Sample bom creation and explosion in sales order

hi,
     can any one help to create a simple bom with atleast one sub item for the bom and create a sales order in which the bom explodes ( i mean when u enter the main bom item it should list its sub items as its line item below it)...
(also mention what item categories are to be taken care ... )
rewards for sure
thanks
mmn

Hi MMn,
Bill of materials (BOM)
1. In the SAP System, you can use BOMs to represent different objects (such as materials, equipment, functional location BOMs, and documents) and to maintain object-specific data.
2. Document BOM: A complex document may be made up of several documents, such as a program, technical drawings, papers, and photographs. These related information and documentation objects are grouped together as a unit using a document structure – a BOM for a document.
3. Equipment BOMs are used to describe the structure of equipment and to assign spare parts to equipment for maintenance purposes. Bills of material for functional locations group together the elements of a technical structure, such as the functional unit of an entire plant.
4. You work with order BOMs when you specially tailor the make-to-order production of your products to the requirements of your customers. In order to meet the customer requirements, sales order specific modifications to various assemblies are often required. Furthermore, assemblies are often specially constructed for a particular sales order.
5. Before you can create a BOM for the component parts of an object, the object must have a valid master record in your system.
6. A bill of material that you create for a material is known as a material BOM in the SAP System. A BOM explosion answers the question: What is the product made of? This question arises in various situations, such as when you want to:
Determine material requirements for a product
Look at the overall structure of a product in a design department
See an overview of the parts and materials required
Calculate the effects of changes to costs
7. BOM is a collection of materials that make up a product. For example – computer, home theatre system. Material BOM is complex and is dependent on sales and distribution, material management or production planning.
8. The most important rule is that the material type has to be a FINISHED PRODUCT (FERT) in order to categorise it as a BOM.
9. BOM processing is divided into two different ways – either at the MAIN item level if the item is assembled or at the sub-item level (i.e. at the component level) if the material is not assembled.
10. BOM is configured at the item category level (VOV7) and transaction code to create a BOM is CS01.
11. In case of single level BOM, main item categories TAQ and TAP should represent single level BOM in VOV7 and in case of multi level BOM, the main item categories should represent multi level BOM.
Main item level processing
1. The material master records should have the item category group ERLA in the sales org.2 screen of the finished product. In this case, the associated sub items function only as text items, and thus are not relevant for delivery. This process ensures that pricing, inventory control and delivery processing is carried out the header level that is for the finished product only. This is mainly relevant to the assembled products.
2. item category group – ERLA; main item category – TAQ (schedule line – CP) and sub item category – TAE (schedule line – CT)
Sub-item level processing
1. If the business prefers to have the sub-items be responsible for pricing, inventory control and delivery processing, the item category group should be LUMF on screen sales org.2 of the respective material master record. This ensures that subcomponents are relevant for processing. This is relevant to the products that are not assembled.
2. item category group – LUMF; main item category – TAP (schedule line is CT), sub item category – TAN (schedule line is CP)
Multi-level BOM
In order to activate the multi-level BOM, structure scope in VOV7 has to be changed from single level explosion to multi level explosion.
Try this and revert back fr clearifications
Reward Points if helpful.
Regards
Srini

Similar Messages

  • Automise CS61 BOM creation with reference to Sales order

    Hi Experts.
    Need your help in fixing one scenario:
    We have scenarion data coming from third party containing BOM data with respect to Sales order.
    We are using XI/PI,
    1: Do we have any idoc for CS61 master creation. (Not likely to move in bdc ....etc)
    2: How to Create multilevel in that....
    Please guide .. Help is appreciable.
    Regards
    Deepak Sodhi

    Hi,
    You will need to make assignment from So item to Delivery item please check if copy control is maintained at item level. Also make sure that Copy controls are maintianed for the billing document from the SO & Delivery both as this would be the next step.

  • Find the user exit while creation and change of sales order

    Hi Team
    Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
    u2022     The logic for the user exit to explode should consider the following assumptions and validations
    o     Customer master to have the entry at KNVV-KVGR1
    o     Material master to have the entry at MVKE
    o     UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
    o     Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
    for example :-->
    Product A with Scales mentioned below
    Product A     Quantity / Scale     UoM     Price(£)
         0-10     PAL/TES     20
         11- 20     PAL/TES     10
         21- 30     PAL/TES     5
         31-40     PAL/TES     2.5
         >41     PAL/TES     
    Product B with Scales mentioned below
    Product B     Quantity / Scale     UoM     Price(£)
         0-15     PAL/TES     25
         16-20     PAL/TES     20
         21- 30     PAL/TES     15
         31-40     PAL/TES     10
         > 41     PAL/TES     5
    u2022     Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
    u2022     The expected results should be
    o     Product A qty 10 + B qty 15 added = 25Pal
    o     The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
    Thanks in Advance.
    Puneet.

