Require help on coast center and work center tables through sales order

dear experts
my requirement is to report the cm05(capacity planning ) transaction.
The original capacity planning consists of workcenter details.
but my client needs the report as follows
on which sales order and on which work center we require the capacity of materials.
any tables and fields for this report please.
help needed.
kindly update me.

hi,
Please explore table CAUFV View "Order Headers PP/CO" ,here you will find the relationships between the three.
Regards,
Neha

Similar Messages

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Link for Cost Center And Work Center.

    Dear Experts,
    Can you Provide me the Link for Cost Center And Work Center.
    Regads,
    Jyoshna

    Dear Experts,
    I got the answer for the Link Between Cost Center And Work Center.
    By using CR03   T Code we can see the Display Work Center : Cost Center Assignment Screen will appear.
    we need to select the costing tab, We can find Cost Center .
    Thanks & Regards
    Jyoshna

  • How to link Cost center and Work center?

    Hi All,
    We have a list of Work centers and the corresponding Cost centers. We need to know which tables can be used to connect the Work center with its corresponding cost center?
    Thanks:
    Siddharth

    Hi Please use t-code OP42. Make sure all your configuration for work centre is there. You link cost centre in the costing tab of work centre basic data.
    Hope this helps.
    Thanks
    Sanjeev

  • Link between Material, Cost center to Work Center.

    Hi Experts,
    Can you provide me the following.
    Link between the material and work center.
    Link between Cost center and Work Center.
    Thanks in advance.
    Jyoshna.

    Extend the cost center validity from 01.01.2008, there won't be any harm. It may take from the beginning of the calendar year.

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • What is the relation between object work area (EH&S) and Work Center (PP)

    Hi gurus,
    I have a conceptual doubt, about the relation when I clasify like work center an object WA of IHS and how this feature is asociated at object work center of module PP?
    Conceptually is the same?
    Thank and Best regards

    Hello Hernan
    the Work Area is defined as: take a look here
    http://help.sap.com/saphelp_47x200/helpdata/en/1f/ea8e69e09311d3b5700004ac160be0/content.htm
    Therefore there is a link available between work area, plant and cost center.
    Work Center is defined as: take a look here:
    http://help.sap.com/saphelp_46c/helpdata/en/b1/c03424439a11d189410000e829fbbd/content.htm
    Work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    To my knowledge there is no "direct" link between these objects.
    Further on on the level of the Work Area (to my knowledge) you define: which employee etc. is linked  to the work area ((is working in the work area).
    So to my knowledge there are a number of "indirect" links between both objects but no direct link
    With best regards
    C.B.
    PS: http://fuller.mit.edu/ehs/ind_hygiene_safety.htm provides a further small overview of the Work Area Topic (EHS IHS)
    Edited by: Christoph Bergemann on Nov 15, 2011 8:53 PM
    Edited by: Christoph Bergemann on Nov 15, 2011 8:55 PM

  • Factory Calendar and Work Center

    Dear All
    I am confused between factory calendar and work center working.  Kindly guide me what factory calendar does and what work center does?

    Hello,
    Factory Calander :-- Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc.
    You can create your company factory calendar via transaction code 'SCAL'.
    Assignment of the factory calendar by plant is done in transaction code 'SM30 - V_T001W'.
    An example of a SAP application that uses the factory calendar is the SAP MRP modules.
    Assuming that you have a specified an alternate working Saturday, MRP will postponed the planned orders to the next working day if it happened to falls on a non-working Saturday.
    Work Center :--
    Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    t-code-- CNR1 - Create
    for more information go to this link
    http://help.sap.com/saphelp_smehp1/helpdata/en/40/8ac473d40943ddb23def12bdb33437/content.htm
    Thanks

  • Functionality of Profit Center and Cost Center

    Hi,
    I am unable to understand the functionality of Profit center and cost center, I know that cost center represents area within an organization for which you will like to see the expenses for a particular time period. for example in an organisation we have three cos centers Accounts, HR and Admin. whenever you post an accounting document in FI you will specify the cost center to which the expense relates. but in some cases when you post an expense and give the relative cost center the profit center is also driven by the system. why is this behavior? i mean i have posted an expense not an income then why is system driving the profit center as well?
    Profit centers are used if you want to see the profit of different area of your organisation. in what kind of postings we use profit center? and if we could use profit center to draw income and loss for a specific area why do we need segment reporting? and what is the difference between Segment and Business area. what i understood from their definition is that they are both same and use for same purpose.
    I am totally lost in these concepts. please some one help me out with an example. i am stuck at this point. some one please clarify my concept of Profit Center, Cost Center, Segments and business area please.

