Replacement path -query level

Hi Friends,
     1)       I have designing the two queries on query designer,  customer characteristics restricted for top 2
customers (how to restricted the characteristics for top 2 )
2)       second query revenue  values come to first query  customer used to replacement path  option ,how to
do it.
Thanks.

Hello,
For first query you can use the "Condition" where u can defined Top 2 customer.
& for second query just go thru this link,
http://www.sd-solutions.com/documents/SDS_BW_Replacement%20Path%20Variables.html
Hope it helps u,
Best Regards,
Santosh

Similar Messages

  • How to feed a query using a variable defined as Replacement Path-Query

    Scenario description : BI NetW 2004S - InfoCube with the following characteristics Customer, OrderDate, OrderYear and the following KeyFigure Number of Pieces.
    Objective: I need a query "QB" that shows how many pieces a set of customers has ordered in the year 2008. The set of customers is defined as all customers that in the previous years (the user can select one or more years) have ordered more than 500 pieces within the same year.
    Implementation: In general terms the idea is to build a query "QB" with the characteristic "Customer"  that is restricted (filtered) using a variable that is fed by another query "QA" (Replacement Path-Query).
    In order to have the selection of customers that for each of previous years (2007, 2006, 2005,...) have ordered more than 500 pieces, in the query "QA":
    - I put OrderYear as filter and defined a variable in order to ask the user which year/s he wants to analyse to define the selection
    - I put Customer and OrderYear in row
    - I put the KeyFigure Number of Pieces in column
    - I've defined the following condition: Number of Pieces > 500 with the option Caracteristic Assignment = All Characteristics in the Drilldown Indipendently
    Now if I run the query "QA" it works correctly showing me all customers that in the selected years have ordered more than 500 pieces within of the same year.
    If I run the query "QB" it shows a correct result only if I enter only one year (for example 2006) in the OrderYear field (coming from the query "QA"); if I enter more than one year (for example 2006 and 2007) the selection of customers showed is not the same defined by the first query "QB": I was expecting to see all customers defined from the first query less all customers that have no ordered any piece in 2008.
    Questions
    1) Why is query "QA" working on a different selection of customers when the user selects more than one year?
    2) Cosidering the scenario and the objective described above do you have any other idea?
    Thanks
    Ciao
    Roberto

    Hi Christophe,
         it's ok for me if I consider the customer only once in the final selection of customers that feeds the final query, this is my objective.
    However as test I've created 2 "input" queries, one related to 2006 and one related to 2007, and then in my destination query I've tried to restrict the customer using 2 variables of type replacement path-query (one attached to the 2006 query and one attached to the 2007 query). Unfortunately when I try to check and save the destination query, Query Designer tells me it is not possible to restrict the characteristic in this way.
    Could you please describe me steps you run in to order to restrict a characteristic using more than one variable of type replacement path-query?
    Thank you in advance for your answer.
    Ciao,
    Roberto

  • How do I...Conditionally control Replacement Path Query execution?

    Hello SDN:
    We are on BW 3.5 SP16.
    We are currently using a replacement path Query(RP) with variables
    to populate a variable in another Query(T).
    The problem we are having is with performance.
    The entry of variables in replacement path Query(RP) is optional (This is necessary there cannot be required values)
    When results from Replacement Path Query are small performance is fine. (e.g. 10 seconds)
    When results from Replacement path query are large performance suffers. (e.g. 1+ minutes)
    Users are free to leave the replacement path query variables empty resulting in a large set of data to be replaced. This is the worst performance case.
    We would like to discover a way to conditionally execute the replacement path query. That is, if users do not enter values for the replacement Query(RP) variables do not execute the replacement path query(RP).
    Does anyone know if this is possible within reason and in customer exit space?
    We have reviewed the situation from all angles and the requirement for the replacement path FUNCTIONALITY and the freedom for the user to leave variable values blank remains.
    I've been searching and reading SDN and SAP notes for about a week and do not find threads which address this situation.
    We are also exploring Customer variable exits to mimic replacement path functionality
    (different topic subject="How do I...Mimic Replacement Path with Query using Customer Variable Exits?")
    Any help will be appreciated
    Many thanks
    David Schuh

