Release of spare part directly

Hello every one,
In my project i m getting requirement related to spare part release for maintainance orders. The requirement whenever some spare part is required on some order used want that we shouldnt do any work in maintenance order. spare part should be directly released by engineers stores. and it should come in maintenance order automatically. I dont think its possible in standard SAP. Kindly give me some solution on this.
Regards
Abhishek

Abhishek,
It is possible to issue material against an Order without planning of material in the Order (Resrvation)
Pls check, for example
1. Goods issue (Tcode: MB1A), select Movement Type as 291 (Consumption for all account assignments from warehouse), Plant and storage location, then press enter. (do not select Order button)
2. Enter the Order number (Order must be released condition), then enter the materials required to issue with quanity
3. Post the document (Material Issue against Order directly)
4. Check the Order for material document flow and Actual cost.
Regards
Siva

Similar Messages

  • Spare parts -DIGI business procedure

    Hi everyone,
    I'm testing how to use spare parts-DIGI direct issues goods.
    I have create and release a service order ,but no following-up document is created automatically.
    At the same time ,I try to find if there is any documents in Customer Demand View.there's nothing.
    I try to check if it's already issued in Outbound Delivery View.It's also nothing and inventory has no change.
    So I try to make confirmation. This reduced the inventory and create a Good and Activity confirmation document automatically.
    But the status of service order is still in process and order pipeline is still not started.
    what should I next?
    Could you please tell me correct procedure in system  that  I should do in SAP step by step?
    thank you very much.

    Hi David,
    DIGI parts in service orders are not relevant for supply planning. So will not see them as a demand. You also do not get any ATP info for DIGI parts. You have to first release the order to service execution, then you can do the confirmation. In the confirmation UI you can specify the logitics area, from which the part will be taken. After service confirmation the inventory is then automatically reduced by the quantity of the DIGI part.

  • Capture storage location for spare parts

    Hi Expert,
    We are using the material type 'ERSA' - Spare Parts. The standard setup does not allows capture storage location.
    How to include storage location in MIGO.
    Regards,
    Peck Har

    which "standard" setup do YOU have?
    Usually a ERSA is quantity managed hence it has storage location views.
    But you have to look into the purchase order, if the purchase order is account assigned e.g. to a cost center or work order, then the receipt is directly consumed and does not go to a storage location, hence the field is not open to be entered in MIGO

  • Where can I get a spare part for my fantastic apple sound dock A1121

    All,
    I am a proud owner of a approx 7 year old apple sound dock (the white bar with contacts on top)
    unfortunately my kids ripped the ipod out of the top contact bar, and somehow the contacts broke.
    I could manage to open the box and dismount to find out whats wrong, but its simply broken.
    the spare part would be a plastich frame with the contact bar.
    Is it possible to obtain from Aplle or the origin manufacturer this plastick frame and the plug?
    I can run the device using the AV cable on the rear, but this is unsufficient and not too elegant.
    any help is appreciated. If anyone has a vendor or support link, just post it here or send it  to me  directly .
    Thanks in advance
    Claus

    I presume you're referring to the Apple Hi-Fi:
    http://www.apple.com/support/ipodhifi/
    Apple never sold parts for that device, and I've never seen any third-party source for parts or repairs. I think you're probably, therefore, out of luck.
    Regards.

  • Advice to create a material type (Semi finished, finished or spare parts)

    Hello all!
    I am facing a big problem to how to create a material type ?
    In my case, this material (engine) is finished good in one plant (let's say 100) and in the same time it's considered as Semi finished good in another plant (200 for example) and we can also sell it as spare parts (plant 200).
    So, i don't know if i will created as finished good or semi finished or spare parts in MM01 transaction? What do you think?

    Lamine,
    Creating an material with type as Semifinsihed and Extending sales view to the article will solve your problem.. Also according to your scenario, i hope you are using SPK for transfer of SEMI FInished Goods from  Plant 100 to Plant 200. If this is there in the MRP view. you will not have any problem in this scenario. You can directly sale from Plant 100 and During MRP run for Plant 200 the material will be used in Plant 200 as Semifinished. Also as Sales view is extended in Plant 200 you can also sell it as Spare parts.
    Regards,
    Vinod Kapote.

  • Report for Order and spare parts

    Hello every one, i am looking for a report which can tell me order number wise use of spare parts. It can be either in order or some seprate report. I have not find any such report till yet. Kindly help me in this.
    Regards
    Abhishek

    Baed on the requiremtns given, IW13 can also be auseful report for you.
    SM

  • Need field and table for spare part material and price for a given material

    Hi,
          In need to create a report with following fields:-
           Customer           Material          spare part material            spare part description             price                   currency.
    From which table and field I can get all this information.Please guide me.
    Hint.  cl30n transaction for material managemant.
             vk13 transaction for price maintenace.
    Regards.