    Hi,
    Cost center & Profit Center are organizational units   within the enterprise structure , created for better internal control.
    As the name suggests Cost Center  is  the lowest level  of the organizational unit representing a defined location of cost incurrence or otherwise to which you can meaningfully assign the cost(both direct & Indirect).
    Profit Center is an organizational unit  in accounting  ,where management would require to see the profitability & fix the responsibility. It may be each plant/division of the company .
    If you consider the Plant is the Profit center, you can take the various deptts in the Plant as cost centers. you can draw a balance sheet & profit & loss account statement at profit center level but this will be for your internal use.From this you can know the ROI on particular area. Profit centers are assigned inside the cost center so when you update cost center, profit centers are updated automatically.
    Where as Segments are used for legal reporting of your accounting standard as per IFRS. Both Business Area & Segments are more or less same with some technical difference.
    Business area  is a free organizational unit. It can be derived through cost center or can be entered manually.
    But segment is a dependent organizational unit. It is defined & attached inside the  profit center master data. It can’t be entered manually.
    SAP suggest to use the Segment concept.
    Thanks & regards
    Deepak

  • Cost center and profit center details

    Hi All
    Is there any function module or BAPI to obtain cost center and profit center details
    for a GL account. Actually I am obtaining the carry forward balance for a
    fiscal year from the table GLT0 but I am not getting the corresponding profit center
    and cost center details.
    Please suggest a way forward!
    Regards
    Ankit

    Hi,
    If you are getting data from GLT0 table, using the Account number go to SKA1/SKB1 tables and get the CostCenter(KOSTL) and Profit Center(PRCTR). If you want to get details about CostCenter, its master table is CSKS and master table for Profit Center is CEPC. you can get required info from these tables.
    thanks,
    sksingh

  • My control center and notification center are not showing when I swipe in there respective locations. Does anybody know why?

    My control center and notification center are not showing when I swipe in there respective locations. Does anybody know why?

    Thank you for the sugestion, but it was working fine both on the lock screen and on my home screen. I check all my settings and it is how it was from Friday, when I got the iPhone 5s. It just stop working.  The only way I can fix it is by shutting down the phone. It will work for a while, then it won't. 

  • Cost Center and Profit Center Planning

    Hi,
    I have one  Co issue.  Pls Suggest me the wiseful solution.
    Cost Center and Profit Center Planning.
    For F-2008 Planning  data they have updated in the month of Aug, 07 for Profit and Loss Items and they have revised the plan data of some cost elements in the month of oct, 2007 (say 5% Increas).  when comparing the cost center report to profit center report, both are not matching.  the reason when i see and reconcile the document nos and values in between cost center and profit center reports  i found out that there are some documents are missing in the profit center report. 
    wherever plan data had revised e.g for cost element Salaries they have updated 100000 Planning cost in the month of Aug, 07.  In the month of Oct, 07 increased 5% i.e.5000. In cost center line items details i found 2 documents for Rs.100000/- and Rs.5000/-  But in Profit Center Line Items i am getting only Rs.5000/- Value Document.
    Note.  As and when KP06 Plan data has been updated Profit Center line items are generating.  It is not necessary to run any programme inorder to transfer Plan Data from cost center to profit center.
    Observations From My Side:-
    I tried to run the transaction code 1ke0. i have selected the cost object is Cost Center, version and had given Cost Center Parameter in development and quality clients and executed the same.By this time already existing data either deleting/ riversing and creating new documents fully except manually changed data in profit center through 7ke1.
    My Question is
    1.Upto what extent it will work.
    2.will it be possible to transfer data from cost center to profit center only missing documents which are available in cost center, without disturbing of existing data in profit center.
    3.suppose if i done this activity, there are some data which was already transferred from other cost objects like internatl orders & wbs elements to Profit Center. will the data get disturbed (deleted/riversed).
    Pls suggest me the wiseful way to solve the

