Reg price control for semifinished material

Dear all,
What is the price control to be given for semifinished which will be sent to subcontractor sometimes and produced in house when there are no orders.
Thanks in advance
Madhav

Dear Venumadhav,
In my understanding this comes under split valuation. If not then you can use mixed costing for the same.
Because standard price can be used for the products produced inhouse and moving average price for the externally procured items
and the sub-contracted items.
check this link also to explore more.
Re: CK11n with procurement type X
Regards
Mangalraj.S

Similar Messages

  • Price Control for Material Type

    Hi
    How to configure a default price condition for a particular material type and should greyed off and not allowed manual change.
    Regard
    MM
    Edited by: Csaba Szommer on Nov 4, 2011 8:15 AM

    Hi,
    1st decide price control for your material type & enter in OMS2 with your material type in Price control field in Valuation segment.
    Get field name of price control: MBEW-VPRSV
    Get Selection Group for price control in T.code: OMSR: 32
    Check Field reference for your material type in T.code: OMS2
    Select round box of  u201CDisplayu201D for   Selection Group 32 by double clicking Field reference & save.
    Now create material (MM01) with your material type and you can find Price control defaulted which you enter in OMS2 and it can not changed.
    Regards,
    Biju K

  • Price change for a material

    Hi Experts,
    Need ur help urgently,
    i have made a PO taking a material with std. price say 1 rs. but before doing GRN i changed the price to 4 rs. Now, when iam
    doing GRN , system post the document taking the old price (1rs.) of the material.
    I want that system should calculate the cost with the new price defined for the material ( 4rs.)
    In Accounting 1 tab of the material display MM03 :
    price control for valuation data for prevoius period is S
    and, price control for valuation data for prevoius year is also S
    Need ur assistance as I am new to MM
    Thanks.
    Dhruv

    Hi Experts,
    Need ur help urgently,
    i have made a PO taking a material with std. price say 1 rs. but before doing GRN i changed the price to 4 rs. Now, when iam
    doing GRN , system post the document taking the old price (1rs.) of the material.
    I want that system should calculate the cost with the new price defined for the material ( 4rs.)
    In Accounting 1 tab of the material display MM03 :
    price control for valuation data for prevoius period is S
    and, price control for valuation data for prevoius year is also S
    Need ur assistance as I am new to MM
    Hi,
    Dhruv,
    Whenever you create purchase order price is suggested from info records (if valid conditions are maintained) , if not from your last purchase order. If info record doesnt exists you have enter the prive manually in the item overview of purchase order. The price mechanism whether Moving average or standard is used basically for valuation purposes only. They are never suggested in purchase order.
    If you have updated your material master record with standard price and has changed it. Then it should be valuated at new standard price during good receipt
    It is always with standard price valuation that good receipt is always valuated at standard price and not purchase order price.
    Kindly check your material master record details.
    Also which transaction you have used for changing the standard price in material master record.Use MM02 Tcode and change the standard price as you like.
    I hope this is useful
    Regards,
    Tushar Patankar

  • Price Control for Traded Goods

    Hi
    Can you please suggest what shld be the price control for the Traded Finished Goods
    Which is the better option  S or V
    Regards
    Ash

    Hi,
    Would always prefer price control V- Moving Average Price, because most of the time for stocks, the stocks are valuated at the real price of procurement.
    Standard price can be opted for FERT material, where most of the time the prices are not fluctuating.
    Anand

  • To change the price control of a material from "V" to "S"

    Dear all,
    I am facing an issue regarding Master's change.Actually ,In Material master i have to change the price control of a material from "V" to "S"& the standard price too. But when i am trying to do the same ,system is showing me an error as "Standard cost estimate exists in period 03 2007 "
    Plz suggest sol !!

    Hi,
    To clarify one point,
    You do not make the change via material types. As long as you are not using standard costing you can change the S to a V or the V to an S at any time even if stock and Open POs exist.
    The material type config merely controls which is defaulted (an S or a V) and can be set to block changes if you don't want it to be chnaged.
    But in most material types it is open for imput.
    If the material is subject to split valuation then you cannot change it to an S, it MUST be a V if the material has a valuation category (i.e. is split-valuated).
    Cheers
    Steve B

  • Price control for material

    Hi,
    i want to configure such that while making the material master it allows me the option either taken as V or S.
    Now i face the prob.that it not allow me  to change price control coming bydefault from OMS2 setting.
    Pl suggest me for that.