    Hello SDN:
    We are on BW 3.5 SP16.
    We are currently using a replacement path Query(RP) with variables
    to populate a variable in another Query(T).
    The problem we are having is with performance.
    The entry of variables in replacement path Query(RP) is optional (This is necessary there cannot be required values)
    When results from Replacement Path Query are small performance is fine. (e.g. 10 seconds)
    When results from Replacement path query are large performance suffers. (e.g. 1+ minutes)
    Users are free to leave the replacement path query variables empty resulting in a large set of data to be replaced. This is the worst performance case.
    We would like to discover a way to conditionally execute the replacement path query. That is, if users do not enter values for the replacement Query(RP) variables do not execute the replacement path query(RP).
    Does anyone know if this is possible within reason and in customer exit space?
    We have reviewed the situation from all angles and the requirement for the replacement path FUNCTIONALITY and the freedom for the user to leave variable values blank remains.
    I've been searching and reading SDN and SAP notes for about a week and do not find threads which address this situation.
    We are also exploring Customer variable exits to mimic replacement path functionality
    (different topic subject="How do I...Mimic Replacement Path with Query using Customer Variable Exits?")
    Any help will be appreciated
    Many thanks
    David Schuh

  • Passing Blanks instead of  ' # ' in Replacement Path query.

    Hi Experts,
    I have a main query which gets its cost center values from another query with replacement path variable.
    The variable should return BLANK to the main query inorder to display all costcenters. But blank is interpreted as '#' and the main query returns No application data found as it treats blank as '# /Not Assigned' instead.
    How to achieve this.
    Please suggest if anyone has done this before. This is we a Web report Not Excel.
    Thanks
    Sarah

    Thanks Arun, I understood the logic now for blanks.
    But,
    1) How to pass 'ALL' for the filter values.As the sub query returns no application data found instead of all cost centers. This is because in the data in ODS is
    <b>UserID CostCenter</b>
    A                   
    B        11234
    C        12345
    D     
    (Blank- representing all costcenters)
    2) Another option was thinkin to have the client fill in the ztable based on which the generic Datasource is made with costcenter values for each user instead will that help.
    Appriciate your help.
    Thanks
    Sarah

  • How do I...Mimic Replacement Path with Query using Customer Variable Exits?

    Hello SDN:
    We are on BW 3.5 SP16.
    We are currently using a replacement path Query(RP) with variables
    to populate a variable in another Query(T).
    The problem we are having is with performance.
    The entry of variables in replacement path Query(RP) is optional (This is necessary there cannot be required values)
    When results from Replacement Path Query are small performance is fine. (e.g. 10 seconds)
    When results from Replacement path query are large performance suffers. (e.g. 1+ minutes)
    Users are free to leave the replacement path variables empty resulting in a large set of data to be replaced. This is the worst performance case.
    We would like to discover a way to conditionally execute the replacement path query. That is if users do not enter values for the replacement Query(RP) variables do not execute the replacement path query(RP).
    Does anyone know if this is possible within reason and in customer exit space?
    We have reviewed the situation from all angles and the requirement for the replacement path FUNCTIONALITY and the freedom for the user to leave variable values blank remains.
    I've been searching and reading SDN and SAP notes for about a week and do not find threads which address this situation.
    We are also exploring Customer variable exits to mimic replacement path functionality
    (different topic subject="How do I...Mimic Replacement Path with Query using Customer Variable Exits?")
    Any help will be appreciated
    Many thanks
    David Schuh

    My appologies-I posted this message with the wrong subject. I will repost it with appropriate subject.
    dave schuh

  • Replacement Path with query---error

    Hi
    I have one query 'B' which uses replacement path variable(with query  A) on 'Customer' infoobject in Global filter area.
    So everytime,I execute query 'B',first query 'A' runs and gives some customers list who are active yesterday and today.This active customers list is fed into replacement variable in query 'B' and query 'B' shows its own result.
    The problem,we have is,Query 'B' is showing some customers who are not in the list returned by query 'A'.
    Any ideas,how I can fix this problem?
    Thanks.............

