Report for basic dates change in maintenance order

Dear friends,
Client requirement is to see the orders for which basic dates have been changed. The scenario is when preventive maintenance is done , if the work cannot be done on the date(basic date in maintenanc eorder), the basic date is changed for a convenient time. They want to have a report showing all the ordres for which the basic dates have been changed and the changed dates detail( ie. initial basic date, changed basic dates).
best regds
Arun

Once you get the Change Document header data from CDHDR you will then need to get the change details from CDPOS.
Have a look at program RSSCD200 via TCode SE38.
There may well be a suitable function module for this...
PeteA

Similar Messages

  • Standard tcode for (mass) data change of internal orders or ... ??

    Hi!
    I really need some info if there by any chance SAP has standard transaction for mass data change of internal orders (more particular, distribution rules in settlement rule section, which can be found in <b>KO02 transaction</b>  ).
    I am trying to change distribution rules for settlement receivers in <b>settlement rule section</b>, that is finish past distribution rules by filling TO PERIOD and TO FISCAL YEAR fields on the right of each rule, and then entering new rules (which i get from external source -flat file, ms excel, csv...).
    If i wanted to import data in SAP i guess i would have to develop a Batch Input. But that would take me some time to develop because it is pretty complicated.
    I found tcode KO08 but i do not really know how to use it. Maybe there is another tcode that i am not aware of?
    I would appreciate any suggestions!
    Thnx, UK

    Hi Srilakshimi,
    If you are familiar with MASS transaction, then you can modify User Responsible field for Internal Orders from transaction KOK2.
    As first step you must create a selection variant in order to define which orders you want to modify. Once selection variant was created, excute transaction with it and you'll get a screen similar to MASS transaction. Select the field you want and massively replace it. Do not forget to save.
    Best Regards!
    Mgitur

  • Configuring reports for express data(2)

    We are in the process of configuring reports for express data.
    In this regard we have done the following steps:
    1.In the machine A reports 9i developer suite release 2 has been installed on Windows 2000
    Professional Edition with the following utilities - (a) Oracle Reports Builder and runtime
    support,(b) Oracle Express Connection Editor and (c) Oracle SNAPI are installed.
    2.Express Server 6.3.4 has been installed on Windows 2000 Professional Edition in machine
    B with Remote Operation SNAPI 6.3.4.0.
    3.Oracle 8i has been installed on Solaris and the Express Support Administrator and User
    Accounts have created and the xrb_admin.sql and xrb_user.sql have been run through the
    respective accounts.
    Queries
    1.We have still not run the Express Oracle8 External Procedures on the Oracle8
    gateway. Should we run this in order to get Express Data in Reports9i incase of the General
    Maintenance where the Express data fetches the data from the Oracle8 gateway on the fly
    ?We are also not able find the Express Oracle8 External Procedures downloads after
    extensive search on OTN.Please guide as to where can we find the downloads.
    2.What are the configurations settings that have to be done in the tnsnames.ora,sqlnet.ora
    and listener.ora ?

    Ramakrishnan,
    Express connectivity for Oracle9i Reports is installed by default as one of your pluggable data sources and it communicated directly with Express, which is a large change over Reports 6i in which you needed an Oracle8i database to talk to the Express database.
    For Oracle9i Reports, you need to have:
    1 - Express installed 6.3 or later.
    2 - Oracle9i Reports
    3 - The connection dialog (which is documented in the release notes if you need to set this up)
    That's it. When you click on the Express PDS to access the data, it will read the connection dialog information and you need to supply the logon information to the Express database.
    You should also look at the help topic for Express and you will find all the necessary documentation on configuring Reports and how to connect.
    Regards,
    The Oracle Reports Team jls

  • How to schedule the webi report based on data changes in the report data

    Hello,
    I want  to schedule a webi report based on data change in a column in the report.
    The scenario is something like below:
    1. If a data of a particular column changes from 2 to 3 than I would like to schedule this report and sent it to users mail box.
    I know how to apply alerts or schedule a report or data tracking for capturing changes in the report but I dont know how to schedule the report only for data changes.
    Anybody done this before.
    Thanks
    Gaurav

    Hi,
    May be these links can help you:
    http://devnet.magicsoftware.com/en/library?book=en/iBOLT/&page=SAP_R_3_Master_Data_Distribution_Defining_Change_Pointers.htm
    SEM-BCS: Load from data stream schedule
    Attribute Change Run

  • Mandatory Infotypes to post Timesheet data to Plant Maintenance orders

    Hi all
    Can somebody tell:
    What are theMandatory Infotypes to post Timesheet data to Plant Maintenance orders via CAT2. I tried creating a data entry profile with PM/CS order objects checked,I need to know ,does it need to be assigned to the user id or some role? As of now CAT2 is not showing any personnel numbers though they are assigned in the Work centres.