    Hi,
    In OMS2 setting if you set price control mandatory checked then you cannot change price control in material master.
    Hope this clarifies your query
    Regards,
    Raviraj

  • Shall v maintain price control  for material type with plant specific ?

    Hai Guru,
                       In OMS2, we change HALB price control [valuation] as V or S.  whether shall v maintain this for plant specific.?
    Kindly guide
    With Regards
    Swetha

    Hi
    if you do not make the indicator Price control manadatory active then you can have different price indicator for each plant. However thsi indicator is never done plant specific. If you wish to have plant specific then you may have to have a new material type and again you need to control the MM01 creation for that particular plant by means of Authorisation control which is littel involved also but can be done.
    Regards

  • Settling production variances when the price control of the material is "V

    Hi,
    Scenario: 1) Materials are maintained at moving average price.
                    2) Production variances need to settle to material and MAP need to be adjusted.
    Issue:  When the closing stock of the material is less than the negative variance need to be settled from the production order   the system is giving the message "Moving average price for material is negative"
    Questions: 1) What is the solution for settlement of negative variance to material when there is no stock?
                       2) Is there is any way to settle these variances to price difference account only when the stock is not available. if stock is available the variance has to adjust the stock, if not settle to the price difference account. Is there anys standard settling for this?
    Advance thanks for your help
    Regards
    Koteswararao Padarti

    Hi Rao
    You should never have Price Control V for In House made material...
    That will ruin your inventory valuation forever.. Consider the eg below if your price control is V
    1. Your moving price in mat master is 100 USD
    2. You Mfr on Jan 1 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and at period end if Qty is lying in stock, 10 variance will also be inventorized
    BUT, now consider this
    1. 1. Your moving price in mat master is 100 USD
    2. You Mfr on Jan 1 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and variance lying is 10 in prod order
    3. You Mfr on Jan 10 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and variance lying is 10 in prod order
    4. On jan 15, you consume Qty 1 and qty lying in stock is 1
    5. In period end, when you do settlement, following will happen
    a. For prod order 1: Qty Mfd 1 and Qty lying in stock 1 - Result: variance 10 will be inventorized.
    Mvg Avg price will shoot upto 110
    b. For prod order 2: Qty Mfd 1 and Qty lying in stock 1 - Result: variance 10 will be inventorized.
    Mvg Avg price (MAP) will shoot upto 120
    System wont check whether the qty lying in stock pertains to prod order 1 or 2... It will simply check if the Qty of prod order matches with qty lying in stock. hence, it will keep on inventorizing variance in this case.... and your MAP will touch the sky
    Regards
    Ajay M

  • Price control for ML & Batch valution

    Hi,
    We are implementing ECC 6.0 with IS Mill in an integrated steel plant. They manufacture Hot rolled, Cold rolled and Galvanized flat steel products starting with hot briquette iron. All production is in-house. The product structure is multi level. We have proposed to use multi level variant configuration (from the slab stage onwards) since there are a huge number of variants of the products that a customer may order. Thus a single configurable material number can represent thousands of variants. It is primarily a make-to-order scenario with mass production.. However there is considerable movement of materials across sales order segments and plant stock due to business constraints. A basic requirement of the client is the need to analyze cost on the basis of the characteristics of a variant (e.g. grade-wise, thickness-wise etc.) . They also need to know the actual cost of production for each batch. This value of the batch needs to be carried even if the batch is moved across sales order segments and plant stock.
    We are proposing to use Batch valuation (which is recommended as a best practice by SAP in such scenarios) to address these requirements. However the client also needs the rollup of the variances for the previous stages of production to the next stage up to the finished product. The same is only possible with the activation of Material Ledger & Actual Costing.
    However we understand that batch valuation requires the material to be valuated at moving average price “V” whereas for single/multi level price determination Standard price “S” is a must.
    We request your advice whether there is any way to avoid this apparent contradiction between price control requirements of batch valuation and material ledger.
    Regards
    Ramesh