    Hi
    Try This
    BAPI_COSTCENTER_CREATEMULTIPLE
    BAPI_COSTCENTERGROUP_CREATE
    BAPI_PROFITCENTER_CREATE
    BAPI_PROFITCENTERGRP_CREATE.
    Regards,
    V.balaji
    Reward if usefull

  • BAPI To Update Profit Center And Profit center group

    HI All,
    We have requirement scenario in which MDM Will Syndicate the PC and PCG And We have to update the PC and PCG in R3.
    Do we have a Standard BAPI For Profit center and Profit Center Group Update?
    Thanks In Advance!!!!!
    Moderator message : Search for available information, duplicate post locked. Continue with original thread.
    Edited by: Vinod Kumar on Oct 17, 2011 1:59 PM

    Hi
    Try This BAPI...
    BAPI_PROFITCENTER_CHANGE
    Regards
    Ajit

  • Transporting Master data - New GLs,Cost Center and profit Center.

    Dear Friends,
    1. I have to create new GLs in Dev, Now i have to transport the new GL to Quality and Production. As per my knowledge, Master data has to created in DEV,Quality and Production.
    please suggest, is there any t.code where i can transport GL from Dev to quality and production.
    2. when Creation of the site, New Cost center,Profit center, Changes to standard hierarchy both in cost center and profit center hierarchy has to done in dev,quality and production manually.
    Any suggestions where i can do only in dev and transport to quality and production.
    3. After creating new cost center and profit center, i have to go to okb9, select the co.code,cost element and insert the new cost center and profit center in every cost element. This takes almost one hour.
    Please suggest how to reduce this manually process.
    All the help will be greatly appreciated.
    Regards
    Sridhar Reddy

    Hi ,
    Master data is to be created in diffrent clients as it is a non transportable object .
    So in case of GL , cost centers you will have to again re run the LSMW which you had created for DEV .
    Secondly OKB9 is a transportable object , so i dont feel there should be an issue in adding it to a transportable object .
    In case of adding the values of tables in a request what you can do is create  a request , go to SE01 open the request in change mode in the objects enter TABU and enter on the relevant entries that you want to transport .
    But again one has to be very clear on what all table entries are to be transported , like SKA1 , SKB1 , SKAT etc. looking at the complexities and moving ahead with the standard way it is advisable to re run the LSMW in QUA and PRD .
    Hope this helps .
    Regards ,
    Dewang T.

  • Responsible Cost Center and Profit Center in a Maintenance Order

    Dears,
    I would like to know what's the real influence that responsible cost center and profit center located in the
    "add. data" tab in maintenance order has when I confirm a labor (through the IW41) and settlement an maintenance order.
    Best Regards,
    D. Quint.

    D Quintal,
    When you perform a confirmation (IW41) the cost centre assigned to the work centre is credited, and the order debited.
    This work centre cost centre may be the same cost centre as the responsible cost centre in the order...
    PeteA

Maybe you are looking for

  • I have a problem to  extract data from oracle dump file (.dmp) using oracle database or any other tools.

    There is IMP utility which provides me data as graphical way. But i need extract data in such a way so that i could able to use in my application. thanks, mohan

  • Import color schemes to Excel 2010

    Hi, Everyone  I really need your help for Excel 2010. For excel 2003, when I import color scheme from another excel: on the menu bar>tools>options>color tab in the "copy color from" box, click the down arrow and select the workbook which contains the

  • RMI Exception in Server but ru

    Hi Guys, this error message i get when i run my application in my local machine RemoteException :java.rmi.ServerException: RemoteException occurred in server thread; nested exception is:      java.rmi.UnmarshalException: error unmarshalling arguments

  • When installing CS5 design premium, Photoshop will not install.

    This is the error code i get every time. What do I need to do? I have tried restarting as well as reinstalling. Exit Code: 7 -------------------------------------- Summary -------------------------------------- - 1 fatal error(s), 2 error(s), 1 warni

  • Dvorak and Chinese

    I wonder if anyone can help. I only have the use of one hand when typing. Because of this I learned to touch type with the Dvorak layout for the right hand, which I do very effectively in English. However now that I have to use Chinese on my mac I ha