    Hi Team
    Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
    u2022 The logic for the user exit to explode should consider the following assumptions and validations
    o Customer master to have the entry at KNVV-KVGR1
    o Material master to have the entry at MVKE
    o UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
    o Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
    for example :-->
    Product A with Scales mentioned below
    Product A Quantity / Scale UoM Price(£)
    0-10 PAL/TES 20
    11- 20 PAL/TES 10
    21- 30 PAL/TES 5
    31-40 PAL/TES 2.5
    >41 PAL/TES
    Product B with Scales mentioned below
    Product B Quantity / Scale UoM Price(£)
    0-15 PAL/TES 25
    16-20 PAL/TES 20
    21- 30 PAL/TES 15
    31-40 PAL/TES 10
    41 PAL/TES 5
    u2022 Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
    u2022 The expected results should be
    o Product A qty 10 + B qty 15 added = 25Pal
    o The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
    Thanks in Advance.
    Puneet.

  • BOM Re-Explosion at sales order created with referance to Contract

    Hi Experts,
      Need your advise in mapping below requirement.
    Our clinet is into service industry.
    The sales process is  Contract --> Sales Order --> Invoice.Currently all the services will be charged using a BOM.
    The BOM IS Created as below.
    BOM Header Material--- ABC
    BOM Components -
    ABC1
    Now because of additional tax requirements for the services we need to differentiate the services charged to the customer, thus we are planning to change the BOM Masterdata as below.
    BOM Header Material--- ABC
    BOM Components---- ABC2 , ABC3, ABC4,ABC5,
    Because of the change in BOM master data all the new contracts created will have the new BOM and its components.
    Our concern is how to convert the existing contracts. Business is asking even for the existing contracts if a sales order is created it should contain the new materials and taxes should be calculated based on the new materials.
    For the Legacy (Existing) contracts as few sales orders and invoices are created, we can not delete the old materials and add new materials.
    Is there any way to make the BOM Re explosion at sales order level .
    Ex: Conract created with old bom data and it has ABC and ABC1 materials in it, when a sales order is created system should read the new bom master data and explode it with the new materials.
    If we do it either through SAP Standard feature or by a user exit will there be any negative impacts on the existing transactions or will there be any problems as the materials in the contracts and sales orders will be different.
    Please share your thoughts and inputs on this.
    Thanks,
    Srini

    Hi All,
      When we ran the test cases the BOM is not Re-exploded in the sales order when created with referance to a contract. One  option we thought about is cancelling all the open contracts and creating new contracts for those, thus the new bom will be added to the contract. It looks very hectic as we have aroung 5000+ open contracts.
        Can any one suggest an alternative approach for this.
    Thanks,
    Srinivas
    Edited by: srini vasarao on Jun 27, 2011 9:02 AM

  • BOM explosion in sales order

    Hi Experts,
    I have met a problem in BOM explosion in sales order.
    I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
    Can anyone help?
    Regards,
    Emily

    Hi,
    Go to CS02 and select ur bom and go to components give 1 that means 1;1
    hope u get it
    regards,
    sadanandam kasarla

  • Automatic creation of project from Sales Order?

    hi..
    can someone guide me how to automatically generate PS Projects from SO USING TCODE HBS0?
    i have been able to generate projects automatically when i use tcode VA41 but my need is to do this for RE using sales browser and creation of Sales Order is by Tcode HBS0.
    when i save the sales order, no project is created. ( Note: Material i used is same one i used successfully in VA41+)
    thanks in advance..