    Hi Ramesh,
    I agree with Umut's statement: You can use price control S for the single valaued batches.
    Your scenario is very interesting to me. I am working in the Mill Products IBU at SAP and we have currently a project running in order to create more flexibility for logistics in using materials that were configured for another sales orders. In such a scenario material valuation and cost order varainace analyis suffers.
    A way out of it is the use of  a modified make-to-stock with batch valuation and actual costing. So it appears very similar to your scenario. We will include our scenario in a best practice for flat steel (China) which is currently under development. Would be interesting to   compare with your experiences.
    Since you write they want to analyze based on characteristics, also my blog in the BPX area on metals and mining industries might be of interest for you:
    <a href="/people/udo.werner/blog/2007/04/11/including-product-configuration-into-analytics:///people/udo.werner/blog/2007/04/11/including-product-configuration-into-analytics
    I would also invite you to write an own blog on your scenario of costing in a steel scenario and open up the discussion. I also intended to contribute with a similar topic.
    best regards,
                      Udo

  • Price Control Indicator in Material Master Record (Accounting View1)

    Hi,
    Is there any way to make the Standard Price (S) or Moving Average Price (V) automatically SET in Material Master Record? So that everytime we create a material, there will be no need to enter which price we prefer.

    Hi,
    Go to OMS2. select material type- goto detail- Tick 'Price control Mandatory".
    Also if you maintain "ext pro allowed i,e,2" ,system will pick price control V automatically.
    For price control S, maintain Int proc allowed as 2.
    Regards,
    Piyush
    Edited by: Piyush Mishra on Jul 20, 2010 9:06 AM

  • Price control for MIGO

    Dear experts,
    I need to know what is the settings required for "When doing GR, price in MIGO should be from the PIR and not from standard price of the material". 
    Please advice

    Hi,
    Material - Price control = S and standard price = USD 30
    PIR  -  Has a condition record valid for Feb-2011 and price  =  USD 25
    PO created and price in PO = same as that of PIR = USD 25 (this is fine)
    PIR price control = 5 (GR date)
    MIGO - completed
    In ME23N or MIGO, when I display GR document, it shows the price was picked up from Material master and not from PIR
    MIRO-  Price = PIR price (no issues  here)
    All I need is to know whether we can have MIGO alos pick up same price from  PIR condition record which is valid for the GR date?
    Best Regards,
    Shashidhar

  • Price Control for FG & SFG

    Hi All,
    Is it mandatory that for Price FG & SFG, one should maintain Price Control as "S" - standard price in the Accounting view of material master?
    Regards,
    Manish

    Hi
    It is mandatory to maintain the Price control in Material master accouting view 1 and  for In house produced material it  should be S standard price  as per the definition of standard price
    A constant price at which a material is valuated without taking goods movements and invoices into account.
    For incoming material or raw material it should be V Moving average
    A price that changes in consequence of goods movements and the entry of invoices, and which is used to valuate a material.
    The moving average price is calculated by dividing the value of the material by the quantity of material in stock. It is automatically recalculated by the system after each goods movement or invoice entry.
    Hope it is clear to you
    Regards
    Anupam Sharma

  • Price Control for Subcontracting.

    Hi All,
    Pls let me know what Price control (STD or MAP) should be kept for the materials that are subcontracted by the company?
    Pls let me know the reason for your suggestion.
    Regards,
    Shyamal

    Hi,
    When you say subcontracting iteself, it being processed by an outside supplier.  In this case, you will not be doing any value addition on the materials in the form of activity costs or overheads.  I don't think the concept of 'Standard or Moving
    average price' makes any sense and it should use only the purchase price or the quotation price whichever would be appropriate.
    Good Luck!!! Assign some points if this was useful input to you!!!
    Thanks and Regards,
    Bhuvaneswari.S

  • Reg: Multiple CMIR for 1 Material

    Dear Gurus,
    Customer material info record can be maintained as one - to - one relation, But our client needs to maintain single material for multiple CMIR's. 1 customer will have different name as his part no, but it related to single FG.
    Is there any way to achieve this requirement in standard SAP, or do we need to go for any Enhancements.
    Please share your  ideas
    Regards
    Praveen.