    Hi
    Thanks for your reply.
    Both run on same Multiprovider.
    First thing is...this Customer infoobject is placed in Global filter area of Main Query and the infoobject has replacement path variable(with query on it).So the main query's data is limited to whatever customers that are given by replacement path query.
    how can Main query show some customers data thats not been given by this replacement path query?
    Second thing is...when user reported this error,he showed error in screenshots.When I ran query today,error is gone.Its showing correct.I reported to user and he informed that its happening now and then ....He gave one more example that happened today which is exactly of some type.....Main Query is showing customers that are not given by Replacement path query .....
    Any ideas?Thanks

  • Replacement path does not work for a specific query after migration 7.0

    Hello all,
    We have a problem with a replacement path variable in a query.
    After the migration, it seems this replacement path doesn't work.  This replacement path is defined inside a structure that is used in some other queries and for the other queries is working properly.
    Another think we have done is to make a copy of the query where the replacement path doesn't work and the copied query works ok.
    Did anybody find this kind of problem in a migration. Any help will be appreciated.
    Regards, Inma

    This is just for those who might have simmilar requirement &  would in case refer to this thread..
    Me too faced same problem of OLE DB for OLAP cant be released. I was using  replacement path query variable which was using result set from the other  query.
    I just had to uncheck 'Allow External Access' in release for OLE  DB for OLAP in query properties. This worked from me, my query using replacement path variable is giving desired results.
    Hope this might be useful for relevant users.
    Regards,
    Pritesh

  • Characterstics variable with replacement path?

    hi friends,
    what scenerio we use characterstivs variable with replacement path in reporting?
    Thanking u
    suneel.

    Hi Suneel,
    If you set a query as a replacement path, you can use that query to fill a characteristic's variable which is used in another query. In this way you can take advantage of the OLAP engine to perform e.g. complex selections on a characteristic's values. Obviously you need to format the replacement path query's layout appropriately. the replacement path technique is intended to fill a characteristic's variable. You use that variable on that characteristic in another query
    check this link for creating step by step
    http://www.sd-solutions.com/documents/SDS_BW_Replacement%20Path%20Variables.html
    Hope this helps,
    Thanks,
    Sudhakar

  • Averages in a query using a variable with Replacement Path: Replacement wit

    I have two queries. Query1 has a handful of characteristics, one of which is used in a formula where I used replacement path in order to be able to use it in some calculated key figures. I also have a couple of key figures that are not calculated and they are averages.
    The second query has a characteristic value variable that is replaced with the first query. This replacement value variable is placed into the filter section and the characteristic itself is placed in the rows section. I am bringing in the same calculated key figures that were in my first query as well as the normal key figures that are averages.
    The issue I am having is the regular key figures that I am bringing in are coming in summed up instead of as averages. Is it possible to bring the normal key figures in Query1 as averages into Query2?
    There is more information in the thread below if you need more background.
    [Replacement Path and Aggregation;
    PS - I am using 7.0.

    Hi Satyakam,
    In the text variable properties make sure that in the replacment path you have chosen "Text" to appear date as per user setting . Other wise as in your case it must be set to "Key" which always shows in the format YYYYMMDD.
    Hope that helps.
    Regards
    Mr Kapadia

  • Replacement Path variable with query

    Hi all,
       I have a replacement path variable in a query that use the result from other query (a pre-query), both of them use the same variables, exactly the same, although the query ask me for the values of the variables twice (for the query and for the pre-query), is possible that the query ask me for the  variables only one time (re-use the same values for both queries)?
    Thanks,
      Javier