    Hi Ramesh,
    Creation of project from sales order in SAP Project system is described as assembly processing.
    In the Project System only networks can be generated directly from a sales document during assembly processing. Indirectly the system can also generate work breakdown structures, when it creates the network.
    1.You start assembly processing by creating a sales document for a material. This sales
       document can be inquiry,quotation, sales order.
    2. The system then
        Configures the material, if necessary
        Creates a network using the standard network as a template
        Configures the network, if necessary
        Schedules the network backwards from the required delivery date
        Checks material availability
        Costs the network and transfers these costs to the sales document.
    3. When you save the sales document, the system saves the network together with the sales
        document. If applicable, it also generates a project definition and work breakdown structure.
        The project number is derived from the sales document number.
    Please refer link mentioned below to know more details
    http://help.sap.com/saphelp_47x200/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm
    Regards
    Tushar

  • BAPI for Outbound Delivery Creation with reference to Sales Order

    Dear all,
    I'm on R/3 4.6B platform and to develop an RFC for outbound Delivery creation instead of using the standard VL01N transaction.
    I've review BAPI for Outbound Delivery Creation with reference to Sales Order - VL01N thread which suggest BAPI_DELIVERYPROCESSING_EXEC .
    However, in 4.6B, that function module doesn't exist. Appreciate any suggestion and or workaround.
    Thanks.
    Steven
    Edited by: Steven Khoo on Mar 25, 2010 7:13 AM
    Edited by: Steven Khoo on Mar 25, 2010 7:14 AM

    Not required anymore

  • Quotation Creation and Billing for Service Orders--node details needed

    Hi ,
    I need to work on node "Quotation Creation and Billing for Service Orders" ....I see lot of integration with SD and FICO . Can any one give details about integrations required and what is done in this node ....
    Regards
    NPB

    There are different steps to be done for that.
    1. Create DIP Profile in ODP1 & check the consistency in ODP2 - DIP will be used to bill the customer based on resource (labor & material) usage. Creation of DIP profile has been discussed many times in this forum. Please check.
    2. Assign the Quotation document type & Billing type used in DIP profile to your sales area - Your document type should be assigned to your sales organisation, distribution channel & division combination.

  • Add 2 buttons Release and Reject on Sales Order CRMD_BUS2000115 application

    Hi Experts,
    My Requirement is to add 2 button 'Release' and 'Reject' for Sales Order CRMD_BUS2000115 aplicaiotn using PCUI.
    Also provide the functionality...as
    1.Click On Release will change the status of seleceted order as "Released" i.e. to remove the Billing/Dleivery Blocks...And SAVE it.
    2. For "Reject"  change status as Rejected and Save it using standard "SAVE'' button.
    Can anybody would explain how should i proceed and where i have to code ??
    Or Source code or sample code?
    Can I call BAPI_TRANSACTION_COMMIT aftre changing it ??
    Thanks in Advance,
    Arjun Pawar.

    Hi Experts,
    I have added 2 buttons 'Release' and 'Reject' for Sales Order CRMD_BUS2000115 aplication using PCUI which provides the functionality...as
    1.Click On Release will change the status of seleceted order as "Released" i.e. to remove the Billing/Dleivery Blocks...And SAVE it. 2. For "Reject" change status as Rejected and Save it using "CRM_ORDER_SAVE" api followed COMMIT work. Functionality is working fine.
    But <b>I'm getting an error / explorer error " An error has occurred in this script page" ( the Error is : 'CAT Params' is undefined ) is coming as soon as query/click on "GO", carried out after the action performed like "Release/Reject"</b> on the sales order approval screen.
    Please, can anyone give an idea @ the cause of error ?? whether it is frame error ?? or else???
    And How to resolve it???
    Thanks,
    Arjun

  • Check Credit and Stock on Sale Order

    Hi All
    Could you please tell me how to check Credit and Stock on Sale Order.
    Thank and Best Regard
    Thang