    CL30N is a general transaction that can be used for any classification, but material master maintenance is usually MM01/MM02 or MM41/MM42
    Material description can be taken from table MAKT
    customer from table KNA1
    The question is what you are going to analyse? where do material and customer tie together? do you do the analysis on sales orders VBAK and VBAP ? or invoices  VBRK and VBRP? or customer material info record KNMT? 
    or do you capture this info in classification? then you get the values from AUSP
    Edited by: Jürgen L. on Aug 3, 2010 9:42 AM

  • Deletion OF schedule LInes from APO SPP(Spare Parts Planning) through ABAP.

    Dear All,
    I need to delete the schedule Lines from APO SPP(spare parts planning ) system.I am looking for any available BAPI provided by SAP for this purpose.Please provide me help if any of you folks previously in your project went through this requirement.
    If any other way is there other than BAPI please suggest.
    Regards
    Mukesh Pandey

    Hi Siddartha,
    That option is not working.
    Thanks

  • Decimal conversion of Sales Tax in 'SPARE PARTS SALE INVOICE' ( smart form)

    Hello,
    I am displaying a the value of the Sales Taxc in 'SPARE PARTS SALE INVOICE'. (in Smart Form)
    The field(which holds the Sales Tax value is 'KWERT' -LBBIL_INVOICE-IT_KOND ), with datatype 'CURR', reference table 'KOMK' and reference field 'WAERK'.
    In my smart form,i have declared a variable 'SALES_VALUE' of datatype 'KWERT' and reference field 'IT_PRICE-WAERK' (LBBIL_INVOICE-IT_PRICE), where 'WAERK' is the SD document currency.
    Now when i display the field 'SALES_VALUE' i get 735.00 , whereas the original value in the field is 73.5
    how to correct this and where am i wrong ?
    Thankyou for yur time and really appreciate the help.
    Shehryar

    You are using currency fields that reference a currency code. Most currencies in SAP have two decimal places. Dividing by 100 will work in most cases. Ideally you should get the CURRDEC value in table TCURX for the currency you are working with... then divide by 10 that number of times.
    example-
    USD, 2 decimals, divide by 10 twice.
    There is a function module that will do this for you. Can't think of the name...???

  • What is best practice for dealing with Engineering Spare Parts?

    Hello All,
    I am after some advice regarding the process for handling engineering spare parts in PM. (We run ECC 5)
    Our current process is as follows:
    All materials are set up as HIBE's
    Each material is batch managed
    The Batch field is used for the Bin location
    We are now looking to role out PM to a site that has in excess of 50,000 spare parts and want to make sure we use best practice for handling the spare parts. We are now considering using a basic WM setup to handle the movement of parts.
    Please can you provide me with some feedback on what you feel the best practice is for dealing with these parts?
    We are looking to set up a solution that will us to generate pick lists etc and implment a scanning solution to move parts in and out of stores.
    Regards
    Chris

    Hi,
    I hope all the 50000 spare parts are maintained as stock items.
    1. Based on the usage of those spare parts, try to define safety stock & define MRP as "Reorder Point Planning". By this, you can avoid petty cash purchase.
    2. By keeping the spare parts (atleast critical components) in stock, Planned Maintenance as well as unplanned maintenance will not get delayed.
    3. By doing GI based on reservation, qty can be tracked against the order & equipment.
    As this question is MM & WM related, they can give better clarity on this.
    Regards,
    Maheswaran.

  • I lost the grey, round shaped rubber placed under the magic trackpad to support clicking. the rubber detached from the trackpad and lost. Where can i find the thing as i am not sure whether apple sell small spare part like this?

    i had lost the grey, round shaped rubber placed under my magic trackpad. i think it detached from the trackpad body and lost. where can i get this small spare part as i couldn't find this small spare part in apple store?

    Wish I could be more positive but as far as I can see, the solution is to make something for yourself and tape it on.  It appears they do not supply a proper replacement and Ifixit, the usual people say they don't have them.
    Here is a company that supply rubber feet.   It may be worth contacting them and asking if they have something that will do the job.
    http://www.wowshop.co.uk/1%20inch%20rubber%20feet?_tt=g_1455876706_6722138569_56 292842294_c&gclid=COvs0q3pysECFavpwgodMU4APA

  • Apple macbook pro with retina display is having yellow screen problems in which screen is not perfectly white and is yellowish. More over the service frm apple's part is ridiculous as they have faulty spare part. Does ne1 hv email of senior person?

    Apple macbook pro with retina display is having yellow screen problems in which screen is not perfectly white and is yellowish. More over the service frm apple's part is ridiculous as they have faulty spare part. Does ne1 hv email of senior person?

    Apple service centre employee told me that they do not have this 14 day offer in India.
    And My mac book pro is taken in by Service centre people to run test etc and I will be informed the next day if they accept it as a fault or not ?
    I feeling ridiculously bad.

