We are into steel industry and packing material which comes along with the raw material is required to recieve. which is NOT required to send back to the supplier and we uses it in further  processing.
We include this material in BOM of some semifinished product.
Now my concern is how to do Good reciept of this material and on what basis , as from the vendor is comes as free and being used as BOM item of semifinished good, so how the valuation of this material will takes place.
Kindly suggest, how this scenario will be handelled in SAP
Thanks & Regards
Nitin

if you get the material for free, then you must not add any value for the stock.
so you create a material master of type VERP with price  of 0,01 if it is a quantity and value managed material in your plant. Or you create a UNBW material which is not value managed.
you receive the material with 501 movement.

Similar Messages

  • Pack material and HU in inbound delivery into given HU

    I want to pack the material and HU in the inbound delivery using VL32N transaction after creating it.Please let me know list of FMS to pack the material and HU in inbound delivery.
    Thanks in advance!

    Hi
    Please check the below code it will work.
    gs_head-DELIV_DATE = sy-datum.
    gs_head-DELIV_TIME = sy-uzeit.
    gs_item-DELIV_ITEM = p_item1.
    gs_item-MATERIAL = p_matnr1.
    gs_item-DELIV_QTY = p_quan.
    gs_item-UNIT = 'EA'.
    gs_item-PO_NUMBER = p_po.
    gs_item-PO_ITEM = 10.
    APPEND gs_item TO gt_item.
    CLEAR:gs_item.
    CALL FUNCTION 'BBP_INB_DELIVERY_CREATE'
      EXPORTING
        IS_INB_DELIVERY_HEADER = gs_head
      IMPORTING
        EF_DELIVERY            = gv_vbeln
      TABLES
        IT_INB_DELIVERY_DETAIL = gt_item
        RETURN                 = gt_ret1.
    gs_refobj-OBJECT = 03.
    gs_refobj-OBJKEY = gv_vbeln.
    gs_humain-vhilm = p_matnr2.
    GS_HUMAIN-HU_STATUS_INIT = 'A'.
    gs_humain-STATUS = '0010'.
    gs_itempr1-VELIN = 1.
    gs_itempr1-QUANTITY = p_quan.
    gs_itempr1-meins = 'EA'.
    gs_itempr1-matnr = p_matnr1.
    gs_itempr1-werks = p_plant.
    CALL FUNCTION 'PROCESS_HU_INBOUND_DLVRY'
      EXPORTING
        I_HU_ID               = gv_huid
        I_NEW_HU              = 'X'
        I_UPDATE_DB           = 'X'
        I_CREATE_HU           = 'X'
        I_REFERENCE_OBJECT    = gs_refobj
        I_HU_HEADER_MAIN      = gs_humain
        I_SAVE_STEP           = 'ITEM'
        I_PACK_ACTIVITY       = 'MAT'
        I_DELIVERY_TYPE       = '7'
        I_PACKING_ACTIVITY    = 'PACK'
        I_PACK_TYPE           = 'MAT'
        IS_ITEM_PROPOSAL      = gs_itempr1
      IMPORTING
        O_HU_REF_ID           = gs_erefid
        O_HU_HEADER           = gt_eheader
        O_HU_ITEMS            = gt_eitem
        O_HU_MESSAGES         = gt_emsg[]
      TABLES
        ET_CREATED_HUS        = gt_ehus[]
      EXCEPTIONS
        INPUT_MISSING         = 1
        NOT_POSSIBLE          = 2
        HEADER_ERROR          = 3
        ITEM_ERROR            = 4
        SERIAL_NR_ERROR       = 5
        FATAL_ERROR           = 6
        OPERATION_FAILED      = 7
        DELIVERY_UPDATE_ERROR = 8
        OTHERS                = 9.
    IF SY-SUBRC EQ 0.
      CLEAR:gs_vekp.
      SELECT SINGLE * FROM vekp INTO gs_vekp WHERE VPOBJKEY = GV_VBELN.
      ls_vbkok_wa-vbeln_vl  = gv_vbeln.
      ls_vbkok_wa-vbeln = gv_vbeln.
      ls_vbkok_wa-VBTYP_VL = 7.
      ls_vbkok_wa-wabuc = 'X'.
      ls_vbkok_wa-spe_auto_gr = 'X'.
      ls_vbkok_wa-kzebu = 'X'.
      lt_verko-exidv = gs_vekp-exidv.
      lt_verko-exida = 'E'.
      lt_verko-magrv = 'YB01'.
      lt_verko-werks = p_plant.
      lt_verko-STATUS = '0010'.
      APPEND lt_verko.
      lt_verpo-venum = gs_vekp-venum.
      lt_verpo-exidv_ob = gs_vekp-exidv.
      lt_verpo-exidv = gs_vekp-exidv.
      lt_verpo-velin = '1'.
      lt_verpo-vbeln = gv_vbeln.
      lt_verpo-POSNR = p_item1.
      lt_verpo-TMENG = p_quan.
      lt_verpo-VRKME = 'EA'.
      lt_verpo-MATNR = p_matnr1.
      lt_verpo-werks = p_plant.
      APPEND lt_verpo.
      lt_repack-SOURCEHU = gs_vekp-exidv.
      lt_repack-DESTHU = gs_vekp-exidv.
      lt_repack-PACK_QTY = p_quan.
      lt_repack-BASE_UOM = 'EA'.
      lt_repack-MATERIAL = p_matnr1.
      lt_repack-PLANT = p_plant.
      lt_repack-DELIV_NUMB = gv_vbeln.
      lt_repack-DELIV_ITEM = p_item1.
      APPEND lt_repack.
      CALL FUNCTION 'WS_DELIVERY_UPDATE_2'
        EXPORTING
          VBKOK_WA               = ls_vbkok_wa
          DELIVERY               = gv_vbeln
          update_picking         = 'X'
          no_messages_update_1   = 'X'
          synchron               = 'X'
          commit                 = ' '
          NICHT_SPERREN_1        = 'Y'
          if_database_update_1   = '1'
          if_error_messages_send = 'X'
        TABLES
          PROT                   = lt_prot
          VERKO_TAB              = lt_verko
          VERPO_TAB              = lt_verpo
          IT_REPACK = lt_repack.
      COMMIT WORK and WAIT.
    Thanks,
    Shankar Darbha