    Hi Rohit
    I guess you need to maintain IT-0007 & IT-0315 for the pernr.
    Edited by: Abap on Jan 11, 2010 12:48 AM

  • Configuring reports for express data

    I am trying to configure reports for express data and in this regard I have done the following :
    1.Machine A having reports 9i Developer suite Release 2 and Pluggable Express Connection Editor
    installed on Windows 2000 professional.
    2.Machine B having which Express Server 6.3.4 installed on Windows 2000 professional.
    3.In Machine A created user OESDBA with Administrator privilige.
    In the reports I am able to connect to the Express Server and attach the database and choose the
    measure.Once all the other steps are done I am able to print the data on the reports.
    But if I use a parameter form in which I give the HOST,USER and PASSWORD then substitute the
    same in the express_server parameter value in the AFTER PARAMETER FORM trigger block then
    the report gives an error saying that
    Express query contains incorrect,missing or damaged information.
    How to solve this error ?
    Can any one help me out.

    Ramakrishnan,
    Express connectivity for Oracle9i Reports is installed by default as one of your pluggable data sources and it communicated directly with Express, which is a large change over Reports 6i in which you needed an Oracle8i database to talk to the Express database.
    For Oracle9i Reports, you need to have:
    1 - Express installed 6.3 or later.
    2 - Oracle9i Reports
    3 - The connection dialog (which is documented in the release notes if you need to set this up)
    That's it. When you click on the Express PDS to access the data, it will read the connection dialog information and you need to supply the logon information to the Express database.
    You should also look at the help topic for Express and you will find all the necessary documentation on configuring Reports and how to connect.
    Regards,
    The Oracle Reports Team jls

  • I need the Log Report for the Data which i am uploading from SAP R/3.

    Hi All,
    I am BI 7.0 Platform with Support Patch 20.
    I need the Log Report for the Data which i am uploading from SAP R/3.
    I extract the DATA from R/3 into BI 7.0 DSO where I am mapping the GL Accounts with the FS Item.   In the Transformation i have return a routine on the FS Item InfObject . I am checking the Gl code into Z table for the FS Item .
    I capture the FS item from the Z table then update this FS item to Infobject FS item.
    Now i  need to stop the Data upload if i do not find the GL code in the Z table, and generate report for all GL code for which the FS item is not maintained in the Z table.
    Please suggest.
    Regards
    nilesh

    Hi.
    Add a field that you will use to identify if the GL account of the record was found in the Z table or not. Fx, create ZFOUND with length 1 and no text.
    In your routine, when you do the lookup, populate ZFOUND with X when you found a match (sy-subrc = 0) and leave it blank if you don't find a match. Now create a report filtering on ZFOUND = <blank> and output the GL accounts. Those will be the ones not existing in the Z table, but coming in from your transactions.
    Regards
    Jacob

  • AP Invoice Aging Report for past date

    hi guys,
    I am running R12.
    my requirement is to run AP invoice aging report for past dates (same like AP Trial Balance Report), but the seeded invoice aging report has no option to do so.
    would appreciate some help
    thanks in advance
    Ravi

    Hi Senthil,
    I am running R12.
    my requirement is to run AP invoice aging report for past dates (same like AP Trial Balance Report
    if u have any solution to this , please suggest me how to resolve this requierement.
    thanks in advance
    Ravi
    mail:[email protected]

  • Report for deleted line-items in Transfer Orders

    Dear All,
    Please help me in writing the code for "Report for deleted line-items in Transfer Orders".
    regards,
    nishu

    Thanks. Repor completed.

  • Report for Asset number and its Purahcse order number

    Hello Friends,
    Please give me details of report for Asset number and its Purchase order number .
    Regards
    Nilesh Vakil

    hi,
    GO to ME2N...
    use SHIFT + F4..
    there check for the acc. assign cata. field and input the asset  and execute..
    Regards
    Priyanka.P

  • Want to schedule WebI report for End date of Prior Month

    Hello Experts,
    We have WebI report created on top of Bex Query, We have key date as prompt for the report. Can we schedule the webi report for key date as last date of prior month, so if current month is February, my key date should be Jan 30 2011. I am not sure if this is possible?
    Thanks,
    Ravi

    You need to apply two FM to get the end day of the month.
    First you need to apply FM MONTHS_PLUS_DETERMINE. This will give you the date after 3 months.
                CALL FUNCTION 'MONTH_PLUS_DETERMINE'
                  EXPORTING
                    MONTHS        = 3   " << for 3 months
                    OLDDATE       = l_start_Date   " << 12/01/2007
                 IMPORTING
                   NEWDATE       = l_3_Date. " << 02/01/2008
    Then call the FM RP_LAST_DAY_OF_MONTHS . this will give you the end date of the month
      CALL FUNCTION 'RP_LAST_DAY_OF_MONTHS'
        EXPORTING
          day_in            = l_3_Date  " << 02/01/2008
        IMPORTING
          last_day_of_month = l_3_Date  " < 02/29/2008
        EXCEPTIONS
          day_in_no_date    = 1
          OTHERS            = 2.
    Call both FMs again to get your another date(after 4 months).
    Regards,
    Naimesh Patel