    How To Do Configuration For Credit Management
    Credit and risk management takes place in the credit control area. According to your corporate requirements, you can implement credit management that is centralized, decentralized, or somewhere in between. 
    An organizational unit that represents the area where customer credit is awarded and monitored.   This organizational unit can either be a single or several company codes, if credit control is performed across several company codes. One credit control area contains credit control information for each customer.
    For example, if your credit management is centralized, you can define one credit control area for all of your company codes. 
    If, on the other hand, your credit policy requires decentralized credit management, you can define credit control areas for each company code or each group of company codes. 
    Credit limits and credit exposure are managed at both credit control area and customer level.  You set up credit control areas and other data related to credit management in Customizing for Financial Accounting. The implementation guide is under Enterprise Structure -> Definition or Assignment -> Financial Accounting and then Maintain credit control area. You assign customers to specific credit control areas and specify the appropriate credit limits in the customer master record.
    Settings for determining the credit control area of a document.  The settings of items 1 - 4 are taken into account according to their priority.  The credit control area found is stored in field VBAK-KKBER.
    1. Transaction OB38
       Check which credit control area is assigned to the company code.
       Company code:
       Credit control area:
    2. Transaction OVFL
       Check which credit control area is assigned to the sales area.
       Sales area:
       Credit control area:
    3. Transaction XD02 or VD02
       Check which credit control area is assigned to the payer.
       Payer:
       Credit control area:
    4. Transaction SE37
       Is user exit EXIT_SAPV45K_001 being used?
    5. Transaction OBZK
       For the settings under items 2 - 4, field "All company codes" must be marked in Transaction
       OB45, or the credit control area must be entered under the relevant company code in table
       T001CM of the credit control areas allowed.
       Company code:
       Credit control areas allowed:
    6. Settings for the credit checks
    7. Transaction OVAK
       Which settings do exist for the sales document type used?
       Sales document:
       Check credit:
       Credit group:
    8. Transaction OVAD
       Which settings do exist for the delivery type used?
       Delivery type:
       Credit group for delivery:
       Credit group for goods issue:
    9. Transaction OB01
       Credit management/Change risk category
       Definition of the risk category for each credit control area. This risk category can be
       assigned to a credit account by using Transaction FD32.
    10. Transaction OVA8
        Here, the individual credit checks for key fields
        o credit control area
        o risk category
        o credit group are set. Take these key fields from the above settings and go to the detail
          screen. In particular, check whether fields "Reaction" and "Status/block" are set
          correctly. To carry out follow-up actions in case of a credit block, the credit check
          status must be set (field "Status/block").
    11. Transaction FD32
        Credit master data for the payer of the relevant document.
        Credit account:
        Credit limit:
        Risk category:
        Currency:
    12. Settings for updating the credit values Update of the credit values is required for the limit
        check (static or dynamic credit limit check).
    13. Transaction OVA7
        Update of the credit value is active for the corresponding item type if the check box is marked. This field corresponds to 
        field "Active receivable" in Transaction VOV7.
        Item type: 
        Active receivable:
    14. Transaction V/08, Pricing
        In the pricing procedure used for pricing, subtotal "A" must be entered in a line for
        determining the credit value (mark the pricing procedure and doubleclick on "Control").
        Usually, the net value plus taxes is used. This way the system is determined to use this
        subtotal for credit pricing. The credit price is stored in field VBAP-CMPRE and used for
        update and credit check.
        You can find the used pricing procedure of the order under "Item -> Condition -> Analysis".
        Pricing procedure:
        Line with subtotal = 'A':
    15. Transaction OB45
        Which update group (field "Update") do you use in the relevant credit control area? The
        default setting is "12". If you use another update group, check whether this is fine with
        you. If you open an OSS message, please tell us the alternative update group.
        Credit control area:
        Update:
    16. Transaction OMO1
        Which kind of update did you choose for structure S066? 
         In any case, "Synchronous update (1)" has to be chosen as the kind of update. 
         All other settings will lead to errors
    Regards
    Raja
    Edited by: ramanathan raja on Jul 25, 2008 4:37 PM

  • Difference between Valuated and Non valuated Sale order stock

    Hi All,
    Can anybody tell me the difference between the above said subject with the steps involved in each scenario.
    That is valuated sale order stock and Non valuated sale order stock in Product cost by Sale Order.
    With Journal entries at each step and whether any WIP or variances at Production order level and sale order level and all the financial entries related to them
    Thanks in Advance,
    Ravi Kumar

    Hi Shail,
    Thans for your inputs,
    But I wanted to know it in more detail. In what scenarios they are used with financial entries in both the cases.
    I will give you my scenario. It goes like this,
    My client is in pipe coating business, who receives pipes from customers and does only coating work(which is considered as service) and despatches it to the customer. this process is carried on the basis of work order(Sale order).
    Now Production order is created and work is done on that with reference to Sale order for that particular customer.
    So the pipe which my client receives should be non valuated stock as it will not be a raw material to them and the cost incurred on it is booked on production order like chemicals as raw material consumption, activity cost etc.
    now in this scenario just tell me how and at which stage FI entries get generated at Production order and Sale order level, and also at wat level Standard cost estimate should be created i,e at production order level or sale order level(sale order cost estimate).
    Will there be any entries at goods isssue and GR against production order. If no then how the COGM account will get hit.
    Please tell me this scenario in both cases Valuated sale order stock and Non valuated sale order stock with financial entries in Sale order costing.
    Thanks & Regards,
    Ravi Kumar

  • Stop Automatic creation and confirmation of Transafer Order for a doc type

    Hello All,
    There is a requirement that I need to stop Automatic creation and confirmation of Transafer Order for a particular document type.
    The issue is that sometimes the cycle goes upto creation of Invoice automatically but sometimes this does not happen. More over the user wants that the transafer order needs to be confirmed manually.
    Can u please provide the .steps involved for thie case.
    Thanks
    Chandrashekhar