  • Question ABAP : Reading a material and its components

    Hi!
    I want to make a report on a FERT and HAWA materials.  I want to specify the standard cost for the product and also the cost for raw material and  the fixed overhead specified separately.
    Which tables do I involve in selection and what logic to retrieve the
    costs for rawmaterial and fixed oh..
    Report:
    PLANT MATERIAL  TOTAL_COST   RAWMAT_COST FIXED_OH_COST
    XXXX   0500-001         50                      40                         10
    Very grateful for answers
    Regards Lars Zinn

    Hi Lars,
    Tables involved are <b>keko</b>(Product Costing - Header Data) / <b>keph</b>(Product Costing: Cost Components for Cost of Goods Mfd).
    Hope this helps,
    erwan

  • Sales Order Material and its MOQ mass change

    *The issue is related to our Spare parts Ordering process in our company.*
    We have a concept of having 65 days of back orders. Hence there will be
    lot many open orders in the system.
    The Material code will be changed from (for eg) M01 to M02. Hence forth the Material (M01) ordered will
    automatically changed to M02 through Material determination logic. But
    for the 65 days back orders, it is very difficult to change the
    material one by one in sales order. There may be more than 100 orders
    for a material. Even if the MASS change option in Transaction VA05
    doesn't address because of the following reasons;
    1. The changed new material (M02) may have new price with new validity
    periods, whereas the back orders will have old pricing dates. Its
    difficult to change individually in the open orders.
    2. Some materials may have partially delivered.
    Similar to ECM changes, there will be MOQ changes which also needs to
    be changed individually the order quantity in the old Open orders.
    For example,
    Initially the MOQ for a material in 10. Order inflow has happened based
    on this MOQ.
    Now if the MOQ is changed to 20, future orders are addressed. But for
    the 65 day back orders, we need to manually open the individual sales
    order and change the order quantity.
    Hence we require a mass change option for the open orders as below:
    1. For Material Changes (M01 to M02), I will give the list of orders and
    the line items and Qty for M01. The program should reject the existing
    line item for M01. An additional line item should be created with M02.
    Also the pricing date should be changed.
    2. For MOQ changes, I will give the list of orders and the line items
    and Qty. The program should reject the existing line item for those
    materials. An additional line item should be created with new Qty.
    If the material is partially delivered, the the existing qty should be
    updated to the extent it is delivered and the remaining qty should be
    updated with new material or New MOQ.