    If possible use only the variable with replacement path on the query. Since the Pre-query has all the same variables as the main query, the user would enter all the required input on the pre-query one time. The result of the pre--query feeds the main query. If the main query has no other selection variables except for the replacement path, the selection screen will not pop up again.
    Thanks
    Vineet

  • Query Variable - Replacement Path

    Hi all,
    I would need to fill a query variable (based on calendar week characteristic) with specific list of values. I need all calendar weeks that are present in infocube, but only if key-figure > 0. So I've created a query with cal. weeks in rows and with suppressed zero rows. Output values from query contains exactly what I need.
    Than I created a variable (replacement path) with reference to mentioned query. But it seems to me that the variable does not contain all values displayed in the query, but only filtered values (if I use some restriction of cal. week).
    Is it possible to achieve this using replacement path at all?
    If not I would appreciate any idea or experiences how to accomplish this requirement.
    Many thanks,
    regards,
    Pavel

    Hi Pavel, I didn't get your requirement 100% . Still, I would like to tell How Replacement path works.
    First of all for the Source query you have given condition to restict the output of the query on particular keyfigure value > 0 ......  Right.
    Now on second query, you have created the Characteristic variable with Replacement path....here some important things to look at.
                    while creating the variable, select Processing Type as REPLACEMENT PATH, then in the "Replacement path" Tab,  give Replaced variable with.. "Query" ...and at bottom, For QUERY give the query name.
    If u want RRI facility from Source Query to Target Query, then u give RRI Connection in T-Code : RSBBS....
    ...and now when u execute the Second Query, First the first Query will be executed and those filtered values > 0 will be passed to the Second Query's variable input...then the second query will be executed...
    But, in your case check once again all settings in Variable in Second Query..and Conditions block in First Query..
    It should definitely work...
    ---Intros.
    Edited by: Intros on Apr 25, 2008 1:31 PM

  • Crystal Report using BW Query that contains replacement path (control query

    I have a Crystal report built on a BW query.  The BW query contains a replacement path on a characteristic (as a control query).  The control query has additional variables that the main query is not using.  The crystal report is not recognizing any of the variables that the control query includes.  How do I get the crystal report to recognize the control query variables?

    Post your question BEX and B1 and/or classic SAP data source issues to the Integration Kit forum

  • Query Designer - Variables - Replacement Path

    I need a help.
    In one query I need to select some data from the current Period until yesterday.
    In another query I need to select the same data, but from the current Month until yesterday.
    I created 2 restricted key figures:
    SEL_PERIOD restricts 0FISCPER by the variable 0FPER, wich is an exit SAP for current Period.
    SEL_MONTH restricts OCALMONTH by the variable 0CMONTH, wich is an exit SAP for current Month.
    Now in both RKFs I want to restrict 0CALDAY from the beginning of the Period or Month until yesterday.
    I found this variable 0DAT, wich is an exit SAP for current day.
    I'm trying to create an interval variable, type replacement path, with From Value not filled and To Value filled with 0DAT - 1.
    But it doesn't work, Query Designer points that 0DAT is not an allowed source for the target variable.
    And the documents that I searched state that "the target variable must represent a single value" and "the source variable must be input-ready".
    Does anyone have a suggestion on how I can restrict 0CALDAY, for this specification ???
    Thanks in advance.
    César Menezes
    Edited by: César Menezes on Jun 25, 2011 11:51 PM
    I forgot an important point:
    Sometimes I need current Period or Month, in other cases I need the same Period or Month from last Fiscal Year or Calendar Year.
    No problem with 0FISCPER and 0CALMONTH, I can off-set the variables by -12.
    But I would like a help on how to do it with 0CALDAY.
    Example: today is 25.06.2011. In some cases I need to restrict until 24.06.2011, in other cases I need to restrict until 24.06.2010.

