hit price difference gl account.
    Regards,
    Sankar

  • Change Excise Duty Group on the Material Master

    What are the steps to change the excise duty group in the Material Master (MARC- OITAXGRP)? I am getting a message 'Excise duty tax group cannot be changed due to posted stock'.
    We realised some of materials have been setup with incorrect excise duty group at a few plants and there have been a lot material movements posted (101s, 301s). But is the best way to fix this?
    Do we have to reverse all the documents or is it good if we zero the inventory and then it will allow us to change?
    Is a direct table update of the table an option?
    Please advice.
    Thanks in advance
    Srini

    you can't change the excise duty group if there is a stock for the material.
    there is a steps that you need to follow if you inisist to change:
    - zerorize the stock in the current period (all stock types)
    - zerorise the stock in previous period (all stock types)
    - then only you can change the excise duty group.
    these steps can only be carried out when the two posting period are still open, so normally you should do it at month end.

  • Change Special Procurement in the material master?

    Hi,
    How can I change Special Procurement in the material master? Right now Special procurement field is greyed out and would not allow me to change it?
    Sincerely,
    Ketan

    Hi,
    Have you used any MRP profile.
    If so in transaction MMD2 for MRP profile, choose the special procurement type field & change the selection from display mode.
    Now in transaction mm02 the spl procurement field can be entered/changed.
    Regards,
    Senthilkumar SD

  • "Conditions" button at the material master - Change the related condition

    There is "Conditions" button at the material master ("Sales: sales org. 1" tab). We can make condition record of PR00 by this button but at our system the condition for the material price is different (it isZPR0 at our system). How can I change the related condition type as ZPR0 for this button?
    Thanks in advance for the answers....

    Check program LMGMMF0Q and FUNCTION SD_COND_GET_DEFAULT_CONDITION for details.
    It looks it is hard coded, but they also mention that Via a user exit (business transaction event), the
    default KSCHL and KOTABNR can be set.
    Regards,

  • RMDATIND program - used for change the Material Master

    Hi Experts,
      Could please confirm whether using RMDATIND program can we change the Material master data?...
    Thanks
    R P R kumaar

    Execute this program and you can find an information icon in the toolbar. press that icon. you will complete documentation regarding this program

  • How to change the base UoM in the material master?

    Hi,
    I want to change the base UoM in the material master for a particular material but I can't change irt with MM02 as system says it has open routings for this material.
    I have set the deletion flag on the routings but still system shows open routings while changing UoM.
    Is there any standard SAP program by which UoM can be changed if open POs, stock etc. are present in the system?
    Thanks,
    Input

    HI
    It is possible to change the Base unit of measure in the following cases:
    1) If there are no stocks of the material in the syatem
    2)If there are no purchase requisitions, purchase orders, or scheduling agreements for the material.
    3)If a purchase order or purchase order item is not being created or changed.
    Procedure for changing is:
    Access the material master record in Change mode.
    Overwrite the old base unit of measure with the new one on any departmental data screen.
    Save the change.
    Thanking you.

  • New Text in the Sales Text View in the Material Master

    Hi All,
    I want to create new text ID in the material master sales text tab
    Can you please help me in how to create the new text for material master sales text tab view.
    Regards
    Rajesh

    Well it may not be possible by standard SAP to create in Material.
    AN alternative might be to use a standard text type and then call it in your Text Determination Procedure.
    T-code "SO10" --> Give "Text Name  & Text ID & Language --> Click at "Create" --> On next screen --> Go to (Menu) --> change editor --> Write the text which you want
    Go to VOTXN , and maintain the required confirguation to get this standard Text copied to the material during order processing.
    Regards
    Sai
    Edited by: Sai on Apr 16, 2010 1:39 PM

  • Change documents of material master classification class type 001 and 300

    Dear guru ,
    I want to see the history of change documents of material master classification using MM02.
    The system allow to see the history only for class type 023.
    For class type 001 or 300 the change document isnu2019t available.
    I must do some settings or the function for these class type arenu2019t available ?
    Thanks.

    Dear ,
    changes in values for a characteristic can be monitored in CL20N but as for MM02/MM03 transaction only for class type 023.
    For class type 001 or 300 the change document isnu2019t available.
    Thanks.

  • Plant specific fields in the material master for product move

    Hi, SAP gurus,
    My scenario is we are moving a existing product in US plant to Brazil plant. What are the fields in the material master that are specific to a plant that will change. For ex MRP controller will change from plant to plant. Like that can anybody please provide me a list of fields that i need to be looking at?
    Thank you
    Anusha

    Hi Anusha,
    First of all, list down all your materials those you want to extend to new plant.
    a) Secondly, pay attention to those fields you will find "filled" in those materials at plant level.
    b) MARC comes handy for you to analyse which fields are at plant level.
    Intersection of fields with values between a and b are the ones you need to work out.
    Good luck,
    Regards

  • Authorisation object for "PO text in the material master"

    Hi,
    My requirement is as below:
    "All users can see the Purchase Order Text as usual, but only a few users should be allowed to create / change the PO Long Text.
    For other users, the same should appear in display mode only (both in creation & in change mode, MM01 & MM02)."
    Please let me know, How to map this.
    As per my knowledge thsi is possible only thru authorisation. But I want to know what is the authorisation object for "PO text in the material master" (Pl note that only for PO text in the material master field). we want control on "PO text of material master"
    Regards.
    Chinna

    Hi,
    The authorisation object is "M_MATE_MAT", pl check
    Regards
    Merwyn

  • MRP TYPE for  Periodic planning in the material master.

    Dear gurus,
    i need planned the materials in the periodic modality, are there the type MRP in the material master for create the planned file ( table MDVM) one once a month or in the specific period chose ?
    Example :
    I need that the material master don't create a file planned ( MD20- TABLE MDVM) for a change of the requirement situation new , but i would like that the flag in the table ( MDVM) or file of the planning MRP created when the today date is in the period specific.
    31.3.2011  (or period 1.4.2011- 10-4-2011)Date for the create a file MRP and after when run MRP planned the material, for others scenary the system must not planned the material.
    Are there the MRP type for my problem? Or the customizing setting?
    Thanks a lot
    Dani

    Dani,
    Not sure if MRP type or customizing can help here. And even if we are able to achieve this requirement it will be applicable at plant level.
    However, try exploring option of periodic lot size (weekly, monthly, etc). This will work according to period you've set and should give you the results you are looking for.
    Regards,
    Himanshu

  • Accounting & costing view in the material master

    hi
    my client wanted to block the accounting & costing view in the material master for the end users
    what i need to do

    Hi,
    You can (Authorization material master by views of accounting & costing ) achieve this by way of authorization control. In transaction PFCG, select your role for creating / changing the material master. Select option Maintenance statuses. Then at change status option select views that you want to give the authorization to the users. Create profile & save the role. Now assign the role to the users. They will get only those views you have selected. You have to select those views in all the roles related to material master (create, change, display).Better Consult Basis Consultant,
    Regards,
    Biju K

Maybe you are looking for