    You can use BAPI_SALESORDER_CHANGE.
    1. Get the SO detail using BAPISDORDER_GETDETAILEDLIST.
    2. MODIFY the ORDER_CFGS_* internal tables and  update.
            CALL FUNCTION 'BAPISDORDER_GETDETAILEDLIST'
              TABLES
                order_cfgs_value   = gt_char
                order_cfgs_ref       = gt_char_ref
                order_cfgs_inst      = gt_char_ins.
            MODIFY gt_cfgs_*.
            CALL FUNCTION 'BAPI_SALESORDER_CHANGE'
             TABLES
                order_cfgs_value   = gt_char
                order_cfgs_ref       = gt_char_ref
                order_cfgs_inst      = gt_char_ins.
    Refer SAP note 549563.

  • Report showing overdelivery material and its value.

    A report is required showing the material received by giving overdelivery/unlimited tolerance.  It should give the details of the material,quantity excess received, excess quantity value.
    How to get it.
    Pl reply.
    T.SRINIVAS

    Hello Friend
    Try Report with Tcode ME2M and in input screen dont forget to choose "ALLES" in Scope of list.
    Else If your corporate policy is the same regardless of vendor /
    material combination, then you can use the ME2N transaction. It
    has a dynamic selections button that allows you to search on
    practically any PO field. The Delivery tolerances fields are
    contained on the PO item folder of the dynamic selections.
    Additionally, you can enter a document date restriction to limit
    the results. I also recommend entering "WE101" - "OPen Goods
    Receipt" as a Selection parameter to keep the list to include
    open, GR relevant PO Items.
    If the Delivery tolerances vary by Material vendor and you can
    not create variants in the ME2N transaction to capture the
    relevant scenarios, then you may have to write a SAP query to
    compare the PO Item to the Purchasing Information REcord. If
    this is the case, I recommend using Infoset MEPOLDB for the
    Purchase ORder information, and table EINE for the Delivery
    tolerance information of the PIR.
    Reward if useful
    Regards
    SE
    Edited by: SAP Enjoy on Jan 24, 2008 4:56 PM

  • REM profile for finished material and its raw material

    Dear Experts
    My question is ,for a repetitive manufacturing scenario
    1) We are maintaining REM profile finished material . Is it necessary to maintain REM profile for its raw materials ?
    2)For raw materials do we need to create the seperate REM profile which is having seperate stock determination rule ?
    Regards ,
    Vishwas.K

    Dear Vishwas,
    1.REM profile assignment is required only for the materials for which production confirmation will be made through T code MFBF or
    MF42N.
    2.For stock determination rule check in control data 2 in the REM profile itself. This setting is linked to the REM profile and further to
    the goods movements posting for the raw materials.(check this setting in T code OSP2).
    Regards
    Mangalraj.S

  • Make the material and its configuration editable after Quotation tranferred

    Hello all,
    When i create a quotation with a configurable product in CRM and transter it to R/3 the fields like item quantity cannot be edited.The same is the case with the configuration - it cannot be changed.
    I need to change the configuration even when it is transferred to R/3.
    Can somebody help me out.
    Regards,
    Sourabh

    Hi Sourabh,
    Can you please let us know the note, which you have applied?
    Thanks,
    Paul Kondaveeti

  • Packing Material with Batch Management and Shelf life expiration date check

    Dear All,
              I created a packing material and activated batch managemnt with shelf life.
                At the time of GR the batch should be created automatically or if i want to create a batch manually for some materials how to do it in the system.
                         Help me

    Before going ahead with the batch creation,
    you need to activate the batch mngmnt level (i.e.Client,plant,material level)
    And also activate the Nor.ranges.
    Then Create the Classification,Characteristics and assign the Chrctstics to Class.
    Then create the batch
    T Code:
    CT04 create Char.
    CL02-Create Class
    CL24N:Assign class to material
    MSC1N:Create Batch

  • MM: Packing Material Supplied to Subcontractor for packaging.