    Dear Steve,
    Thanks a lot for giving reply with what I need to do, but I am unable to see result.
    I have down configuration like below even though system not processing Auto TO creation. Can you explain me if I have down any mistake below.
    Click on ‘Assign’ button,
    Press on ‘New entries’
    WhN = ‘900’
    Reference Movement Type = ‘101’
    Movement indicator = ‘B’
    Movement type for Whse Mgmt = ‘101’
    TR create Transfer Requirement = ‘X’
    Immed.TO Creation
    Mail confirmation for background processing = ‘01’.
    GR date = ‘2’

  • Possibility of addition creation time in the sales order over view screen

    Hi,
    Is there a possibility of adding the creation time in the sales order overview screen in VA01/2/3.
    thank you

    hi,
    this is to inform you that,
    contact your ABAPER for this is to find out if there any possibility making time field mandatory if it is there in Standard SAP. there in VBAK table i am able to see VBAK - ERZET
    or
    if it is not available then you need to go for field exit.
    hope this helps.
    balajia
    Edited by: balaji timmampalli achari on Nov 30, 2010 6:11 AM

  • User exit during creation and saving of Produciton order

    Hi folks,
    I need to append a row in the material component of transaction code COR1. This needs to be triggerd when an order is created and saved in COR1. Please help me out...........
    thanks in advance

    Hi Team
    Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
    u2022 The logic for the user exit to explode should consider the following assumptions and validations
    o Customer master to have the entry at KNVV-KVGR1
    o Material master to have the entry at MVKE
    o UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
    o Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
    for example :-->
    Product A with Scales mentioned below
    Product A Quantity / Scale UoM Price(£)
    0-10 PAL/TES 20
    11- 20 PAL/TES 10
    21- 30 PAL/TES 5
    31-40 PAL/TES 2.5
    >41 PAL/TES
    Product B with Scales mentioned below
    Product B Quantity / Scale UoM Price(£)
    0-15 PAL/TES 25
    16-20 PAL/TES 20
    21- 30 PAL/TES 15
    31-40 PAL/TES 10
    41 PAL/TES 5
    u2022 Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
    u2022 The expected results should be
    o Product A qty 10 + B qty 15 added = 25Pal
    o The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
    Thanks in Advance.
    Puneet.

  • How to include both items and service on Sales Orders

    Hello experts,
    I have a client who wants to include extra handling charges such as gift wrapping charges on their sales order in addition to regular items that is on the sales order.
    If I create the sales order as a Item/Service Type ='Service'. I can select the correct G/L account for this Sales Order. But if I create the sales order as a Item/Service Type ='Item', then I can only select items and not the sales order.
    The client wants to include both the items and service in the sales order. Is there a way to do this in SAP B1?
    Michael

    Hello Michael,
    I think you may create Service type items to include both by Item Type documents.
    Thanks,
    Gordon

Maybe you are looking for

  • ITunes Installation Error Message?

    I recently had to install an update for iTunes. After the update was installed, I was promted by an error message that "iTunes was not installed correctly", and that I needed to reinstall iTunes. Once I completed the process of uninstalling iTunes, I

  • Trouble in Starting Tomcat server

    Hi, I installed Eclipse & Tomcat. I started Tomcat using Eclipse. In console it showed as Jun 24, 2006 4:55:09 PM org.apache.coyote.http11.Http11Protocol init INFO: Initializing Coyote HTTP/1.1 on http-8080 Starting service Tomcat-Standalone Apache T

  • HT204088 i want to purchase box of gems for my clash of clans .

    i am playing game on i pad .my i pad version 5.1.1 (9b206) model mc349ll , .i am traying to get gems for my game .i try to chard my visa card .i dont know wot to do ,please help me out thanks kamran <Personal Information Edited by Host>

  • Controlling print options through triggers

    Hi, I developed a report which runs in 2 modes. 1. Automatic mode(runs in a request set) 2. Manual Mode(submitted manually through SRS as a single request) I got a new requirrment where I need to print the output when print flag is Y and the report i

  • Oracle installation query

    Hi , i have downloaded Oracle Linux Release 4 Update 7 Media Pack for x86 (32 bit) but the vmare iam using is VMWare 6 Workstation 6 for Windows and when i tried to install it it's not getting installed so do i require another Vmware .......... Thank