  • How to take unreconcilled transactions report for a date range ?

    hi all,
    How to take unreconcilled transactions report for a
    data range ?
    we have taken unreconcilled transactons from
    external reconcillation using filter option mentioning
    range of dates,But when we take print out using PLD,
    it showing unreconcilled transactions for all dates.
    But our client requires it as a standard report from SAP ?
    Our client is using SAP B1 2005B PL39.
    Jeyakanthan

    Hi
    Financials -> Financial Reports -> Accounting -> General Ledger.
    In the 'Display' dropdown select, 'Unreconciled' .
    Hope this should help you.

  • User exit or BADI for technical closure of a maintenance order

    Hello,
    Please I need the help of you.
    Is there any User exit or BADI for technical closure of a maintenance order
    regards

    Hello ROB,
    Please do not post duplicate thread.
    You can check below two BADI's.  ATP_PUBLISH_RESULTS and  IWO1_SCREEN_MODIFY. Because I have got two BADI's through finder.
    You can also check WO10004, WO10005, WO10006, WO10007, WO10008, WO10009, WO10010 and WO10011 user exits.
    Thanks & Regards,
    Abhijit

  • Forecast dates instead for Basic dates in ECP

    Hello all,
    We want to use the forecast dates in the project instead for basic dates in easy cost planning, is that possible to do?
    In standard, ECP take the basic dates but it will be very usefull to use forecast dates in different CO-version as a forcast planning.
    Do not hesitate to contact me,
    Best regards
    Jose Marin

    Hi Abhra,
    You can check both basic and forcast dates WBS Elements in project planning Board at a time.
    as you said, you have to select both Basic and Forecast dates options in Set of Dates Icon. Before that while scheduling the entire project system will consider either Basic or Forecast dates at WBS Level and Carried out scheduling.
    If you did Scheduling with Basic Dates then you have to transfer Basic dates to Forecast dates in Planning Board through Edit --> Reconsile dates --> copy basic dates to forecast dates.
    if both Basic and Forecast dates are planning at WBS level, system shows you the Time Bars in different colour which you can check the corresponding colour matches with the specific dates through Legend.
    Hope you can understand the above solution..
    Regards,
    Hari krishna.k

  • Options for auditing data changes

    Hi Friends,
    I thought I will get some inputs on my following implementation. The requirement is to audit some data changes with in the system.( Oracle 10.2 on RHEL 4.7 )
    The audit is required in a sense that, the before images of data and information of who changed the data is required. I have looked at options like Oracle Auditing,FGA and so. But this cannot give me audit for the data changes,when and who changed.
    The first thing that comes into my mind are using triggers . Another option is using log miner. I have successfully tested it out with both of these approaches. The environment is like
    1 ) For some critical tables for which audit is required triggers were written ( ours is an OLTP application )
    2 ) For some non critical tables, log miner which was called by a stored procedure which runs at certain periods is used.
    3 ) audit data is stored in a different schema , with same table names as in base schema.
    I would like to know your thoughts on this.
    Thank You,
    SSN

    The delay with log miner is acceptable with some less critical audit tables and as you said, tirggers can be implemented for some critical tables.
    One bottleneck with using logminer is that it depends on the availability of archived redo logs, the backup mechanism if any implemented should make sure that, no archive logs are removed from the locations specified for the audit program. The backup mechanism should ensure that all archived logs are processed by periodically running audit program which uses log miner.
    Wondering if there is any other recommended approach for this.
    Thanks
    SSN

Maybe you are looking for

  • GIF animations help is unclear

    sorry but trying to follow the step-by-step in adobe help, well, i was not able to follow it. i just want to put two jpg's in the same animation.

  • Reversal of a goods receipt for PO in EUR is differently valuated.

    Hi, Do you know how can i solve such problem: The return delivery or reversal of a goods receipt for a purchase order, scheduling agreement, or production order is valuated differently than the original goods receipt becouse system takes exchane rate

  • How to I read a text file attachment in email on my playbook

    I can read it on my black berry smartphone, I have a program that will read text files but it can not see into wherever email attachments are saved. I get log files in emails and the phone screen is a bit small to read them so I would like to use my

  • I just installed adobe creative cloud and Adobe Bridge.

    I just installed adobe creative cloud and Adobe Bridge. When I try to open a image in camera raw I get an error "Bridges parent application is not active" "Bridge requires that a qualifying product has been launched atleast once to enable this featur

  • Can't open Print Settings dialog

    All of the sudden I cannot open the print settings dialog from the print window in Aperture. Every time I click the button, I get this in console: 3/22/08 3:16:22 PM Aperture[574] * Assertion failure in -[RedRock _commonBeginModalSessionForWindow:rel