    Yes, you may be right.
    But you can try with a field type that is same as MATNR but that is not checked against MARA, while creating condition table.
    I found the below post from the thread, you may try : Material determination
    The system is not delivered initially with the necessary configurations for enabling material determination. In order to make possible an automatic substitution when you create e.g. a sales order, the following configuration settings must be performed in SPRO:
    1. Maintain Prerequisites for Material Determination -> Maintain access sequences should have the following value in the list: “A001 Material entered”
    2. In the submenu Access sequences -> Accesses we should have the following values: “Access 10, table 1, description Material entered”
    3. For the values above, the following fields must be defined: “Condition MATWA, Document structure KOMPD, Document field MATWA, Long field label Material entered”
    4. In the menu Assign procedures to sales documents types the concerned document types (orders and quotations) must be assigned the material determination procedure A001.
    5. And finally, in Define substitution reason, the corresponding substitution reasons must be activated.
    Please follow these steps and you will get an automatic material substitution, even if the material entered is not in the database. The only material that has to be in the database is the substitution material.

  • Price control for material as per delivery

    They are purchasing material which are used in the production process  these have a fluctuating price and the price paid is the price at the point of delivery not the point of ordering.  The prices are fixed for three months at a time but the delivery lead time is six weeks to two months, this means that at the time of ordering they do not know what the price will be.
    This results in a significant volume of manual work to change all the POu2019s as they cannot think how to put the prices into the system.  We would like to remove the requirement for the local to have to update the prices constantly and have the prices placed in the system centrally and then called off from locally.
    What is the best possible solution for above business process .

    See the SAP help:
    Date of Price Determination
    In the automatic price determination process, the price can be calculated as at the document date of the PO, or as at another date (such as the current dayu2019s date, the delivery date, or the goods receipt date). You can specify the date to which the price that is determined relates at the following points:
    In the vendor master record, in the Pricing date control field, if you wish to use the same price determination date for all a vendoru2019s materials.
    In the purchasing info record, in the Pricing date category field, if you wish to use a different pricing date for a certain material supplied by a particular vendor.
    The value in the purchasing info record takes precedence over the value in the vendor master record.
    In the purchase order, in the Pricing date category field (found via Item ® More functions ® Additional data).
    The value from the info or vendor master record is preset when a purchase order is created. However, this is only used if you change it in the purchase order and carry out a new price determination process.
    The pricing date category in the PO takes precedence.
    Example:
    In the info record, you have specified that the price determination process is to be carried out with the conditions that are valid on the delivery date (pricing date category 2). Furthermore, you have created two validity periods (from 04. 01.1997 until 04. 31.1997 and from 05. 01.1997 until 12. 31.1997), each with different conditions.
    You create a purchase order with the delivery date 05.05.1997. The pricing date category from the info record is adopted. In the course of the price determination process, the info record conditions from the validity period 05. 01.1997 until 12. 31.1997 are then adopted.
    If you wish to adopt the info record conditions from the first validity period in the purchase order, you must change the pricing date category in the PO to blank and carry out a new price determination process.

Maybe you are looking for

  • Thinkpad edge 0578 possibly incomplete recovery disks

    My gf said her lenovo is getting slow so I decided to get her an SSD and do a fresh install of win7 on it. She has 3 DVDs created which I believe believe from the lenovo Rescue and recovery software.They are DVD1) lenovo recovery boot. DVD2) lenovo r

  • Can the camera reference in a file be changed?

    The file metadata show the correct camera but the file is located under" unknown camera"? In one case I  shot 90 fotos with the same camera (nikon d1x) same date, same place and 85 are correctly placed - 5 not! Since I have a backup folder that is ba

  • Lead time for Item / Weekends

    Hi I am confused about the lead time to be entered for the item planning/MRP. Do I include weekends when entering lead times in Items master data or not? 2 weeks = 10 days or 14 days? In MRP I can select to respect Holidays. Does that also influence

  • Maximum number of Item Master Data

    Hi! is there anyone, who used SAP B12007 for more than 1,00,000 item master data? I would like to know the issues in this context, if there is any.

  • How do you go about getting signal at your work place?

    Hi, None of the verizon customers at my work place get any signal at all. However, other providers(ATT/T-mobile) all have signals. Can verizon provide a signal booster or anything for that matter to get us some kind of signal? We are located in Pasad