    Hi Ceaser,
    This is a generic explanation to your scenario. Please make some changes as per your requirement. Just to give you some idea......................
    We  need to manipulate u201CKey Dateu201D values to achieve required analytics.
    Step 1: As a first step, create a variable on u201CSales Dateu201D (or whichever date is used for Sales Date) field (ZPDATE) with user input. It was meant to capture u201CKey Dateu201D through user entry.
    Step 2: Create a restricted key figure on Sales & restrict it on u201CKey Dateu201D value to get first analytics need i.e. u201CSales on Dayu201D.
    Step 3:Next step was to manipulate the value of u201CKey Dateu201D on which I could restrict u201CSalesu201D (Key Figure) again and again to get other values.
    Step 4: Create a new variable (e.g. ZPUTMNTH) and assigned it to be filled up by Customer Exit. (For simplicity purposes only u201CMonth to Dateu201D value is explained below. Same procedure can be repeated to fulfill other needs. Though in code section, ABAP code is available for almost all the variables)
    Create Variable
    Step 5:  Create one variable (ZPUTMNTH) for u201CMonth to Dateu201D with processing by u201CCustomer Exitu201D. This variable was created on u201CDateu201D characteristics.
    Sample ABAP Code
    *& Include ZXRSRU01
    DATA: L_S_RANGE TYPE RSR_S_RANGESID.
    DATA: LOC_VAR_RANGE LIKE RRRANGEEXIT.
    Data: v_loc_date type d.
    Data: v_loc_date1 type d.
    Data: v_loc(4) type c.
    CASE I_VNAM.
    to calculate "month to date" user input is "Calday" Key Date
    WHEN 'ZPUTMNTH'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    L_S_RANGE-LOW = LOC_VAR_RANGE-LOW(6). "low value, e.g.YYYYMM (200606) part of key date (20060625)
    L_S_RANGE-LOW+6(2) = '01'. u201C low value e..g. YYYYMM01 (20060601)
    L_S_RANGE-HIGH = LOC_VAR_RANGE-LOW. "high value = input
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'BT'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    to Calculate no of days up to "month to date" (user input Calday Key date)
    WHEN 'ZDAYMTH'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    L_S_RANGE-LOW = LOC_VAR_RANGE-LOW+6(2). "YYYYMMDD - DD will indicate the no of days
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'EQ'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    to calculate Previous year "month to date" (User input Calday u2013 Key date)
    WHEN 'ZDAYPMTH'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    L_S_RANGE-LOW = LOC_VAR_RANGE-LOW.
    L_S_RANGE-LOW(4) = L_S_RANGE-LOW(4) - 1. "low value previos year
    v_loc_date = L_S_RANGE-LOW. "take input value in another variable
    L_S_RANGE-LOW+6(2) = '01'.
    L_S_RANGE-HIGH = v_loc_date. "high value = input, taken into another variable
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'BT'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    to calculate "year to date" (User input Calday u2013 key date)
    WHEN 'ZPUTYEAR'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    L_S_RANGE-LOW = LOC_VAR_RANGE-LOW(4)."low value, e.g.200001
    L_S_RANGE-LOW+4(4) = '0101'.
    L_S_RANGE-HIGH = LOC_VAR_RANGE-LOW. "high value = input
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'BT'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    to calculate "Previous year to date" (User input Calday u2013 key date)
    WHEN 'ZDAYPYR'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    L_S_RANGE-LOW = LOC_VAR_RANGE-LOW.
    L_S_RANGE-LOW(4) = L_S_RANGE-LOW(4) - 1. "low value previos year
    v_loc_date = L_S_RANGE-LOW. "take input value in another variable
    L_S_RANGE-LOW+4(4) = '0101'.
    L_S_RANGE-HIGH = v_loc_date. "high value = input, taken into another variable
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'BT'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    to calculate "Previous year" User input Calday u2013 key date
    WHEN 'ZPYEAR'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    v_loc = LOC_VAR_RANGE-LOW(4) - 1.
    L_S_RANGE-LOW = v_loc. "low value previos year
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'EQ'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    to calculate No of Days - "year to date"
    WHEN 'ZYRDAY'.
    IF I_STEP = 2. "after the popup
    LOOP AT I_T_VAR_RANGE INTO LOC_VAR_RANGE
    WHERE VNAM = 'ZPDATE'.
    CLEAR L_S_RANGE.
    v_loc_date1 = LOC_VAR_RANGE-LOW.
    v_loc_date = LOC_VAR_RANGE-LOW(4). "low value, e.g.200001
    v_loc_date+4(4) = '0101'.
    L_S_RANGE-LOW = v_loc_date1 - v_loc_date. "get the difference between current date & first date of year
    L_S_RANGE-SIGN = 'I'.
    L_S_RANGE-OPT = 'EQ'.
    APPEND L_S_RANGE TO E_T_RANGE.
    EXIT.
    ENDLOOP.
    ENDIF.
    Save and Activate the Include.
    Go back to Exit and activate again.
    Go back to Project and activate again.
    Variable (ZPUTMNTH) is ready (its values filled up with the manipulation of u201CKey Dateu201D) to be used in query to restrict Key Figure u201CSalesu201D on it and get u201CMonth to Dateu201D (MTD) Sales Value.
    Regards,
    Suman