    Dear MMers,
    I have a scenario here that we re purchasing a RAW material from a vendor, but to purchase this raw material we are providing the vendors with the packing material, say bags. when PO is issued to this vendor, the bags are also provided to the vendor so that he can pack the material the way we want it.
    When we finally receive the RAW material it is actually the receipt of RAW+Packing material. How can i handle this issance and then receiving of packing material in SAP?
    If i use the subocntracting procedure, the packing material when attached as a component to the raw material is consumed when the raw material is received in stock. This should not happen, i want to receive the packing material also back in stock.
    Any help is appreciated.
    Warm regards.
    OSss

    hi
    try following
    create BOm for the packing material as +100 and -100 (100 is quantity
    two line items with +and - quantity
    so +quantity will be for sending material and -will be when u return
    regards
    kunal

  • Packing material consumsion

    Hi ,
    I am doing packing at the time of delivery. When i do PGI the packing material stock is not reduce. if the packing material is not present it also not giving any error.When I checking the Handling Unit " status " tab it is showing the field " HU storage location " is showing "Handling unit without inventory management".
    That field is non editable . But i also want the inventory of the packing material .
    Guide me . Where is the setting for that .
    Thanks In Advance .
    Regards,
    Abhijit ...............

    Dear Abhijit
    For Packing materials, you need to ensure certain criterias. 
    Please check the following:-
    1)  Go to *VHAR,* you create the packing material type say carton
    2)  In IMG -- Logistics-Execution --> Shipping --> Packing --> Define Material Group for Packaging Material.  Here create a group, say PACK
    3)  Choose the next- Define Allowed Packaging Materials.  Here for Material Group PACK, assign carton (as stated in point 1)
    4)  Now create packing material in material master with type VERP and also Item Category Group VERP.
    5)  In Sales: General/Plant tab, you need to maintain the following
                 a)  for Matl Grp Pack.Matls   as PACK
                 b)  Packaging mat. type        as Carton
                 c)  Allowed Pkg weight
    Save the master.  Now while creating delivery, after selecting Goto -- Pack, ensure that you block both the "Pack material" and "Material to be Packed".  Once you do this, click on "Pack" which is above Material to be packed (left top).  Once clicked the pack button, system will show a message material packed.  Now select "Back" button so that you will come to the main screen of delivery.
    Now do pgi and check the stock of packing material.  The stock will get reduced to the extent of you posted goods issue.
    thanks
    G. Lakshmipathi

  • Packing Material returned back to inventory

    Hi,
      Our client uses standard costing for all materials. We have a scenario where material is packed in drums. The drums are then returned back into inventory as the material is despatched to the customer packed in a different form. A drum rate per pound of production is loaded into the standard cost of the packed material. The problem now is that the inventory of the used drum is in a balance sheet account while the credit for drum cost on production goes to the P&L account. Is there some method by which only that portion of the drum cost on production can be credited to a reserve account?
      I was thinking i could apply an overhead rate on the packed material and credit it to an internal order and end of month settle to a balance sheet account. But overhead cannot be provided on output, rather it is based on input. is there some way by which I could use template allocation to credit an order andd debit the production order? Or is there some other better method?
    Thanks,
    Shivram

    Hi
    I myself never used it, but I know it can be used to allocate OH based on Output....
    refer this thread for more details... Re: Activity Type Planning on the basis of  Raw materials
    Moreover, I would prefer to use a work around as below, which I used in a similar scenario
    1. Convert the Drums into Fixed Asset... The FA recon account can be "Inventory of Drums".. Dont club this account under FA in your Financial St Version in FI
    2. Assign a Manual Dep Key in this asset masters... i.e. You can manually post the Depreciation of these assets as per your choice
    3. Post this entire dep into one cost center... Later on allocate it to the Prod orders or absorb it as an overhead using costing sheet
    To make it more simpler, assign an activity type "PRDQTY" in your Routing.... This PRDQTY will record your Prod Qty....
    The Activity Qty of this PRDQTY will be equal to your Base Qty of the routing.... So, whatever output you confirm on the Prod order in CO11N, the same amount of Act Qty will also get confirmed
    Then calculate the Act Price for this act type which will be Depreciation amount for wear n tear / Prod Qty.... THIS IS EXACTLY WHAT YOU WANT!!
    Br, Ajay M

  • Direct material and indirect material

    please explain the what is direct material and indirect material and its different between them

    Hi.
    Direct materils: These material are bulkly needed and regularly needed for that orgnization to have their end product.  these materials usually raw materials ....
    Indirect materials: these materils are needed with direct materlias  for the manufacture or to produce end product.
    Ex: If your orgn's is cement Industry.
    Direct materials: Silica Sand. etc..
    Indirect matrials:BAG. Gypisum.....
    Hope you are Understand with these example...
    Regards
    S B H