  • Unable to view Spare Part Components in SAP CRM Service Order

    Hello All,
    We are implementing CRM 7.0 Ehp 2.0
    As per the following video it is now possible to integrate the spare part components in the CRM Service Order, using the BOM replication and Product Proposal functionality in SAP CRM
    SAP CRM 7.0 - Integration of ERP BOM Information in the CRM Product Proposal
    However in our case we are not able to achieve the desired results.
    Following configurations are done
    1) The BOM is replicated from ECC to CRM the same can be viewed in commpr01
        Material 4561 is the main product and 4562 is the component
    2) The item category for the main product is YRVS where the customization for structure scope is done
    3) For the Product Proposal customization's, I have created a new method schema
    4) The transaction type and the sales org are assigned to the method schema
    5) However now when I am creating the service order, I enter the sold to party, the product id
    6) Next  I go to the line item to click on product proposal.
    7) The system issues the below message
    Please advice if I am missing on any configurations.
    Kind Regards
    Atul

    Hi Raghavendra,
    Thanks for your reply, appreciate the same, I have now added the relationship objects as per your post above in comm_hierarchy for the particular category
    Now  in the product master , I am now able to view the tabs(screen shot attached)
    Next I create my BOM in ECC with BOM Usage 5 and save the same
    Next I run the initial download for the adaptor object  BOM in SAP CRM
    When I check in commpr01 for the material 4561 the component and the main material have not come.
    Can you please advice further.
    Kind Regards
    Atul

  • How to define alternate items for Spare Parts

    Hi SAP Gurus,
    My Client wants to implement Alternate items for Spare Parts. It is not a Manufacturing unit.
    Actually Client wants their Service Partners to know that
    ex., Material A is an alternate item to Material B and can be used for servicing without ordering for Material A.
    Whether there is any Possibility to define alternate item in the Material Master.
    Off course I have gone through the thread and document of Alternate items in BOM.
    I would appreciate for providing Clarity on the subject.
    Best Regards,
    R.Velmurugan

    Hi Velmurugan,
    As per your requirement  i think you can achieve alternate item group functionality ( as your client is not manufacturing)
    You can maintain alternate material in MRP 4 view followup material field or basic data 1 old material Field than develop a ZReport extract the same as of client not manufacturing  any thing.
    Otherwise refer this document if you to go to Follow up material Functionality.
    Concept of Discontinuation Data - Material Master and BOM
    If you have any other query kindly revert back otherwise close the thread.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Need to know the exact name and P/N of a spare part, cannot find it anywhere.

    Hello,
    I would like to know the exact name and P/N of the -Touch Panel Control Assembly- for the HP Pavilion dv3510nr?.  
    or is it -Touch Panel Kit-?
    or is it -Multimedia Touch Control Panel-?
    Recently, mine got physically damaged and none of the touch buttons work, I cannot even turn the WiFi on. So I need to replace it, but I cannot find this spare part anywhere.
    It does not appear on the list of spare parts for this laptop, with any of those names.
    Does anybody know where can I find this spare part?
    Thanks very much.
    Glendy

    In case it was not very clear, the spare part that I am referring to is the panel placed above the keyboard, that has touch sensitive buttons for multimedia functions and for enabling the wireless device.
    Buttons appear In this order:
    MediaSmart button
    Audio on/off button
    Volume control
    Skip backward button
    Play/Pause button
    Skip forward button
    Stop button
    WiFi enable/disable
    Glendy 

Maybe you are looking for

  • How to find whether an Invoice is been posted for a particular PO

    Hi, How to find whether an Invoice is been posted for a particular PO. I have a scenario where I fetch data into an internal table T_CDHDR(It has PO and other details). For each and every entry(PO) in that internal table I have to see whether an Invo

  • File to Proxy scenario message failed in ECC with staus SYSFAIL

    Hi All, We are working on File to proxy scenario,  PI  able to send message successfully to ECC, but  In ECC , message got  stuck in queues with the status 'SYSFAIL', when I read the error message it is showing Address Invalid. when I run the LUW, it

  • OIM 11 Informix 9.03 Table as Trusted Source

    Hi, My customer has Informix 9.30 as repository for his RH application (Database Table), but reviewing DataBase Table Connector documentation Informix is not mentioned as certified database, is it possible to integrate Informix via it's JDBC driver's

  • DI Server and IIS on different physical Servers

    Hi all, I'm pretty new to this topic regarding Web-Services and DI-Server. We are trying to build a solution which enables a customer to change BP-data through the internet. In the DI-Server Sample program from SAP I've found a reference to the SBODI

  • Need a way to handle oracle.jbo.RowInconsistentException

    This exception throws (as you know :-) when the another user changes data, and after that the first user tries to commit his changes ,by calling "Commit" operation binding from a pageDef, in a usual way :         BindingContainer bindings = getBindin