  • Query View in Replacement Path variable

    When selecting the query for a replacement path variable there is an option 'Use View for Query Start'.
    Does anyone know what this is (supposed) to do?
    Whatever setting I use during testing, the result is always the same.
    Thanks,
    József.

    I, too, have this same question.  I have looked for an explanation of the "Use View for Query Start" checkbox and its usage, and while I would expect that to be explained in one of the following links, it is not...
    http://help.sap.com/saphelp_nw70ehp1/helpdata/EN/bd/589b3c494d8e15e10000000a114084/content.htm
    http://help.sap.com/saphelp_nw70ehp1/helpdata/EN/ee/1e9b3c334d8c15e10000000a114084/content.htm
    http://help.sap.com/saphelp_nw70ehp1/helpdata/EN/2c/78a03c1178ad2ce10000000a114084/content.htm

  • How to get a replacement path variable working in same query

    Hi All
    I have a query in which the user enters a value for the 0fiscper variable. Our users want to display for the last 12 months the previous year same period sales.
    I do this by putting a value range offset restriction on 0fiscper varianle to -12 to 0fscper variable value. I have 0fiscper as drill down on the rows.
    Fiscal Year period                LY Month Sales
    010/2010                                  9999.89
    011/2010                                    8888.99
    To get the LY Month Sales I would like to set up a replacement path variable on 0fiscper so if the value of 0fiscper on the
    row is available in the replacement path var I can offset it ti -12 to get the LY Month Sales.
    Can someone share ideas how I can set up this replacement path variable.
    Thanks
    Karen

    Hi,
      Why u want to go for replacement path. You can attain your result bu just offsetting the fiscyear period variable.
    Regards,
    Raghavendra.

Maybe you are looking for

  • How can I receive a list of all app store downloads I've done?

    Hi everybody..I need to download the list of all downloads I've done since I made my apple ID, or at least the last month..with the dates of the downloads and the name of the downloaded app..it is possible? how can i do? Thanks

  • Not able to post invoice.

    User is trying to post an invoice against a PO.  The PO requires a tax code for the account assigned in the PO, but that account doesnu2019t require a tax code in the ledger and there isnu2019t a way to select a tax code in the ledger for this accoun

  • XSLT with large file size

    Hello all, I am very new to XSL. I have been reading a lot on it. I have a small transformation program which takes an xml file, an xsl file and performs the transformation. Everything works fine when the file size is in terms of KB. When I tried the

  • Report for std templates

    Hi Experts Is there any std report like CN41N to see the structures of standard templates? I am unable to find the std structures in table PROJ. Please let me know see the tables entries for Project definition and WBS for Standard structures. warm re

  • Verbose boot stuck at - USB caused wake event (EHCI)

    I've been having problems booting my mac mini for a while. i thought I resolved the issue by re-installing the mini from the boot disks but after trying to upgrade to Leopard its now stuck one more time at the grey apple logo. Booting in verbose mode