  • Non valuated material and free materials

    hi,
    friends
    pl provide me the difference between non valuated and free materials.
    thanks
    durga prasd

    Hi Durga Prasad
    Free material: These materials are valuated ,but we procure it free of charge.So while creating a PO for free materials then in the PO we can check the Free of charge indicator.Then if you do a GR aganist this PO,there are 2 scenarios ie
        If the material is valuated at moving average price,then there will not be any accounting documents at the time of GR.But the moving average price gets recalculated since your stock level increases.
    If the material is valuated at Standard price,then accounting documents gets generated at the time of GR even if its frree of charge delivery.
    If we dont have a PO,then also if we want to do GR for free material,then this can be donr using the movement type 511.Transaction code is MIGO.Goods receipt with reference to others
    Non -Valuated Material:This type of material is not valuated in any valaution areas.
    (But if you are refering to non valuated material type(UNBW) then its different scenario)
    Hope this will help you
    Reward if useful
    Thanks and Regards
    SHYAM.R

  • I have purchased a monthly subscription to Adobe PDF pack so that i can edit a PDF file, i have uploaded the file and its now in "my assets". how do i now edit this file??

    I have purchased a monthly subscription to Adobe PDF pack so that i can edit a PDF file, i have uploaded the file and its now in "my assets". how do i now edit this file??

    You can't edit a file with PDF Pack, but you should be able to convert it to a Word document, and if you are really lucky edit THAT and make a new PDF. Don't expect too much though!

  • "Taxes for SEZ" and "Opg Stock of Material for Non Valuated Project Stock"

    Hi Guru's,
    Need two clarifications specific to SEZ:
    a. When an SEZ unit buys any materials from a DTA unit, and if the supplier issues ARE1 form then there is no Excise duty charged on such purchase. Similarly VAT is also exempt and CST is exempt if the SEZ unit issues Form I. However in case the SEZ unit is not NEF +ve after 5 years, then all these benifits taken on ED, CST, VAT etc needs to be paid back to the Govt.
    Hence how is it possible in SAP to capture all these benfits (ED,CST,VAT) in the MIRO Invoice posting stage, so that the details are available when needed?
    b. We are using Project Systems and the project is non-valuated. So in our case all material which we buy for Project is consumed at the GRN stage and there is no valuated inventory.
    However for "Annual Performance Report" it is mandatory to give the Opening stock of material.
    Can anyone throw some light how this can be calculated when we the Project is non valuated?
    Regards,
    Prasad

    Hi,
    This is little difficult to manage a material as valuated and non valuated. To make it non valuated you have to use a material type which is managed only on quantity basis and not on value basis like non valuated stock. Then you can do a material to material transfer posting. I haven't checked this scenario. For more info on this please refer these links:
    http://help.sap.com/saphelp_dimp50/helpdata/en/4c/227bb446e611d189470000e829fbbd/content.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227bdb46e611d189470000e829fbbd/content.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227ba746e611d189470000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227be846e611d189470000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227b8d46e611d189470000e829fbbd/frameset.htm
    Regards,
    Atal

Maybe you are looking for

  • Purchase Price Variances

    Hi, I am new to SAP.  What is the best way to look at all the purchase price variances for a whole month? Thanks

  • PDF does not show correct font with RTF template

    Hi, I have some doubts regarding fonts in PDF reports. when we create any XML report of PDF output type with RTF template, does the font used in the template has to be uploaded to the server? I have create a RTF template to produce PDF output with ar

  • Problem in J1IFQ -Reconciling the Qty -Received in Multiple Batches- reg

    Dear Sir/ Madam, We are encountering the Problem During Reconcilation of Quantity in Subcontracting cycle Received in Multiple Batches. The Following steps are followed, 1. We have created a Subcontract PO with BOM Explosion. 2. The Required Componen

  • Error in depreciation postings after upgrade to ECC6.

    Hi FI/Asset Gurus We recently upgraded from 4.7 to ECC6.  In 4.7 our depreciation postings were working fine but, after upgrade it is throwing an erroru2026u2026.. Create document number range Z2 using internal number assignment Our number range Z2 h

  • "set bounds of window 1 to" doesn't do anything in Preview

    hi, I have a script that resizes the window of the frontmost app. I call the script via a shortcut with quicksilver. That works fine with the most apps. But in Preview, Acrobat Pro, Firefox and some other programs nothing happens at all, or a window